  Evaporator_2, Page 24 of 34  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target Material Target Oven W.O#down Source Status Subject
  68   Friday, April 19, 2013, 15:27 Anders MjosEmpty38481-4HP-FEBIADDoneCTL test

Target installed with 4 T/C

The target assembly is ITD0300 with the CTL Cu cooling block slightly modified.

Ch1 - CTL cooling block T/C feedtrough
Ch2 - Heat shield below left gripper arm - T/C feedthrough
Ch3 - Heat shield below left gripper arm - 9 pin connector
Ch4 - Target left side leg on tube - 9 pin connector

Friday, April 19, 2013, 15:23: Roughing

Friday, April 19, 2013, 15:41: Started turbo


Monday, April 22, 2013, 09:43: Opened water supply. Vacuum stable at 2.8E-7 T (IGP1)

  69   Monday, April 22, 2013, 18:49 John WongEmpty38481-4HP-FEBIADDoneCTL test

Anders Mjos wrote:

Target installed with 4 T/C

The target assembly is ITD0300 with the CTL Cu cooling block slightly modified.

Ch1 - CTL cooling block T/C feedtrough
Ch2 - Heat shield below left gripper arm - T/C feedthrough
Ch3 - Heat shield below left gripper arm - 9 pin connector
Ch4 - Target left side leg on tube - 9 pin connector

Friday, April 19, 2013, 15:23: Roughing

Friday, April 19, 2013, 15:41: Started turbo


Monday, April 22, 2013, 09:43: Opened water supply. Vacuum stable at 2.8E-7 T (IGP1)

Monday, April 22, 2013, 18:48

Ramping TGHT/TBHT to 850A/300A at 1A/min.


 

  70   Tuesday, April 23, 2013, 10:11 Anders MjosEmpty38481-4HP-FEBIADDoneCTL test

 

John Wong wrote:

 

Anders Mjos wrote:

Target installed with 4 T/C

The target assembly is ITD0300 with the CTL Cu cooling block slightly modified.

Ch1 - CTL cooling block T/C feedtrough
Ch2 - Heat shield below left gripper arm - T/C feedthrough
Ch3 - Heat shield below left gripper arm - 9 pin connector
Ch4 - Target left side leg on tube - 9 pin connector

Friday, April 19, 2013, 15:23: Roughing

Friday, April 19, 2013, 15:41: Started turbo


Monday, April 22, 2013, 09:43: Opened water supply. Vacuum stable at 2.8E-7 T (IGP1)

 

Monday, April 22, 2013, 18:48

Ramping TGHT/TBHT to 850A/300A at 1A/min.


 

 

Tuesd ay, April 23, 2013, 10:07

TBHT / TGHT: 820A / 300A

TGHT:RDCUR: 816.6A
TBHT:RDCRU: 303.5A

Local P/S displays
TGHT: 821A / 11.05V
TBHT: 307A / 4.37V

Tuesday, April 23, 2013, 10:45: Ramping down TBHT to 0A @ 5A/min

Tuesday, April 23, 2013, 12:49: Ramping down TGHT to 0A @ 5A/min

Tuesday, April 23, 2013, 15:52: Swithced off TGHT and TBHT P/S. TGHT P/S showed 30A read back value, while local value was 0A


 Wednesday, April 24, 2013, 09:53: Turbo stopped

Wednesday, April 24, 2013, 12:00: Target removed 


The ionizer tube was found to have deformed as seen in the attached photo.

Attachment 1: 2013-04-23_Evap2_ITD0300_CTL_Thermal_Test.xlsx
Attachment 2: CTL_ITD0300_Evap2.pdf
CTL_ITD0300_Evap2.pdf
Attachment 3: Deformed_Ionizer_Tube.jpg
Deformed_Ionizer_Tube.jpg
  17   Tuesday, May 15, 2012, 12:26 John WongSiC38481-2HP-SISDoneRe-condition the HP-SIS SiC target

Tuesday, May 15, 2012, 12:24

The HP-SIS SiC target was made on Nov 03, 2010.  The target consists of 405 discs, 18.5cm in length.  It was sintered in the Evaporator#1. 

This target is going into Evap#2 for re-conditioning.  It is currently being pumped down. 


 

  22   Friday, May 18, 2012, 12:19 Nikita BernierSiC38481-2HP-SISDoneRe-condition the HP-SIS SiC target

John Wong wrote:

Tuesday, May 15, 2012, 12:24

The HP-SIS SiC target was made on Nov 03, 2010.  The target consists of 405 discs, 18.5cm in length.  It was sintered in the Evaporator#1. 

This target is going into Evap#2 for re-conditioning.  It is currently being pumped down. 


 

Friday, May 18, 2012, 12:19 

The target is wrapped with only one heat shield.

Evaporator #2 Target Heater is now auto-ramping at 0.5 A/min, up to 820 A, with the maximum voltage limited at 2 V, between 2.00e-05 (Good vacuum) and 3.00e-05 Torr (Bad vacuum). Tube Heater is auto-ramping at 0.5 A/min, up to 230 A, with the maximum voltage limited at 1 V. See attachments.

Attachment 1: autoramp1.png
autoramp1.png
Attachment 2: ievap2autoheat1.png
ievap2autoheat1.png
  23   Friday, May 18, 2012, 13:17 John WongSiC38481-2HP-SISDoneRe-condition the HP-SIS SiC target

Nikita Bernier wrote:

John Wong wrote:

Tuesday, May 15, 2012, 12:24

The HP-SIS SiC target was made on Nov 03, 2010.  The target consists of 405 discs, 18.5cm in length.  It was sintered in the Evaporator#1. 

This target is going into Evap#2 for re-conditioning.  It is currently being pumped down. 


 

Friday, May 18, 2012, 12:19 

The target is wrapped with only one heat shield.

Evaporator #2 Target Heater is now auto-ramping at 0.5 A/min, up to 820 A, with the maximum voltage limited at 2 V, between 2.00e-05 (Good vacuum) and 3.00e-05 Torr (Bad vacuum). Tube Heater is auto-ramping at 0.5 A/min, up to 230 A, with the maximum voltage limited at 1 V. See attachments.

 Friday, May 18, 2012, 13:15

Increased TBHT voltage to 5V, and TGHT to 15V.  Currently, TBHT =83A, 0.986V, TGHT= 144A, 1.65V, IGP1 = 5.2e-7 Torr, IGP2 = 4.3e-7 Torr. 

Continue ramping up... 


 Tuesday, May 22, 2012, 12:02

TGHT and TBHT were ramped up to 830A/13.65V (local), and 235A/3.85V, respectively.  The target was conditioned over the long weekend.  


 

  24   Tuesday, May 22, 2012, 12:15 Nikita BernierSiC38481-2HP-SISDoneRe-condition the HP-SIS SiC target

John Wong wrote:

Nikita Bernier wrote:

John Wong wrote:

Tuesday, May 15, 2012, 12:24

The HP-SIS SiC target was made on Nov 03, 2010.  The target consists of 405 discs, 18.5cm in length.  It was sintered in the Evaporator#1. 

This target is going into Evap#2 for re-conditioning.  It is currently being pumped down. 


 

Friday, May 18, 2012, 12:19 

The target is wrapped with only one heat shield.

Evaporator #2 Target Heater is now auto-ramping at 0.5 A/min, up to 820 A, with the maximum voltage limited at 2 V, between 2.00e-05 (Good vacuum) and 3.00e-05 Torr (Bad vacuum). Tube Heater is auto-ramping at 0.5 A/min, up to 230 A, with the maximum voltage limited at 1 V. See attachments.

 Friday, May 18, 2012, 13:15

Increased TBHT voltage to 5V, and TGHT to 15V.  Currently, TBHT =83A, 0.986V, TGHT= 144A, 1.65V, IGP1 = 5.2e-7 Torr, IGP2 = 4.3e-7 Torr. 

Continue ramping up... 


 Tuesday, May 22, 2012, 12:02

TGHT and TBHT were ramped up to 830A/13.65V (local), and 235A/3.85V, respectively.  The target was conditioned over the long weekend.  


 

 Tuesday, May 22, 2012, 12:13

Initiating the cool-down process at 5 A/min.

See archive plots of the Target Heater (Attachment 1) and the Tube Heater (Attachment 2).

Attachment 1: TGHT-VAC1.JPG
TGHT-VAC1.JPG
Attachment 2: TBHT-VAC1.JPG
TBHT-VAC1.JPG
  25   Tuesday, May 22, 2012, 15:26 John WongSiC38481-2HP-SISDoneRe-condition the HP-SIS SiC target

Nikita Bernier wrote:

John Wong wrote:

Nikita Bernier wrote:

John Wong wrote:

Tuesday, May 15, 2012, 12:24

The HP-SIS SiC target was made on Nov 03, 2010.  The target consists of 405 discs, 18.5cm in length.  It was sintered in the Evaporator#1. 

This target is going into Evap#2 for re-conditioning.  It is currently being pumped down. 


 

Friday, May 18, 2012, 12:19 

The target is wrapped with only one heat shield.

Evaporator #2 Target Heater is now auto-ramping at 0.5 A/min, up to 820 A, with the maximum voltage limited at 2 V, between 2.00e-05 (Good vacuum) and 3.00e-05 Torr (Bad vacuum). Tube Heater is auto-ramping at 0.5 A/min, up to 230 A, with the maximum voltage limited at 1 V. See attachments.

 Friday, May 18, 2012, 13:15

Increased TBHT voltage to 5V, and TGHT to 15V.  Currently, TBHT =83A, 0.986V, TGHT= 144A, 1.65V, IGP1 = 5.2e-7 Torr, IGP2 = 4.3e-7 Torr. 

Continue ramping up... 


 Tuesday, May 22, 2012, 12:02

TGHT and TBHT were ramped up to 830A/13.65V (local), and 235A/3.85V, respectively.  The target was conditioned over the long weekend.  


 

 Tuesday, May 22, 2012, 12:13

Initiating the cool-down process at 5 A/min.

See archive plots of the Target Heater (Attachment 1) and the Tube Heater (Attachment 2).

 Tuesday, May 22, 2012, 15:24

TGHT/TBHT were ramped down to 0A.  The target has cooled for about 45 min.  All pumps and chillers are off.  The chamber has been vented.


 

  30   Monday, June 11, 2012, 12:26 John WongSiC38481-2HP-SISProblemsEnd caps vaporized

John Wong wrote:

Nikita Bernier wrote:

John Wong wrote:

Nikita Bernier wrote:

John Wong wrote:

Tuesday, May 15, 2012, 12:24

The HP-SIS SiC target was made on Nov 03, 2010.  The target consists of 405 discs, 18.5cm in length.  It was sintered in the Evaporator#1. 

This target is going into Evap#2 for re-conditioning.  It is currently being pumped down. 


 

Friday, May 18, 2012, 12:19 

The target is wrapped with only one heat shield.

Evaporator #2 Target Heater is now auto-ramping at 0.5 A/min, up to 820 A, with the maximum voltage limited at 2 V, between 2.00e-05 (Good vacuum) and 3.00e-05 Torr (Bad vacuum). Tube Heater is auto-ramping at 0.5 A/min, up to 230 A, with the maximum voltage limited at 1 V. See attachments.

 Friday, May 18, 2012, 13:15

Increased TBHT voltage to 5V, and TGHT to 15V.  Currently, TBHT =83A, 0.986V, TGHT= 144A, 1.65V, IGP1 = 5.2e-7 Torr, IGP2 = 4.3e-7 Torr. 

Continue ramping up... 


 Tuesday, May 22, 2012, 12:02

TGHT and TBHT were ramped up to 830A/13.65V (local), and 235A/3.85V, respectively.  The target was conditioned over the long weekend.  


 

 Tuesday, May 22, 2012, 12:13

Initiating the cool-down process at 5 A/min.

See archive plots of the Target Heater (Attachment 1) and the Tube Heater (Attachment 2).

 Tuesday, May 22, 2012, 15:24

TGHT/TBHT were ramped down to 0A.  The target has cooled for about 45 min.  All pumps and chillers are off.  The chamber has been vented.


 

 Monday, June 11, 2012, 12:20

After the re-conditioning, the target's end-caps vaporized.  This is something happened before (see elog entries below):

https://elog.triumf.ca/TIS/Evaporator_1/20

https://elog.triumf.ca/TIS/Evaporator_1/22

The caps were removed and yellow crystals were observed. (see attachment#1).

The D-caps will be inserted in both ends and will be re-conditioned again to see if the yellow crystals can be removed at high temperature.


 

Attachment 1: Photo_2012-06-11_12_06_19_PM.jpg
Photo_2012-06-11_12_06_19_PM.jpg
  43   Tuesday, August 14, 2012, 15:57 John WongSiC38295-8 HP-FEBIADDoneTesting endcaps inserted /w the new expansion tool

Tuesday, August 14, 2012, 15:44

This SiC target was prepared in May 2011 with the Evaporator#1.  The target will not used for online. 

Two endcaps were inserted with the new expansion tool.  The target will be heated up to the normal operating condition (TGHT =580A, TBHT = 230A). 

The chamber is currently being pumped down. 


 Tuesday, August 14, 2012, 16:21

Earlier, the Cu-heat shield was removed from the evaporator to replace the insulators, so all the seals were placed with new ones.  However,

there seems to be some leaks after the HS cooling water is turned on.  (see attachment#1).

The TP off, and the chamber is vented for investigation.


 Tuesday, August 14, 2012, 17:25

All the 3 seals for the Cu-heat shield were replaced.  The chamber has been pumped down and the HS water valve is open.  No leaks are detected.


Tuesday, August 14, 2012, 17:29

Initiated auto-ramping at 2A/min for both TGHT and TBHT.

Parameter constraints: good vac @ 2.0e-5 Torr, bad vac @ 3.0e-5 Torr.

Currently, IG1 @ 6.5e-6 Torr.


 Wednesday, August 15, 2012, 09:52

TGHT and TBHT have reached to 520A and 230A, respectively, and have stayed at the currents for about 10 hours. (see attachment #2) 

IG is currently at 7.7e-7 Torr.  

Initiating auto-cool down at 2A/min. 


 Thursday, August 16, 2012, 11:23

Chamber is vented.


 

Attachment 1: vacuum_leaks.PNG
vacuum_leaks.PNG
Attachment 2: TGHT_TBHT.png
TGHT_TBHT.png
  439   Wednesday, April 17, 2019, 09:06 Marla Cervantes 38295-10LP-FEBIADDoneGraphite insert test

 Wednesday, April 17, 2019, 09:03

An uncoated target container was loaded with a graphite insert and wrapped with 3 tantalum layers,

Two Ta caps were used

EVAP2 was pumped down, IGP1 = 5.14e-7 Torr


 The TGHT and TBHT current was tapped to 40 A manually

Autoramp was set to TGHT 1A/min to 500 A

and TBHT 0.5A/min to 230 A.

The temperature reached 2000 C as planned 

the target container stayed at that temperature for 1 week.


Tuesday, April 23, 2019, 10:00

EVAP2 was vented and the target container was removed.


The container crystalized but did not break.

Attachment 1: 190417-TargetContainer-TEMP.pdf
190417-TargetContainer-TEMP.pdf
Attachment 2: IMG_1074.JPG
IMG_1074.JPG
  582   Tuesday, June 14, 2022, 09:04 Darwin Ortiz RosalesTa37978-1HP-FEBIADDoneTaC coating sintering

Tuesday, June 14, 2022, 08:47

Ta HP-FEBIAD was coated with TaC and wrapped with Ta heat-shields (3 layers)

Desired temperature = 1800 C , TBHT will be set fixed at 230A (max).

Evap 2 will be pumped down over previous night

OMEGA slope= 0.990

Good vacuum = 3.00 e-4 Torr

Bad vacuum = 5.00 e-2 Torr

IGP1= 1.2 e-06 Torr

Start autoramp @2A/min to 80 A then autoramp heat @1A/min to 150 A.  Then autoramp TGHT to 675A and TBHT to 230A.


Tuesday, June 14, 2022, 08:49

IGP1= 0.13 Torr

*had timed out and it was off.  I RST and turned back on.*

Will wait for the pressure to drop to start heating


 Tuesday, June 14, 2022, 09:36

IGP1= 9.4e-06 Torr

Start autoramp @2A/min to 80A


Tuesday, June 14, 2022, 11:27

IGP1= 8.7 e-06 Torr Trending down. 

TGHT= 146A, 1.6V

TBHT= 146A, 1.7V

Has been ramping at 1A/min

Change ramp rate to 2A/min to 700A on TGHT and 230A on TBHT


Tuesday, June 14, 2022, 14:48

Change final current on TGHT to 675A, according to plot.  May change again. 

Currently TGHT=  537A, 7.7V 

IGP1= 4.4e-06 Torr


Tuesday, June 14, 2022, 18:46

Top temperature was 1825 Celsius at TGHT = 675A

Will start rampdown at 8:00 pm

 


 Tuesday, June 14, 2022, 20:01

TGHT= 675A, 10.3 V

TBHT= 230A, 3V

OMEGA= 1815C

IGP1= 3.9e-06 Torr

ramping down @-2A/min TGHT and -1A/min TBHT

  584   Tuesday, June 21, 2022, 09:48 Darwin Ortiz RosalesSiC37978-1HP-FEBIADDoneT-220617 sintering

Tuesday, June 21, 2022, 09:43

Total number of foils: 377 ( including 6 analysis discs on the right side of the container)

Total weight = 1454 g (includes heatshields, spring and T bar)

Total length packed 15.5 cm (excluding 6 analysis discs that will be removed)

container has 3 Ta heat shields and is coated

No endcaps inserted to facilitate out-gassing

Ta coated spring at  front (right) side

Initially to ramp TGHT and TBHT to 80A at 2 A/min

then to 120A and slow down ramp when pressure begins to increase

max approx 675A on TGHT and 230A on TBHT (Omega slope set = 0.990)

Then temperature = 1800C

TBHT will be set fixed at 230 A (max).  TBHT heated manually and automatically to max.

Good vac at 3.00 e -4 Torr

Bad vac at 5.00 e-2 Torr

 IGP1=3.6 e-07 Torr at start of initial ramp.

 


Tuesday, June 21, 2022, 13:54

IGP1= 7.1 e-05 and dropping.  Start ramp to 150A for both TGHT and TBHT @1A/min


Tuesday, June 21, 2022, 21:27

Increased ramp rate to 3A/min for TGHT to 675A


Tuesday, June 21, 2022, 22:38

Ramp up to 685 A on TGHT and leave for 4 hours. 

OMEGA = 1645 C but suspect reading not on Ta surface.


Wednesday, June 22, 2022, 02:28

IGP1=7.7e-6 Torr

OMEGA =1610C

TGHT = 685A, 10.5V

TBHT = 230A, 3V

initiate rampdown at -2A/min and -1Amin TGHT and TBHT

  36   Thursday, July 19, 2012, 17:05 John WongEmpty37918-3LP-FEBIADDoneCoating target oven /w TaC & sintering for UCx#5

Thursday, July 19, 2012, 16:58

The target container was coated with TaC. 

It's wrapped with 3 layers of Ta as the heat-shield, including the backblock.

TGHT will be ramped up to 580A at 0.2A/min.

TBHT will be ramped up to 230A at 0.2A/min.

Currently, IGP1 = 1.5e-6 Torr.  BP = 15mTorr


 Friday, July 20, 2012, 13:56

TGHT and TBHT reached to 580A & 230A, respectively, and stayed for ~ 2hrs. 

Measured temperature at the ionizer tube to be 1630C.

Cooling down in process at 2A/min...


 Sunday, July 22, 2012, 20:53

The chamber was vented earlier around 14:00hr.  

The target container looks good! 


 

  660   Wednesday, May 01, 2024, 11:54 Darwin Ortiz RosalesTaC25447-27HP-SISDoneTaC coating sintering

Wednesday, May 01, 2024, 11:53

The coated container was wrapped in 4 Ta foil heatshields.

Vacuum IGP1 initial =8.1 e-06 Torr

Target temperature on OMEGA= 1850-1900 C

OMEGA slope:= 0.990

Target time at max temperature = 4 hours

Final Current TBHT= 230 A

Final TGHT current= ~500A (adjustable)

Heating autoramp starged at 3A/min(1A/30s) on  TGHT  100A

Then at 2A/min  to =400 A TGHT and 230A TBHT

Good vacuum = 5.0 e-04 Torr

Bad vacuum = 5.0E-02 Torr

 


Wednesday, May 01, 2024, 22:19

1830C reached at 670A. 10.0V TGHT

Start cooling after 4 hours. 

  429   Thursday, February 07, 2019, 15:20 Darwin Ortiz RosalesEmpty 43630-1 DoneTaC coating/sintering

Thursday, February 07, 2019, 14:12

Tantalum tube coated with TaC and wrapped with 3 layers of Ta heat-shielding.

Desired temperature= 1900 Celsius (expected TGHT ~445A/7.5V)

EVAP2 Currently pumped down, heating will be initiated tomorrow.


Friday, February 08, 2019, 08:46

Current pressure IGP1 = 3.46e-07 Torr

Manual tapping to 50A on TGHT

TGHT 47.43A, 0.26V

Waiting for pressure to stabilize.


Pressure was going down so current was increased manually to 65 A to induce the outgassing.

TGHT 73.9A, 0.67V

MAx pressure IGP1 = 4.41e-6 Torr

After approx 1 hour

TGHT = 0.70 V  74.1 A

IGP1 = 1.63 e-6 Torr

Autoramp was set to 2 A/min for final current of 350 A

 


 Friday, February 08, 2019, 13:43

Autoramp TGHT reached 350 A /5.47 V, current temperature at 1660 Celsius

IGP1 = 3.0e-06 Torr/coming down

Increase TGHT to 400 A autoramp at 2A/min


 Friday, February 08, 2019, 14:39

TGHT reached 413 A, 6.8 V, pressure at 1.9 e-06 Torr coming down

Continue to tap up TGHT to reach 1900 C


Friday, February 08, 2019, 14:56

TGHT manually increased to 428 A, 7.18V, pressure at 2.0e-06 Torr coming down slowly

Temperature at 1903 C

Will continue to heat at ~1900 C for four hours before cooling down


 Friday, February 08, 2019, 21:00

TGHT 7.21 V, 429.75 A, 1873 C

IGP1 6.77e-7 Torr

The heater ramp is set to -2 A/min to 0 A.

  559   Monday, October 25, 2021, 11:53 Darwin Ortiz RosalesTaC 42218-4HP-IG-LISDoneTaC coating/sintering

 Monday, October 25, 2021, 11:52

Ta IGLIS tube was coated with TaC and wrapped with Ta heat-shields (3 layers)

Desired temperature = 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).

Evap 2 will be pumped down over previous night

Good vacuum = 3.00 e-3 Torr

Bad vacuum = 5.00 e-2 Torr

Initial total weight = 439.0 g

Final weight after sintering = 438.8 g


Tuesday, October 26, 2021, 07:18 

IGP1= 9.2 e-07 Torr

Will ramp to 50A at 1A/min on both TGHT and TBHT.


Tuesday, October 26, 2021, 08:37 

IGP1= 3.0 e-05 Torr

TGHT= 50.2 A, 0.6 V

TBHT = 49.4 A, 0.5 V

Will allow pressure to drop further then start further ramp up


Tuesday, October 26, 2021, 14:36

TGHT =  100 A, 1.3 V

TBHT = 99 A, 1.0 V

IGP1 = 3.e-5 Torr

ramp up TGHT to 400 A and TBHT to 230 A at 1.5 A/ min


Tuesday, October 26, 2021, 18:46 

 Will keep at 430A on TGHT and 230A on TBHT for 4 hours.

OMEGA reading = 1653  C is suspicious based on previous coating.  


Tuesday, October 26, 2021, 23:05

TGHT = 430.5 A, 6.9 V

TBHT = 232.09A, 2.8 V

IGP1= 8.8e-06 Torr

Start cooling THGT at -2A/min and TBHT at -1A/min 

  1   Monday, March 28, 2011, 12:40 John Wong    Under Construction

Evaporator #2 is still under construction.  For further information please contact Jens Lassen.

  2   Thursday, July 21, 2011, 17:33 Pierre Bricault   Maintenance 
Rick mentioned to me that the evaporator is ready for the next steps of the commissioning process.
In the chamber only the target leg heaters have current by-pass clamps on them. 
The ionizer tube heaters do not have them because these lines do not have the same configuration as the others. The current by-pass clamps will 
not fit these lines.

We may not need this for the commissioning, Rick will design and manufacture something  for this when I get back from holiday.

The water is on in all circuits except for the power supply cooling circuit.

Pierre
  3   Monday, February 13, 2012, 16:24 John Wong   DoneEvaporator #2 Commissioned

 Monday, February 13, 2012, 16:21

The Evaporator 2 is now commissioned.  See attachment#1 for the commissioning report or refer to Document #43321.  

Attachment 1: Evap2_Commissioning_Report.PDF
Evap2_Commissioning_Report.PDF Evap2_Commissioning_Report.PDF Evap2_Commissioning_Report.PDF Evap2_Commissioning_Report.PDF