Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 23 of 34  Not logged in ELOG logo
  ID Date Author Target Material Target Oven W.O# Source Statusdown Subject Text Attachments
  408   Tuesday, May 01, 2018, 18:07 John Wongnp-SiCTube container DoneNanoSiC thermal treatment batch#1Tuesday, May 01, 2018, 18:06
21 fibrous discs of nanoSiC are loaded
into a tube container (coated/Sintered with
  
  409   Tuesday, May 08, 2018, 15:06 John Wongnp-SiCTube container  DoneNanoSiC thermal treatment batch#2Tuesday, May 08, 2018, 15:02
22 np-SiC fibrous discs loaded in
the tube container (coated and sintered with
  
  410   Wednesday, May 23, 2018, 15:21 Laura LambertEmpty HP-FEBIAD-CTLDoneSintering TaC coating container for UCx#23Wednesday, May 16, 2018, 09:56
Container coated with TaC using
  
  412   Thursday, June 21, 2018, 11:38 Aaron SchmidtTa42218-9HP-SISDoneConditioning Ta#56 Ta#56 HP-SIS target description:
 Ta#56_Evap_2_Conditioning.docx 
  413   Tuesday, July 03, 2018, 17:05 John Wongnp-SiCTube container DoneNanoSiC thermal treatment batch #3Tuesday, July 03, 2018, 17:02
49 discs/ 15.42g np-SiC fibrous discs
loaded into the tube container
 data-retrieval.JPG 
  414   Tuesday, July 10, 2018, 16:43 John WongEmpty LP-SISDoneFor nano-SiC#1 Tuesday, July 10, 2018, 16:40
Container was flashed with TaC solution
and let dry in air. 
  
  415   Wednesday, July 25, 2018, 17:33 John WongEmpty43044-2LP-SISDoneTaC coating/sintering for UCx#24Wednesday, July 25, 2018, 17:32
Container is coated with TaC and
wrapped with 3 layers of Ta heat-shields.
  
  416   Monday, August 20, 2018, 18:10 John Wongnp-SiC43044-1LP-SISDonenano-SiC final conditioningMonday, August 20, 2018, 17:58
14.9 g of np-SiC fibrous target discs
are loaded into the container (previously
  
  418   Monday, September 10, 2018, 15:09 Marla CervantesEmpty42218-3LP-IG-LISDoneTaC coating/sintering for UC target container  Monday, September 10, 2018, 15:09
Container is coated with TaC
 EVAP2-_01.JPGHeater-ramp.jpgPlot_400A-230A.jpgTempeature-at-400A.jpgTaC-coating.png 
  420   Thursday, October 25, 2018, 15:37 Marla CervantesTaC43044-7LP-SISDoneTaC coating/sintering for graphite insert test Thursday, October 25, 2018, 10:36
Container is coated with TaC
 181027-TaContainer-sintering.jpg 
  421   Wednesday, October 31, 2018, 19:35 Marla CervantesTaC39530-1LP-FEBIADDoneTaC coating/sintering for graphite insert test Wednesday, October 31, 2018, 19:35
Container is coated with TaC
 Capture.JPGCoating.jpg 
  422   Friday, November 02, 2018, 17:36 Marla CervantesEmpty39530-1LP-FEBIADDoneGraphite insert test #1 Friday, November 02, 2018, 17:33
A new LP-FEBIAD was coated and
  
  423   Monday, November 19, 2018, 12:57 Marla CervantesEmpty43630-7 DoneTaC coating/sintering for graphite insert test Monday, November 19, 2018, 08:57
Tantalum tube was coated with
 TaC-coatingPlot.JPG 
  424   Thursday, November 22, 2018, 10:19 Marla Cervantes 43630-7  DoneGraphite insert test #2 Thursday, November 22, 2018, 10:12
A previously sintered tantalum tube
with 3 layers of shielding was loaded with
  
  425   Thursday, December 20, 2018, 10:27 Marla Cervantes 43630-6 DoneTantalum tube heatingThursday, December 20, 2018, 10:24
A tantalum tube was
  
  426   Wednesday, January 16, 2019, 11:53 Marla CervantesTaC43630-2 DoneTaC coating/sintering for graphite insert test Tuesday, January 15,
2018, 17:30
  
  427   Friday, January 18, 2019, 15:11 Darwin Ortiz RosalesEmpty43044-5LP-SISDoneTaC coating/sintering (training/online use) Friday, January 18, 2019, 15:00
Container was coated with TaC and
wrapped with 3 Ta heat shields.
  
  428   Wednesday, January 23, 2019, 13:06 Marla Cervantes 43630-2 DoneGraphite insert test #3 Wednesday, January 23, 2019, 13:01
A previously coated tantalum
  
  429   Thursday, February 07, 2019, 15:20 Darwin Ortiz RosalesEmpty 43630-1 DoneTaC coating/sinteringThursday, February 07, 2019, 14:12
Tantalum tube coated with TaC and
wrapped with 3 layers of Ta heat-shielding.
  
  430   Wednesday, February 13, 2019, 10:08 Darwin Ortiz Rosales 43630-1  DoneGraphite insert test 3b Wednesday, February 13, 2019, 10:04
A previously coated tantalum
  
ELOG V2.9.2-2455