77
|
Monday, June 17, 2013, 16:59 |
Laura Lambert | SiC | 38481-6 | HP-FEBIAD | Done | Sintering of SiC #29 | Monday, June 17, 2013, 16:57
Target is loaded with 510 SiC discs
Container was previously coated with TaC and sintered
SiC is wrapped with tantalum heat shield
Chamber is currently being pumped down

|
78
|
Tuesday, June 18, 2013, 16:40 |
John Wong | SiC | 38481-6 | HP-FEBIAD | Done | Sintering of SiC #29 |
Laura Lambert wrote: |
Monday, June 17, 2013, 16:57
Target is loaded with 510 SiC discs
Container was previously coated with TaC and sintered
SiC is wrapped with tantalum heat shield
Chamber is currently being pumped down

|
Tuesday, June 18, 2013, 16:16
HS water valves opened; no leaks were detected.
IG @ 8.9e-7 Torr.
Note: This target has a regular end cap inserted on one end, and the other with a D-cap.
TGHT will be heated up to 820A and TBHT to 300A; ramping rate at 1A/min.
Stepped up TGHT/TBHT to 60A. Vacuum slowly increasing...
Tuesday, June 18, 2013, 17:55
Stepped up TGHT/TBTH to 80A. 10 mins later, pressure went beyond the limit and tripped of the p/s. F! 
Allowed vacuum to come down below 8e-5 Torr. Stepped down TGHT/TBHT to 50A.
Currently IG @ 4.8-5 Torr.
Initiated auto-ramping: setting: Good Vac = 3e-5 Torr, Bad Vac = 4.0e-5 Torr.
Thursday, June 20, 2013, 06:21
About 10 min ago, Evap tripped off due to high vacuum.
Vacuum came back down below the trip limit and both TGHT/TBHT p/s were stepped down to 40A and turned back on.
Changed auto ramping rate to 05A/120min.
The process continues... (And I'm going back to sleep!)
Friday, June 21, 2013, 15:19
Vacuum is close to the trip limit.
Change the ramping rate to 0.2A/120min.
Monday, June 24, 2013, 17:04
Organic burnt out is complete and vacuum has come down to ~9.0e-6 Torr.
Increase ramping rate to 0.2A/60min - The sintering process should take about another 2 days if everything goes smoothly.
Wednesday, June 26, 2013, 17:29
TGHT & TBHT have reached to 820A and 300A, respectively, for 4 hours.
Vacuum is at 9e-7 Torr.
Cooling down is in progress, at a rate of 1.0A/min for TGHT and 0.5A/min for TBHT.
The target will be ready to come out by tomorrow.
Thursday, June 27, 2013, 11:02
TGHT/TBHT reached to 0A. Vacuum is leveled at 1.2e-7 Torr.
Chamber will be vented in air soon.
|
71
|
Tuesday, April 30, 2013, 11:20 |
Anders Mjos | Empty | 38481-5 | HP-FEBIAD | Done | CTL thermal test | CTL block on T/C F/T Ch 1
Supply on Ch 3
HS Return on Ch 4
Tuesday, April 30, 2013, 11:20: Roughing
Tuesday, April 30, 2013, 11:45: Turbo started
Wednesday, May 01, 2013, 08:43: Cooling water opened. Vacuum stable at 5.1E-7 T (IGP1)
Wednesday, May 01, 2013, 08:48: Ramping TGHT and TBHT to 850A and 300A at 1A/60s
Thursday, May 02, 2013, 09:10: TGHT reached voltage limit (12V) at ~780A yesterday at ~10pm. Increased limit to 12.5V and continued auto ramping. CTL block temp ~80C
Thursday, May 02, 2013, 10:08: TGHT voltage limit changed to 13V. TGHT:RDCUR goes to ~810A with TGHT:RDVOL at 12.5V. CTL block temp ~80C
Thursday, May 02, 2013, 11:33: TGHT manually stepped to 850A RDCUR at 846A, RDVOL at 13.1V. CTL block temp ~84C
Thursday, May 02, 2013, 15:13: Ramping down TGHT and TBHT to 580A and 280A at 2A/min and 1A/min
Friday, May 03, 2013, 08:30: TGHT and TBHT at 580A and 280A. CTL block temp ~60C
Friday, May 03, 2013, 08:37: Ramping down TGHT and TBHT to 0 at 2/min and 1A/min
Friday, May 03, 2013, 11:04: T/C logger removed
Monday, May 06, 2013, 09:37: Turbo stopped.
Monday, May 06, 2013, 10:26: Venting |
Attachment 1: StripTool_2013-05-02.png
|
|
Attachment 2: CTL_ITD0431_Evap2.pdf
|
|
Attachment 3: 2013-04-30_Evap2_ITD0431_CTL_Thermal_Test.pdf
|
|
60
|
Wednesday, March 06, 2013, 10:41 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL thermal test | Wednesday, March 06, 2013
The Cool Transfer Line (CTL) test target is installed for thermal tests. Drawing number is ITD0431 REV A.
Thermocouple channels are as follows:
T1: Cu block on CTL
T2: Heat Shield above CTL
T3: Heat Shield cooling water Supply
T4: Heat Shield cooling water Return
Cooling water is in Evap2 supplied to the cooling line that goes directly to the area on the Heat Shield above the CTL.
Test results attached.
|
Attachment 1: CTL_1st_Assebmly_Thermal_Test_Evap2.pdf
|
|
Attachment 2: 2013-03-08_Evap2_First_Thermal_Test.pdf
|
|
61
|
Wednesday, March 06, 2013, 17:53 |
John Wong | Empty | 38481-4 | HP-FEBIAD | Done | CTL thermal test |
Anders Mjos wrote: |
Wednesday, March 06, 2013
The Cool Transfer Line (CTL) test target is installed for thermal tests. Drawing number is ITD0431 REV A.
Thermocouple channels are as follows:
T1: Cu block on CTL
T2: Heat Shield above CTL
T3: Heat Shield cooling water Supply
T4: Heat Shield cooling water Return
Cooling water is in Evap2 supplied to the cooling line that goes directly to the area on the Heat Shield above the CTL.
|
Wednesday, March 06, 2013, 17:23
The target has been pumping down to 5.3 e-7 Torr. On the RGA mass scan, mainly H2O (mass 18 + constituents) was detected at ~2.7pA (see attachment #1).
The target will be heated up: TGHT = 850A (rate @ 1A/min); TBHT = 300A (rate @ 1A/min).
Thursday, March 07, 2013, 11:51
TGHT and TBHT reached to 850A (local, 845A\13.80V) and 300A, respectively. The out gassing of CO (mass 28) reached to ~5pA at the max currents. (see attachment #2)
TBHT will be ramped down to 0A to compare the temperatures.
Thursday, March 07, 2013, 15:55
TBHT at 0A. See attachment#3 for the temperatures and RGA data before further ramping down the TGHT.
|
Attachment 1: rampingup_1.PNG
|
|
Attachment 2: rampingup_2.PNG
|
|
Attachment 3: autorampingdown_23.PNG
|
|
62
|
Monday, March 11, 2013, 12:23 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL thermal test 2 |
Anders Mjos wrote: |
Wednesday, March 06, 2013
The Cool Transfer Line (CTL) test target is installed for thermal tests. Drawing number is ITD0431 REV A.
Thermocouple channels are as follows:
T1: Cu block on CTL
T2: Heat Shield above CTL
T3: Heat Shield cooling water Supply
T4: Heat Shield cooling water Return
Cooling water is in Evap2 supplied to the cooling line that goes directly to the area on the Heat Shield above the CTL.
|
Monday, March 11, 2013
The CTL test target was installed again for a second thermal test. CTL block fastened to HS with 1 in lbs. A small piece of Ta-foil of 0.001" thickness was used between the CTL Cu-block and the Ta transfer line to reduce the heat transfer..
Thermocouples were re-attached to CTL and Heat Shield (see above for channels #s).
See attached graph (PDF) for details. |
Attachment 1: 2013-03-11_Evap2_Second_Thermal_Test.pdf
|
|
63
|
Monday, March 11, 2013, 15:59 |
John Wong | Empty | 38481-4 | HP-FEBIAD | Done | CTL thermal test 2 |
Anders Mjos wrote: |
Anders Mjos wrote: |
Wednesday, March 06, 2013
The Cool Transfer Line (CTL) test target is installed for thermal tests. Drawing number is ITD0431 REV A.
Thermocouple channels are as follows:
T1: Cu block on CTL
T2: Heat Shield above CTL
T3: Heat Shield cooling water Supply
T4: Heat Shield cooling water Return
Cooling water is in Evap2 supplied to the cooling line that goes directly to the area on the Heat Shield above the CTL.
|
Monday, March 11, 2013
The CTL test target was installed again for a second thermal test. CTL block fastened to HS with 1 in lbs. A small piece of Ta-foil of 0.001" thickness was used between the CTL Cu-block and the Ta transfer line to reduce the heat transfer..
Thermocouples were re-attached to CTL and Heat Shield (see above for channels #s).
|
Monday, March 11, 2013, 15:55
Chamber was pumped down to 2 e-7 Torr. HS water valve opened and no leaks were detected.
TGHT and TBHT are ramping up to 850A and 300A at 2A/min, respectively.
RGA is running...
Tuesday, March 12, 2013, 10:44
TGHT/TBHT reached to max currents.
See attachment #1 for temperature and RGA measurements.
Cooling down in process... 5A/min.
|
Attachment 1: autorampingup_110.PNG
|
|
64
|
Wednesday, March 13, 2013, 16:08 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | Thermal test | Wednesday, March 13, 2013
Thermocouple channels (see attached PDF for photos)
T1 - Left target leg at tube
T2 - Between cooling fins close to tube, left side
T3 - Supply water HS
T4 - Return water HS
Friday, March 22, 2013
Test not conducted. Target removed. |
Attachment 1: HP-FEBIAD-A_TC_at_fins.pdf
|
|
65
|
Thursday, March 14, 2013, 12:27 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL thermal test 3 (w/o CTL block) | Thursday, March 12, 2013
The CTL was removed and target heated to 580A / 300A
T1: Left target leg close to tube
T2: Heat Shield above CTL
T3: Heat Shield cooling water Supply
T4: Heat Shield cooling water Return
Thursday, March 13, 2013
The target was cooled down
Results attached as PDF and Excel |
Attachment 1: 2013-03-13_-_FEBIAD-HP-A_TargetLeg_and_HeatShield_TC.pdf
|
|
Attachment 2: 2013-03-13_-_FEBIAD-HP-A_TargetLeg_and_HeatShield_TC.xlsx
|
68
|
Friday, April 19, 2013, 15:27 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL test | Target installed with 4 T/C
The target assembly is ITD0300 with the CTL Cu cooling block slightly modified.
Ch1 - CTL cooling block T/C feedtrough
Ch2 - Heat shield below left gripper arm - T/C feedthrough
Ch3 - Heat shield below left gripper arm - 9 pin connector
Ch4 - Target left side leg on tube - 9 pin connector
Friday, April 19, 2013, 15:23: Roughing
Friday, April 19, 2013, 15:41: Started turbo
Monday, April 22, 2013, 09:43: Opened water supply. Vacuum stable at 2.8E-7 T (IGP1) |
69
|
Monday, April 22, 2013, 18:49 |
John Wong | Empty | 38481-4 | HP-FEBIAD | Done | CTL test |
Anders Mjos wrote: |
Target installed with 4 T/C
The target assembly is ITD0300 with the CTL Cu cooling block slightly modified.
Ch1 - CTL cooling block T/C feedtrough
Ch2 - Heat shield below left gripper arm - T/C feedthrough
Ch3 - Heat shield below left gripper arm - 9 pin connector
Ch4 - Target left side leg on tube - 9 pin connector
Friday, April 19, 2013, 15:23: Roughing
Friday, April 19, 2013, 15:41: Started turbo
Monday, April 22, 2013, 09:43: Opened water supply. Vacuum stable at 2.8E-7 T (IGP1)
|
Monday, April 22, 2013, 18:48
Ramping TGHT/TBHT to 850A/300A at 1A/min.
|
70
|
Tuesday, April 23, 2013, 10:11 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL test |
John Wong wrote: |
Anders Mjos wrote: |
Target installed with 4 T/C
The target assembly is ITD0300 with the CTL Cu cooling block slightly modified.
Ch1 - CTL cooling block T/C feedtrough
Ch2 - Heat shield below left gripper arm - T/C feedthrough
Ch3 - Heat shield below left gripper arm - 9 pin connector
Ch4 - Target left side leg on tube - 9 pin connector
Friday, April 19, 2013, 15:23: Roughing
Friday, April 19, 2013, 15:41: Started turbo
Monday, April 22, 2013, 09:43: Opened water supply. Vacuum stable at 2.8E-7 T (IGP1)
|
Monday, April 22, 2013, 18:48
Ramping TGHT/TBHT to 850A/300A at 1A/min.
|
Tuesd ay, April 23, 2013, 10:07
TBHT / TGHT: 820A / 300A
TGHT:RDCUR: 816.6A
TBHT:RDCRU: 303.5A
Local P/S displays
TGHT: 821A / 11.05V
TBHT: 307A / 4.37V
Tuesday, April 23, 2013, 10:45: Ramping down TBHT to 0A @ 5A/min
Tuesday, April 23, 2013, 12:49: Ramping down TGHT to 0A @ 5A/min
Tuesday, April 23, 2013, 15:52: Swithced off TGHT and TBHT P/S. TGHT P/S showed 30A read back value, while local value was 0A
Wednesday, April 24, 2013, 09:53: Turbo stopped
Wednesday, April 24, 2013, 12:00: Target removed
The ionizer tube was found to have deformed as seen in the attached photo. |
Attachment 1: 2013-04-23_Evap2_ITD0300_CTL_Thermal_Test.xlsx
|
Attachment 2: CTL_ITD0300_Evap2.pdf
|
|
Attachment 3: Deformed_Ionizer_Tube.jpg
|
|
17
|
Tuesday, May 15, 2012, 12:26 |
John Wong | SiC | 38481-2 | HP-SIS | Done | Re-condition the HP-SIS SiC target | Tuesday, May 15, 2012, 12:24
The HP-SIS SiC target was made on Nov 03, 2010. The target consists of 405 discs, 18.5cm in length. It was sintered in the Evaporator#1.
This target is going into Evap#2 for re-conditioning. It is currently being pumped down.
|
22
|
Friday, May 18, 2012, 12:19 |
Nikita Bernier | SiC | 38481-2 | HP-SIS | Done | Re-condition the HP-SIS SiC target |
John Wong wrote: |
Tuesday, May 15, 2012, 12:24
The HP-SIS SiC target was made on Nov 03, 2010. The target consists of 405 discs, 18.5cm in length. It was sintered in the Evaporator#1.
This target is going into Evap#2 for re-conditioning. It is currently being pumped down.
|
Friday, May 18, 2012, 12:19
The target is wrapped with only one heat shield.
Evaporator #2 Target Heater is now auto-ramping at 0.5 A/min, up to 820 A, with the maximum voltage limited at 2 V, between 2.00e-05 (Good vacuum) and 3.00e-05 Torr (Bad vacuum). Tube Heater is auto-ramping at 0.5 A/min, up to 230 A, with the maximum voltage limited at 1 V. See attachments.
|
Attachment 1: autoramp1.png
|
|
Attachment 2: ievap2autoheat1.png
|
|
23
|
Friday, May 18, 2012, 13:17 |
John Wong | SiC | 38481-2 | HP-SIS | Done | Re-condition the HP-SIS SiC target |
Nikita Bernier wrote: |
John Wong wrote: |
Tuesday, May 15, 2012, 12:24
The HP-SIS SiC target was made on Nov 03, 2010. The target consists of 405 discs, 18.5cm in length. It was sintered in the Evaporator#1.
This target is going into Evap#2 for re-conditioning. It is currently being pumped down.
|
Friday, May 18, 2012, 12:19
The target is wrapped with only one heat shield.
Evaporator #2 Target Heater is now auto-ramping at 0.5 A/min, up to 820 A, with the maximum voltage limited at 2 V, between 2.00e-05 (Good vacuum) and 3.00e-05 Torr (Bad vacuum). Tube Heater is auto-ramping at 0.5 A/min, up to 230 A, with the maximum voltage limited at 1 V. See attachments.
|
Friday, May 18, 2012, 13:15
Increased TBHT voltage to 5V, and TGHT to 15V. Currently, TBHT =83A, 0.986V, TGHT= 144A, 1.65V, IGP1 = 5.2e-7 Torr, IGP2 = 4.3e-7 Torr.
Continue ramping up...
Tuesday, May 22, 2012, 12:02
TGHT and TBHT were ramped up to 830A/13.65V (local), and 235A/3.85V, respectively. The target was conditioned over the long weekend.
|
24
|
Tuesday, May 22, 2012, 12:15 |
Nikita Bernier | SiC | 38481-2 | HP-SIS | Done | Re-condition the HP-SIS SiC target |
John Wong wrote: |
Nikita Bernier wrote: |
John Wong wrote: |
Tuesday, May 15, 2012, 12:24
The HP-SIS SiC target was made on Nov 03, 2010. The target consists of 405 discs, 18.5cm in length. It was sintered in the Evaporator#1.
This target is going into Evap#2 for re-conditioning. It is currently being pumped down.
|
Friday, May 18, 2012, 12:19
The target is wrapped with only one heat shield.
Evaporator #2 Target Heater is now auto-ramping at 0.5 A/min, up to 820 A, with the maximum voltage limited at 2 V, between 2.00e-05 (Good vacuum) and 3.00e-05 Torr (Bad vacuum). Tube Heater is auto-ramping at 0.5 A/min, up to 230 A, with the maximum voltage limited at 1 V. See attachments.
|
Friday, May 18, 2012, 13:15
Increased TBHT voltage to 5V, and TGHT to 15V. Currently, TBHT =83A, 0.986V, TGHT= 144A, 1.65V, IGP1 = 5.2e-7 Torr, IGP2 = 4.3e-7 Torr.
Continue ramping up...
Tuesday, May 22, 2012, 12:02
TGHT and TBHT were ramped up to 830A/13.65V (local), and 235A/3.85V, respectively. The target was conditioned over the long weekend.
|
Tuesday, May 22, 2012, 12:13
Initiating the cool-down process at 5 A/min.
See archive plots of the Target Heater (Attachment 1) and the Tube Heater (Attachment 2). |
Attachment 1: TGHT-VAC1.JPG
|
|
Attachment 2: TBHT-VAC1.JPG
|
|
25
|
Tuesday, May 22, 2012, 15:26 |
John Wong | SiC | 38481-2 | HP-SIS | Done | Re-condition the HP-SIS SiC target |
Nikita Bernier wrote: |
John Wong wrote: |
Nikita Bernier wrote: |
John Wong wrote: |
Tuesday, May 15, 2012, 12:24
The HP-SIS SiC target was made on Nov 03, 2010. The target consists of 405 discs, 18.5cm in length. It was sintered in the Evaporator#1.
This target is going into Evap#2 for re-conditioning. It is currently being pumped down.
|
Friday, May 18, 2012, 12:19
The target is wrapped with only one heat shield.
Evaporator #2 Target Heater is now auto-ramping at 0.5 A/min, up to 820 A, with the maximum voltage limited at 2 V, between 2.00e-05 (Good vacuum) and 3.00e-05 Torr (Bad vacuum). Tube Heater is auto-ramping at 0.5 A/min, up to 230 A, with the maximum voltage limited at 1 V. See attachments.
|
Friday, May 18, 2012, 13:15
Increased TBHT voltage to 5V, and TGHT to 15V. Currently, TBHT =83A, 0.986V, TGHT= 144A, 1.65V, IGP1 = 5.2e-7 Torr, IGP2 = 4.3e-7 Torr.
Continue ramping up...
Tuesday, May 22, 2012, 12:02
TGHT and TBHT were ramped up to 830A/13.65V (local), and 235A/3.85V, respectively. The target was conditioned over the long weekend.
|
Tuesday, May 22, 2012, 12:13
Initiating the cool-down process at 5 A/min.
See archive plots of the Target Heater (Attachment 1) and the Tube Heater (Attachment 2).
|
Tuesday, May 22, 2012, 15:24
TGHT/TBHT were ramped down to 0A. The target has cooled for about 45 min. All pumps and chillers are off. The chamber has been vented.
|
30
|
Monday, June 11, 2012, 12:26 |
John Wong | SiC | 38481-2 | HP-SIS | Problems | End caps vaporized |
John Wong wrote: |
Nikita Bernier wrote: |
John Wong wrote: |
Nikita Bernier wrote: |
John Wong wrote: |
Tuesday, May 15, 2012, 12:24
The HP-SIS SiC target was made on Nov 03, 2010. The target consists of 405 discs, 18.5cm in length. It was sintered in the Evaporator#1.
This target is going into Evap#2 for re-conditioning. It is currently being pumped down.
|
Friday, May 18, 2012, 12:19
The target is wrapped with only one heat shield.
Evaporator #2 Target Heater is now auto-ramping at 0.5 A/min, up to 820 A, with the maximum voltage limited at 2 V, between 2.00e-05 (Good vacuum) and 3.00e-05 Torr (Bad vacuum). Tube Heater is auto-ramping at 0.5 A/min, up to 230 A, with the maximum voltage limited at 1 V. See attachments.
|
Friday, May 18, 2012, 13:15
Increased TBHT voltage to 5V, and TGHT to 15V. Currently, TBHT =83A, 0.986V, TGHT= 144A, 1.65V, IGP1 = 5.2e-7 Torr, IGP2 = 4.3e-7 Torr.
Continue ramping up...
Tuesday, May 22, 2012, 12:02
TGHT and TBHT were ramped up to 830A/13.65V (local), and 235A/3.85V, respectively. The target was conditioned over the long weekend.
|
Tuesday, May 22, 2012, 12:13
Initiating the cool-down process at 5 A/min.
See archive plots of the Target Heater (Attachment 1) and the Tube Heater (Attachment 2).
|
Tuesday, May 22, 2012, 15:24
TGHT/TBHT were ramped down to 0A. The target has cooled for about 45 min. All pumps and chillers are off. The chamber has been vented.
|
Monday, June 11, 2012, 12:20
After the re-conditioning, the target's end-caps vaporized. This is something happened before (see elog entries below):
https://elog.triumf.ca/TIS/Evaporator_1/20
https://elog.triumf.ca/TIS/Evaporator_1/22
The caps were removed and yellow crystals were observed. (see attachment#1).
The D-caps will be inserted in both ends and will be re-conditioned again to see if the yellow crystals can be removed at high temperature.
|
Attachment 1: Photo_2012-06-11_12_06_19_PM.jpg
|
|
43
|
Tuesday, August 14, 2012, 15:57 |
John Wong | SiC | 38295-8 | HP-FEBIAD | Done | Testing endcaps inserted /w the new expansion tool | Tuesday, August 14, 2012, 15:44
This SiC target was prepared in May 2011 with the Evaporator#1. The target will not used for online.
Two endcaps were inserted with the new expansion tool. The target will be heated up to the normal operating condition (TGHT =580A, TBHT = 230A).
The chamber is currently being pumped down.
Tuesday, August 14, 2012, 16:21
Earlier, the Cu-heat shield was removed from the evaporator to replace the insulators, so all the seals were placed with new ones. However,
there seems to be some leaks after the HS cooling water is turned on. (see attachment#1).
The TP off, and the chamber is vented for investigation.
Tuesday, August 14, 2012, 17:25
All the 3 seals for the Cu-heat shield were replaced. The chamber has been pumped down and the HS water valve is open. No leaks are detected.
Tuesday, August 14, 2012, 17:29
Initiated auto-ramping at 2A/min for both TGHT and TBHT.
Parameter constraints: good vac @ 2.0e-5 Torr, bad vac @ 3.0e-5 Torr.
Currently, IG1 @ 6.5e-6 Torr.
Wednesday, August 15, 2012, 09:52
TGHT and TBHT have reached to 520A and 230A, respectively, and have stayed at the currents for about 10 hours. (see attachment #2)
IG is currently at 7.7e-7 Torr.
Initiating auto-cool down at 2A/min.
Thursday, August 16, 2012, 11:23
Chamber is vented.
|
Attachment 1: vacuum_leaks.PNG
|
|
Attachment 2: TGHT_TBHT.png
|
|
439
|
Wednesday, April 17, 2019, 09:06 |
Marla Cervantes | | 38295-10 | LP-FEBIAD | Done | Graphite insert test | Wednesday, April 17, 2019, 09:03
An uncoated target container was loaded with a graphite insert and wrapped with 3 tantalum layers,
Two Ta caps were used
EVAP2 was pumped down, IGP1 = 5.14e-7 Torr
The TGHT and TBHT current was tapped to 40 A manually
Autoramp was set to TGHT 1A/min to 500 A
and TBHT 0.5A/min to 230 A.
The temperature reached 2000 C as planned
the target container stayed at that temperature for 1 week.
Tuesday, April 23, 2019, 10:00
EVAP2 was vented and the target container was removed.
The container crystalized but did not break. |
Attachment 1: 190417-TargetContainer-TEMP.pdf
|
|
Attachment 2: IMG_1074.JPG
|
|
|