  454   Wednesday, August 28, 2019, 05:59 Marla Cervantes 44062-2-SK DoneGraphite insert test

Wednesday, August 28, 2019, 06:00

A graphite insert (with conical caps) was loaded in tantalum tube 

the Ta tube was wrapped with 3 tantalum foils,

a tantalum cap was inserted in one side of the Ta tube and sealed.

The tube was set in the EVAP2 and the furnace was pumped down.

IGP1 = 1.23e-6 Torr.

The current was tapped to 50 A

Autoramp was set to 1 A/min to 400 A.


 Wednesday, August 28, 2019, 12:02

Autoramp reached 400 A

TGHT = 6.57 V, 404.4 A, IGP1=4.7e-6 Torr

Autoramp was set to 450 A at 1A/min


 Wednesday, August 28, 2019, 12:48

Autoramp reached 450 A

TGHT =7.526 V, 450.188 A, IGP1=5.88e-6 Torr

Autoramp was set to 500 A at 1A/min


Wednesday, August 28, 2019, 13:40

Autoramp reached 500 A, temperature 1880 C

TGHT =8.79 V, 501.094A, IGP1=7.48-6 Torr

Autoramp was set to 540 A at 1A/min 


Wednesday, August 28, 2019, 14:03

The autoramp was stopped at 520 A, because according to previous tests that current is enough to have 2000 C,

the temperature read was 1930 C

TGHT =9.23 V, 520.7 A, IGP1=7.8-6 Torr


Wednesday, August 28, 2019, 15:20

The autoramp was set to 540 A at 1A/min

When the ramp stopped the conditions were:

TGHT=9.59 V, 539.5 A, IGP1= 6.08e-6 Torr

Temperature= 1988 C

Manually tapped to 545 A the temperature reached 2000 C


Wednesday, August 28, 2019, 17:08 

To keep the temperature at 2000 or less the current was decreased,

TGHT= 8.91 V, 445.125 A, IGP1=9.93e-7 Torr

Max temperature read: 2001 C

Min temperature read: 1996 C


Tuesday, September 03, 2019, 11:15

The tube was stable at 1950-1960 C during the weekend but today at around 6 am it had a drop in the current indicating mechanical failure 

The autoramp was set to -2A/min to 0 A. 

The tube will be examined and in case that it is not broken it will be set in the EVAP1 to continue heating it.


Monday, September 09, 2019, 16:35  

The tube became brittle and broke.

  455   Friday, September 06, 2019, 11:58 Darwin Ortiz Rosales 44062-4LP-SISDoneTaC coating/sintering

Friday, September 06, 2019, 11:20

Container was coated with Tac and wrapped with 2 Ta heat shields.

Desired temp=1900 C, Omega slope set =0.990

Chamber pumped down over night and will be initially tapped manually to 40A for both TGHT and TBHT.

Subsequently, current will be automatically ramped up in increments of 1A/min to reach 400A for TGHT and 230A for TBHT.

Then TGHT will be manually tapped to target temperature and allow to stabilize for a minimum of 3 hours.

Good vac at 3.0e-5 Torr

Bad vac at 5.0e-5 Torr


Friday, September 06, 2019, 11:32

IEVAP2:IGP1=9.6e-7 Torr

Tapping to 40A (TGHT and TBHT).


Friday, September 06, 2019, 12:54

Start autoramp

1A/min TGHT and TBHT

IGP1=4.0e-06 Torr


Friday, September 06, 2019, 13:29

TGHT = 70A, TBHT=70A, pressure started to spike rapidly so aborted autoramp and lowered the current to 66A for both TGHT and TBHT.

pressure continued to rise so tapped current to 60A.  A drop observed.  Will allow to stabilize.


Friday, September 06, 2019, 14:06

IGP1=5.3e-06 Torr.  Restart previous ramping. 


At 66A paused ramping.  IPG1= 1.0e-5 Torr

Friday, September 06, 2019, 15:44

IGP1=6.0e-6 Torr

Start modified autoramping: 0.4A/min for TGHT and TBHT.  Will manually tap up in the morning, over ham and eggs. 


Saturday, September 07, 2019, 10:52

 Will tap up to 423 A on TGHT as per attachment #1 regression

IGP1= 1.13e-6 Torr

OMEGA = 1802 C

TGHT= 401.0 A, 6.84V

TBHT=233.6A, 4.1V


Saturday, September 07, 2019, 11:06

Tapped up TGHT to 438A

OMEGA= 1903C

Will monitor and adjust if necessary.


Saturday, September 07, 2019, 15:06

IGP1 =  1.17e-6 Torr

TGHT = 7.46 V, 439.3 A

TBHT = 4.13 V, 233.4 A

Autoramps

TGHT = -2 A/min, TBHT = -1 A/min


Monday, September 09, 2019, 16:34

The EVAP2 was vented and the target container was removed. 

 

Attachment 1: 190906LPSIS_Sintering.PNG
190906LPSIS_Sintering.PNG
  456   Wednesday, September 11, 2019, 15:16 Marla Cervantes 44062-4LP-SISDoneTaC coated target container calibration/conditioning

 Wednesday, September 11, 2019, 15:12

A target container coated with TaC elog 455 was loaded with an empty graphite cartridge and set it in the EVAP2

The system is currently pumping down.

The target container was wrapped with 3 new Ta heat shields.

The target container will be heated to 2000 C and the temperature will be held for 4 hours.


 The autoramp was set to:

TGHT 1 A/min, 450 A

TBHT 0.5 A/min, to 230 A


At 500 A on the TGHT, 20 additional amps were programmed to increased at 1 A/min, however, the autoramp increased the current to 520 A without stepping (see figure A). 


The final conditions were:

TGHT: 9.95 V, 565.59 A

TBHT: 4.18 V, 233.43 A

IGP1: 2.2 e-6 Torr


Friday, September 13, 2019, 11:16

After 4 hours the EVAP2 was cooled down

at a rate of TGHT 1 A/min and TBHT 0.5 A/min

The EVAP2 was vented with air.


 

Attachment 1: A.JPG
A.JPG
Attachment 2: B.JPG
B.JPG
  460   Friday, September 27, 2019, 18:18 Marla CervantesNb TARGET BOATDoneConditioning NB samples for Edward

Wednesday, September 25, 2019, 18:06

Target boat with a layer of niobium foil on the bottom is used to heat up Nb samples to 1400 C for 4 hrs.

The niobium samples are wrapped in a Nb foil.

Boat is wrapped with 2 layers of Ta foil, careful to avoid touching samples.


Thursday, September 26, 2019, 18:10 

The target assembly was exchange to a clean one e-log 459 and the Nb arrangement was loaded into evap2.


Friday, September 27, 2019, 18:13

HS water valves opened, no leaks detected.

Tapped up manually to 40 A.

IGP1 = 9.54e-7 Torr

Setting auto-ramp rate at 0.2 A/min to max setpoint of 100 A.

Vacuum stable.

Setting auto-ramp at 1 A/min to 300 A lead to ~1200 C.

Autoramping at 1 A/min to 400 A will stop at 1400 C.

Temperature reading is 1400 C at:

TGHT = 5.61 V, 345.656 A

The temperature reading went to 1408 C on Omega and 1417 C on Micron so the current was dropped to 342.537 A and 5.56 V

The temperature went to 1418 C on Omega and the current was dropped to 339.281 A


After 4 hours at 1400 C, the Nb was cooled down

The final pressure was 3.07e-7 Torr 

The EVAP2 was vented with air and the Nb was removed. 

Attachment 1: Nb-finalTemp.JPG
Nb-finalTemp.JPG
Attachment 2: Nb-arrangement.jpg
Nb-arrangement.jpg
  461   Thursday, October 03, 2019, 09:26 Darwin Ortiz RosalesTaC44062-6LP-SISDoneTaC coating/sintering

Thursday, October 03, 2019, 08:58

Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)

Initial weight including heat-shields = 427 g

Desired temperature = 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).

Evap 2 was pumped down previous night.

IGP1= 7.81e-07 Torr

Manually tapping up to ~40A on both TGHT and TBHT at ~1A/min

Good vacuum = 3.00 e-5 Torr

Bad vacuum = 5.00 e-5 Torr


Thursday, October 03, 2019, 09:21

Manually tapped to 50A on TGHT and TBHT

Will allow pressure to stabilize and begin autoramp TGHT and TBHT at 1A/min to 400A and 230A respectively.

autoramp increments might be increased to 2A/min depending on stability of system.


Thursday, October 03, 2019, 10:00

TGHT = 51.6A, 0.36V

TBHT = 49.5A, 0.62V

IGP1=9.6e-7 Torr

Starting autoramp at 1A/min to a max of 400A for TGHT and 230A for TBHT.  Will monitor and increase ramp increments to 2A/min if stable.


Thursday, October 03, 2019, 11:09

TGHT = 103A, TBHT=97A

IGP1=9.1e-06 Torr and dropping

Will increase autoramp increments to 2A/min


Thursday, October 03, 2019, 11:41

With TGHT = 148A, 1.9V and TBHT = 141A, 2.3V

IGP1= 7.9e-6 Torr

Autoramp was increased to 3A/min


Thursday, October 03, 2019, 13:45

TGHT=401A, 6.9V

TBHT=233A, 4.2V

IGP1= 1.14e-05Torr

OMEGA = 1874

begin manual ramp to 1900C

(Temperature dropping as pressure drops)


 Thursday, October 03, 2019, 14:11

 TGHT= 416A, 7.1V

TBHT=233A, 4.2V

OMEGA = 1900 C

IGP1= 6.9e-06 Torr and trending down


Thursday, October 03, 2019, 15:24

TGHT manually bumped to 421A,  7.2 V because temperature dropped slightly.

Thursday, October 03, 2019, 19:00

TGHT manually increased to 425A, 7.3V

 


Thursday, October 03, 2019, 19:12

TGHT = 424.9A, 7.3V

TBHT=233.2A, 4.1V

OMEGA= 1897 C

IGPA=1.45e-06 Torr

Starting ramp-down at -1A/min on TGHT and 0.5A/min on TBHT


Friday, October 04, 2019, 11:34

Container taken out.

 

  465   Monday, November 04, 2019, 14:25 Darwin Ortiz RosalesEndcaps40282-4TARGET BOATDone 

Monday, November 04, 2019, 14:19 

Each endcap is separated with a disc of graphite foil and rolled into packs one pack of 4 and one pack of 8 within a foil envelope in a target boat.

There are also 3 coated springs interspersed.

The boat is wrapped with 3-layers of Ta heatshields.

Chamber pumped down overnight.

OMEGA slope = 0.99

Will Tap TGHT up to 40 A then autoramp to 400A at 1A/min.

Final desired temperature on OMEGA (tap)= 1800C


 Tuesday, November 05, 2019, 11:30

IGP1 = 9.6e-7 Torr

Autoramp TGHT to 40A at 1A/min


Tuesday, November 05, 2019, 11:44

IGP1= 2.6e-06 Torr

TGHT = 40.8 A, 0.37V

Will leave at 40 A for 1 hour


 Tuesday, November 05, 2019, 12:39

 IGP1=2.5e-6 Torr

TGHT =40.0A, .33V

Start ramping TGHT to 400A at 0.1A/min


Wednesday, November 06, 2019, 09:32

IGP1=7.8e-7 Torr

TGHT = 168.4A, 2.38V

increase ramp speed to 1A/min


 Wednesday, November 06, 2019, 14:07

IGP1= 2.34e-6 Torr

TGHT=400.0 A, 6.98V

set TGHT autoramp to 460A @ 1A/min aiming for 1850C (see attached plot)

 


Wednesday, November 06, 2019, 15:18

OMEGA = 1776 C

TGHT = 460.0A, 8.52V

IGP1= 4.7e-6 Torr

Starting manual tap up to 1810C


Wednesday, November 06, 2019, 15:36

OMEGA=1810 C

TGHT = 468.8A, 8.74V

IGP1=4.14e-6


Wednesday, November 06, 2019, 19:04

OMEGA=1822 C (has been between 1817-1824 C over 3.5 hours )

TGHT=468.8A, 8.67V

IGP1=1.9498e-06 Torr

Start TGHT ramp down at -2A/min


Thursday, November 07, 2019, 09:55

THGT = 0A, 0V overnight

IGP1= 3.2 e-07 Torr

Proceeding with unloading.


End caps looked good for online use.

 

Attachment 1: Nov4CapCoating.PNG
Nov4CapCoating.PNG
  469   Saturday, November 23, 2019, 14:03 Darwin Ortiz RosalesTaC42464-3HP-FEBIADDoneTaC coating/sintering

12.3

Saturday, November 23, 2019, 14:00

Container coated with TaC and wrapped with 3 Ta heat shields.

Desired temperature= 1900 C, Omega Slope set = 0.990, Auto TGHT at 0.2A/min to reach 400A, TGHT will be tapped up accordingly to reach desired Temp.

TBHT will be set fixed at 230 A (max). 

Good vac at 3.00e -5 Torr

Bad vac at 5.00e-5 Torr

Chamber pump down was started on Friday November 22; however.

No leaks were observed when turning water lines on.

IGP1= 4.6e-07 Torr


 Saturday, November 23, 2019, 15:30

autoramp at 0.5A /min up to 50A for both TGHT and TBHT and maintained for 1 hour.


Saturday, November 23, 2019, 16:15

IGP1= 1.1e-06 Torr

Auto Ramp to 450 A on THGT and 230A on TBHT at 0.5A/min


Saturday, November 23, 2019, 23:44

IGP1= 5.2e-06 Torr

TGHT = 248A, 2.9V  TBHT= 233A 2.9V

Increased ramp step to 1A/min to 620 A


Sunday, November 24, 2019, 00:14

IGP1=1.9e-06 Torr

TGHT = 274.3, 3.3V   TBHT= 233A, 2.9V

 


Sunday, November 24, 2019, 07:33

IGP1=3.2e-06 Torr

OMEGA= 1490C

TGHT = 619 A, 9.1V   TBHT=233A, 2.9V

Continue ramping THGT at 1A/min to 700 A


Sunday, November 24, 2019, 10:05

IGP1= 2.1 e-05 Torr

OMEGA= 1676 C

TGHT= 700A, 10.6V   TBHT= 233A, 2.0V

Start autoramp to 780A as per regression in attachment


Sunday, November 24, 2019, 13:22

Autoramp to 795A  for TGHT


Sunday, November 24, 2019, 21:16

OMEGA= 1854 C

TGHT= 789.6A, 12.27V  TBHT= 233.A, 2.9V

IGP1= 2.0e-05

Will allow pressure to stabilize lower.


Sunday, November 24, 2019, 22:16

TGHTT= 789.6A, 12.3V TBHT=233.3A, 2.9V

OMEGA=1855C

IGP1 = 6.9e-06Torr

Start cooling TGHT at 2A/min and TBHT at 1A/min

Attachment 1: HPFIBIAD20191124.PNG
HPFIBIAD20191124.PNG
  471   Tuesday, November 26, 2019, 15:21 Darwin Ortiz RosalesSiC42464-3HP-FEBIADDoneConditioning of SiC discs (sintering) (RUSH)

Tuesday, November 26, 2019, 14:53

Total number of foils: 504

Total length packed 17.4 cm

container has 3 Ta heat shields.

No endcaps inserted to facilitate out-gassing

Two TaC coated Ta wire springs inserted at either end.

Initially to ramp TGHT and TBHT to 50A at 1A/min

Then heat manually to OMEGA ~1400 C , ramping TGHT manually and automatically  to reach 530A A (Omega slope set = 0.990)

Then temperature= (Correected to 1800C) 1900 C, Omega Slope set = 0.990, manually and automatically ramp to 700A, TGHT will be tapped up accordingly to reach desired Temp.

TBHT will be set fixed at 230 A (max).  TBHT heated manually and automatically to max.

Good vac at 3.00 e -5 Torr

Bad vac at 5.00 e-5 Torr

System experienced some vacuum issues due to cooling water leak in a heatshield line. 

Evaluation discs not included because no space.

Total Green disc mass measured = 58.250 g

 


Tuesday, November 26, 2019, 15:00

IGP1= 7.4e-06 Torr.  No leak issues found after last fix (Anders will add details).


Tuesday, November 26, 2019, 15:33

TGHT= 52.7A, .22V   TBHT= 49.3A, .52V

IGP1= 7.202 e-06 Torr (trending up so will allow to stabilize).


Wednesday, November 27, 2019, 06:09

left with autoramp waiting for vac to drop but no advance overnight.

Pressure did not seem to drop back below 3e-5 Torr magnitude, therefore not much advance in current ramp.


Thursday, November 28, 2019, 11:15

Continued ramping manually 

OMEGA = 1429 C  (0.99 slope), TGHT = 542A, 7.8V

With slope = 1.08 OMEGA = 1724 C, therefore staying at 0.99 slope

TaC coating sintering  plot suggests 753A to reach 1800C (See attachment 1)

Windows a little bit coated but not enough to disturb laser. 


Thursday, November 28, 2019, 12:17

TGHT =753A, 11.8V since 12:00 noon. 

TBHT= 233.4A, 3.3V

OMEGA= 1735 C (0.99 slope)


 Thursday, November 28, 2019, 13:01

OMEGA = 1860C (1.08 slope)


 Thursday, November 28, 2019, 14:38

OMEGA temperature began to creep up to ~1880.  Tapped TGHT current down to 733.5A, 11.4V


Thursday, November 28, 2019, 15:12

Checked windows and no significant additional buildup of obstructive material.

Temperature creeping up again.  Tap down TGHT current to 729 A, 11.2 V

OMEGA = 1870C at slope 1.08


 Thursday, November 28, 2019, 16:03

Temperature increase to 1880C

Tap down TGHT current to 715A, 10.9V

OMEGA= 1870 C (slope = 1.08)


Thursday, November 28, 2019, 16:22

Temperature creep to 1880 C

Tap down TGHT to 700A, 10.8V

OMEGA= 1845C

IGP1=2.2e-06 Torr


Thursday, November 28, 2019, 16:37

IGP1= 1.9e-06 Torr

OMEGA = 1850C (1.08 slope)

TGHT = 692A, 10.5V  TBHT= 233A, 3.2V

 

Initiating pressure ramp at -2A/min on TGHT and -1A/min on TBHT


Thursday, November 28, 2019, 16:45

IGP1= 1.28e-06 Torr

OMEGA= 1770 C (1.08 slope)

TGHT = 650A, 9.8V

ramp TGHT at -3.5A/min maintain TBHT at -1A/m in


 Thursday, November 28, 2019, 17:11

IGP1= 1.14e-06 Torr

OMEGA = 1730 C (1.08 slope)

ramp TGHT at -5A/min maintain TBHT at -1A/m


Thursday, November 28, 2019, 17:20

IGP1- 8.9e-07 Torr

OMEGA=1636C

ramp TGHT at -6A/min maintain TBHT at -1A/min


 Thursday, November 28, 2019, 17:34

IGP1= 7e-07 Torr

OMEGA= 1500 C (1.08 slope)

ramp TGHT at -8A/min maintain TBHT at -1A/min

TBHT = 183A


 OMEGA 1180C

TGHT =300 A

TBHT = 155A

Initiated -15A/min TGHT and -4A/min TBHT

IGP1= 5.2e-07 Torr


OMEGA below 1000C

begin manual tapdown


Thursday, November 28, 2019, 19:42

Target was dismounted after cooling.  Two graphite discs and end caps inserted.

 

Attachment 1: HPFIBIAD20191124-SinteringTaC.PNG
HPFIBIAD20191124-SinteringTaC.PNG
  473   Wednesday, November 27, 2019, 17:45 John WongSiC42464-3HP-FEBIADDoneConditioning of SiC discs (sintering) (RUSH)

Darwin Ortiz Rosales wrote:

Tuesday, November 26, 2019, 14:53

Total number of foils: 504

Total length packed 17.4 cm

container has 3 Ta heat shields.

No endcaps inserted to facilitate out-gassing

Two TaC coated Ta wire springs inserted at either end.

Initially to ramp TGHT and TBHT to 50A at 1A/min

Then heat manually to OMEGA ~1400 C , ramping TGHT manually and automatically  to reach 530A A (Omega slope set = 0.990)

Then temperature= 1900 C (Correction = 1800 C, NOT 1900 - JW), Omega Slope set = 0.990 (use 1.08, check temp, JW), manually and automatically ramp to 700A (check temp to see if it's matching with the 1.08 slope), TGHT will be tapped up accordingly to reach desired Temp.

TBHT will be set fixed at 230 A (max).  TBHT heated manually and automatically to max.

Good vac at 3.00 e -5 Torr

Bad vac at 5.00 e-5 Torr

System experienced some vacuum issues due to cooling water leak in a heatshield line. 

Evaluation discs not included because no space.

Total Green disc mass measured = 58.250 g

 


Tuesday, November 26, 2019, 15:00

IGP1= 7.4e-06 Torr.  No leak issues found after last fix (Anders will add details).


Tuesday, November 26, 2019, 15:33

TGHT= 52.7A, .22V   TBHT= 49.3A, .52V

IGP1= 7.202 e-06 Torr (trending up so will allow to stabilize).

 

 Wednesday, November 27, 2019, 17:44

I'll take over from here to step up the target heater, and I'll coordinate it with Darwin. 


 Wednesday, November 27, 2019, 20:36

Note: Sintering temp should be at 1800 C, NOT 1900.  Use Omega slope 1.08 and check temperature.  Correction made on elog #471.

Continue to step up TGHT and TBHT, keeping vacuum below 1.5 e-5 Torr. 


 Thursday, November 28, 2019, 03:06

TGHT reached to 400A/5.29V, TBHT at 230A/3.13V. 

Vacuum coming down from 1.3 e-5 Torr.

OMEGA = 1105 C (slope at 0.99).

Instructions for Darwin:

1.  Confirm temperature - check the temp plot from the TaC coating step. 

2.  Change OMEGA slop to 1.08 - check to see if this matches the temp plot.  If not, bring it back to 0.99.

3.  Continue to step up TGHT, check temp at 1400C (change slop 1.08 and check), 1500 C, 1600 C (check windows for coating - if any coating, then OMEGA is no longer useful hereon)

4.  Use the temp plot and continue to tap up TGHT to reach 1800 C and hold it for at least 4 hours or until the vacuum goes below 1 e-6 Torr then proceed with cooling down.

5.  Use the auto cooling program for TGHT (-2A/min) and TBHT (-1A/min)

Note:  For ramping up TGHT, keep vacuum below 1.5 e-4 Torr and keep tapping up to reach 1800 C.  Above 1100 C, this should be a quick step to get to 1800 C; should take < 2 hrs to get there.  

See the striptool or the attachment below to see how I did it. 

Once the chamber is cool down, take out a few samples for SEM analysis. 

Good luck!


 

Attachment 1: SiC_42464-3_RUSH_400A.JPG
SiC_42464-3_RUSH_400A.JPG
  476   Tuesday, March 10, 2020, 09:34 Darwin Ortiz RosalesEmpty42218-8HP-SISDoneTaC coating/sintering

Monday, March 9, 2020, 03:15

Container coated with TaC and wrapped with 3 Ta heat shields.

Desired temperature= 1900 C, Omega Slope set = 0.990, Auto TGHT at 0.2A/min to reach 400A, TGHT will be tapped up accordingly to reach desired Temp.

TBHT will be set fixed at 230 A (max).

Good vac at 3.00e -5 Torr

Bad vac at 5.00e-5 Torr

Chamber pump down


Tuesday, March 10, 2020, 09:17

Starting manual ramp to 50 A @ approximately 2A/min

IGP1 = 3.73e-7 Torr after opening water line pressure slowly incresed to 4.4e-7 Torr

TBHT also has Chiller interlock reached out to controls for removal.


Tuesday, March 10, 2020, 10:47

Chiller Interlock removed for TBHT.   Started manual ramp to 50A @ approximately 2A/min


Tuesday, March 10, 2020, 11:15

allowing to stabilize at 50A on TGHT and TBHT

IGP1= 7.9 e=7 Torr and trending up


Tuesday, March 10, 2020, 12:09

Pressure on IGP1 spiked.  Allowing to stabilize.

Tuesday, March 10, 2020, 14:36: Stopped By to check. Vacuum @ 3.02e-03T. Turbo pump appears to have tripped. Shut off Both PS. Prepare to vent. - Aaron S.

Tuesday, March 10, 2020, 14:48: Tightened all fittings (Just in case). HS side & HS waterline at the feed through. Roughing. 

Tuesday, March 10, 2020, 15:06: TP1 @ 38KRPM 1.34e-04T & dropping.  TGHT & TBHT PS on. Monitor before heating. -AS


Wednesday, March 11, 2020, 06:25: Vacuum @ 3.39e-07T. TGHT / TBHT PS on. - AS

Wednesday, March 11, 2020, 06:26: Manually tapped up TGHT / TBHT to 10 / 10 A. Ok.

Wednesday, March 11, 2020, 06:28: Auto-ramping TGHT / TBHT @ 4 A per min to 50 / 50 A.

Wednesday, March 11, 2020, 07:07: Vacuum @ 3.64e-07T. TGHT / TBHT @ 50 A. All appears stable. - AS


Wednesday, March 11, 2020, 07:036

Started autoramp  at 2 A/min

IGP1= 3.6e-7 Torr


Wednesday, March 11, 2020, 08:06

TGHT=10 5A, 1.3 V       TBHT = 105 A, 1.2 V

pressure rising fast; manual ramp down to 95A on both TGHT and TBHT


 Wednesday, March 11, 2020, 09:54

 IGP1= 4.7e-6 Torr; TGHT = 93.1 A, 1.2 V; TBHT = 95.1 A, 1.1 V

start autoramp at 1A/min (0.5 A/30s)


IGP1= 1.28e-5 Torr

TGHT = 108.3 A, 1.44 V

TBHT = 110 A, 1.29 V

Stop autoramp


Wednesday, March 11, 2020, 10:25

IGP1= 5.9e-5 Torr

manually tapped TGHT and TBHT set-current to  105 A respectively. 

pressure dropping.


Wednesday, March 11, 2020, 11:18

IGP1=8.0e-06 Torr

manually ramp to set-current 115 A for both TGHT and TBHT at approximately 2A/ min

allow to stabilize before proceeding


Wednesday, March 11, 2020, 12:12

IGP1=7.02e-6 Torr

TGHT = 112.7 A, 1.5 V

TBHT = 114.6 A, 1.4 V

Auto-ramping at 1A/min TGHT to 430 A and TBHT top 230A


 Wednesday, March 11, 2020, 18:45

IGP1= 1.2 e-06 Torr

TGHT=421.8 A, 6.2 V

TBHT = 231.9 A, 3.1 V

auto-ramp TGHT at 1A/min to set-current 530A


Wednesday, March 11, 2020, 23:08

IGP1= 1.3e-6 Torr

TGHT= 519.9 A, 7.87V

TBHT = 232.0 A, 3.1 V

start autoramp TGHT to 600A at  1A/min


Wednesday, March 11, 2020, 23:36

IGP1= 1.6e-6 Torr

TGHT = 542.9 A, 8.2V

TBHT = 232.9 A, 3.1V

Set autoramp to 750A on TGHT at 0.5 A/min


Thursday, March 12, 2020, 06:55

The Voltage set on TGHT was too low so current had not increased

IGP1= 1.5e-6 Torr

TGHT = 640 A, 10V

TBHT 232/9A, 3.1V

Oncrease TGHT voltage set to 14.5 and start autoramp at 3A/min to 750 A


Thursday, March 12, 2020, 7:43

TGHT = 735.7 A, 11.8V

OMEGA = 1595C

Auto -ramp set to 780 A for TGHT


Thursday, March 12, 2020, 7:58

OMEGA = 1655 C

TGHT set to 800 A at 3A/min


Thursday, March 12, 2020, 9:42

OMEGA =  1704 C

TGHT = 789.5 A, 13.0 V

Manual tap up to 837 A set on TGHT and 821 A readback


Thursday, March 12, 2020, 10:00

TGHT readback = 821.0 A, 13.7 V

OMEGA = 1744 C

TBHT same as previous entry.


 Thursday, March 12, 2020, 10:35

 Tapped up TGHT to 832.6 A, 13.8 V

OMEGA = 1759 C

TBHT = 232.9 A, 3.6 V

Will not tap further. 


Thursday, March 12, 2020, 13:22

IGP1 = 5.0 e-06 Torr (stable)

TGHT = 832.7 A readback (849 A set), 13.7V

TBHT = 232.9 A, 3.6 V

OMEGA = 1758 C

Start cooling at TGHT 3A/min


 Thursday, March 12, 2020, 14:08

IGP1= 1.32e-06 Torr

TGHT = 706 A, 11.0 V

TBHT = same as previous

OMEGA = 1583C

Start cooling TBHT at 1A/min continue cooling TGHT at 3A/min


Friday, March 13, 2020, 08:18

IGP1= 3.9e-8 Torr

Will unload sintered container


 

Attachment 1: SiC#40.PNG
SiC#40.PNG
  477   Friday, March 13, 2020, 14:21 Darwin Ortiz RosalesSiC42218-8 HP-SISDone Conditioning of SiC discs (sintering) (RUSH)

Friday, March 13, 2020, 13:52

Total number of foils: 493

Total length packed 17.4 cm

container has 3 Ta heat shields.

No endcaps inserted to facilitate out-gassing

Two TaC coated Ta wire springs inserted at both ends.

Initially to ramp TGHT and TBHT to 50A at 1A/min

Then heat manually to OMEGA ~1400 C , ramping TGHT manually and automatically  to reach 530A A (Omega slope set = 0.990)

Then temperature = 1800 (C using slope 1.08 at after 1700C manually and automatically ramp to 700A then  TGHT will be tapped up accordingly to reach desired Temp).

TBHT will be set fixed at 230 A (max).  TBHT heated manually and automatically to max.

Good vac at 3.00 e -5 Torr

Bad vac at 5.00 e-5 Torr

Evaluation discs not included because no space.

Total Green disc mass measured = 58.78 g


Friday, March 13, 2020, 14:22

Container loaded and pressuring down started without any pump issues.


Friday, March 13, 2020, 23:26

IGP1= 9.1e-07 Torr

Start auto tap at .25A/min to 50A on both TBHT and TGHT


Saturday, March 14, 2020, 07:09

IGP1=6.9e-6 Torr

TGHT = 49.1 A, 0.58V

TBHT = 49.2A, .49V

Continue ramp to 80 A on both heaters at .0.25A/min (good vacuum 3.0 e-04 Torr, bad vaccum 5.0 e-04 Torr


Saturday, March 14, 2020, 08:22

IGP1=6.8 e-05 Torr

Pressure spike TGHT =63.7 A, 0.77 V; TBHT = 60.0 A , 0.62 V

Aborted ramp alow to stabilize (Tapped TBHT to 63.8 A


Saturday, March 14, 2020, 12:16

IGP1= 8.1e-05 Torr

start autoramp at 0.25A/min


Saturday, March 14, 2020, 17:47

IGP1= 2.9e-05 Torr

TGHT= 78.4A, 1.0 V

TBHT = 79.4A, .88 V

manual and automatic  tap up to 740A TGHT and 230A TBHT then tap manually to 1800 C (mostly at .075 A/min and increasing to 1A /min as pressure stabilizes)


Sunday, March 15, 2020, 22:40

OMEGA = 1711 C

TGHT = 784,6 A, 12.9V (readback)

TBHT = 232 A, 3.5 V

Tap TGHT to 800 A readback set to 815A


Sunday, March 15, 2020, 23:20

OMEGA =1801 C

TGHT = 799.2 A, 13.3 V, TBHT = 232.9, 3.6V

Start gradual tap-down as temperature rising (1810 C at end of this note)


Sunday, March 15, 2020, 23:49

OMEGAA = 1818 C

TGHT = 769.9A, 12.6 V; TBHT = 232.9 A, 3.6 V

Temperature dropping tapped back up to 799 A on TGHT read back (set to 815 A)


Monday, March 16, 2020, 04:10

OMEGA = 1395 C (not reliable)

TGHT = 799.2 A, 13.2 V

TBHT = 232.9 A, 3.6 V

IGP1 = 2.2 e-06 Torr

Initiate cooling at -1.5 A/min on TGHT to 600A (at 600 A increase cooling rate to 3 A/min ; at 300 A increase cooling to 4 A/min and start TBHT cooling at 1 A/min; at `200 A on TGHT increase cooling to 4 A/min and TBHT 2 A/min)


Monday, March 16, 2020, 09:43

TGHT = 0 A , 0.02V

TBHT = 53,2 A, .56 V  (increase cooling to 4 A/min)

IGP1= 1.12e-07 Torr


Monday, March 16, 2020, 10:37

IGP1= 9.5 e -8 Torr

TGHT and TBHT = 0A, 0V

Will unload container


Monday, March 16, 2020, 12:40

Ten discs removed for evaluation (6 from left side and 4 from right side)

two graphite discs placed at each end as well as two TaC coated and sintered end-caps

total length after sintering = 17.8 cm

 

 

 

  478   Monday, March 16, 2020, 13:47 Marla Cervantes 40282-5TARGET BOATDoneConditioning graphite target #1

 Monday, March 16, 2020, 13:47

Target material characteristics: Graphite cast of 0.965g/cm3, 287 D-shaped discs, disc area 0.969cm2, total mass of 9.972g, length 10.657cm.

The target material is loaded in a graphite cartridge.

The graphite cartridge is placed in a tantalum boat previously coated with TaC,

the Ta boat was wrapped with two used Ta heat shields.

The system is currently pumping down.


 Tuesday, March 17, 2020, 08:11

IGP1 = 3.18e-7 Torr

Current will be increased manually to 10 A, and then it will be autoramp to 500 A

During the input of the 10 A there was no anomaly with the pressure and the autoramp was set to:

1 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr 


 Tuesday, March 17, 2020, 09:03

After 30 min:

TGHT: 98.1 A, 1.48 V (the voltage is increasing)

IGP1 = 3e-4 Torr

The autoramp is set to 2 A each 10 s to 500 A


Tuesday, March 17, 2020, 09:52

At 500 A the temperature was ~1243 C

So, the autoramp was re started  2 A each 10 s to 520 A


 Tuesday, March 17, 2020, 09:56

TGHT= 510 A, 9.18 V

IGP1= 8.2e-5 Torr

Pressure decreasing.

Temperature register in iR2C: 1272 C

The target will stay at 520 A for 15 min to account for thermal equilibrium, and then the current will be increased to go to 1800 C

 Tuesday, March 17, 2020, 10:11

The temperature stayed at 1270 C, 

The autoramp is re started: 2 A each 10 s to 600 A


Tuesday, March 17, 2020, 10:24

TGHT: 10.693 V, 588.5 A

IGP1 max 7.4e-5 Torr

Temperature after 3 min at 588.5 A: 1368 C


Tuesday, March 17, 2020, 10:34 

The autoramp is re started: 2 A each 10 s to 650 A


Tuesday, March 17, 2020, 10:46

TGHT=11.99 V, 637.6 A

IGP1=5.5e-5 Torr (8e-5 Torr max)

Temperature 1459 C

The current and voltage drop 10 A and 0.3 V respectively when the autoramp is stopped


Tuesday, March 17, 2020, 10:53

The autoramp is re started: 2 A each 10 s to 700A 


Tuesday, March 17, 2020, 11:04

TGHT: 13 V, 686.59 A

IGP1: 6.2e-5 Torr (Max 8.7e-5Torr) 

Temperature: 1507 C


Tuesday, March 17, 2020, 11:05

 The autoramp is re started: 2 A each 10 s to 800A 


Tuesday, March 17, 2020, 11:16

TGHT=14.29 V, 759 A

IGP1: 8.6e-5 Torr (Max 1e-4 Torr)

Temperature 1527 C

There is a current discrepancy in EPICs (see current discrepancy picture),

the autoramp stopped at 761 A because EPICS? reads 800 A

Increasing current manually. 


Increasing the current manually did not work, because set current is at fake maximum 


 Tuesday, March 17, 2020, 13:43

The temperature stabilized to 1567 C. The current however was not stable ( look at the CarbonTarget - Max current)

an autoramp is set to -2 A  each 10 s to 0A

The set current is going down but not the epics reading current neither the temperature. I assume the current will star going down when the set and the reading current from epics are the same.


Tuesday, March 17, 2020, 13:50

Autoramp was stopped, and current was reduced manually, at around 652 A (set current) the reading current started going down (639.5 A) 

Autoramp is set to -2 A each 10s to 0 A


The tantalum boat deformed and the graphite cartridge rim broke 

Attachment 1: CarbonTarget-100A.JPG
CarbonTarget-100A.JPG
Attachment 2: Current_discrepancy.JPG
Current_discrepancy.JPG
Attachment 3: Manual_current_incresing.JPG
Manual_current_incresing.JPG
Attachment 4: CarbonTarget-Max_current.JPG
CarbonTarget-Max_current.JPG
  479   Wednesday, March 18, 2020, 07:21 Marla CervantesTaC44139-11LP-SISDoneTaC coating/sintering

 Wednesday, March 18, 2020, 07:10

Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)

Desired temperature= 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).

Evap 2 was pumped down on the previous night.

Good vacuum= 3.00 e-5 Torr

Bad vacuum = 5.00 e-5 Torr

Ramped TGHT and TBHT to 40A at 0.5A/min

Initial pressure IGP1 = 4.8e-7Torr


 Wednesday, March 18, 2020, 09:29

After an hour pressure reduced to 5.45e-6 Torr

TGHT; 0.518 V, 40.5 A

TBHT: 0.41 V, 38.6 A

Autoramp TGHT and TBHT at 1A/min to 400A and 230A respectively.


 Wednesday, March 18, 2020, 18:29

TGHT = 400A, 6.6V, TBHT= 232.9, 3.9V

OMEGA = 1240 C, this is 500 degC lower than previous LP-SIS at same conditions

https://elog.triumf.ca/TIS/Evaporator_2/464

Start autoramp to 460A on TGHT at 1A/min


Wednesday, March 18, 2020, 20:51

TGHT: 464 A, 7.75 V

Temperature 1328, I won't increase the temperature because there is a chance that the reading is 500 degC off and the target is sitting at 1828 degC instead of 1328 degC 


Wednesday, March 18, 2020, 23:17

After ~4 hours at 1317 degC according to the pyrometer:

TGHT = 7.7 V, 457.8 A,

TBHT = 3.9 V, 232.9 A,

IGP1 = 1.16e-6

Commence cooling at -2A/min for TGHT and -1A/min for TBHT


Thursday, March 19, 2020, 15:53

Venting and dismounting.

The coating does not have the quality to be used online, another LP-SIS will be coated and sinter

Attachment 1: IMG_1538.JPG
IMG_1538.JPG
  480   Monday, March 23, 2020, 07:50 Marla Cervantes 41882-1TARGET BOATDoneConditioning graphite target #1 (T2)

Friday, March 20, 2020, 19:39

The target material is loaded in a graphite cartridge.

The graphite cartridge is placed in a new tantalum boat previously without TaC,

the Ta boat was wrapped with three new Ta heat shields.

The system is currently pumping down. 


Monday, March 23, 2020, 07:49

IGP1 = 2.2e-7 Torr

Good vacuum= 3.00 e-5 Torr

Bad vacuum = 5.00 e-5 Torr

Ramping TGHT to 40A at 0.5A/min 


Monday, March 23, 2020, 10:35

Due to the COVID-19, non-essential activities are wrapped up,

the conditioning of the carbon target will be postponed until further notice 

  482   Wednesday, May 20, 2020, 12:54 Marla Cervantes 41882-1TARGET BOATDoneConditioning graphite target #1 (T2)

Marla Cervantes wrote:

Friday, March 20, 2020, 19:39

The target material is loaded in a graphite cartridge.

The graphite cartridge is placed in a new tantalum boat previously without TaC,

the Ta boat was wrapped with three new Ta heat shields.

The system is currently pumping down. 


Monday, March 23, 2020, 07:49

IGP1 = 2.2e-7 Torr

Good vacuum= 3.00 e-5 Torr

Bad vacuum = 5.00 e-5 Torr

Ramping TGHT to 40A at 0.5A/min 


Monday, March 23, 2020, 10:35

Due to the COVID-19, non-essential activities are wrapped up,

the conditioning of the carbon target will be postponed until further notice 

 Wednesday, May 20, 2020, 12:50

On May 19 the pumps of EVAP2 were turned on to purge the system

Today Aaron made a leak check, for details, visit elog-481

Currently IGP1 = 8.17e-7 Torr


 Thursday, May 21, 2020, 09:41

IGP1 = 4.5e-7 Torr

TGHT = 0.03 V, 0.028 A

Current will be increased manually to 10 A, and then it will be autoramp to 500 A

Whit this power supply the current increments are register since the beging 

TGHT = 0.145 V, 10.35 A

During the input of the 10 A there was no anomaly with the pressure and the autoramp was set to 50A:

1 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr 


Thursday, May 21, 2020, 10:39

The autoramp reached the 50 A set

TGHT = 0.65 V, 49.05 A

Power supply = 0.64 V, 50 A

IGP1 = 4.7e-7 Torr

Everything looks good, autoramp is set to 80 A same conditions

1 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr 


Thursday, May 21, 2020, 10:49 

The autoramp reached the 80 A set

TGHT = 1.075 V, 79.36 A

Power supply = 1.07 V, 80 A

IGP1 = 1.7e-6 Torr and increasing

Autoramp is set to 100 A,conditions:

1 A each 20 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr 

There was a jump in the vacuum e-log-482-fig-1.


Thursday, May 21, 2020, 11:01 

The autoramp reached the 100 A set

TGHT = 1.4V, 99.9 A

Power supply = 1.4V, 100 A

IGP1 =  0.001 Torr and increasing

Autoramp is set to 120 A,conditions:

1 A each 20 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr 


Thursday, May 21, 2020, 11:12 

TGHT = 1.75 V, 120.6 A

Power supply = 1.74 V, 120 A

IGP1 = 0.0018 Torr

The current will be hold and to let the vacuum reduce 


Thursday, May 21, 2020, 11:34

 TGHT = 1.8 V, 120.825 A

Power supply = 1.74 V, 120 A

IGP1 = 9.8e-5 Torr


Thursday, May 21, 2020, 11:37

 Autoramp is set to 300 A,conditions:

2 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr 


Thursday, May 21, 2020, 12:21

TGHT = 5.015 V, 298.125 A

Power supply = 5 V, 300 A

IGP1 = 4.77e-5 Torr 

Omega = 1130 degC

Note: Measurments will be taken with ARIEL's pyrometer (I will call it AP in this elog).

The emmisivity this pyrometer accounts for is 0.91 for the range of 1000 C to 1800 C

Above 01800 it will use 0.93 as the emissivity

AP = 977.7 degC


 

Attachment 1: e-log482-fig-1.JPG
e-log482-fig-1.JPG
  483   Sunday, May 24, 2020, 13:39 Marla CervantesEmpty44139-11LP-SISDoneTaC coating/sintering

 Sunday, May 24, 2020, 06:54

Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)

Desired temperature= 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).

Evap 2 was pumped down

Good vacuum= 3.00 e-5 Torr

Bad vacuum = 5.00 e-5 Torr

Ramped TGHT and TBHT to 40A at 0.5A/min

Initial IGP1 = 2.5e-7 Torr


Sunday, May 24, 2020, 08:24

Autoramp deliver 40 A

TGHT = 0.58 V, 39.6 A

TBHT = 0.46 V, 39.81 A

IGP1 = 2.9 e-7 Torr and increasing

Heater conditions will be hold for 15 min to account for pressure changes.


 Sunday, May 24, 2020, 08:39

IGP1 = 2.7e-7 Torr and decreasing

Autoramp TGHT and TBHT at 1A/min to 400A and 230A respectively.


 Sunday, May 24, 2020, 14:57

After 15 min the autoramp stopped

TGHT = 6.8 V, 394.65 A

TBHT =4 V, 232.9 A

IGP1 = 2.2e-6 Torr and going down

Omega = 1747 degC

Autoramp set to TGHT 1A/min to 450A


Sunday, May 24, 2020, 16:07

After 15 min the autoramp stopped

TGHT = 7.7 V, 448 A

IGP1 = 2.88e-6 Torr

Omega = 1886 degC

The current will be increased manually to reach 1900 deg C

Final TGHT = 7.9 V, 453.15 A (455 A input)

Omega = 1899 degC

The TGHT and TBHT will leave at current conditions until pressure reduce (approx 4 hours)


Sunday, May 24, 2020, 20:01

TGHT = 7.9 V, 456 A

TBHT = 4 V, 232.9 A

IGP1 = 1.8e-6 Torr

Omega = 1893 degC

Initiating auto-cool at -2.0A/min and -1.0A/min for the TGHT and TBHT respectively.

Attachment 1: TaC-coating-sintering.PNG
TaC-coating-sintering.PNG
  484   Wednesday, May 27, 2020, 13:04 Marla Cervantes 44139-7-SK DoneConditioning graphite target #2

 Wednesday, May 27, 2020, 10:22

IGP1 = 3.2e-7 Torr

TGHT = 0.186 V, 0.028 A

The autoramp is set to 50A:

1 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr 


Wednesday, May 27, 2020, 10:40

 TGHT = 1.17 V, 50.9 A

PS = 1.21 V, 50 A

IGP1 = 8e-4 Torr and going down

Autoramp is set to 80 A same conditions

1 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr


Wednesday, May 27, 2020, 12:29

TGHT = 1.59 V, 80.04 A

PS = 1.58 V, 80 A

IGP1 =  2e-4 Torr and going down

Autoramp is set to 100 A,conditions:

1 A each 20 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr 


Wednesday, May 27, 2020, 12:38

TGHT = 1.97 V, 100.35 A

IGP1 = 4e-4 Torr

Autoramp is set to 120 A,conditions:

1 A each 20 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr 


 Wednesday, May 27, 2020, 12:48

TGHT = 2.27 V, 119.1 A

IGP1 = 4e-4 Torr

Autoramp is set to 190 A,conditions:

1 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr 


Wednesday, May 27, 2020, 13:03

TGHT = 3.4 V, 191.25 A

IGP1 = 3e-4 Torr

Autoramp is set to 190 A,conditions:

2 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr 


Wednesday, May 27, 2020, 13:36 

TGHT = 7.8 V, 423 A

IGP1 = 3e-4 Torr

Autoramp is set to 450 A,conditions:

2 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr 


Wednesday, May 27, 2020, 13:43

TGHT = 8.5 V, 451.6 A

IGP1 = 2e-4 Torr

Autoramp is set to 520 A,conditions:

2 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr  


Wednesday, May 27, 2020, 14:02 

TGHT = 10.3 V, 508.16 A

Power supply = 10.39 V, 506 A

Omega = 2000 degC

AP = 2046.4 degC


After 3 hours at 2000 degC, the autoramp was set to 0 A,

conditions: -2 A each 10 s.


Note: There was a voltage drop of 0.6 V (fig. elog-484-fig2)

Attachment 1: e-log-484.JPG
e-log-484.JPG
Attachment 2: elog-484-fig2.PNG
elog-484-fig2.PNG
  485   Friday, May 29, 2020, 10:26 Marla CervantesEmpty43044-8LP-SISDoneTaC coating/sintering

 Friday, May 29, 2020, 08:52

Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)

Desired temperature= 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).

Evap 2 was pumped down

Good vacuum= 3.00 e-5 Torr

Bad vacuum = 5.00 e-5 Torr

Ramped TGHT and TBHT to 40A at 0.5A/min

Initial IGP1 = 3.7e-7 Torr


Friday, May 29, 2020, 10:23

Autoramp deliver 40 A

TGHT = 0.47 V, 40.72 A

TBHT = 0.5 V, 38.78 A

IGP1 = 4.5 e-6 Torr and going down

Autoramp TGHT and TBHT at 1A/min to 400A and 230A respectively.


Friday, May 29, 2020, 11:27

Autoramp was stopped at 70 A, since pressure kept increasing, current was manually decreased to 65 A in both TGHT and TBHT.

The system will remain at current conditions until pressure reduce.


Friday, May 29, 2020, 12:44

 Autoramp TGHT and TBHT at 1A/min to 400A and 230A respectively.


Saturday, May 30, 2020, 00:23 

Autoramp deliver 400 A at TGHT and 230 A at TBHT

TGHT = 7.8 V, 453.9 A

TBHT = 4.21 V, 232.9 A

IGP1 = 9.7 e-6 Torr and going down

Omega = 1893 degC

Autoramp TGHT and TBHT at -1A/min to 400 A

Initiating auto-cool at -2.0A/min and -1.0A/min for the TGHT and TBHT respectively

Attachment 1: e-log-485.PNG
e-log-485.PNG
  487   Thursday, June 11, 2020, 13:01 Darwin Ortiz RosalesEmpty44139-12LP-SISDone 

 Thursday, June 11, 2020, 09:56

Previous day (Wednesday June 10, 2020) 

Container coated with TaC and wrapped with 3 Ta heat shields.

Desired temperature= 1900 C, Omega Slope set = 0.990, Auto TGHT at 0.2A/min to reach 400A, TGHT will be tapped up accordingly to reach desired Temp.

TBHT will be set fixed at 230 A (max).

Good vac at 3.00e -5 Torr

Bad vac at 5.00e-5 Torr

Chamber pump down


Thursday, June 11, 2020, 10:19

IEVAP2:IGP1=1.06e-6 Torr

ramping to 40A (TGHT and TBHT) at 1A/min


Thursday, June 11, 2020, 12:35

IEVAP2:IGP1=1.8e-6 Torr

TGHT = 39.8 A, 0.45V

TBHT=38.5 A, 0.48V

Manually rampted to 45A on both TGHT and TBHT 


Thursday, June 11, 2020, 12:58

IEVAP2:IGP1=1.6e-6 Torr

TGHT = 34.8 A, 0.52V

TBHT=44.2A, 0.55V 

Start Autoramp at .5A/min to 400A on TGHT and 230A on TBHT


Thursday, June 11, 2020, 17:14

Irregular pressure profile.  Cooling .  Need to check for leak.

TGHT = 99 A 1.3 V

TBHT = 99 A 1.4 V


Friday, June 12, 2020, 12:59

Restarting ramping

IGP1= 4.98e7 Torr

Autoramp at 1A/min to 400A on TGHT and 230A on TBHT

(pressure and TGHT current and voltage profile seem normal compared to previous coating sintering with the same power supply)


Friday, June 12, 2020, 14:40

Paused ramping

TGHT = 90A

After a few minutes the profile (noise) was still there.  Continue autoramp at 0.5A/min to 400 A on TGHT and 230A on TBHT


Friday, June 12, 2020, 15:21

IGP1= 1.97e-06 Torr trending down

TGHT = 111.5 A , 1.5 V

TBHT = 112.9 A, 1.9 V

Increase ramping speed to 1A/min to 400A on TGHT and 230A on TBHT


Friday, June 12, 2020, 20:50

OMEGA = 1754 C

IGP1= 2.5e-6 Torr

TGHT = 394.1 A, 6.6 V

TBHT = 232.8 A, 4.0 V 

Tapping to 1900 C


Friday, June 12, 2020, 21:00

OMEGA =1901 C

IGP1= 5.6e-6 Torr

TGHT = 448.3 A, 7.5 V

TBHT = 232.8 A, 4.1 V


Saturday, June 13, 2020, 00:51 

 OMEGA = 1898 C

IGP1 = 2.0e-6 Torr

TGHT = 447.2 A, 7.5 V

TBHT = 232.9 A, 4.1 V

Start cooling at -2A/ min for TGHT and -1A/min for TBHT

 

 

 

 

Attachment 1: WO#_44139-12_TaC_sintering.PNG
WO#_44139-12_TaC_sintering.PNG
  488   Monday, June 15, 2020, 14:28 Darwin Ortiz RosalesEmpty42218-7HP-SISDoneTaC coating/sintering

 Monday, June 15, 2020, 13:30

Container coated with TaC and wrapped with 3 Ta heat shields.

Desired temperature= 1900 C, Omega Slope set = 0.990, Auto TGHT at 0.2A/min to reach 400A, TGHT will be tapped up accordingly to reach desired Temp.

TBHT will be set fixed at 230 A max).

Good vac at 3.00e -5 Torr

Bad vac at 5.00e-5 Torr

Chamber pump down


 Tuesday, June 16, 2020, 08:55
IGP1= 4.2e-7 Torr
Starting ramp to 50A at 0.2A/min  for both TGHT and TBHT.  Observing pressure behaviour.

Tuesday, June 16, 2020, 14:14
IGP1 = 9.0e-7 Torr
TGHT = 50.3 A, 0.6 V
TBHT = 49.4 A, 0.54 V
Set TGHT to 400A and TBHT to 230A

Tuesday, June 16, 2020, 16:58
IGP1 = 7.32e-7 Torr
TGHT = 82.3A, 1.0 V
TBHT = 81.8 A, 0.96V
Will try to increase ramp rate to 2 A/min for both TGHT and TBHT

Tuesday, June 16, 2020, 17:30
Pressure spike.  
IGP1 = 2.5e-5Torr
TGHT = 44.1 A, 0.57 V
TBHT = 43.0 A, 0.49 V
Will return to 0.2A/ min ramp rate for both heaters

 Thursday, June 18, 2020, 20:26
Autoramped to 720A , 11.6V on TGHT at 0.2A/min
OMEGA = 1850C
Manually ramped to 740 A , on TGHT while TBHT remains at 230A 
OMEGA= 1885 C
IGP1=4.6e-06 Torr trending down
Will remain at this temperature for next 4 hours
NOTE* Current on TGHT very unstable (oscillates) 

Friday, June 19, 2020, 11:31 
Last night at 00:15 am started cooling TGHT at -2A/min and TBHT at -0.2 A/min
(The elog entry was not submitted and computer restarted overnight so notes were lost).
at 6:30 am Friday June 19, 2020
Increased TBHT cooling to -2A/min  and decreased THGT cooling to -1A/min

Monday, June 22, 2020, 13:54
IGP1= 8.1e-8 Torr
Evaporator vented and container pulled out.  There is slight peeling near one end of the container.  This area should be on the outside of the end-caps so the container should be usable. 
Files to be uploaded later.
 
 
 
ELOG V2.9.2-2455