Entry  Thursday, October 17, 2019, 13:53, Darwin Ortiz Rosales, TaC, 44062-3, LP-SIS, In progress, TaC coating/sintering 

Thursday, October 17, 2019, 12:00

Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)

Desired temperature= 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).

Evap 2 was pumped down on the previous night.

Good vacuum= 3.00 e-5 Torr

Bad vacuum = 5.00 e-5 Torr

Ramped TGHT and TBHT to 40A at 0.5A/min

Initial IGP1= 7.0 e-07 Torr


Thursday, October 17, 2019, 13:53

After pressure stabilization at 40A:

 Autoramp TGHT and TBHT at 1A/min to 400A and 230A respectively.


 Friday, October 18, 2019, 6:20

TGHT = 400A, 6.52V, TBHT= 233A, 4.1V

OMEGA = 1733C

Start autoramp to 430A on TGHT at 1A/min


Friday, October 18, 2019, 7:05

TGHT= 431A, 7.1V

TBHT= 233A, 4.1V

IGP1= 1.13e-06 Torr

OMEGA = 1828 C

Set autoramp to 465 at 1A/min


Friday, October 18, 2019, 11:13

TGHT = 465A, 7.8V, TBHT = 233A, 4.1V

OMEGA = 1865C

(Something is different with the heat dissipation on this target.  Will leave at this current and start cooling at 1200 noon to avoid container strain)


 Friday, October 18, 2019, 12:00

TGHT = 462.7A, 7.8V

TBHT= 233.4A, 4.1V

OMEGA = 1863C

IPG1= 1.02e-06 Torr

Commence cooling at -2A/min for TGHT and -1A/min for TBHT


 Monday, October 21, 2019, 09:11

Pump down and dismount.

 

Entry  Monday, November 04, 2019, 14:25, Darwin Ortiz Rosales, Endcaps, 40282-4, TARGET BOAT, Done,  Nov4CapCoating.PNG

Monday, November 04, 2019, 14:19 

Each endcap is separated with a disc of graphite foil and rolled into packs one pack of 4 and one pack of 8 within a foil envelope in a target boat.

There are also 3 coated springs interspersed.

The boat is wrapped with 3-layers of Ta heatshields.

Chamber pumped down overnight.

OMEGA slope = 0.99

Will Tap TGHT up to 40 A then autoramp to 400A at 1A/min.

Final desired temperature on OMEGA (tap)= 1800C


 Tuesday, November 05, 2019, 11:30

IGP1 = 9.6e-7 Torr

Autoramp TGHT to 40A at 1A/min


Tuesday, November 05, 2019, 11:44

IGP1= 2.6e-06 Torr

TGHT = 40.8 A, 0.37V

Will leave at 40 A for 1 hour


 Tuesday, November 05, 2019, 12:39

 IGP1=2.5e-6 Torr

TGHT =40.0A, .33V

Start ramping TGHT to 400A at 0.1A/min


Wednesday, November 06, 2019, 09:32

IGP1=7.8e-7 Torr

TGHT = 168.4A, 2.38V

increase ramp speed to 1A/min


 Wednesday, November 06, 2019, 14:07

IGP1= 2.34e-6 Torr

TGHT=400.0 A, 6.98V

set TGHT autoramp to 460A @ 1A/min aiming for 1850C (see attached plot)

 


Wednesday, November 06, 2019, 15:18

OMEGA = 1776 C

TGHT = 460.0A, 8.52V

IGP1= 4.7e-6 Torr

Starting manual tap up to 1810C


Wednesday, November 06, 2019, 15:36

OMEGA=1810 C

TGHT = 468.8A, 8.74V

IGP1=4.14e-6


Wednesday, November 06, 2019, 19:04

OMEGA=1822 C (has been between 1817-1824 C over 3.5 hours )

TGHT=468.8A, 8.67V

IGP1=1.9498e-06 Torr

Start TGHT ramp down at -2A/min


Thursday, November 07, 2019, 09:55

THGT = 0A, 0V overnight

IGP1= 3.2 e-07 Torr

Proceeding with unloading.


End caps looked good for online use.

 

Entry  Saturday, November 23, 2019, 14:03, Darwin Ortiz Rosales, TaC, 42464-3, HP-FEBIAD, Done, TaC coating/sintering HPFIBIAD20191124.PNG

12.3

Saturday, November 23, 2019, 14:00

Container coated with TaC and wrapped with 3 Ta heat shields.

Desired temperature= 1900 C, Omega Slope set = 0.990, Auto TGHT at 0.2A/min to reach 400A, TGHT will be tapped up accordingly to reach desired Temp.

TBHT will be set fixed at 230 A (max). 

Good vac at 3.00e -5 Torr

Bad vac at 5.00e-5 Torr

Chamber pump down was started on Friday November 22; however.

No leaks were observed when turning water lines on.

IGP1= 4.6e-07 Torr


 Saturday, November 23, 2019, 15:30

autoramp at 0.5A /min up to 50A for both TGHT and TBHT and maintained for 1 hour.


Saturday, November 23, 2019, 16:15

IGP1= 1.1e-06 Torr

Auto Ramp to 450 A on THGT and 230A on TBHT at 0.5A/min


Saturday, November 23, 2019, 23:44

IGP1= 5.2e-06 Torr

TGHT = 248A, 2.9V  TBHT= 233A 2.9V

Increased ramp step to 1A/min to 620 A


Sunday, November 24, 2019, 00:14

IGP1=1.9e-06 Torr

TGHT = 274.3, 3.3V   TBHT= 233A, 2.9V

 


Sunday, November 24, 2019, 07:33

IGP1=3.2e-06 Torr

OMEGA= 1490C

TGHT = 619 A, 9.1V   TBHT=233A, 2.9V

Continue ramping THGT at 1A/min to 700 A


Sunday, November 24, 2019, 10:05

IGP1= 2.1 e-05 Torr

OMEGA= 1676 C

TGHT= 700A, 10.6V   TBHT= 233A, 2.0V

Start autoramp to 780A as per regression in attachment


Sunday, November 24, 2019, 13:22

Autoramp to 795A  for TGHT


Sunday, November 24, 2019, 21:16

OMEGA= 1854 C

TGHT= 789.6A, 12.27V  TBHT= 233.A, 2.9V

IGP1= 2.0e-05

Will allow pressure to stabilize lower.


Sunday, November 24, 2019, 22:16

TGHTT= 789.6A, 12.3V TBHT=233.3A, 2.9V

OMEGA=1855C

IGP1 = 6.9e-06Torr

Start cooling TGHT at 2A/min and TBHT at 1A/min

Entry  Tuesday, November 26, 2019, 15:21, Darwin Ortiz Rosales, SiC, 42464-3, HP-FEBIAD, Done, Conditioning of SiC discs (sintering) (RUSH) HPFIBIAD20191124-SinteringTaC.PNG

Tuesday, November 26, 2019, 14:53

Total number of foils: 504

Total length packed 17.4 cm

container has 3 Ta heat shields.

No endcaps inserted to facilitate out-gassing

Two TaC coated Ta wire springs inserted at either end.

Initially to ramp TGHT and TBHT to 50A at 1A/min

Then heat manually to OMEGA ~1400 C , ramping TGHT manually and automatically  to reach 530A A (Omega slope set = 0.990)

Then temperature= (Correected to 1800C) 1900 C, Omega Slope set = 0.990, manually and automatically ramp to 700A, TGHT will be tapped up accordingly to reach desired Temp.

TBHT will be set fixed at 230 A (max).  TBHT heated manually and automatically to max.

Good vac at 3.00 e -5 Torr

Bad vac at 5.00 e-5 Torr

System experienced some vacuum issues due to cooling water leak in a heatshield line. 

Evaluation discs not included because no space.

Total Green disc mass measured = 58.250 g

 


Tuesday, November 26, 2019, 15:00

IGP1= 7.4e-06 Torr.  No leak issues found after last fix (Anders will add details).


Tuesday, November 26, 2019, 15:33

TGHT= 52.7A, .22V   TBHT= 49.3A, .52V

IGP1= 7.202 e-06 Torr (trending up so will allow to stabilize).


Wednesday, November 27, 2019, 06:09

left with autoramp waiting for vac to drop but no advance overnight.

Pressure did not seem to drop back below 3e-5 Torr magnitude, therefore not much advance in current ramp.


Thursday, November 28, 2019, 11:15

Continued ramping manually 

OMEGA = 1429 C  (0.99 slope), TGHT = 542A, 7.8V

With slope = 1.08 OMEGA = 1724 C, therefore staying at 0.99 slope

TaC coating sintering  plot suggests 753A to reach 1800C (See attachment 1)

Windows a little bit coated but not enough to disturb laser. 


Thursday, November 28, 2019, 12:17

TGHT =753A, 11.8V since 12:00 noon. 

TBHT= 233.4A, 3.3V

OMEGA= 1735 C (0.99 slope)


 Thursday, November 28, 2019, 13:01

OMEGA = 1860C (1.08 slope)


 Thursday, November 28, 2019, 14:38

OMEGA temperature began to creep up to ~1880.  Tapped TGHT current down to 733.5A, 11.4V


Thursday, November 28, 2019, 15:12

Checked windows and no significant additional buildup of obstructive material.

Temperature creeping up again.  Tap down TGHT current to 729 A, 11.2 V

OMEGA = 1870C at slope 1.08


 Thursday, November 28, 2019, 16:03

Temperature increase to 1880C

Tap down TGHT current to 715A, 10.9V

OMEGA= 1870 C (slope = 1.08)


Thursday, November 28, 2019, 16:22

Temperature creep to 1880 C

Tap down TGHT to 700A, 10.8V

OMEGA= 1845C

IGP1=2.2e-06 Torr


Thursday, November 28, 2019, 16:37

IGP1= 1.9e-06 Torr

OMEGA = 1850C (1.08 slope)

TGHT = 692A, 10.5V  TBHT= 233A, 3.2V

 

Initiating pressure ramp at -2A/min on TGHT and -1A/min on TBHT


Thursday, November 28, 2019, 16:45

IGP1= 1.28e-06 Torr

OMEGA= 1770 C (1.08 slope)

TGHT = 650A, 9.8V

ramp TGHT at -3.5A/min maintain TBHT at -1A/m in


 Thursday, November 28, 2019, 17:11

IGP1= 1.14e-06 Torr

OMEGA = 1730 C (1.08 slope)

ramp TGHT at -5A/min maintain TBHT at -1A/m


Thursday, November 28, 2019, 17:20

IGP1- 8.9e-07 Torr

OMEGA=1636C

ramp TGHT at -6A/min maintain TBHT at -1A/min


 Thursday, November 28, 2019, 17:34

IGP1= 7e-07 Torr

OMEGA= 1500 C (1.08 slope)

ramp TGHT at -8A/min maintain TBHT at -1A/min

TBHT = 183A


 OMEGA 1180C

TGHT =300 A

TBHT = 155A

Initiated -15A/min TGHT and -4A/min TBHT

IGP1= 5.2e-07 Torr


OMEGA below 1000C

begin manual tapdown


Thursday, November 28, 2019, 19:42

Target was dismounted after cooling.  Two graphite discs and end caps inserted.

 

Entry  Tuesday, March 10, 2020, 09:34, Darwin Ortiz Rosales, Empty, 42218-8, HP-SIS, Done, TaC coating/sintering SiC#40.PNG

Monday, March 9, 2020, 03:15

Container coated with TaC and wrapped with 3 Ta heat shields.

Desired temperature= 1900 C, Omega Slope set = 0.990, Auto TGHT at 0.2A/min to reach 400A, TGHT will be tapped up accordingly to reach desired Temp.

TBHT will be set fixed at 230 A (max).

Good vac at 3.00e -5 Torr

Bad vac at 5.00e-5 Torr

Chamber pump down


Tuesday, March 10, 2020, 09:17

Starting manual ramp to 50 A @ approximately 2A/min

IGP1 = 3.73e-7 Torr after opening water line pressure slowly incresed to 4.4e-7 Torr

TBHT also has Chiller interlock reached out to controls for removal.


Tuesday, March 10, 2020, 10:47

Chiller Interlock removed for TBHT.   Started manual ramp to 50A @ approximately 2A/min


Tuesday, March 10, 2020, 11:15

allowing to stabilize at 50A on TGHT and TBHT

IGP1= 7.9 e=7 Torr and trending up


Tuesday, March 10, 2020, 12:09

Pressure on IGP1 spiked.  Allowing to stabilize.

Tuesday, March 10, 2020, 14:36: Stopped By to check. Vacuum @ 3.02e-03T. Turbo pump appears to have tripped. Shut off Both PS. Prepare to vent. - Aaron S.

Tuesday, March 10, 2020, 14:48: Tightened all fittings (Just in case). HS side & HS waterline at the feed through. Roughing. 

Tuesday, March 10, 2020, 15:06: TP1 @ 38KRPM 1.34e-04T & dropping.  TGHT & TBHT PS on. Monitor before heating. -AS


Wednesday, March 11, 2020, 06:25: Vacuum @ 3.39e-07T. TGHT / TBHT PS on. - AS

Wednesday, March 11, 2020, 06:26: Manually tapped up TGHT / TBHT to 10 / 10 A. Ok.

Wednesday, March 11, 2020, 06:28: Auto-ramping TGHT / TBHT @ 4 A per min to 50 / 50 A.

Wednesday, March 11, 2020, 07:07: Vacuum @ 3.64e-07T. TGHT / TBHT @ 50 A. All appears stable. - AS


Wednesday, March 11, 2020, 07:036

Started autoramp  at 2 A/min

IGP1= 3.6e-7 Torr


Wednesday, March 11, 2020, 08:06

TGHT=10 5A, 1.3 V       TBHT = 105 A, 1.2 V

pressure rising fast; manual ramp down to 95A on both TGHT and TBHT


 Wednesday, March 11, 2020, 09:54

 IGP1= 4.7e-6 Torr; TGHT = 93.1 A, 1.2 V; TBHT = 95.1 A, 1.1 V

start autoramp at 1A/min (0.5 A/30s)


IGP1= 1.28e-5 Torr

TGHT = 108.3 A, 1.44 V

TBHT = 110 A, 1.29 V

Stop autoramp


Wednesday, March 11, 2020, 10:25

IGP1= 5.9e-5 Torr

manually tapped TGHT and TBHT set-current to  105 A respectively. 

pressure dropping.


Wednesday, March 11, 2020, 11:18

IGP1=8.0e-06 Torr

manually ramp to set-current 115 A for both TGHT and TBHT at approximately 2A/ min

allow to stabilize before proceeding


Wednesday, March 11, 2020, 12:12

IGP1=7.02e-6 Torr

TGHT = 112.7 A, 1.5 V

TBHT = 114.6 A, 1.4 V

Auto-ramping at 1A/min TGHT to 430 A and TBHT top 230A


 Wednesday, March 11, 2020, 18:45

IGP1= 1.2 e-06 Torr

TGHT=421.8 A, 6.2 V

TBHT = 231.9 A, 3.1 V

auto-ramp TGHT at 1A/min to set-current 530A


Wednesday, March 11, 2020, 23:08

IGP1= 1.3e-6 Torr

TGHT= 519.9 A, 7.87V

TBHT = 232.0 A, 3.1 V

start autoramp TGHT to 600A at  1A/min


Wednesday, March 11, 2020, 23:36

IGP1= 1.6e-6 Torr

TGHT = 542.9 A, 8.2V

TBHT = 232.9 A, 3.1V

Set autoramp to 750A on TGHT at 0.5 A/min


Thursday, March 12, 2020, 06:55

The Voltage set on TGHT was too low so current had not increased

IGP1= 1.5e-6 Torr

TGHT = 640 A, 10V

TBHT 232/9A, 3.1V

Oncrease TGHT voltage set to 14.5 and start autoramp at 3A/min to 750 A


Thursday, March 12, 2020, 7:43

TGHT = 735.7 A, 11.8V

OMEGA = 1595C

Auto -ramp set to 780 A for TGHT


Thursday, March 12, 2020, 7:58

OMEGA = 1655 C

TGHT set to 800 A at 3A/min


Thursday, March 12, 2020, 9:42

OMEGA =  1704 C

TGHT = 789.5 A, 13.0 V

Manual tap up to 837 A set on TGHT and 821 A readback


Thursday, March 12, 2020, 10:00

TGHT readback = 821.0 A, 13.7 V

OMEGA = 1744 C

TBHT same as previous entry.


 Thursday, March 12, 2020, 10:35

 Tapped up TGHT to 832.6 A, 13.8 V

OMEGA = 1759 C

TBHT = 232.9 A, 3.6 V

Will not tap further. 


Thursday, March 12, 2020, 13:22

IGP1 = 5.0 e-06 Torr (stable)

TGHT = 832.7 A readback (849 A set), 13.7V

TBHT = 232.9 A, 3.6 V

OMEGA = 1758 C

Start cooling at TGHT 3A/min


 Thursday, March 12, 2020, 14:08

IGP1= 1.32e-06 Torr

TGHT = 706 A, 11.0 V

TBHT = same as previous

OMEGA = 1583C

Start cooling TBHT at 1A/min continue cooling TGHT at 3A/min


Friday, March 13, 2020, 08:18

IGP1= 3.9e-8 Torr

Will unload sintered container


 

Entry  Friday, March 13, 2020, 14:21, Darwin Ortiz Rosales, SiC, 42218-8 , HP-SIS, Done, Conditioning of SiC discs (sintering) (RUSH)  

Friday, March 13, 2020, 13:52

Total number of foils: 493

Total length packed 17.4 cm

container has 3 Ta heat shields.

No endcaps inserted to facilitate out-gassing

Two TaC coated Ta wire springs inserted at both ends.

Initially to ramp TGHT and TBHT to 50A at 1A/min

Then heat manually to OMEGA ~1400 C , ramping TGHT manually and automatically  to reach 530A A (Omega slope set = 0.990)

Then temperature = 1800 (C using slope 1.08 at after 1700C manually and automatically ramp to 700A then  TGHT will be tapped up accordingly to reach desired Temp).

TBHT will be set fixed at 230 A (max).  TBHT heated manually and automatically to max.

Good vac at 3.00 e -5 Torr

Bad vac at 5.00 e-5 Torr

Evaluation discs not included because no space.

Total Green disc mass measured = 58.78 g


Friday, March 13, 2020, 14:22

Container loaded and pressuring down started without any pump issues.


Friday, March 13, 2020, 23:26

IGP1= 9.1e-07 Torr

Start auto tap at .25A/min to 50A on both TBHT and TGHT


Saturday, March 14, 2020, 07:09

IGP1=6.9e-6 Torr

TGHT = 49.1 A, 0.58V

TBHT = 49.2A, .49V

Continue ramp to 80 A on both heaters at .0.25A/min (good vacuum 3.0 e-04 Torr, bad vaccum 5.0 e-04 Torr


Saturday, March 14, 2020, 08:22

IGP1=6.8 e-05 Torr

Pressure spike TGHT =63.7 A, 0.77 V; TBHT = 60.0 A , 0.62 V

Aborted ramp alow to stabilize (Tapped TBHT to 63.8 A


Saturday, March 14, 2020, 12:16

IGP1= 8.1e-05 Torr

start autoramp at 0.25A/min


Saturday, March 14, 2020, 17:47

IGP1= 2.9e-05 Torr

TGHT= 78.4A, 1.0 V

TBHT = 79.4A, .88 V

manual and automatic  tap up to 740A TGHT and 230A TBHT then tap manually to 1800 C (mostly at .075 A/min and increasing to 1A /min as pressure stabilizes)


Sunday, March 15, 2020, 22:40

OMEGA = 1711 C

TGHT = 784,6 A, 12.9V (readback)

TBHT = 232 A, 3.5 V

Tap TGHT to 800 A readback set to 815A


Sunday, March 15, 2020, 23:20

OMEGA =1801 C

TGHT = 799.2 A, 13.3 V, TBHT = 232.9, 3.6V

Start gradual tap-down as temperature rising (1810 C at end of this note)


Sunday, March 15, 2020, 23:49

OMEGAA = 1818 C

TGHT = 769.9A, 12.6 V; TBHT = 232.9 A, 3.6 V

Temperature dropping tapped back up to 799 A on TGHT read back (set to 815 A)


Monday, March 16, 2020, 04:10

OMEGA = 1395 C (not reliable)

TGHT = 799.2 A, 13.2 V

TBHT = 232.9 A, 3.6 V

IGP1 = 2.2 e-06 Torr

Initiate cooling at -1.5 A/min on TGHT to 600A (at 600 A increase cooling rate to 3 A/min ; at 300 A increase cooling to 4 A/min and start TBHT cooling at 1 A/min; at `200 A on TGHT increase cooling to 4 A/min and TBHT 2 A/min)


Monday, March 16, 2020, 09:43

TGHT = 0 A , 0.02V

TBHT = 53,2 A, .56 V  (increase cooling to 4 A/min)

IGP1= 1.12e-07 Torr


Monday, March 16, 2020, 10:37

IGP1= 9.5 e -8 Torr

TGHT and TBHT = 0A, 0V

Will unload container


Monday, March 16, 2020, 12:40

Ten discs removed for evaluation (6 from left side and 4 from right side)

two graphite discs placed at each end as well as two TaC coated and sintered end-caps

total length after sintering = 17.8 cm

 

 

 

Entry  Thursday, June 11, 2020, 13:01, Darwin Ortiz Rosales, Empty, 44139-12, LP-SIS, Done,  WO#_44139-12_TaC_sintering.PNG

 Thursday, June 11, 2020, 09:56

Previous day (Wednesday June 10, 2020) 

Container coated with TaC and wrapped with 3 Ta heat shields.

Desired temperature= 1900 C, Omega Slope set = 0.990, Auto TGHT at 0.2A/min to reach 400A, TGHT will be tapped up accordingly to reach desired Temp.

TBHT will be set fixed at 230 A (max).

Good vac at 3.00e -5 Torr

Bad vac at 5.00e-5 Torr

Chamber pump down


Thursday, June 11, 2020, 10:19

IEVAP2:IGP1=1.06e-6 Torr

ramping to 40A (TGHT and TBHT) at 1A/min


Thursday, June 11, 2020, 12:35

IEVAP2:IGP1=1.8e-6 Torr

TGHT = 39.8 A, 0.45V

TBHT=38.5 A, 0.48V

Manually rampted to 45A on both TGHT and TBHT 


Thursday, June 11, 2020, 12:58

IEVAP2:IGP1=1.6e-6 Torr

TGHT = 34.8 A, 0.52V

TBHT=44.2A, 0.55V 

Start Autoramp at .5A/min to 400A on TGHT and 230A on TBHT


Thursday, June 11, 2020, 17:14

Irregular pressure profile.  Cooling .  Need to check for leak.

TGHT = 99 A 1.3 V

TBHT = 99 A 1.4 V


Friday, June 12, 2020, 12:59

Restarting ramping

IGP1= 4.98e7 Torr

Autoramp at 1A/min to 400A on TGHT and 230A on TBHT

(pressure and TGHT current and voltage profile seem normal compared to previous coating sintering with the same power supply)


Friday, June 12, 2020, 14:40

Paused ramping

TGHT = 90A

After a few minutes the profile (noise) was still there.  Continue autoramp at 0.5A/min to 400 A on TGHT and 230A on TBHT


Friday, June 12, 2020, 15:21

IGP1= 1.97e-06 Torr trending down

TGHT = 111.5 A , 1.5 V

TBHT = 112.9 A, 1.9 V

Increase ramping speed to 1A/min to 400A on TGHT and 230A on TBHT


Friday, June 12, 2020, 20:50

OMEGA = 1754 C

IGP1= 2.5e-6 Torr

TGHT = 394.1 A, 6.6 V

TBHT = 232.8 A, 4.0 V 

Tapping to 1900 C


Friday, June 12, 2020, 21:00

OMEGA =1901 C

IGP1= 5.6e-6 Torr

TGHT = 448.3 A, 7.5 V

TBHT = 232.8 A, 4.1 V


Saturday, June 13, 2020, 00:51 

 OMEGA = 1898 C

IGP1 = 2.0e-6 Torr

TGHT = 447.2 A, 7.5 V

TBHT = 232.9 A, 4.1 V

Start cooling at -2A/ min for TGHT and -1A/min for TBHT

 

 

 

 

Entry  Monday, June 15, 2020, 14:28, Darwin Ortiz Rosales, Empty, 42218-7, HP-SIS, Done, TaC coating/sintering 

 Monday, June 15, 2020, 13:30

Container coated with TaC and wrapped with 3 Ta heat shields.

Desired temperature= 1900 C, Omega Slope set = 0.990, Auto TGHT at 0.2A/min to reach 400A, TGHT will be tapped up accordingly to reach desired Temp.

TBHT will be set fixed at 230 A max).

Good vac at 3.00e -5 Torr

Bad vac at 5.00e-5 Torr

Chamber pump down


 Tuesday, June 16, 2020, 08:55
IGP1= 4.2e-7 Torr
Starting ramp to 50A at 0.2A/min  for both TGHT and TBHT.  Observing pressure behaviour.

Tuesday, June 16, 2020, 14:14
IGP1 = 9.0e-7 Torr
TGHT = 50.3 A, 0.6 V
TBHT = 49.4 A, 0.54 V
Set TGHT to 400A and TBHT to 230A

Tuesday, June 16, 2020, 16:58
IGP1 = 7.32e-7 Torr
TGHT = 82.3A, 1.0 V
TBHT = 81.8 A, 0.96V
Will try to increase ramp rate to 2 A/min for both TGHT and TBHT

Tuesday, June 16, 2020, 17:30
Pressure spike.  
IGP1 = 2.5e-5Torr
TGHT = 44.1 A, 0.57 V
TBHT = 43.0 A, 0.49 V
Will return to 0.2A/ min ramp rate for both heaters

 Thursday, June 18, 2020, 20:26
Autoramped to 720A , 11.6V on TGHT at 0.2A/min
OMEGA = 1850C
Manually ramped to 740 A , on TGHT while TBHT remains at 230A 
OMEGA= 1885 C
IGP1=4.6e-06 Torr trending down
Will remain at this temperature for next 4 hours
NOTE* Current on TGHT very unstable (oscillates) 

Friday, June 19, 2020, 11:31 
Last night at 00:15 am started cooling TGHT at -2A/min and TBHT at -0.2 A/min
(The elog entry was not submitted and computer restarted overnight so notes were lost).
at 6:30 am Friday June 19, 2020
Increased TBHT cooling to -2A/min  and decreased THGT cooling to -1A/min

Monday, June 22, 2020, 13:54
IGP1= 8.1e-8 Torr
Evaporator vented and container pulled out.  There is slight peeling near one end of the container.  This area should be on the outside of the end-caps so the container should be usable. 
Files to be uploaded later.
 
 
 
Entry  Thursday, July 16, 2020, 11:15, Darwin Ortiz Rosales, SiC, 44139-11, LP-SIS, Done, SiC sintering for Luca 1 of 2 

 Thursday, July 16, 2020, 11:15

Coated Ta tube cotaining 233 SiC disks wrapped with Ta heat-shields (3 layers)

Desired temperature= 1800C (expected TGHT 410 A), TBHT will be set fixed at 230A (max).

Evap 2 was pumped down


 Friday, July 17, 2020, 08:49

Total length packed approximately 10 cm

container has 3 Ta heat shields.

No endcaps inserted to facilitate out-gassing

Two TaC coated Ta wire springs inserted at both ends.

Initially to ramp TGHT and TBHT to 40 A at 0.5 A/min

Then heat ramping TGHT manually and automatically  to reach 400 A  (Omega slope set = 0.990)

Then ramp to temperature = 1800 C

TBHT will be set fixed at 230 A (max).  TBHT heated manually and automatically to max.

Good vac at 3.00 e -5 Torr

Bad vac at 5.00 e-5 Torr

Initial IGP1 = 6.45e-07 Torr

 


 

Friday, July 17, 2020, 20:49

TBHT = 38.9 A, 0.47 V

TGHT = 39.7 A, 0.59 V

IGP1 = 9.1e-06 Torr

Autoramp to 50 A at 0.5 A/min for both TGHT and TBHT


 Saturday, July 18, 2020, 09:04

IGP1 = 1.6e-06 Torr

TGHT = 50.5 A, 0.76V

TBHT = 49.7 A, 0.62 V

Starting autoramp at 0.5 A/ min to 400 A TGHT and 230 A TBHT


Saturday, July 18, 2020, 10:17

IGP1 = 5.06e-05 torr

stopped autoramp and allow pressure to decrease and stabilize


Saturday, July 18, 2020, 10:47 

IGP1 = 6.65 e-06 Torr and trending down

TGHT = 55.4 A, 0.83 V

TBHT= 54.6 A, 0.68 V

Change autoramp to 0.25 A/min for both heaters (.05 increments and 120s wait) 


Sunday, July 19, 2020, 08:46 

 IGP1= 2.2 e-05 Torr

TBHT = 109.5 A, 1.6 V

TGHT = 106.6 A, 1.7 V

increased ramping rate to .5A/min by decreasing wait intervals to 60 s


Sunday, July 19, 2020, 14:55 

IGP1 = 7.1 e -06 Torr

TGHT = 271.8 A, 4.7 V

TBHT = 233.1 A, 4.1 V

Increasing ramping rate to 1 A/min 


 Sunday, July 19, 2020, 17:35

IGP1 = 2.6e-06 Torr

TGHT = 400 A, 7.2 V

TBHT = 233 A, 4.1 V

Tap manually  to 410 (expected 1800 C )

Note*  OMEGA reading cannot be obtained.  

Leave at 410 A on TGHT for 4 hours.


Sunday, July 19, 2020, 22:57

IGP1 = 7.0 e-07 Torr

TGHT= 410 A , 7.2 V

TBHT = 233 A, 4.2 V

Start cool down at -2A/min for TGHT and -1A/min for TBHT

 


 Monday, July 20, 2020, 12:20

IGP1 = 2.2e-07 Torr

Unloading target

Entry  Monday, July 20, 2020, 19:25, Darwin Ortiz Rosales, SiC, 44139-11, LP-SIS, Done, SiC sintering for Luca 2 of 2 

Monday, July 20, 2020, 19:27 

Coated Ta tube cotaining 355 SiC disks wrapped with Ta heat-shields (3 layers)

Desired temperature= 1800C (expected TGHT 410 A), TBHT will be set fixed at 230A (max).

good vacuum = 3.00 e-05 Torr

bad vacuum = 5.00 e-05 Torr

Evap 2 was left to pump down over night.


 Monday, July 20, 2020, 23:06

IPG1 = 3.1e-06 Torr

Start autoramp at .25A/min to 40A for both TGHT and TBHT


Tuesday, July 21, 2020, 08:06

TGHT = 40.3 A, 0.51 V

TBHT = 39.0 A, 0.46 V

increase auto ramp limit to 50 A for both TGHT and TBHT 

IGP1=1.8e-05 Torr

 


Tuesday, July 21, 2020, 16:22

IGP1= 1.5 e-05 Torr 

TGHT = 50.1 A, 0.65 V

TBHT = 50.0 A, 0.60 V

 Change ramp target to 350 A for TGHT and 230A for TBHT


Wednesday, July 22, 2020, 13:24

Stopped autoramp.  Will allow pressure to drop. 

TGHT = 64.0 A, 0.86 V

TBHT = 64.5 A, 0.82 V 

 

Thursday, July 23, 2020, 23:55

TGHT Reached 430 A,  7.7 V

OMEGA reads 1310 C but reading is not considered accurate so will leave at this current for 4 hours.


Friday, July 24, 2020, 11:31

IGP1 = 1.98e-07 Torr

Window for pyrometer was coated with condensate.  

Dismounted target and cleaned two windows in line with the pyrometer.

 

 

 

Entry  Saturday, July 25, 2020, 08:58, Darwin Ortiz Rosales, ZrC, 44139-7-SK, , In progress, ZrC for Luca's experiments 

Friday, July 24, 2020, 15:00

Ta tube cotaining 497 ZrC discs wrapped with Ta heat-shields (3 layers)

Desired temperature= 1800C (expected TGHT 410 A), TBHT will be set fixed at 230A (max).

good vacuum = 3.00 e-05 Torr

bad vacuum = 5.00 e-05 Torr

Evap 2 was left to pump down over night.


Saturday, July 25, 2020, 08:57

IGP1= 8.7 e-07 Torr

Start ramp at 0.25 A/min to 20 A on TGHT 


Saturday, July 25, 2020, 10:07

IGP1= 2.7e -06 Torr

Set ramp target to 30 A 


Wednesday, July 29, 2020, 13:11 

OMEGA reading 1700 C at 430 A during the night.  It was kept at this temperature for 3.5 hours.  The OMEGA slope was not changed from 0.990

when IGP1 = 1.2 e-06 Torr and stable, cooling was started at -3A/min at 9 am on this day.

IGP1= 2.2 e-07 Torr now at time of dismounting

 

Entry  Friday, September 25, 2020, 10:32, Darwin Ortiz Rosales, Nb, , TARGET BOAT, Done, Heat Treatment of Nb for Edward 

Friday, September 25, 2020, 10:30 

Target boat with a layer of niobium foil on the bottom is used to heat up Nb samples to 1400 C for 4 hrs.

OMEGA slope = 0.99

The niobium samples are wrapped in two layers of  Nb foil.

Boat is wrapped with 2 layers of Ta foil, careful to avoid touching samples.


 Friday, September 25, 2020, 10:35
Manually ramped TGHT to 40 A and kept at that current for approximately 15 minutes.  
Then started autoramp at  1A/min up to 100 A

 Friday, September 25, 2020, 16:58
IPG1= 4.7e-07 Torr
TGHT =100.0 A, 1.3 V
Start autoramp to TGHT to 300 A  @ 2A/min

 @ 300A temperature = 1179 C
 

Friday, September 25, 2020, 20:00 

autoramp to 345 A


 Friday, September 25, 2020, 20:39

TGHT = 345 A, 5.4 V

OMEGA = 1296 C

IPG1= 8.1 e-07 Torr

Ramp manually to 1400 C


 Friday, September 25, 2020, 20:51

reached 1400 C on OMEGA at TGHT = 476 A


Friday, September 25, 2020, 20:59

OMEGA increased to 1410, lowered TGHT to 468 A to get back to 1400 C on OMEGA 


Friday, September 25, 2020, 21:40

Lowered TGHT to 463 A,  5.79 V to bring OMEGA to 1400 C from 1404 C


 Saturday, September 26, 2020, 00:51

Sample has been at 1400 C for 4 hours.

IGP1= 7.2 e-07 Torr

Cooling at- 2A/min

 

 

Entry  Monday, February 01, 2021, 13:57, Darwin Ortiz Rosales, SiC, 40282-4, TARGET BOAT, Done, Sintering of SiC discs for SEM 

Monday, February 01, 2021, 13:52  

Ta boat loaded with 20 Disc on either end capped with Ta springs to prevent overexpansion.   discs wrapped Graphite foil and boat wrapped in Ta heat-shields (3 layers).

Sample A on left side and sample B on right side.

Desired temperature= 1800C (expected TGHT 410 A).

good vacuum = 3.00 e-05 Torr

bad vacuum = 5.00 e-05 Torr

Evap2 left to pump down over night.


 Tuesday, February 02, 2021, 10:01

Pressure stable at IGP1= 7.8e-7 Torr

TGHT autoramp  set to 50 A @ 1/min


Tuesday, February 02, 2021, 13:45

IGP1=3.5e-6 Torr

TGHT =49.9 A, 0.56 V

Ramp at 1A/min to 100A


Wednesday, February 03, 2021, 08:25

IGP1= 5.5 e-07 Torr

TGHT = 100 A, , 1.2 V

Yesterday the camera failed to operate.  Cloud service discontinued.  The TS camera is offline but it is a different provider.  Will start ramping to 400A .

Ramp rate 2A/min


Wednesday, February 03, 2021, 15:55

ramped up to 520 A and 9.1V TGHT

Temperature average 1644 C but suspect actual temperature higher.

Held for 5 hours and started ramp down at -2A/min


Thursday, February 04, 2021, 9:35

IGP1= 2.99e-7 Torr

Begin pumpdown procedure and remove container

Note:  SiC evaporation on most discs.  The temperature was too high.  Need to repeat.

 

 

 

Entry  Saturday, February 13, 2021, 08:14, Darwin Ortiz Rosales, SiC, 41992-1, TARGET BOAT, Done, Sintering of SiC discs for SEM  Screenshot_2021-02-14_114713.png

Saturday, February 13, 2021, 08:10

Ta boat loaded with 80 discs enclosed in graphite foil in pockets of 20.  Sample A at both ends and sample B in the middle spaced out. Boat wrapped in Ta heat-shields (3 layers).

(A B B A)

Desired temperature= 1800C (expected TGHT approx 410 A).

good vacuum = 3.00 e-05 Torr

bad vacuum = 5.00 e-05 Torr

Evap2 left to pump down over previous night.

IGP1= 5.4e-7 Torr and stable

Initiating TGHT ramp up at 1 A/ min to 30 A


Saturday, February 13, 2021, 12:19

IGP1= 6.9e-06 Torr

Ramp to 50 A 1A/min


Saturday, February 13, 2021, 14:35

IGP1 = 6.4e-6 Torr

Pressure trending down. 


Saturday, February 13, 2021, 14:56

IGP1= 4.9 e-6 Torr

Initiate Ramp up @ 1 A/min to 400 A

Changed ramp up to 0.5 A/min at around 11:30 pm


Sunday, February 14, 2021, 11:43

The current will be ramped up to 420 A according to the trendline approximation (see attachement 1)


Sunday, February 14, 2021, 12:26

IGP1 = 8.9 e-06 Torr and trending down

TGHT = 420 A, 7.5 V

OMEGA = 1730 C

Will ramp up to 428 A manually 


Sunday, February 14, 2021, 12:30

Reached 428 A on TGHT.  

OMEGA = 1760 C

Will bump to 430 A and hold for 4 hours

OMEGA= 1765 C


Sunday, February 14, 2021, 18:00

OMEGA = 1789 C

IGP1= 7.5 e -7 Torr

TGHT = 430.5 A , 7.8 V

Start ramping down at -1A/min to zero A

 

 

 

 

 

 

Entry  Tuesday, March 02, 2021, 11:32, Darwin Ortiz Rosales, TaC, 44691-5, LP-SIS, Done, TaC coating/sintering 

Tuesday, March 02, 2021, 11:26 

Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)

Initial weight including heat-shields = 433.8 g

Desired temperature = 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).

Evap 2 will be pumped down over night.

Good vacuum = 3.00 e-5 Torr

Bad vacuum = 5.00 e-5 Torr


Wednesday, March 03, 2021, 13:28

IGP1 = 4.0 e-7 Torr

Start ramping @ 1A/min to 20A on both TGHT and TBHT


Wednesday, March 03, 2021, 15:03

Start ramping @1/min to 60A on Both TGHT and TBHT


Wednesday, March 03, 2021, 22:42

TGHT = 60A, TBHT = 60A

IGP1= 4.2 e-7 stable

Start ramping to 400A @ .5A/min for TGHT and @0.5A/min for TBHT to 230A


Thursday, March 04, 2021, 11:56

TGHT = 400 A, TBHT =230A

IGP1= 1.9e-6 Torr

OMEGA = 1695 C

Continue ramp up @0.5A/min to 430A on TGHT


Thursday, March 04, 2021, 14:02

IGP1 = 1.87e-6 Torr

TGHT = 434 A , 7.2 V

OMEGA = 1787 C

Will tap up manually 450A @ on TGHT and leave at that current for ~4 hours


Thursday, March 04, 2021, 19:35

After ~ 5 hours at 1829 C max OMEGA reading

OMEGA = 815 C 

Start ramp down at 1A/min on TGHT and 0.8A/min for TBHT

IGP1= 1.2e-6 Torr

 


 

 

Entry  Friday, March 05, 2021, 10:48, Darwin Ortiz Rosales, TaC, 44691-1, LP-SIS, Done, TaC coating/sintering 2021-03-07_090107-44691-1_Tac_Sintering.png

 Friday, March 05, 2021, 10:47

Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)

Initial weight including heat-shields = 431.0 g

Desired temperature = 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).

Evap 2 will be pumped down over night.

Good vacuum = 3.00 e-5 Torr

Bad vacuum = 5.00 e-5 Torr


 Saturday, March 06, 2021, 10:29

IGP1= 2.7 e-07 Torr and stable

AutoRamp at 1A/min to 40 A on TGHT and TBHT

 


Saturday, March 06, 2021, 22:36

IGP1= 2.2e-07 Torr

TGHT = 40.3 A, .46V

TBHT = 38.48 A, .48 V  (set to 40 A)

Start Autoramp at 0.5A/min to 400 A on TGHT and 230A on TBHT


Sunday, March 07, 2021, 07:48

IGP1=8.5e-7 Torr

TGHT = 287 A, 4.6V

TBHT = 232 A, 4.0 V

OMEGA = 1493C

 Increase ramp speed on TGHT to 2A/min to 400A


Sunday, March 07, 2021, 08:36 

 IGP1=1.7 e-06 Torr

TGHT = 373.7 A, 6.3V

TBHT = 232.9 A, 4.1 V

OMEGA = 1752 C


Sunday, March 07, 2021, 08:53

 IGP1= 1.7e-06 Torr

TGHT = 400 A, 6.8 V

TBHT = 232.8 A, 4.1 V

OMEGA= 1842

Ramp TGHT @ 2A/min to 420 A as per attached current approximation


Sunday, March 07, 2021, 09:25

OMEGA=1915 C

TGHT = 420A, 7.2V

TBHT= 232.8 A, 4.1V

IGP1= 1.6 e-06 Torr

Tap down manually to approx 1900 C

TGHT = 412.9 A, 7.0 V and OMEGA=1900 C

Will leave for about 4 hours at this temperature

 


Sunday, March 07, 2021, 13:05

IGP1= 1.1 e-06 Torr

TGHT = 415 A, 7.2 V

TBHT = 232.8 A, 4.1 V

OMEGA = 1880C

Start cool down at -2A/min on TGHT and -1A/min TBHT

 

 

 

Entry  Tuesday, March 09, 2021, 11:54, Darwin Ortiz Rosales, TaC, 42464-1, HP-FEBIAD, Done, TaC coating/sintering 

Tuesday, March 09, 2021, 11:54 

 Container coated with TaC and wrapped with 3 Ta heat shields.

Desired temperature= 1900 C, Omega Slope set = 0.990, Auto TGHT at 0.2A/min to reach 400A, TGHT will be increased  accordingly to reach desired Temp.

TBHT will be set fixed at 230 A max).

Good vac at 3.00e -5 Torr

Bad vac at 5.00e-5 Torr

Chamber pump down


Wednesday, March 10, 2021, 08:32

IGP1 = 2.6 e -07 Torr

Start autoramp @ 1A/min to 40 A on both TGHT and TBHT

***Autoramp aborted due to work on EF12 affecting EVAP2***

Will have to resume Thursday or Friday

 


Saturday, March 13, 2021, 7:54

  IGP1= 3.8e-07 Torr

Initiate heating @ 0.5A/min TBHT and TGHT to 60 A


Saturday, March 13, 2021, 23:01

IGP1 = 2.7e-07Torr

TGHT = 60.5A, 0.7V

TBHT= 60.0A, 0.7V

Initiate ramp @ 1 a/min to 400 A on TGHT and 230A on TBHT


Sunday, March 14, 2021, 08:45

IGP1= 8.2e-07 Torr

TGHT = 400A, 5.6V

TBHT = 232.9A, 3.0V 

OMEGA = 1142 C

Continue ramping to 460 A on TGHT at 1a/min


 Sunday, March 14, 2021, 10:11

IGP1 = 1.0 e-06 Torr

TGHT= 460.4 A, 6.5 V

TBHT = 232.9 A, 3.0 V

OMEGA = 1239 C

Will ramp up to 500 A at 1a/min on TGHT


Sunday, March 14, 2021, 10:53

 IGP1 = 1.3 e-06 Torr

TGHT= 495 A, 7.2 V

TBHT = 232.9 A, 3.0 V

OMEGA = 1316 C

Will ramp up to 600 A at 1a/min on TGHT

 


Sunday, March 14, 2021, 12:45

IGP1 = 3.0 e-06 Torr

TGHT= 604 A, 9.1 V

TBHT = 232.9 A, 3.1 V

OMEGA = 1610 C

Will ramp up to 660 A at 1a/min on TGHT 

 


Sunday, March 14, 2021, 17:01

IGP1= 2.4e-06 Torr

TGHT =  664 A, 10V

TBHT = 232.9 A, 3.1V

OMEGA = 1733 C

tapping TGHT to 740 A

OMEGA = 1883 C


 Sunday, March 14, 2021, 21:45

IGP1= 3.1e-06 Torr

TGHT =  744A, 11.5V

TBHT = 232.9 A, 3.2V

OMEGA = 1875 C

Start cooling TGHT @-3A/min and TBHT @-1A/min

 

Entry  Tuesday, March 16, 2021, 08:29, Darwin Ortiz Rosales, TaC, , TARGET BOAT, Done, sintering of TaC on Caps and springs 

 Tuesday, March 16, 2021, 08:28 

Each endcap is separated with a disc of graphite foil and rolled into packs of 5 within a foil envelope in a target boat.

There are also 4 coated springs, one in between endcaps and three on the ends

The boat is wrapped with 3-layers of Ta heatshields.

Chamber pumping down

OMEGA slope = 0.99

Will ramp TGHT up to 40 A then autoramp to 400A at 1A/min.

Final desired temperature on OMEGA (tap)= 1800C


Tuesday, March 16, 2021, 11:22

 IGP1= 3.5e-06 Torr

TGHT = 40A, 0.4V

Will ramp up at 1A/min to 400 A


Wednesday, March 17, 2021, 08:06

IGP1=  2.98 e-07 Torr

TGHT = 400 A, 4.3V

OMEGA shows no temperature reading.  Will ramp up to 450A at 1A/min

 


Wednesday, March 17, 2021, 08:58

OMEGA still shows no reading

IGP1= 4.2e-07 Torr

ramping to 470A @ 1A/min 


Wednesday, March 17, 2021, 09:21

OMEGA no reading

IGP1 = 4.4 e-07 Torr

TGHT = 470 A, 5V

ramp up to 490 A at 1A/min


Wednesday, March 17, 2021, 11:05 

TGHT at 490 A, 5.2 V since 10 am.  Will start cooling at 2 pm.  


Wednesday, March 17, 2021, 13:47

TGHT = 493A, 5.3V

IGP1= 3.2e-07 Torr and stable

Start ramp down at -2A/min


Thursday, March 18, 2021, 11:20 

The boat was dismounted but the materials had not sintered properly.  The boat looked very twisted.  Everything was transferred to a new boat with uncoated Ta caps at either end.  

It was left overnight to establish vacuum.


Friday, March 19, 2021, 08:23

IGP1= 2.2 e-07 Torr

initiate heating at 1A/min on TGHT to 60 A


Friday, March 19, 2021, 10:04

IGP1= 3.6 e-07 Torr

TGHT = 60 A, .73 V

Ramp up to 450 A @ 2A/min

 


Friday, March 19, 2021, 14:26

OMEGA 1895 at 455A, 8.4 V

manually ramp down to 1800C

OMEGA 1800C at 416A, 7.6V

will leave like that for 3 hours more


Friday, March 19, 2021, 17:12

OMEGA 1795 C

 TGHT = 415A, 7.6V

IGP1= 6.8e-07 Torr

Start ramp down at -2A/min


Monday, March 22, 2021, 23:07 

Marla removed from Evap 2.  Sintering vwas very good.  The container with Ta caps is better for sintering these pieces.

 

Entry  Wednesday, April 28, 2021, 11:57, Darwin Ortiz Rosales, SiC, 42218-7, HP-SIS, Done, sintering discs for SiC#41 (or back-up for #40) 

Wednesday, April 28, 2021, 11:54

Total number of foils: 449 (not including analysis discs)

Total length packed 16.7 cm

5 extra analysis discs and 2 dr. Blade discs

container has 3 Ta heat shields.

No endcaps inserted to facilitate out-gassing

One Ta disc inserted at front end

Initially to ramp TGHT and TBHT to 50A at0.5 A/min

Then heat manually to OMEGA ~1400 C , ramping TGHT manually and automatically  to reach 530A A (Omega slope set = 0.990)

Then temperature = 1800C

TBHT will be set fixed at 230 A (max).  TBHT heated manually and automatically to max.

Good vac at 3.00 e -5 Torr

Bad vac at 5.00 e-5 Torr

 


Thursday, April 29, 2021, 10:09

IGP1 = 6.5 e-07 Torr

Start heating at 0.5 A/min to 50 A on both TGHT and TBHT 


Thursday, April 29, 2021, 21:45

 IGP1= 7.7 e-06 

TGHT = 50.3A , 0.59 V

TBHT = 49.4 A, 0.56 V

Pressure is taking a while to equilibrate.  Will wait a bit more to continue heating

 


Thursday, April 29, 2021, 23:49

IGP1 = 7.2 e-06 Torr

will start ramping at 0.5 A/min to 100 A 


Saturday, May 01, 2021, 20:09 


Friday, April 30, 2021, 08:19

IGP1 pressure higher than bad vacuum.  Stopped autoramp.  Will allow vacuum to come back down and restart ramp. 


Saturday, May 01, 2021, 09:04

Yesterday the system had tripped.  All pumps had turned off and the pressure was found at 0.005 torr

vacuum was restarted.

 Current IGP1= 6.5e-07 Torr

Restarting heaters.  

Autoramp at 0.5A/min to 20A on both TGHT and TBHT


Saturday, May 01, 2021, 10:48

IGP1=5.9e-7 Torr

TGHT = 20.0 A, 0.24V

TBHT = 20A, 0.20V 

 Autoramp at 0.5A/min to 40A both TGHT and TBHT


Saturday, May 01, 2021, 13:26 

TGHT = 40.0 A, 0.47 V

TBHT= 39A, 0.44V

IGP1= 5.5 e-07 Torr

Autoramp at 0.5A/min to 60 A on both TGHT and TBHT


Saturday, May 01, 2021, 20:09

TGHT = 60.0 A, 0.72V

TBHT = 59.4 A, 0.69V

IGP1= 4.4e-07 Torr

Autoramp at 0.5A/min to 100 A on both TGHT and TBHT

 


Sunday, May 02, 2021, 18:30 

IGP1= 1.7 e-06 Torr

TGHT =100A, 1.3V

TBHT = 99.9A, 1.3V

Autoramp both heaters at 0.25A/min to 120A and monitor 


Sunday, May 02, 2021, 18:45

pressure increase to 4.1e-06 Torr.  TBHT unexpectedly rose to 120A and was manually tapped back down to 104 A.  Will keep both , TGHT and TBHT, at 104 A  for a while. 


Sunday, May 02, 2021, 19:50

Stepping at 0.5A/min to 105A then to 110 A on both TGHT and TBHT


Sunday, May 02, 2021, 22:10 

Will leave both TGHT and TBHT at 110 A until pressure comes back down

currently IGP1= 1.3e-05 Torr


Monday, May 03, 2021, 09:35 

IGP1= 2.2 e-06 Torr

Tapping TGHT and TBHT to 115A 


Monday, May 03, 2021, 11:30

 Tapping TGHT and TBHT to 120A @ 1A/min


Monday, May 03, 2021, 18:38

IGP1= 5.4e-06 Torr

TGHT = 130.3 A, 1.8 V

TBHT = 129.1 A, 1.8 V

Continue gradual ramping at 1A/min in increments of 5 A 


Tuesday, May 04, 2021, 09:27

IGP1= 3.2e-5 Torr

TGHT = 400 A, 6.0V

TBHT = 232 A, 3.6V

OMEGA = 1104 C

waiting for pressure to drop then will continue heating 


Tuesday, May 04, 2021, 17:27

TGHT = 420.1 A, 6.5V

TBHT= 232A, 3.6V

OMEGA = 1139 C

IGP1= 1.15e-5 Torr 

will increase ramp up at 0.5A/min to 430A and hold (TGHT)


Tuesday, May 04, 2021, 22:43

TGHT= 430A, 6.6V

TBHT = 232.8A, 3.6V

OMEGA= 1157 C

IGP1=6.6e-6 Torr

 Set Autoramp at 0.5A/min to 540 A (TGHT)


Wednesday, May 05, 2021, 08:09

IGP1= 7.5e-06 Torr

TGHT = 534 A, 8.5V

TBHT=232 A, 3.7 V 

OMEGA = 1485

Continue ramp at 0.5A/min to to 600 A on TGHT

 


Wednesday, May 05, 2021, 15:07

IGP1=1.2e-5 Torr

TGHT=601A, 9.6V

TBHT= 232A, 3.7V

OMEGA =1600 C

ramp to 650A on TGHT at 0.5A/min 


Wednesday, May 05, 2021, 20:05

Tapped TGHT to 694A, 11.4 V (manually)

TBHT= 232A, 3.7V

OMEGA =  1790 C

IGP1= 2.5e-05 Torr

Will monitor Pressure and temperature .  Will start 4 hour count.


Wednesday, May 05, 2021, 22:03

OMEGA = 1765 C 

TGHT = 694A, 11.5V

TBHT = 232A, 3.8 V

IPG1= 1.6e-05 Torr

Manually bumping TGHT to 700 A

 

Entry  Friday, June 11, 2021, 08:41, Darwin Ortiz Rosales, Nb, , TARGET BOAT, Done, Nb treatment for Norman 

 Friday, June 11, 2021, 08:05

Target boat with a layer of niobium foil on the bottom is used to heat up Nb samples to 1100 C for 4 hrs.

OMEGA slope = 0.99

The niobium samples are wrapped in a layer of  Nb foil.

Boat is wrapped with 2 layers of Nb foil.

Good vacuum 3.00e-02 Torr

Bad vacuum 5.00e-02 Torr

Autoramping TGHT at 2A/min to 50A then to 100A, then monitor until desired temperature

Initial IGP1= 9.4e-07 Torr


Friday, June 11, 2021, 09:59

TGHT = 200 A, 2.7V

IGP1=  9.8e-07 Torr

Tap to 1100C


Friday, June 11, 2021, 10:09 

Temperature reached at 10:05 am.

TGHT = 224A, 3.1V

IGP1= 1.0e-06 Torr

OMEGA= 1100C +/- 10C fluctuations


Friday, June 11, 2021, 14:10

TGHT = 224A, 3.1V

IGP1= 9.2e-.07 Torr

OMEGA = 1100C +/-  10C fluctuations

Started rampdown at -3A/min

 