  68   Friday, April 19, 2013, 15:27 Anders MjosEmpty38481-4HP-FEBIADDoneCTL testTarget installed with 4 T/C
The target assembly is ITD0300 with
the CTL Cu cooling block slightly modified.
  
  69   Monday, April 22, 2013, 18:49 John WongEmpty38481-4HP-FEBIADDoneCTL test


   
        
            
  
  70   Tuesday, April 23, 2013, 10:11 Anders MjosEmpty38481-4HP-FEBIADDoneCTL test 

    
 2013-04-23_Evap2_ITD0300_CTL_Thermal_Test.xlsxCTL_ITD0300_Evap2.pdfDeformed_Ionizer_Tube.jpg 
  17   Tuesday, May 15, 2012, 12:26 John WongSiC38481-2HP-SISDoneRe-condition the HP-SIS SiC targetTuesday, May 15, 2012, 12:24
The HP-SIS SiC target was made on
Nov 03, 2010.  The target consists of
  
  22   Friday, May 18, 2012, 12:19 Nikita BernierSiC38481-2HP-SISDoneRe-condition the HP-SIS SiC target

    

       
            
 autoramp1.pngievap2autoheat1.png 
  23   Friday, May 18, 2012, 13:17 John WongSiC38481-2HP-SISDoneRe-condition the HP-SIS SiC target

    

       
            
  
  24   Tuesday, May 22, 2012, 12:15 Nikita BernierSiC38481-2HP-SISDoneRe-condition the HP-SIS SiC target

    

       
            
 TGHT-VAC1.JPGTBHT-VAC1.JPG 
  25   Tuesday, May 22, 2012, 15:26 John WongSiC38481-2HP-SISDoneRe-condition the HP-SIS SiC target

    

       
            
  
  30   Monday, June 11, 2012, 12:26 John WongSiC38481-2HP-SISProblemsEnd caps vaporized

    

       
            
 Photo_2012-06-11_12_06_19_PM.jpg 
  43   Tuesday, August 14, 2012, 15:57 John WongSiC38295-8 HP-FEBIADDoneTesting endcaps inserted /w the new expansion toolTuesday, August 14, 2012, 15:44
This SiC target was prepared in May
2011 with the Evaporator#1.  The target
 vacuum_leaks.PNGTGHT_TBHT.png 
  439   Wednesday, April 17, 2019, 09:06 Marla Cervantes 38295-10LP-FEBIADDoneGraphite insert test Wednesday, April 17, 2019, 09:03
An uncoated target container was
loaded with a graphite insert and wrapped
 190417-TargetContainer-TEMP.pdfIMG_1074.JPG 
  582   Tuesday, June 14, 2022, 09:04 Darwin Ortiz RosalesTa37978-1HP-FEBIADDoneTaC coating sinteringTuesday, June 14, 2022, 08:47
Ta HP-FEBIAD was coated
  
  584   Tuesday, June 21, 2022, 09:48 Darwin Ortiz RosalesSiC37978-1HP-FEBIADDoneT-220617 sinteringTuesday, June 21, 2022, 09:43
Total number of foils:
  
  36   Thursday, July 19, 2012, 17:05 John WongEmpty37918-3LP-FEBIADDoneCoating target oven /w TaC & sintering for UCx#5 Thursday, July 19, 2012, 16:58
The target container was coated with
TaC. 
  
  660   Wednesday, May 01, 2024, 11:54 Darwin Ortiz RosalesTaC25447-27HP-SISDoneTaC coating sinteringWednesday, May 01, 2024, 11:53
The coated container was wrapped
in 4 Ta foil heatshields.
  
  429   Thursday, February 07, 2019, 15:20 Darwin Ortiz RosalesEmpty 43630-1 DoneTaC coating/sinteringThursday, February 07, 2019, 14:12
Tantalum tube coated with TaC and
wrapped with 3 layers of Ta heat-shielding.
  
  559   Monday, October 25, 2021, 11:53 Darwin Ortiz RosalesTaC 42218-4HP-IG-LISDoneTaC coating/sintering Monday, October 25, 2021, 11:52
Ta IGLIS tube was coated with
  
  1   Monday, March 28, 2011, 12:40 John Wong    Under ConstructionEvaporator #2 is still under construction. 
For further information please contact Jens
Lassen.
  
  2   Thursday, July 21, 2011, 17:33 Pierre Bricault   Maintenance Rick mentioned to me that the evaporator is
ready for the next steps of the commissioning
process.
  
  3   Monday, February 13, 2012, 16:24 John Wong   DoneEvaporator #2 Commissioned  Monday, February 13, 2012, 16:21
The Evaporator 2 is now commissioned.
 See attachment#1 for the commissioning
 Evap2_Commissioning_Report.PDF 