Thursday, November 05, 2015, 16:20, Laura Lambert, , 41077-3, LP-SIS, In progress, Sintering TaC coating on 'temporary endcaps' springs   
|
Thursday, November 05, 2015, 16:19
Springs coated with TaC and loaded into container for sintering.
3x Ta heat shield.
EVAP2 currently pumping down.
Friday, November 06, 2015, 08:39
Opened HS water valves, no leaks detected.
Tapped up manually to 35A.
IGP1 = 5.5e-7 Torr.
Friday, November 06, 2015, 10:08
IGP1 = 5.8e-7 Torr.
Vacuum stable.
Initiating auto-ramp at 0.2A/min and 0.1A/min with final setpoints of 450A and 230A for the TGHT and TBHT respectively.
See photos attached to view how springs were coated and loaded into container.
Monday, November 09, 2015, 09:07
TGHT reached 450A, 7.2V ~8pm sat, nov 7th.
OMEGA = 1775C
IGP1 = 3.2e-7 Torr.
Tapping up manually to 1900C.
|
Monday, November 09, 2015, 12:56, John Wong, , 41077-3, LP-SIS, In progress, Sintering TaC coating on 'temporary endcaps' springs (Slope changed to 1.04)
|
Laura Lambert wrote: |
Thursday, November 05, 2015, 16:19
Springs coated with TaC and loaded into container for sintering.
3x Ta heat shield.
EVAP2 currently pumping down.
Friday, November 06, 2015, 08:39
Opened HS water valves, no leaks detected.
Tapped up manually to 35A.
IGP1 = 5.5e-7 Torr.
Friday, November 06, 2015, 10:08
IGP1 = 5.8e-7 Torr.
Vacuum stable.
Initiating auto-ramp at 0.2A/min and 0.1A/min with final setpoints of 450A and 230A for the TGHT and TBHT respectively.
See photos attached to view how springs were coated and loaded into container.
Monday, November 09, 2015, 09:07
TGHT reached 450A, 7.2V ~8pm sat, nov 7th.
OMEGA = 1775C
IGP1 = 3.2e-7 Torr.
Tapping up manually to 1900C.
|
Monday, November 09, 2015, 12:30
Checked the temp on the inner surface (not at the spring) of the container was around 2050C at 500A.
The TaC coated spring is reading at 1900C; that's what the OMEGA is reading with the setting for 2-colors and slope at 0.98.
Lower TGHT to 450A/ 7.12V.
By comparing the data from the previous temp curve (OMEGA slope at 0.98) with no material inside the container, the voltage and current plot is aligned with the curve.
Changed OMEGA setting slope to 1.04. Current temp is reading at 1917C at 450A.
For 2-Color setting, the emissivity should be negligible. That makes me believe that different materials has different slope setting for the temp reading.
One thing to note is that, the sintering temp of TaC is around 1900-2000C. It was clear that the container was fully sintered with TGHT at 450A.
Will need to gather more data with different material to understand the slope setting better.
Try:
SiC at 1700C, slope at 1.04
ZrC at 1900C, slope at 104
Ta at 1900C, slope at 0.98.
Compare the data...
|
Monday, November 09, 2015, 14:22, Laura Lambert, , 41077-3, LP-SIS, Done, Sintering TaC coating on 'temporary endcaps' springs (Slope changed to 1.04)
|
John Wong wrote: |
Laura Lambert wrote: |
Thursday, November 05, 2015, 16:19
Springs coated with TaC and loaded into container for sintering.
3x Ta heat shield.
EVAP2 currently pumping down.
Friday, November 06, 2015, 08:39
Opened HS water valves, no leaks detected.
Tapped up manually to 35A.
IGP1 = 5.5e-7 Torr.
Friday, November 06, 2015, 10:08
IGP1 = 5.8e-7 Torr.
Vacuum stable.
Initiating auto-ramp at 0.2A/min and 0.1A/min with final setpoints of 450A and 230A for the TGHT and TBHT respectively.
See photos attached to view how springs were coated and loaded into container.
Monday, November 09, 2015, 09:07
TGHT reached 450A, 7.2V ~8pm sat, nov 7th.
OMEGA = 1775C
IGP1 = 3.2e-7 Torr.
Tapping up manually to 1900C.
|
Monday, November 09, 2015, 12:30
Checked the temp on the inner surface (not at the spring) of the container was around 2050C at 500A.
The TaC coated spring is reading at 1900C; that's what the OMEGA is reading with the setting for 2-colors and slope at 0.98.
Lower TGHT to 450A/ 7.12V.
By comparing the data from the previous temp curve (OMEGA slope at 0.98) with no material inside the container, the voltage and current plot is aligned with the curve.
Changed OMEGA setting slope to 1.04. Current temp is reading at 1917C at 450A.
For 2-Color setting, the emissivity should be negligible. That makes me believe that different materials has different slope setting for the temp reading.
One thing to note is that, the sintering temp of TaC is around 1900-2000C. It was clear that the container was fully sintered with TGHT at 450A.
Will need to gather more data with different material to understand the slope setting better.
Try:
SiC at 1700C, slope at 1.04
ZrC at 1900C, slope at 104
Ta at 1900C, slope at 0.98.
Compare the data...
|
Monday, November 09, 2015, 14:20
IGP1 = 3.3e-7 Torr.
TGHT = 450A, 7.12V
OMEGA = 1915C
Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Tuesday, November 10, 2015, 13:23
Vented and opened this morning.
springs look [mostly] sintered.
see photo attached.
|
Monday, November 02, 2015, 16:29, Laura Lambert, Empty, 41077-3, LP-SIS, Done, temp measurements with 3xTa h.s on LPSIS (small block) container 
|
Monday, November 02, 2015, 16:28
Container previously sintered with TaC coating and temperature measurements taken with 1x Ta heat shield [see elog ID# 256] and 2x Ta heat shield [see elog ID#257]
3x Ta heat shields on this container.
Loaded into evap2 and currently pumping down.
Tuesday, November 03, 2015, 10:37
HS water valves opened up this morning, no leaks detected.
Tapped up manually to 35A.
Vacuum stable.
IGP1 = 6.8e-7 Torr.
Initiating auto-ramp at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Final setpoints: 250A for the TGHT and 230A for the TBHT
Tuesday, November 03, 2015, 13:09
IGP1 = 7.7e-7 Torr
TGHT = 250A, 3.42V
TBHT = 185A, 3.0V
OMEGA = 1237C
Increasing ramping rate of TBHT to 2.0A/min.
Tuesday, November 03, 2015, 13:47
Reached final setpoints.
IGP1 = 8.7e-7 Torr.
Tapping up manually to 1900C
Tuesday, November 03, 2015, 15:45
Tapped up manually to 1900C
TGHT = 450A, 7.26V
IGP1 = 1.6e-6 Torr
Will remain at 450A overnight and ramp-down in the morning.
Wednesday, November 04, 2015, 10:00
TGHT remained at 450A for ~18hrs.
IGP1 = 6e-7 Torr.
OMEGA = 1908C
See attachment for raw data of temperature measurements and picture showing voltage movement at max setpoint.
Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Wednesday, November 04, 2015, 16:43
Vented and took out this afternoon.
Container looks good.
No visible changes to container compared to 2xTa heat shield temp measurements.
|
Monday, October 26, 2015, 16:17, Laura Lambert, Empty, 41077-3, LP-SIS, Done, temp measurements with 2xTa h.s on LPSIS (small block) container 6x
|
Monday, October 26, 2015, 16:16
Container previously sintered with TaC coating and temperature measurements taken with 1x Ta heat shield [see elog ID# 256]
2x Ta heat shields on this container.
Loaded into evap2 and currently pumping down.
Tuesday, October 27, 2015, 10:07
HS water valves opened up this morning, no leaks detected.
Tapped up manually to 35A.
Waited ~10min, vacuum stable
Initiating auto-ramp at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Final setpoints: 300A for the TGHT and 230A for the TBHT
Tuesday, October 27, 2015, 13:54
Reached final setpoints.
IGP1 = 5.3e-7 Torr.
Tapping up manually to 1900C
Tuesday, October 27, 2015, 16:42
Tapped up manually to 1900C
TGHT = 455A, 7.66V
IGP1 = 9e-7 Torr
Will remain at 455A overnight and ramp-down in the morning.
Wednesday, October 28, 2015, 09:32
TGHT remained at 455A for ~17hrs.
IGP1 = 4.3e-7 Torr.
OMEGA = 1888C
See attachment for raw data of temperature measurements.
Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Wednesday, October 28, 2015, 16:32
Vented and took out this afternoon.
Container looks good.
See photos attached.
|
Wednesday, October 21, 2015, 17:39, John Wong, Empty, 41077-3, LP-SIS, In progress, Sintering TaC on LPSIS (small block) container
|
Wednesday, October 21, 2015, 17:35
This container is prepared for a backup UCx target (otherwise it will be used for development purposes).
The container is coated with TaC; one layer of Ta-heat shield is used.
TGHT will be ramped up to reach 1900C (previous container had TGHT ramped up to 440A).
TBHT will be ramped up to max 230A.
Chamber is currently being pumped down.
Heating can begin once the vacuum is good, currently at 4.8e-5 Torr.
Friday, October 23, 2015, 16:15
TGHT reached to 500A and temp measured at 1940C. More about the temp plot can be found in the dropbox.
Initiated cooling down at 2A/min.
Target will be inspected next Monday.
|
Thursday, October 22, 2015, 11:41, Laura Lambert, Empty, 41077-3, LP-SIS, In progress, Sintering TaC on LPSIS (small block) container
|
John Wong wrote: |
Wednesday, October 21, 2015, 17:35
This container is prepared for a backup UCx target (otherwise it will be used for development purposes).
The container is coated with TaC; one layer of Ta-heat shield is used.
TGHT will be ramped up to reach 1900C (previous container had TGHT ramped up to 440A).
TBHT will be ramped up to max 230A.
Chamber is currently being pumped down.
Heating can begin once the vacuum is good, currently at 4.8e-5 Torr.
|
Thursday, October 22, 2015, 11:36
HS water valves opened, no leaks detected.
Tapped up manually to 35A.
Vacuum stabilized, initiated auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
Final setpoints TGHT = 300A, TBHT = 230A
IGP1 = 1.0e-6 Torr; TGHT = 45.18A, 0.17V; TBHT = 38.4A, 0.41V
|
Thursday, October 22, 2015, 17:10, John Wong, Empty, 41077-3, LP-SIS, In progress, Sintering TaC on LPSIS (small block) container
|
Laura Lambert wrote: |
John Wong wrote: |
Wednesday, October 21, 2015, 17:35
This container is prepared for a backup UCx target (otherwise it will be used for development purposes).
The container is coated with TaC; one layer of Ta-heat shield is used.
TGHT will be ramped up to reach 1900C (previous container had TGHT ramped up to 440A).
TBHT will be ramped up to max 230A.
Chamber is currently being pumped down.
Heating can begin once the vacuum is good, currently at 4.8e-5 Torr.
|
Thursday, October 22, 2015, 11:36
HS water valves opened, no leaks detected.
Tapped up manually to 35A.
Vacuum stabilized, initiated auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
Final setpoints TGHT = 300A, TBHT = 230A
IGP1 = 1.0e-6 Torr; TGHT = 45.18A, 0.17V; TBHT = 38.4A, 0.41V
|
Thursday, October 22, 2015, 17:09
Pressure coming down to 1.5e-6 Torr.
Increased ramping rate to 2A/min for both TGHT and TBHT.
|
Monday, October 26, 2015, 16:14, Laura Lambert, Empty, 41077-3, LP-SIS, Done, Sintering TaC on LPSIS (small block) container & temp measurements with 1xTa h.s
|
John Wong wrote: |
Laura Lambert wrote: |
John Wong wrote: |
Wednesday, October 21, 2015, 17:35
This container is prepared for a backup UCx target (otherwise it will be used for development purposes).
The container is coated with TaC; one layer of Ta-heat shield is used.
TGHT will be ramped up to reach 1900C (previous container had TGHT ramped up to 440A).
TBHT will be ramped up to max 230A.
Chamber is currently being pumped down.
Heating can begin once the vacuum is good, currently at 4.8e-5 Torr.
|
Thursday, October 22, 2015, 11:36
HS water valves opened, no leaks detected.
Tapped up manually to 35A.
Vacuum stabilized, initiated auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
Final setpoints TGHT = 300A, TBHT = 230A
IGP1 = 1.0e-6 Torr; TGHT = 45.18A, 0.17V; TBHT = 38.4A, 0.41V
|
Thursday, October 22, 2015, 17:09
Pressure coming down to 1.5e-6 Torr.
Increased ramping rate to 2A/min for both TGHT and TBHT.
|
Monday, October 26, 2015, 16:10
Target container was ramped down over the weekend and taken out today.
Coating looks good.
Will add on another Ta layer and continue with temperature measurements.
See attachment for raw data.
|
Tuesday, September 01, 2015, 17:20, John Wong, SiC, 39530-5, HP-FEBIAD, In progress, Sintering SiC#32
|
Tuesday, September 01, 2015, 17:16
Target container contains 533 discs of SiC with packed length of 17cm.
Mass of 533 discs SiC(green) = 57.8979g
Total mass SiC(green) + target container = 1455g
Container is wrapped with 3 heatshields; no end caps are inserted yet.
Sintering temp at 1800C - TGHT will be set accordingly. TBHT max at 230A.
Chamber is currently being pumped down.
|
Wednesday, September 02, 2015, 11:28, Laura Lambert, SiC, 39530-5, HP-FEBIAD, In progress, Sintering SiC#32
|
John Wong wrote: |
Tuesday, September 01, 2015, 17:16
Target container contains 533 discs of SiC with packed length of 17cm.
Mass of 533 discs SiC(green) = 57.8979g
Total mass SiC(green) + target container = 1455g
Container is wrapped with 3 heatshields; no end caps are inserted yet.
Sintering temp at 1800C - TGHT will be set accordingly. TBHT max at 230A.
Chamber is currently being pumped down.
|
Wednesday, September 02, 2015, 09:11
HS water valves opened, no leaks detected.
IGP1 = 1.15e-6 Torr
Tapped up manually to 40A.
Waited ~1hr40 for vacuum to stabilize.
IGP1 = 3.6e-6 Torr.
Max setpoints set to TGHT = 630A and TBHT = 230A, ~1400C
Initiating auto ramp at a rate of 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
Once max setpoints achieved, will tap up manually until window port becomes coated [as previously observed]
Once window port becomes coated will leave at set temp for ~4hrs to continue with outgassing, then cool down, clean window and ramp back up.
If LS port still clean, will continue to ramp up to final desired temperature of 1800C.
Wednesday, September 02, 2015, 14:23
IGP1 = 4.0e-5 Torr.
Vacuum too high, stopped auto-ramp and tapped down manually.
Dropped TGHT down from 80A to 50A
Dropped TBHT down from 55A to 50A
Wednesday, September 02, 2015, 15:29
Vacuum down to IGP1 = 1.2e-5 Torr.
Re-initiating auto-ramp...
Tuesday, September 08, 2015, 10:04
IGP1 = 4.5e-7 Torr.
TGHT = 630A, 9.6V
TBHT = 230A, 3.2V
DV = 0.22V
OMEGA RS = 1476C
OMEGA LS = 1450C
see attached photo for screenshot.
will tap up manually with a visual on both window ports...
|
Tuesday, September 08, 2015, 15:56, John Wong, SiC, 39530-5, HP-FEBIAD, In progress, Sintering SiC#32   
|
Laura Lambert wrote: |
John Wong wrote: |
Tuesday, September 01, 2015, 17:16
Target container contains 533 discs of SiC with packed length of 17cm.
Mass of 533 discs SiC(green) = 57.8979g
Total mass SiC(green) + target container = 1455g
Container is wrapped with 3 heatshields; no end caps are inserted yet.
Sintering temp at 1800C - TGHT will be set accordingly. TBHT max at 230A.
Chamber is currently being pumped down.
|
Wednesday, September 02, 2015, 09:11
HS water valves opened, no leaks detected.
IGP1 = 1.15e-6 Torr
Tapped up manually to 40A.
Waited ~1hr40 for vacuum to stabilize.
IGP1 = 3.6e-6 Torr.
Max setpoints set to TGHT = 630A and TBHT = 230A, ~1400C
Initiating auto ramp at a rate of 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
Once max setpoints achieved, will tap up manually until window port becomes coated [as previously observed]
Once window port becomes coated will leave at set temp for ~4hrs to continue with outgassing, then cool down, clean window and ramp back up.
If LS port still clean, will continue to ramp up to final desired temperature of 1800C.
Wednesday, September 02, 2015, 14:23
IGP1 = 4.0e-5 Torr.
Vacuum too high, stopped auto-ramp and tapped down manually.
Dropped TGHT down from 80A to 50A
Dropped TBHT down from 55A to 50A
Wednesday, September 02, 2015, 15:29
Vacuum down to IGP1 = 1.2e-5 Torr.
Re-initiating auto-ramp...
Tuesday, September 08, 2015, 10:04
IGP1 = 4.5e-7 Torr.
TGHT = 630A, 9.6V
TBHT = 230A, 3.2V
DV = 0.22V
OMEGA RS = 1476C
OMEGA LS = 1450C
see attached photo for screenshot.
will tap up manually with a visual on both window ports...
|
Tuesday, September 08, 2015, 15:44
TGHT has stepped up to 820A. Coating on both windows is becoming obvious and it's interfering the temp readers; however, the left window (see attachment, which is further away from the target) is lightly coated than the right. See attachment for The Temp (and Power) vs current plots.
Target will remained heated at the current and will be cooled down later today.
The target will be re-conditioned up to 820A and temp and mass will be re-measured.
Plans:
The chamber will be vented tomorrow and the target will be taken out to weigh for mass change.
The chamber windows will need to be clean.
A piece of Ta foil will be cover in front of the ionizer to trap any loss material (if any).
Tuesday, September 08, 2015, 17:37
TGHT was at 800A for 2 hours before ramping up 820A for another 2 hours heating. More coating on the right window is observed and temp reading came down to 1340C. The left window remains the same and temp reads at 1646C.
Ramping TGHT/TBHT to 0A at 2A/min and 1A/min, respectively.
Wednesday, September 09, 2015, 12:27
Result after the sintering process:
No yellow crystal formed (compared to previously observed SiC targets that heated up above 1900C).
Total green mass = 57.90g
mass of graphite foil = 0.035g x 533 discs = 18.7g
mass of green SiC = 39.30g
Target container with SiC before sintered = 1455g
Target container after sintered = 1450g
mass loss ~ 5.0g ~ 13% organic mass, as expected!
The target will undergo the re-condition stage, and the temperature will be measured from 600A to 820A.
|
Wednesday, September 09, 2015, 18:24, John Wong, SiC, 39530-5, HP-FEBIAD, In progress, Re-conditioning SiC#32
|
John Wong wrote: |
Laura Lambert wrote: |
John Wong wrote: |
Tuesday, September 01, 2015, 17:16
Target container contains 533 discs of SiC with packed length of 17cm.
Mass of 533 discs SiC(green) = 57.8979g
Total mass SiC(green) + target container = 1455g
Container is wrapped with 3 heatshields; no end caps are inserted yet.
Sintering temp at 1800C - TGHT will be set accordingly. TBHT max at 230A.
Chamber is currently being pumped down.
|
Wednesday, September 02, 2015, 09:11
HS water valves opened, no leaks detected.
IGP1 = 1.15e-6 Torr
Tapped up manually to 40A.
Waited ~1hr40 for vacuum to stabilize.
IGP1 = 3.6e-6 Torr.
Max setpoints set to TGHT = 630A and TBHT = 230A, ~1400C
Initiating auto ramp at a rate of 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
Once max setpoints achieved, will tap up manually until window port becomes coated [as previously observed]
Once window port becomes coated will leave at set temp for ~4hrs to continue with outgassing, then cool down, clean window and ramp back up.
If LS port still clean, will continue to ramp up to final desired temperature of 1800C.
Wednesday, September 02, 2015, 14:23
IGP1 = 4.0e-5 Torr.
Vacuum too high, stopped auto-ramp and tapped down manually.
Dropped TGHT down from 80A to 50A
Dropped TBHT down from 55A to 50A
Wednesday, September 02, 2015, 15:29
Vacuum down to IGP1 = 1.2e-5 Torr.
Re-initiating auto-ramp...
Tuesday, September 08, 2015, 10:04
IGP1 = 4.5e-7 Torr.
TGHT = 630A, 9.6V
TBHT = 230A, 3.2V
DV = 0.22V
OMEGA RS = 1476C
OMEGA LS = 1450C
see attached photo for screenshot.
will tap up manually with a visual on both window ports...
|
Tuesday, September 08, 2015, 15:44
TGHT has stepped up to 820A. Coating on both windows is becoming obvious and it's interfering the temp readers; however, the left window (see attachment, which is further away from the target) is lightly coated than the right. See attachment for The Temp (and Power) vs current plots.
Target will remained heated at the current and will be cooled down later today.
The target will be re-conditioned up to 820A and temp and mass will be re-measured.
Plans:
The chamber will be vented tomorrow and the target will be taken out to weigh for mass change.
The chamber windows will need to be clean.
A piece of Ta foil will be cover in front of the ionizer to trap any loss material (if any).
Tuesday, September 08, 2015, 17:37
TGHT was at 800A for 2 hours before ramping up 820A for another 2 hours heating. More coating on the right window is observed and temp reading came down to 1340C. The left window remains the same and temp reads at 1646C.
Ramping TGHT/TBHT to 0A at 2A/min and 1A/min, respectively.
Wednesday, September 09, 2015, 12:27
Result after the sintering process:
No yellow crystal formed (compared to previously observed SiC targets that heated up above 1900C).
Total green mass = 57.90g
mass of graphite foil = 0.035g x 533 discs = 18.7g
mass of green SiC = 39.30g
Target container with SiC before sintered = 1455g
Target container after sintered = 1450g
mass loss ~ 5.0g ~ 13% organic mass, as expected!
The target will undergo the re-condition stage, and the temperature will be measured from 600A to 820A.
|
Wednesday, September 09, 2015, 17:39
Both end-caps are inserted onto the targets. The total mass (Target, Sintered SiC, end caps, 4x 19"round graphite foils) = 1453g.
Target is wrapped with 3 layers of heat shields.
The extraction electrode is wrapped with Ta-foil (see attachment). This is to trap any lose particle, if any.
Chamber is currently being pumped down, currently at 1.2e-5 Torr.
|
Thursday, September 10, 2015, 09:58, Laura Lambert, SiC, 39530-5, HP-FEBIAD, In progress, Re-conditioning SiC#32
|
John Wong wrote: |
John Wong wrote: |
Laura Lambert wrote: |
John Wong wrote: |
Tuesday, September 01, 2015, 17:16
Target container contains 533 discs of SiC with packed length of 17cm.
Mass of 533 discs SiC(green) = 57.8979g
Total mass SiC(green) + target container = 1455g
Container is wrapped with 3 heatshields; no end caps are inserted yet.
Sintering temp at 1800C - TGHT will be set accordingly. TBHT max at 230A.
Chamber is currently being pumped down.
|
Wednesday, September 02, 2015, 09:11
HS water valves opened, no leaks detected.
IGP1 = 1.15e-6 Torr
Tapped up manually to 40A.
Waited ~1hr40 for vacuum to stabilize.
IGP1 = 3.6e-6 Torr.
Max setpoints set to TGHT = 630A and TBHT = 230A, ~1400C
Initiating auto ramp at a rate of 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
Once max setpoints achieved, will tap up manually until window port becomes coated [as previously observed]
Once window port becomes coated will leave at set temp for ~4hrs to continue with outgassing, then cool down, clean window and ramp back up.
If LS port still clean, will continue to ramp up to final desired temperature of 1800C.
Wednesday, September 02, 2015, 14:23
IGP1 = 4.0e-5 Torr.
Vacuum too high, stopped auto-ramp and tapped down manually.
Dropped TGHT down from 80A to 50A
Dropped TBHT down from 55A to 50A
Wednesday, September 02, 2015, 15:29
Vacuum down to IGP1 = 1.2e-5 Torr.
Re-initiating auto-ramp...
Tuesday, September 08, 2015, 10:04
IGP1 = 4.5e-7 Torr.
TGHT = 630A, 9.6V
TBHT = 230A, 3.2V
DV = 0.22V
OMEGA RS = 1476C
OMEGA LS = 1450C
see attached photo for screenshot.
will tap up manually with a visual on both window ports...
|
Tuesday, September 08, 2015, 15:44
TGHT has stepped up to 820A. Coating on both windows is becoming obvious and it's interfering the temp readers; however, the left window (see attachment, which is further away from the target) is lightly coated than the right. See attachment for The Temp (and Power) vs current plots.
Target will remained heated at the current and will be cooled down later today.
The target will be re-conditioned up to 820A and temp and mass will be re-measured.
Plans:
The chamber will be vented tomorrow and the target will be taken out to weigh for mass change.
The chamber windows will need to be clean.
A piece of Ta foil will be cover in front of the ionizer to trap any loss material (if any).
Tuesday, September 08, 2015, 17:37
TGHT was at 800A for 2 hours before ramping up 820A for another 2 hours heating. More coating on the right window is observed and temp reading came down to 1340C. The left window remains the same and temp reads at 1646C.
Ramping TGHT/TBHT to 0A at 2A/min and 1A/min, respectively.
Wednesday, September 09, 2015, 12:27
Result after the sintering process:
No yellow crystal formed (compared to previously observed SiC targets that heated up above 1900C).
Total green mass = 57.90g
mass of graphite foil = 0.035g x 533 discs = 18.7g
mass of green SiC = 39.30g
Target container with SiC before sintered = 1455g
Target container after sintered = 1450g
mass loss ~ 5.0g ~ 13% organic mass, as expected!
The target will undergo the re-condition stage, and the temperature will be measured from 600A to 820A.
|
Wednesday, September 09, 2015, 17:39
Both end-caps are inserted onto the targets. The total mass (Target, Sintered SiC, end caps, 4x 19"round graphite foils) = 1453g.
Target is wrapped with 3 layers of heat shields.
The extraction electrode is wrapped with Ta-foil (see attachment). This is to trap any lose particle, if any.
Chamber is currently being pumped down, currently at 1.2e-5 Torr.
|
Thursday, September 10, 2015, 09:55
HS water valves opened this morning, no leaks detected.
TGHT and TBHT tapped up manually to 35A.
IGP1 = 4.4e-7 Torr, vacuum stable.
Initiating auto-ramp at 1.0A/min and 0.5A/min for the TGHT and TBHT respectively with final setpoints of 600A and 230A.
|
Thursday, September 10, 2015, 12:05, John Wong, SiC, 39530-5, HP-FEBIAD, Done, Re-conditioning SiC#32  
|
Laura Lambert wrote: |
John Wong wrote: |
John Wong wrote: |
Laura Lambert wrote: |
John Wong wrote: |
Tuesday, September 01, 2015, 17:16
Target container contains 533 discs of SiC with packed length of 17cm.
Mass of 533 discs SiC(green) = 57.8979g
Total mass SiC(green) + target container = 1455g
Container is wrapped with 3 heatshields; no end caps are inserted yet.
Sintering temp at 1800C - TGHT will be set accordingly. TBHT max at 230A.
Chamber is currently being pumped down.
|
Wednesday, September 02, 2015, 09:11
HS water valves opened, no leaks detected.
IGP1 = 1.15e-6 Torr
Tapped up manually to 40A.
Waited ~1hr40 for vacuum to stabilize.
IGP1 = 3.6e-6 Torr.
Max setpoints set to TGHT = 630A and TBHT = 230A, ~1400C
Initiating auto ramp at a rate of 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
Once max setpoints achieved, will tap up manually until window port becomes coated [as previously observed]
Once window port becomes coated will leave at set temp for ~4hrs to continue with outgassing, then cool down, clean window and ramp back up.
If LS port still clean, will continue to ramp up to final desired temperature of 1800C.
Wednesday, September 02, 2015, 14:23
IGP1 = 4.0e-5 Torr.
Vacuum too high, stopped auto-ramp and tapped down manually.
Dropped TGHT down from 80A to 50A
Dropped TBHT down from 55A to 50A
Wednesday, September 02, 2015, 15:29
Vacuum down to IGP1 = 1.2e-5 Torr.
Re-initiating auto-ramp...
Tuesday, September 08, 2015, 10:04
IGP1 = 4.5e-7 Torr.
TGHT = 630A, 9.6V
TBHT = 230A, 3.2V
DV = 0.22V
OMEGA RS = 1476C
OMEGA LS = 1450C
see attached photo for screenshot.
will tap up manually with a visual on both window ports...
|
Tuesday, September 08, 2015, 15:44
TGHT has stepped up to 820A. Coating on both windows is becoming obvious and it's interfering the temp readers; however, the left window (see attachment, which is further away from the target) is lightly coated than the right. See attachment for The Temp (and Power) vs current plots.
Target will remained heated at the current and will be cooled down later today.
The target will be re-conditioned up to 820A and temp and mass will be re-measured.
Plans:
The chamber will be vented tomorrow and the target will be taken out to weigh for mass change.
The chamber windows will need to be clean.
A piece of Ta foil will be cover in front of the ionizer to trap any loss material (if any).
Tuesday, September 08, 2015, 17:37
TGHT was at 800A for 2 hours before ramping up 820A for another 2 hours heating. More coating on the right window is observed and temp reading came down to 1340C. The left window remains the same and temp reads at 1646C.
Ramping TGHT/TBHT to 0A at 2A/min and 1A/min, respectively.
Wednesday, September 09, 2015, 12:27
Result after the sintering process:
No yellow crystal formed (compared to previously observed SiC targets that heated up above 1900C).
Total green mass = 57.90g
mass of graphite foil = 0.035g x 533 discs = 18.7g
mass of green SiC = 39.30g
Target container with SiC before sintered = 1455g
Target container after sintered = 1450g
mass loss ~ 5.0g ~ 13% organic mass, as expected!
The target will undergo the re-condition stage, and the temperature will be measured from 600A to 820A.
|
Wednesday, September 09, 2015, 17:39
Both end-caps are inserted onto the targets. The total mass (Target, Sintered SiC, end caps, 4x 19"round graphite foils) = 1453g.
Target is wrapped with 3 layers of heat shields.
The extraction electrode is wrapped with Ta-foil (see attachment). This is to trap any lose particle, if any.
Chamber is currently being pumped down, currently at 1.2e-5 Torr.
|
Thursday, September 10, 2015, 09:55
HS water valves opened this morning, no leaks detected.
TGHT and TBHT tapped up manually to 35A.
IGP1 = 4.4e-7 Torr, vacuum stable.
Initiating auto-ramp at 1.0A/min and 0.5A/min for the TGHT and TBHT respectively with final setpoints of 600A and 230A.
|
Thursday, September 10, 2015, 12:05
Changed TGHT to 2A/min and TGHT remains at 1A/min. Vacuum is table at 1.0e-6 Torr.
Friday, September 11, 2015, 11:34
TGHT was at 600A for almost 20 hours. Vac at 5.2 e-7 Torr. L-temp at 1490C, R-temp at 1685 (odd?). Using pyrometer to measure - Right end does seem brighter than the L end.
Continue to ramp up TGHT. Date is collected, will be posted later.
Friday, September 11, 2015, 11:53
L/R-temp measurements just don't seem normal.
Ramped up to 220A- temp reads L = 1522C, R = 1722C.
Ramping down TBHT doesn't change the temp.
Will cool TGHT/TBHT to 0A at 2A/min & 1A/min, respectively.
Will vent the chamber on Monday and inspect for any wrong.
Monday, September 14, 2015, 12:13
The target has taken out for inspection. No visible damage/problem was observed. The Ta-foil for loss particle capture only showed some heat marking but no material was trapped.
Target was weighted, no mass loss was observed.
Try expending the end caps to get a good thermal conductivity and will re-conditiong again.
Tuesday, September 15, 2015, 12:31
The end caps have been expended.
New Ta foils are used for the heat shields. The foils are cut in 3 1/4" x 12" and wrapped around the target. (see attachment). This is to see if the heat is evenly distributed.
Both omega optical lens are aligned properly.
Target is installed but the chamber is NOT yet being pumped down. Awaiting for the fume hood work in B2 level to be complete before the evaporator can be started.
Wednesday, September 16, 2015, 17:57
The work in the B2 level is done; the nuclear ventilation for the evaporators is now operational.
Chamber is currently being pumped down.
Thursday, September 17, 2015, 12:19
Chamber has been pump down overnight and pressure is currently at 5.8e-7 Torr.
HS valves are opened and no leaks are detected.
Ramping up TGHT/TBHT to 600A at 2A/min and 230A at 1A/min, respectively.
Thursday, September 17, 2015, 17:58
TGHT has reached to 600A/9.14V. Both the L and R temperatures are measured at 1710C and 1760C, respectively. At 600A, the temperature now is about 300C higher compared to that during the sintering process.
The difference in the temperature could be from Ta surface vs SiC surface. (But the 2-color IR temp reader shouldn't matter what color it's measuring?!! I don't know!)
Note:
Both temperature readings are fairly close. Could this be improved from the new Ta-foils? Possible!
It is still unclear what is the absolute temperature. A more systematic student needs to be done.
Using a thermocouple couple to measurement the endcaps at 600A and compared with the Omage reader may help to understand more.
After discussing with Friedhelm, it is decided to stay the target at 600A for the conditioning process.
Friday, September 18, 2015, 09:10
Target has been heated at 600A at stable temperature at 1716C (LS) and 1769C (RS), see attachment.
Friday, September 18, 2015, 11:45
Initiated cooling down at 2A/min for TGHT, and 1A/min TBHT.
Currently vac at 5.48e-7 Torr.
Thursday, September 24, 2015, 11:31
Target was inspected after the 2nd conditioning, up to 1700C at 600A for overnight.
No solid particle was observed that might have extracted from the ionizer tube.
The heat shields have been removed and the target is ready for assembly.
|
Tuesday, August 25, 2015, 11:54, Laura Lambert, Empty, , HP-FEBIAD, In progress, Sintering TaC coating container for SiC Target
|
Tuesday, August 25, 2015, 11:50
Container coated with TaC using new method: Ends tapped off, with liquid poured in and swirled around entire container, then poured back out - 'flushing technique'
Container is wrapped with 3 x Ta heat shields, not incl center block.
Loaded into EVAP2 and currently pumping down.
Tuesday, August 25, 2015, 13:52
IGP1 = 2.2e-6 Torr.
HS water valves opened.
No leaks detected.
Tapped up manually to 35A.
Vacuum stable.
Initiated auto ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
Final setpoints for TGHT = 720A and TBHT = 230A, with final desired temp of 1800C
Wednesday, August 26, 2015, 09:56
IGP1 = 8.8e-7 Torr.
TGHT = 260A, 3.0V
TBHT = 145A, 1.8V
Increasing ramping rate to 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Wednesday, August 26, 2015, 14:15
IGP1 = 3.5e-6 Torr.
TGHT = 720A, 11.3V
TBHT = 230A, 3.2V
DV = 5.48V
OMEGA RS [right side-old port] = 1745C
OMEGA LS [left side-new port] = 1880C
Tapping up manually to achieve 1800C on OMEGA RS
Wednesday, August 26, 2015, 14:44
IGP1 = 3.7e-6 Torr.
TGHT = 748A, 11.9V
DV = 5.78V
OMEGA RS = 1803C
OMEGA LS = 1935C
Thursday, August 27, 2015, 07:31
Remained at max setpoints for ~17hrs.
IGP1 = 1.3e-6 Torr.
DV = 5.79V
OMEGA RS = 1862 [this reading may not be correct due to the laser being moved at max setpoint - this temperature reading may be taken from a different location then the last reading]
OMEGA LS = 1955
Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
|
Thursday, August 27, 2015, 16:37, John Wong, Empty, , HP-FEBIAD, Done, Sintering TaC coating container for SiC Target
|
Laura Lambert wrote: |
Tuesday, August 25, 2015, 11:50
Container coated with TaC using new method: Ends tapped off, with liquid poured in and swirled around entire container, then poured back out - 'flushing technique'
Container is wrapped with 3 x Ta heat shields, not incl center block.
Loaded into EVAP2 and currently pumping down.
Tuesday, August 25, 2015, 13:52
IGP1 = 2.2e-6 Torr.
HS water valves opened.
No leaks detected.
Tapped up manually to 35A.
Vacuum stable.
Initiated auto ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
Final setpoints for TGHT = 720A and TBHT = 230A, with final desired temp of 1800C
Wednesday, August 26, 2015, 09:56
IGP1 = 8.8e-7 Torr.
TGHT = 260A, 3.0V
TBHT = 145A, 1.8V
Increasing ramping rate to 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Wednesday, August 26, 2015, 14:15
IGP1 = 3.5e-6 Torr.
TGHT = 720A, 11.3V
TBHT = 230A, 3.2V
DV = 5.48V
OMEGA RS [right side-old port] = 1745C
OMEGA LS [left side-new port] = 1880C
Tapping up manually to achieve 1800C on OMEGA RS
Wednesday, August 26, 2015, 14:44
IGP1 = 3.7e-6 Torr.
TGHT = 748A, 11.9V
DV = 5.78V
OMEGA RS = 1803C
OMEGA LS = 1935C
Thursday, August 27, 2015, 07:31
Remained at max setpoints for ~17hrs.
IGP1 = 1.3e-6 Torr.
DV = 5.79V
OMEGA RS = 1862 [this reading may not be correct due to the laser being moved at max setpoint - this temperature reading may be taken from a different location then the last reading]
OMEGA LS = 1955
Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
|
Thursday, August 27, 2015, 16:34
Target is removed from the evaporator and inspected.
The "flushing technique" has a much better result. The inner coated surface is sintered well.
|
Monday, August 24, 2015, 12:58, John Wong, , , , Maintenance, Replacing turbo pump, IEVAP2TP1
|
Monday, August 24, 2015, 12:54
The turbo pump was found to be faulty. The pump couldn't get on full speed and eventually timed out. Vacuum group inspected the pump and it is time for a service.
A new pump has been installed. Leak check was performed and no leaks were detected.
Pump is now fully operational.
Back in business….
|
Tuesday, August 18, 2015, 16:02, Laura Lambert, Ta, , HP-SIS, In progress, Conditioning Ta#46 Target
|
Tuesday, August 18, 2015, 15:53
Target consists of 505 discs.
Total packed length 3.4cm.
Total mass 75.2772g.
Re foil inserted.
3x Ta Heat shields.
No endcaps inserted.
Chamber currently pumping down.
TBHT will be ramped up to 230A at 1.0A/min.
TGHT will be ramped up to 1800C, auto ramp to 600A at 2.0A/min [estimated final value of 720A according to elog ID 184]
*Note: Turbo Pump is on low speed
Wednesday, August 19, 2015, 10:15
IGP1 = 8.3e-7 Torr.
Tapped up manually to 35A.
Initiating auto-ramp.
Wednesday, August 19, 2015, 15:55
IGP1 = 3.3e-6 Torr.
TBHT reached max setpoint of 230A
TGHT reached max setpoint of 600A
OMEGA = 1554C
Increasing final setpoint of TGHT to 700A and re-initiating auto-ramp.
|
Wednesday, August 19, 2015, 17:26, John Wong, Ta, , HP-SIS, In progress, Conditioning Ta#46 Target
|
Laura Lambert wrote: |
Tuesday, August 18, 2015, 15:53
Target consists of 505 discs.
Total packed length 3.4cm.
Total mass 75.2772g.
Re foil inserted.
3x Ta Heat shields.
No endcaps inserted.
Chamber currently pumping down.
TBHT will be ramped up to 230A at 1.0A/min.
TGHT will be ramped up to 1800C, auto ramp to 600A at 2.0A/min [estimated final value of 720A according to elog ID 184]
*Note: Turbo Pump is on low speed
Wednesday, August 19, 2015, 10:15
IGP1 = 8.3e-7 Torr.
Tapped up manually to 35A.
Initiating auto-ramp.
Wednesday, August 19, 2015, 15:55
IGP1 = 3.3e-6 Torr.
TBHT reached max setpoint of 230A
TGHT reached max setpoint of 600A
OMEGA = 1554C
Increasing final setpoint of TGHT to 700A and re-initiating auto-ramp.
|
Wednesday, August 19, 2015, 17:13
TGHT reached to 700A/10.5V, direct voltage at 5.2V, and temp measured at both ends at 1755C. Vac is coming down from 4.2e-6 Torr.
Stepping up TGHT to reach 1800C
Wednesday, August 19, 2015, 17:22
Increased TGHT to 722A/11.3V (direct voltage at 5.48V) to reach 1800C (consistant with the heating curve as for the previous HPTa target, elog 184)
Will continue to condition the target at this temperature for overnight.
Cooling down can be initiated tomorrow morning at 2A/min --- Please measure the target temperature from the new window port before cooling it down.
|
Thursday, August 20, 2015, 10:07, Laura Lambert, Ta, , HP-SIS, In progress, Conditioning Ta#46 Target
|
John Wong wrote: |
Laura Lambert wrote: |
Tuesday, August 18, 2015, 15:53
Target consists of 505 discs.
Total packed length 3.4cm.
Total mass 75.2772g.
Re foil inserted.
3x Ta Heat shields.
No endcaps inserted.
Chamber currently pumping down.
TBHT will be ramped up to 230A at 1.0A/min.
TGHT will be ramped up to 1800C, auto ramp to 600A at 2.0A/min [estimated final value of 720A according to elog ID 184]
*Note: Turbo Pump is on low speed
Wednesday, August 19, 2015, 10:15
IGP1 = 8.3e-7 Torr.
Tapped up manually to 35A.
Initiating auto-ramp.
Wednesday, August 19, 2015, 15:55
IGP1 = 3.3e-6 Torr.
TBHT reached max setpoint of 230A
TGHT reached max setpoint of 600A
OMEGA = 1554C
Increasing final setpoint of TGHT to 700A and re-initiating auto-ramp.
|
Wednesday, August 19, 2015, 17:13
TGHT reached to 700A/10.5V, direct voltage at 5.2V, and temp measured at both ends at 1755C. Vac is coming down from 4.2e-6 Torr.
Stepping up TGHT to reach 1800C
Wednesday, August 19, 2015, 17:22
Increased TGHT to 722A/11.3V (direct voltage at 5.48V) to reach 1800C (consistant with the heating curve as for the previous HPTa target, elog 184)
Will continue to condition the target at this temperature for overnight.
Cooling down can be initiated tomorrow morning at 2A/min --- Please measure the target temperature from the new window port before cooling it down.
|
Thursday, August 20, 2015, 08:27
OMEGA = 1830C
Internal temperature using Mikron taken from the second 'new' view port: Hottest point on target leg = 2250C; hottest point on target material discs inside container = 1830C.
IGP1 = 1.5e-6 Torr.
EVAP2 has been sitting at max setpoints for ~15hours.
Initiated auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
|
Thursday, August 20, 2015, 17:15, John Wong, Ta, , HP-SIS, Done, Conditioning Ta#46 Target
|
Laura Lambert wrote: |
John Wong wrote: |
Laura Lambert wrote: |
Tuesday, August 18, 2015, 15:53
Target consists of 505 discs.
Total packed length 3.4cm.
Total mass 75.2772g.
Re foil inserted.
3x Ta Heat shields.
No endcaps inserted.
Chamber currently pumping down.
TBHT will be ramped up to 230A at 1.0A/min.
TGHT will be ramped up to 1800C, auto ramp to 600A at 2.0A/min [estimated final value of 720A according to elog ID 184]
*Note: Turbo Pump is on low speed
Wednesday, August 19, 2015, 10:15
IGP1 = 8.3e-7 Torr.
Tapped up manually to 35A.
Initiating auto-ramp.
Wednesday, August 19, 2015, 15:55
IGP1 = 3.3e-6 Torr.
TBHT reached max setpoint of 230A
TGHT reached max setpoint of 600A
OMEGA = 1554C
Increasing final setpoint of TGHT to 700A and re-initiating auto-ramp.
|
Wednesday, August 19, 2015, 17:13
TGHT reached to 700A/10.5V, direct voltage at 5.2V, and temp measured at both ends at 1755C. Vac is coming down from 4.2e-6 Torr.
Stepping up TGHT to reach 1800C
Wednesday, August 19, 2015, 17:22
Increased TGHT to 722A/11.3V (direct voltage at 5.48V) to reach 1800C (consistant with the heating curve as for the previous HPTa target, elog 184)
Will continue to condition the target at this temperature for overnight.
Cooling down can be initiated tomorrow morning at 2A/min --- Please measure the target temperature from the new window port before cooling it down.
|
Thursday, August 20, 2015, 08:27
OMEGA = 1830C
Internal temperature using Mikron taken from the second 'new' view port: Hottest point on target leg = 2250C; hottest point on target material discs inside container = 1830C.
IGP1 = 1.5e-6 Torr.
EVAP2 has been sitting at max setpoints for ~15hours.
Initiated auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
|
Thursday, August 20, 2015, 17:14
Target was removed the the evaporator and inspected. It looks good!
Ta-heat shields are removed.
End caps are inserted but need to be expended.
Ready for assembly.
|
Thursday, August 06, 2015, 15:45, Laura Lambert, Endcaps, , TARGET BOAT, Done, Sintering TaC coating on Ta endcaps    
|
Thursday, August 06, 2015, 15:36
The endcaps are stacked together with a punched out disc of graphite foil placed in between each endcap for separation so endcaps won't fuse together.
The end caps are further wrapped in a larger piece of graphite foil to hold together as a tube [same method used in elogID # 158]
There are two separate tubes in the target boat:
1) endcaps coated with TaC coating - never been sintered
2) previously sintered [but not fully] endcaps with a second coating done on the one side of each endcap
The boat is wrapped with 3-layers of Ta heatshields.
Chamber is currently being pumped down.
Friday, August 07, 2015, 08:45
HS water valves opened, no leaks detected.
IGP1 = 3.6e-7 Torr.
Tapped up manually to 30A.
Friday, August 07, 2015, 11:23
IGP1 = 2.2e-6 Torr.
Vacuum stable.
Initiating auto-ramp at 0.2A/min with a final setpoint of 480A.
Will ramp up over the weekend, confirm temperature readings on monday and tap up to final desired temperature of 1800C manually.
Friday, August 07, 2015, 13:04
Vacuum climbed quite fast.
IGP1 = 6.3e-6 Torr.
Stopped auto-ramp to allow vacuum to settle.
Waited ~1hr.
IGP1 = 4.3e-6 Torr.
Re-initiating auto-ramp.
Monday, August 10, 2015, 09:22
TGHT reached 480A, 8.2V on the weekend.
OMEGA = 1708C
IGP1 = 3.8e-7 Torr.
Tapped up manually to 1803C, 520A, 9.0V
IGP1 = 5.9e-7 Torr.
Monday, August 10, 2015, 14:50
EVAP2 remained at 1800C for 4.5hours.
Internal temperature taken at new window port read 1800C using the mikron.
Initiating auto-cool at 2.0A/min.
Tuesday, August 11, 2015, 09:23
Vented in air and opened up this morning.
The following observations were noted:
1) single round sintered endcaps:
-Batch of green endcaps, single round of sintering look good. fully sintered.
-however when applying a scratch test, excess TaC scrapes off.
[see single round sintering photos]
2) Re-sintering of batch from july 14th
-Outside of endcap [concave side] was re-coated, Inside of endcap had good first coating - therefore no second coating applied [see photos from elog ID#230]
-A few endcaps almost heated too long and started to appear brittle/ further crystallization on inside of endcap - the side that did not have a second coating applied.
-Outside of endcap looks good/ fully sintered - the side that had a second round of TaC coating
-further tests confirm this batch should still be okay to use
[see round2 batch photos]
|
Friday, July 31, 2015, 15:51, John Wong, Ta, , TARGET BOAT, In progress, Test for homogeneity: Sintering TaC coating on a Ta tube
|
Friday, July 31, 2015, 15:39
A Ta tube was coated with TaC. The inner of the tube was filled with TaC solution and the excess was drained out to give a homogenous coating. The outer layer of the tube was brushed with TaC.
The tube is installed in a target boat and wrapped with 3 layers of heat shields.
Chamber is currently pumped down and the target heater will be ramped up after the long weekend (Tue)
A new window port is installed (see photo). TGHT will need to be ramped up slowly to make sure the new window can sustain the heat shine from the target - local check on the Evap is required to make sure it's safe to keep ramping up the heater.
|
Tuesday, August 04, 2015, 12:04, Laura Lambert, Ta, , TARGET BOAT, Done, Test for homogeneity: Sintering TaC coating on a Ta tube  
|
John Wong wrote: |
Friday, July 31, 2015, 15:39
A Ta tube was coated with TaC. The inner of the tube was filled with TaC solution and the excess was drained out to give a homogenous coating. The outer layer of the tube was brushed with TaC.
The tube is installed in a target boat and wrapped with 3 layers of heat shields.
Chamber is currently pumped down and the target heater will be ramped up after the long weekend (Tue)
A new window port is installed (see photo). TGHT will need to be ramped up slowly to make sure the new window can sustain the heat shine from the target - local check on the Evap is required to make sure it's safe to keep ramping up the heater.
|
Tuesday, August 04, 2015, 11:26
HS water valves opened, no leaks detected.
IGP1 = 2.2e-7 Torr.
Tapped up manually to 30A.
IGP1 = 2.7e-7 Torr.
Initiating auto-ramp at 0.2A/min with a final value of 350A.
Tuesday, August 04, 2015, 15:30
IGP1 = 2.8e-6 Torr.
TGHT = 79A.
Increasing ramping rate to 0.5A/min
Wednesday, August 05, 2015, 15:25
EVAP2 reached 350A this morning, OMEGA = 1414C
Temperature measurements were taken using the FLUKE IR camera of the new window port to be used for the second OMEGA camera.
Measurements were taken of both the Cu seal on the inside of the window and in the centre of the window [the hottest point].
TGHT was ramped up at 2.0A/min from 1414C --> 1800C with auto ramp paused at each measurement reading taken.
See attachment for raw data.
TGHT remained at 500A/1800C for 4hrs and will be cooled down at a rate of 2.0A/min.
Thursday, August 06, 2015, 15:32
Vented and opened today.
New window port passed inspection, max temperature reached = 32.4C
Coating on tube looks good, partial sintering. Internal sintered better than outside of tube.
See attached photos.
|
Friday, July 31, 2015, 15:10, John Wong, , , , Maintenance, Installed leftside port
|
Friday, July 31, 2015, 15:09
The left side port was installed on the evaporator #2. Leak check was performed and no leak was detected.
|
Thursday, July 30, 2015, 17:07, John Wong, , , , Maintenance, Connect NALCW to EVAP1
|
Thursday, July 30, 2015, 17:02
EVAP1 cooling system is now on the NALCW. The city water has been removed from the system.
Tested all the cooling system interlocks by shutting off each individual valve, and the main supply valve to the lab - All Passed!
|
Monday, July 13, 2015, 11:54, Laura Lambert, Endcaps, 40282-5, TARGET BOAT, Problems, Sintering TaC coating on Ta endcaps   
|
Monday, July 13, 2015, 11:53
A Ta foil is placed in the target boat with separate slots for each endcap [same as elog 200]
The target boat is wrapped with 3-layers of Ta-heat shield.
The boat is installed in EVAP2, chamber is currently being pumped down.
Monday, July 13, 2015, 15:00
Opened HS water valves, no leaks detected.
IGP1 = 2.7e-6 Torr.
Tapping up manually.
Monday, July 13, 2015, 15:41
Tapped up manually to 30A
TGHT = 30A, 0.05V
IGP1 = 7e-6 Torr.
Initiating auto-ramp at 0.2A/min up to 480A with a final desired temperature of 1800C
Tuesday, July 14, 2015, 09:12
IGP1 = 7.8e-7 Torr
TGHT = 241A, 3.3V
OMEGA = 1010C
Increasing auto-ramp to 2.0A/min
Tuesday, July 14, 2015, 11:12
Reached final setpoint of TGHT = 480A, 8.43V
OMEGA = 1667C
IGP1 = 3.3e-6 Torr.
Tapping up manually to reach final desired temperature of 1800C.
Tuesday, July 14, 2015, 11:33
Reached TGHT = 500A, 8.8V by tapping up manually.
OMEGA = 1714V
IGP1= 3.5e-6 Torr.
Re-initiating auto-ramp at 2.0A/min with a final setpoint of 580A.
New final desired temperature min of 1900C
Tuesday, July 14, 2015, 13:16
TGHT = 577A, 10.74V
OMEGA = 1938C
IGP1 = 3.2e-6 Torr
Endcaps have been at this temperature for just over an hour.
Spikes in vacuum started ~430A - this is due to the green TaC coating reacting with the Ta foil, the carbide is reacting directly with the Ta foil [see picture]
Stopping sintering early before endcaps break -> initiating auto-cool at 2.0A/min.
Wednesday, July 15, 2015, 11:33
Vented in air and took out this morning.
Endcaps sintered on top side but not fully sintered on inner edge.
Inner edge is peeling off and unsintered green TaC.
The coating peeling off did not shrink, as seen with previous tests done, one would expect a shrinkage in the coating when heated.
The peeling is most likely due to the way to endcaps were placed in the slots of the Ta foil.
This may have cause the foil to be hotter than the inside of the endcaps and subsequently the Ta foil and TaC coating on the inside reacted - with the Ta foil extracting the carbide from the coating.
This would cause the outer edges of the inside of the endcap to peel/curl inwards as it was heated [like a cast, as the cast dries the outer edges curl inwards].
See photos attached for clarification.
Endcaps will be re-coated and sintered again via a different procedure.
|
Monday, June 29, 2015, 16:18, Laura Lambert, Empty, 41369-2, LP-SIS, In progress, Sintering TaC coating container
|
Monday, June 29, 2015, 16:17
Target container is coated with TaC. No Ta-heat shields are used.
TGHT will be ramped up to 580A at 0.2A/min.
TBHT will be ramped up to 230A at 01A/min.
Chamber is currently being pumped down.
|
Monday, June 29, 2015, 23:42, John Wong, Empty, 41369-2, LP-SIS, In progress, Sintering TaC coating container
|
Laura Lambert wrote: |
Monday, June 29, 2015, 16:17
Target container is coated with TaC. No Ta-heat shields are used.
TGHT will be ramped up to 580A at 0.2A/min.
TBHT will be ramped up to 230A at 01A/min.
Chamber is currently being pumped down.
|
Monday, June 29, 2015, 23:37
Opened the HS valves around 5pm. Small leaks or just a vibration in the pipe line caused a rise in vacuum. Leak rate is small, so allow the chamber to continue to pump down over night.
Sintering process can begin tomorrow if vacuum is allowed.
|
Tuesday, June 30, 2015, 09:50, Laura Lambert, Empty, 41369-2, LP-SIS, In progress, Sintering TaC coating container   
|
John Wong wrote: |
Laura Lambert wrote: |
Monday, June 29, 2015, 16:17
Target container is coated with TaC. No Ta-heat shields are used.
TGHT will be ramped up to 580A at 0.2A/min.
TBHT will be ramped up to 230A at 01A/min.
Chamber is currently being pumped down.
|
Monday, June 29, 2015, 23:37
Opened the HS valves around 5pm. Small leaks or just a vibration in the pipe line caused a rise in vacuum. Leak rate is small, so allow the chamber to continue to pump down over night.
Sintering process can begin tomorrow if vacuum is allowed.
|
Tuesday, June 30, 2015, 08:22
IGP1 = 3.6e-7 Torr.
Tapped up manually to 40A.
Vacuum looks good.
IGP1 = 6.9e-7 Torr.
Inititating auto-ramp...
Thursday, July 02, 2015, 09:56
IGP1 = 8.9e-7 Torr.
OMEGA = 1728C
TGHT and TBHT = 580A and 230A respectively.
Tapping up manually to 1800C.
Thursday, July 02, 2015, 11:02
TGHT = 615A, 10.9V
OMEGA = 1800C
IGP1 = 1.1e-6 Torr.
Will continue to heat for 4hrs.
Thursday, July 02, 2015, 15:43
Target container remained at 1800C for 4hrs50min.
Initiating auto-cool for TGHT = 2A/min and TBHT = 1A/min.
Friday, July 03, 2015, 08:24
Vented in air and opened up this morning.
Edge of container on both ends not fully sintered [see photos]
|
Monday, July 06, 2015, 12:07, John Wong, Empty, 41369-2, LP-SIS, In progress, Sintering TaC coating container
|
Laura Lambert wrote: |
John Wong wrote: |
Laura Lambert wrote: |
Monday, June 29, 2015, 16:17
Target container is coated with TaC. No Ta-heat shields are used.
TGHT will be ramped up to 580A at 0.2A/min.
TBHT will be ramped up to 230A at 01A/min.
Chamber is currently being pumped down.
|
Monday, June 29, 2015, 23:37
Opened the HS valves around 5pm. Small leaks or just a vibration in the pipe line caused a rise in vacuum. Leak rate is small, so allow the chamber to continue to pump down over night.
Sintering process can begin tomorrow if vacuum is allowed.
|
Tuesday, June 30, 2015, 08:22
IGP1 = 3.6e-7 Torr.
Tapped up manually to 40A.
Vacuum looks good.
IGP1 = 6.9e-7 Torr.
Inititating auto-ramp...
Thursday, July 02, 2015, 09:56
IGP1 = 8.9e-7 Torr.
OMEGA = 1728C
TGHT and TBHT = 580A and 230A respectively.
Tapping up manually to 1800C.
Thursday, July 02, 2015, 11:02
TGHT = 615A, 10.9V
OMEGA = 1800C
IGP1 = 1.1e-6 Torr.
Will continue to heat for 4hrs.
Thursday, July 02, 2015, 15:43
Target container remained at 1800C for 4hrs50min.
Initiating auto-cool for TGHT = 2A/min and TBHT = 1A/min.
Friday, July 03, 2015, 08:24
Vented in air and opened up this morning.
Edge of container on both ends not fully sintered [see photos]
|
Monday, July 06, 2015, 11:54
Inner tube surface isn't homogeneously sintered with TaC (see attachment).
A second coating may help.
For the re-sintering process, the target container will be wrapped with 6.2cm Ta (width) foil as a layer for heat shield on each side of the tube, excluding the centre block - just like the same process was done last time, see e-log ID#217.
The Ta-foil and the target tube will be spaced with Ta wire coiled around it.
TGHT can be ramped up about 520A/9.1V to achieve 1900C. Heating time for 3-4 hours until vacuum comes down to low 10-6 Torr.
|
Monday, July 06, 2015, 16:30, Laura Lambert, Empty, 41369-2, LP-SIS, Done, Sintering TaC coating container   
|
John Wong wrote: |
Laura Lambert wrote: |
John Wong wrote: |
Laura Lambert wrote: |
Monday, June 29, 2015, 16:17
Target container is coated with TaC. No Ta-heat shields are used.
TGHT will be ramped up to 580A at 0.2A/min.
TBHT will be ramped up to 230A at 01A/min.
Chamber is currently being pumped down.
|
Monday, June 29, 2015, 23:37
Opened the HS valves around 5pm. Small leaks or just a vibration in the pipe line caused a rise in vacuum. Leak rate is small, so allow the chamber to continue to pump down over night.
Sintering process can begin tomorrow if vacuum is allowed.
|
Tuesday, June 30, 2015, 08:22
IGP1 = 3.6e-7 Torr.
Tapped up manually to 40A.
Vacuum looks good.
IGP1 = 6.9e-7 Torr.
Inititating auto-ramp...
Thursday, July 02, 2015, 09:56
IGP1 = 8.9e-7 Torr.
OMEGA = 1728C
TGHT and TBHT = 580A and 230A respectively.
Tapping up manually to 1800C.
Thursday, July 02, 2015, 11:02
TGHT = 615A, 10.9V
OMEGA = 1800C
IGP1 = 1.1e-6 Torr.
Will continue to heat for 4hrs.
Thursday, July 02, 2015, 15:43
Target container remained at 1800C for 4hrs50min.
Initiating auto-cool for TGHT = 2A/min and TBHT = 1A/min.
Friday, July 03, 2015, 08:24
Vented in air and opened up this morning.
Edge of container on both ends not fully sintered [see photos]
|
Monday, July 06, 2015, 11:54
Inner tube surface isn't homogeneously sintered with TaC (see attachment).
A second coating may help.
For the re-sintering process, the target container will be wrapped with 6.2cm Ta (width) foil as a layer for heat shield on each side of the tube, excluding the centre block - just like the same process was done last time, see e-log ID#217.
The Ta-foil and the target tube will be spaced with Ta wire coiled around it.
TGHT can be ramped up about 520A/9.1V to achieve 1900C. Heating time for 3-4 hours until vacuum comes down to low 10-6 Torr.
|
Monday, July 06, 2015, 16:28
Container has been re-coated with TaC.
Target container is wrapped with a single 15.5cm x 8.5cm Ta foil heat shield on each side of the center block, spaced with Ta wire coil.
Chamber is currently being pumped down.
Tuesday, July 07, 2015, 09:36
HS water valves were opened this morning, no leaks detected.
IGP1 = 6e-7 Torr.
Tapped up manually to 30A.
Waited ~1hr.
Vacuum stable, IGP1 = 1.9e-6 Torr.
Initiating auto-ramp at 0.2A/min and 0.1A/min for TGHT and TBHT respectively.
Target container reached max setpoints of 520A/230A and 1950C ~6hrs ago.
IGP1 = 7.6e-7 Torr.
Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Friday, July 10, 2015, 11:16
Vented in air and removed from evap2.
Again, edges not fully sintered [see photos]
Inside of container looks better, fully coated.
|
Thursday, June 25, 2015, 16:20, Laura Lambert, ZrC, 41177-2, LP-SIS, In progress, Sintering back-up ZrC
|
Thursday, June 25, 2015, 16:14
Total number of foils: 422 discs
Total mass of materials [incl graphite foils]:
Total length packed: 12.0cm
Container has one Ta heat shield.
No endcaps inserted to allow outgassing
Two TaC coated Ta wires formed into a spring inserted either end to avoid ZrC expansion of materials.
Currently being pumped down.
Friday, June 26, 2015, 11:44
HS water valves opened.
No leaks detected.
Initiating ramp up.
Friday, June 26, 2015, 14:44
EVAP2 was tapped up manually to 50A.
Vacuum tripped evap off.
Tapping back up manually now...
Friday, June 26, 2015, 15:53
Tapped up manually to 45A for both TGHT and TBHT
IGP1 = 4.8e-5 Torr
Will initiate auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively once vacuum settled down and stable.
Max setpoints set to 520A and 230A for the TGHT and TBHT respectively.
Good Vacuum = 3.0e-5 Torr. Bad Vacuum = 4.0e-5 Torr.
|
Monday, June 29, 2015, 07:05, John Wong, ZrC, 41177-2, LP-SIS, Done, Sintering back-up ZrC
|
Laura Lambert wrote: |
Thursday, June 25, 2015, 16:14
Total number of foils: 422 discs
Total mass of materials [incl graphite foils]:
Total length packed: 13.2cm
Container has one Ta heat shield.
No endcaps inserted to allow outgassing
Two TaC coated Ta wires formed into a spring inserted either end to avoid ZrC expansion of materials.
Currently being pumped down.
Friday, June 26, 2015, 11:44
HS water valves opened.
No leaks detected.
Initiating ramp up.
Friday, June 26, 2015, 14:44
EVAP2 was tapped up manually to 50A.
Vacuum tripped evap off.
Tapping back up manually now...
Friday, June 26, 2015, 15:53
Tapped up manually to 45A for both TGHT and TBHT
IGP1 = 4.8e-5 Torr
Will initiate auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively once vacuum settled down and stable.
Max setpoints set to 520A and 230A for the TGHT and TBHT respectively.
Good Vacuum = 3.0e-5 Torr. Bad Vacuum = 4.0e-5 Torr.
|
Monday, June 29, 2015, 06:57
TGHT has been at 520A/9.80V, DV 5.80V for 7 hours, temperature measured at 1800C. Vac is coming down to 9.18e-6 Torr. However, TGHT voltage is slightly going up over the 7 hours of heating, See screenshot attachment. (Can't make further comments until target is inspected.)
Initiated cooling down at 2A/min for TGHT and 1A/min for TBHT.
Chamber can be vented later today.
Monday, June 29, 2015, 14:58
Target has been inspected.
Slightly crystallization on the outer tube of the container can be observed.
Overall, the container looks a lot better than before.
Rn foiled inserted. Salt added - Ready for test-stand
|
Tuesday, June 23, 2015, 12:26, John Wong, SiC, 38817-6, HP-SIS, In progress, RUSH! SiC backup target undergoes sintering process
|
Tuesday, June 23, 2015, 12:21
Target container is loaded with 485 discs of SiC with packed length of 17.4cm.
Container is wrapped with 3 Ta-heat shields and previously coated/sintered with TaC.
Chamber is currently being pumped down
TGHT will be ramped up to 800A, ~1800C, and TBHT is limited to 230A max.
Tuesday, June 23, 2015, 15:53
HS valves are open, no leaks detected.
TGHT stepped up to 70A, pressure is currently at 4.17e-5 torr and coming up.
Initiated auto-ramping at 0.5A/min for both TGHT and TBHT: good vac at 3.0e-5, bad vac at 4.0e-5 Torr.
Wednesday, June 24, 2015, 00:03
Stopped auto-ramping about 2 hours ago.
Manual stepped up TGHT to 73A. Vac is stabilizing at 5e-8 Torr. Will keep it at that current over night.
Wednesday, June 24, 2015, 07:41
Vac has come down to 3.6e-6 Torr.
Continue to step up TGHT...
Wednesday, June 24, 2015, 23:52
It has been a super long day operating the evaporator and finally the target is up to 1800C. Vac is coming down from 2.e-5 Torr.
TGHT is at 790A/12.61V, DV at 6.60V, TBHT at 230A/3.57V. Omega temp reader is at 1680C - that's due to the window being coated with SiC, as expected.
Target will continue heated at that current for over night, and will start the cooling process next AM.
Thursday, June 25, 2015, 06:18
Target is holding pretty well over night. Vac is coming down to 1.6e-6 Torr.
Initiated cooling down at 2A/min.
|
Thursday, June 25, 2015, 16:13, Laura Lambert, SiC, 38817-6, HP-SIS, Done, RUSH! SiC backup target undergoes sintering process 
|
John Wong wrote: |
Tuesday, June 23, 2015, 12:21
Target container is loaded with 485 discs of SiC with packed length of 17.4cm.
Container is wrapped with 3 Ta-heat shields and previously coated/sintered with TaC.
Chamber is currently being pumped down
TGHT will be ramped up to 800A, ~1800C, and TBHT is limited to 230A max.
Tuesday, June 23, 2015, 15:53
HS valves are open, no leaks detected.
TGHT stepped up to 70A, pressure is currently at 4.17e-5 torr and coming up.
Initiated auto-ramping at 0.5A/min for both TGHT and TBHT: good vac at 3.0e-5, bad vac at 4.0e-5 Torr.
Wednesday, June 24, 2015, 00:03
Stopped auto-ramping about 2 hours ago.
Manual stepped up TGHT to 73A. Vac is stabilizing at 5e-8 Torr. Will keep it at that current over night.
Wednesday, June 24, 2015, 07:41
Vac has come down to 3.6e-6 Torr.
Continue to step up TGHT...
Wednesday, June 24, 2015, 23:52
It has been a super long day operating the evaporator and finally the target is up to 1800C. Vac is coming down from 2.e-5 Torr.
TGHT is at 790A/12.61V, DV at 6.60V, TBHT at 230A/3.57V. Omega temp reader is at 1680C - that's due to the window being coated with SiC, as expected.
Target will continue heated at that current for over night, and will start the cooling process next AM.
Thursday, June 25, 2015, 06:18
Target is holding pretty well over night. Vac is coming down to 1.6e-6 Torr.
Initiated cooling down at 2A/min.
|
Thursday, June 25, 2015, 16:09
Vented in air and took out this afternoon.
Target looks good [see photos]
Window for OMEGA fully coated from outgassing of target materials |
Monday, June 22, 2015, 13:11, John Wong, Empty, 38817-6, HP-SIS, In progress, RUSH! Sintering TaC coated container for SiC
|
Monday, June 22, 2015, 13:00
Containers is coated with TaC. Wrapped with 3 layers of Ta heat-shield. Air blown to for quick dry.
Installed, and pumped down, vac currently at 6.7e-6 Torr.
HS water valve open, no leaks detected.
Stepping up TGHT/TBTH: 50A.
Monday, June 22, 2015, 14:22
Pressure is coming down, currently at 1.75e-5 Torr.
auto-ramping initiated: TGHT = 820A; TBHT = 230A, rate at 2A/min.
Tuesday, June 23, 2015, 00:50
Target container has reached to 1860C and has been heated for almost 4 hours, with TGHT at 800A/12.60V, DV = 6.28. TBHT at 230A/3.8V.
Vac at 3e-6 Torr.
Cooling down at 2A/min.
Chamber can be vented tomorrow and SiC can be loaded in for the sintering process.
|
Tuesday, June 23, 2015, 10:18, Laura Lambert, Empty, 38817-6, HP-SIS, Done, RUSH! Sintering TaC coated container for SiC
|
John Wong wrote: |
Monday, June 22, 2015, 13:00
Containers is coated with TaC. Wrapped with 3 layers of Ta heat-shield. Air blown to for quick dry.
Installed, and pumped down, vac currently at 6.7e-6 Torr.
HS water valve open, no leaks detected.
Stepping up TGHT/TBTH: 50A.
Monday, June 22, 2015, 14:22
Pressure is coming down, currently at 1.75e-5 Torr.
auto-ramping initiated: TGHT = 820A; TBHT = 230A, rate at 2A/min.
Tuesday, June 23, 2015, 00:50
Target container has reached to 1860C and has been heated for almost 4 hours, with TGHT at 800A/12.60V, DV = 6.28. TBHT at 230A/3.8V.
Vac at 3e-6 Torr.
Cooling down at 2A/min.
Chamber can be vented tomorrow and SiC can be loaded in for the sintering process.
|
Tuesday, June 23, 2015, 10:17
vented in air and opened up this morning.
coating looks good.
loading container now...
|
Thursday, June 18, 2015, 11:39, Rick Maharaj, , , , , Installation of Extraction Electrode Insulator - New Material
|
Tuesday June 16, 2015
An Extraction Insulator ITD0381 made from a different grade of AiN was installed in Evaporator 2 for testing purposes. The sub assembly included the SIS Restraint Housing ITD0389, New Extraction Insulator ITD0381, Repeller Electrode ITD0377, Extraction Electrode ITD0374 with fingerstock mounted.
The standoff insulator ITD0400 was found to be swelled up and broken. It was replaced with and glazed alumina insulator.
The tube heater Insulator ITD0342 - central support helicoil was repaired. |
Tuesday, June 09, 2015, 10:44, Laura Lambert, Empty, 41177-2, LP-SIS, In progress, Sintering TaC coating container for ZrC back-up
|
Tuesday, June 09, 2015, 9:16
Target container is coated with TaC. No Ta-heat shields are used.
TGHT will be ramped up to 580A at 0.2A/min.
TBHT will be ramped up to 230A at 01A/min.
Chamber is currently being pumped down.
Tuesday, June 09, 2015, 15:37
HS water valves were opened. no leaks detected.
Tapped up manually to 35A.
Once vacuum stabilized after ~45min, initiated auto-ramp.
Wednesday, June 10, 2015, 08:02
IGP1 = 5.3e-7 Torr.
TGHT = 250A and TBHT = 140A.
Increasing auto ramp to 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
|
Wednesday, June 10, 2015, 16:35, John Wong, Empty, 41177-2, LP-SIS, In progress, Sintering TaC coating container for ZrC back-up
|
Laura Lambert wrote: |
Tuesday, June 09, 2015, 9:16
Target container is coated with TaC. No Ta-heat shields are used.
TGHT will be ramped up to 580A at 0.2A/min.
TBHT will be ramped up to 230A at 01A/min.
Chamber is currently being pumped down.
Tuesday, June 09, 2015, 15:37
HS water valves were opened. no leaks detected.
Tapped up manually to 35A.
Once vacuum stabilized after ~45min, initiated auto-ramp.
Wednesday, June 10, 2015, 08:02
IGP1 = 5.3e-7 Torr.
TGHT = 250A and TBHT = 140A.
Increasing auto ramp to 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
|
Wednesday, June 10, 2015, 16:32
TGHT/TBHT are at 580A/230A for almost 6 hours, temp at 1728C.
Vac at 8.5e-7 Torr.
Cooling down initiated at 1A/min.
Target container should be inspected once the chamber is vented.
|
Thursday, June 11, 2015, 16:10, Laura Lambert, Empty, 41177-2, LP-SIS, In progress, Sintering TaC coating container for ZrC back-up
|
John Wong wrote: |
Laura Lambert wrote: |
Tuesday, June 09, 2015, 9:16
Target container is coated with TaC. No Ta-heat shields are used.
TGHT will be ramped up to 580A at 0.2A/min.
TBHT will be ramped up to 230A at 01A/min.
Chamber is currently being pumped down.
Tuesday, June 09, 2015, 15:37
HS water valves were opened. no leaks detected.
Tapped up manually to 35A.
Once vacuum stabilized after ~45min, initiated auto-ramp.
Wednesday, June 10, 2015, 08:02
IGP1 = 5.3e-7 Torr.
TGHT = 250A and TBHT = 140A.
Increasing auto ramp to 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
|
Wednesday, June 10, 2015, 16:32
TGHT/TBHT are at 580A/230A for almost 6 hours, temp at 1728C.
Vac at 8.5e-7 Torr.
Cooling down initiated at 1A/min.
Target container should be inspected once the chamber is vented.
|
Thursday, June 11, 2015, 10:55
Vented in air and opened up this morning.
Same as last container sintered in evap2 [IG-LIS for UCx#13] - ends not quite fully sintered and coating not very good.
most likely due to old TaC spray.
See link for photos.
https://www.dropbox.com/sh/75o43x8y2z16e7j/AABc8Z1fTTaTRtJ5_Jr1eacWa?dl=0
|
Monday, June 15, 2015, 15:30, John Wong, Empty, 41177-2, LP-SIS, Done, Re-Sintering TaC coating container for ZrC back-up
|
Laura Lambert wrote: |
John Wong wrote: |
Laura Lambert wrote: |
Tuesday, June 09, 2015, 9:16
Target container is coated with TaC. No Ta-heat shields are used.
TGHT will be ramped up to 580A at 0.2A/min.
TBHT will be ramped up to 230A at 01A/min.
Chamber is currently being pumped down.
Tuesday, June 09, 2015, 15:37
HS water valves were opened. no leaks detected.
Tapped up manually to 35A.
Once vacuum stabilized after ~45min, initiated auto-ramp.
Wednesday, June 10, 2015, 08:02
IGP1 = 5.3e-7 Torr.
TGHT = 250A and TBHT = 140A.
Increasing auto ramp to 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
|
Wednesday, June 10, 2015, 16:32
TGHT/TBHT are at 580A/230A for almost 6 hours, temp at 1728C.
Vac at 8.5e-7 Torr.
Cooling down initiated at 1A/min.
Target container should be inspected once the chamber is vented.
|
Thursday, June 11, 2015, 10:55
Vented in air and opened up this morning.
Same as last container sintered in evap2 [IG-LIS for UCx#13] - ends not quite fully sintered and coating not very good.
most likely due to old TaC spray.
See link for photos.
https://www.dropbox.com/sh/75o43x8y2z16e7j/AABc8Z1fTTaTRtJ5_Jr1eacWa?dl=0
|
Monday, June 15, 2015, 15:24
Same problem also found for the LP-IG-LIS container, WO#40860-1, see elog id#215. After re-coating and sintering, it seems better.
For this container, it is re-coated and will undergo the sintering process one more time.
Will try to go up to 1900C for the sintering process.
Target container is temporarily wrapped with 6.2cm of Ta foil as a layer for heat shield on each side of the tube, excluding the centre block. The shield will be removed once the process is done.
Target current will be controlled accordingly.
Chamber is being pumped down.
Monday, June 15, 2015, 16:17
HS water valves open; no leaks detected.
IGP1 at 6.8e-6 Torr and coming down.
Monday, June 15, 2015, 17:21
Stepping up TGHT/TBHT to 60A, pressure seems pretty stable at 7.2e-6 Torr and coming down.
Setting TGHT to 400A and TBHT to 230A, auto-ramping initiated. Will setup up current to reach 1900C, if necessary.
Monday, June 15, 2015, 20:28
TGHT and TBHT reached 400A/230A, Temp at 1552C. Vac at 2.7e-6 Torr.
Stepping TGHT
Monday, June 15, 2015, 21:16
TGHT at 520A/9.06 V to achieve 1900C. DV at 5.09V.
Vac at 4.2e-6 Torr.
Will continue the sintering process at this temperature for another 3-4 hours.
Tuesday, June 16, 2015, 00:15
Target container has been heated at 1900C for over 3 hours.
Vacuum is coming down to 1.4e-6 Torr.
Initiated cooling process at 2A/min
Chamber can be vented tomorrow and container should be inspected
Friday, June 26, 2015, 16:04
Container looks good!
|
Thursday, June 04, 2015, 11:10, Laura Lambert, Empty, , LP-IG-LIS, In progress, Sintering TaC coating container for UCx
|
Thursday, June 04, 2015, 9:07
Container was sprayed with TaC and let dry.
Container has 3x Ta heat shields including center block.
Container was loaded into EVAP2 yesterday and pumped down overnight.
HS water valves were opened up this morning, no leaks detected.
IGP1 = 4.6e-7 Torr.
Tapped up manually to 40A.
Waited ~25min, Vacuum stable.
IGP1 = 5.0e-7 Torr.
Initiating auto-ramp.
TGHT will be ramped to reach 2000C
Friday, June 05, 2015, 10:01
IGP1 = 4.5e-7 Torr.
TGHT = 313A, 4.47V
OMEGA = 1444C
Increasing ramping rate to 1.0A/min
Friday, June 05, 2015, 11:31
IGP1 = 1.2e-6 Torr.
Increasing ramping rate to 2.0A/min
|
Friday, June 05, 2015, 12:19, John Wong, Empty, , LP-IG-LIS, In progress, Sintering TaC coating container for UCx
|
Laura Lambert wrote: |
Thursday, June 04, 2015, 9:07
Container was sprayed with TaC and let dry.
Container has 3x Ta heat shields including center block.
Container was loaded into EVAP2 yesterday and pumped down overnight.
HS water valves were opened up this morning, no leaks detected.
IGP1 = 4.6e-7 Torr.
Tapped up manually to 40A.
Waited ~25min, Vacuum stable.
IGP1 = 5.0e-7 Torr.
Initiating auto-ramp.
TGHT will be ramped to reach 2000C
Friday, June 05, 2015, 10:01
IGP1 = 4.5e-7 Torr.
TGHT = 313A, 4.47V
OMEGA = 1444C
Increasing ramping rate to 1.0A/min
Friday, June 05, 2015, 11:31
IGP1 = 1.2e-6 Torr.
Increasing ramping rate to 2.0A/min
|
Friday, June 05, 2015, 12:01
TGHT reached to 465A/7.56V, temp is stable at 2000C. Current vac at 1.2e-6 Torr and coming down
Cooling down process can be initiated after 4 hours.
|
Friday, June 05, 2015, 13:22, Laura Lambert, Empty, 40860-1, LP-IG-LIS, In progress, Sintering TaC coating container for UCx 
|
John Wong wrote: |
Laura Lambert wrote: |
Thursday, June 04, 2015, 9:07
Container was sprayed with TaC and let dry.
Container has 3x Ta heat shields including center block.
Container was loaded into EVAP2 yesterday and pumped down overnight.
HS water valves were opened up this morning, no leaks detected.
IGP1 = 4.6e-7 Torr.
Tapped up manually to 40A.
Waited ~25min, Vacuum stable.
IGP1 = 5.0e-7 Torr.
Initiating auto-ramp.
TGHT will be ramped to reach 2000C
Friday, June 05, 2015, 10:01
IGP1 = 4.5e-7 Torr.
TGHT = 313A, 4.47V
OMEGA = 1444C
Increasing ramping rate to 1.0A/min
Friday, June 05, 2015, 11:31
IGP1 = 1.2e-6 Torr.
Increasing ramping rate to 2.0A/min
|
Friday, June 05, 2015, 12:01
TGHT reached to 465A/7.56V, temp is stable at 2000C. Current vac at 1.2e-6 Torr and coming down
Cooling down process can be initiated after 4 hours.
|
Friday, June 05, 2015, 13:21
OMEGA = 1995C
Increasing TGHT to 470A to achieve desired max temperature of 2000C
Friday, June 05, 2015, 15:59
TGHT sat at max desired temperature of 2000C for ~4hrs.
TGHT = 470A, 7.7V
Initiating auto-cool at 1.0A/min.
Monday, June 08, 2015, 11:31
Vented in air and opened up this morning.
Target container mostly sintered, two tiny patches near both ends not fully sintered.
Will re-install and re-sinter next week as another container with priority needs to be sintered first.
Tuesday, June 09, 2015, 10:45
See attachements for 'not-fully-sintered' photos
|
Wednesday, June 10, 2015, 12:15, John Wong, Empty, 40860-1, LP-IG-LIS, In progress, Sintering TaC coating container for UCx
|
Laura Lambert wrote: |
John Wong wrote: |
Laura Lambert wrote: |
Thursday, June 04, 2015, 9:07
Container was sprayed with TaC and let dry.
Container has 3x Ta heat shields including center block.
Container was loaded into EVAP2 yesterday and pumped down overnight.
HS water valves were opened up this morning, no leaks detected.
IGP1 = 4.6e-7 Torr.
Tapped up manually to 40A.
Waited ~25min, Vacuum stable.
IGP1 = 5.0e-7 Torr.
Initiating auto-ramp.
TGHT will be ramped to reach 2000C
Friday, June 05, 2015, 10:01
IGP1 = 4.5e-7 Torr.
TGHT = 313A, 4.47V
OMEGA = 1444C
Increasing ramping rate to 1.0A/min
Friday, June 05, 2015, 11:31
IGP1 = 1.2e-6 Torr.
Increasing ramping rate to 2.0A/min
|
Friday, June 05, 2015, 12:01
TGHT reached to 465A/7.56V, temp is stable at 2000C. Current vac at 1.2e-6 Torr and coming down
Cooling down process can be initiated after 4 hours.
|
Friday, June 05, 2015, 13:21
OMEGA = 1995C
Increasing TGHT to 470A to achieve desired max temperature of 2000C
Friday, June 05, 2015, 15:59
TGHT sat at max desired temperature of 2000C for ~4hrs.
TGHT = 470A, 7.7V
Initiating auto-cool at 1.0A/min.
Monday, June 08, 2015, 11:31
Vented in air and opened up this morning.
Target container mostly sintered, two tiny patches near both ends not fully sintered.
Will re-install and re-sinter next week as another container with priority needs to be sintered first.
Tuesday, June 09, 2015, 10:45
See attachements for 'not-fully-sintered' photos
|
Wednesday, June 10, 2015, 12:06
After inspecting the target container, the inner tube surface has "dark" patches, which may not be evenly coated or the coating layer was too think.
See link for photos: https://www.dropbox.com/sh/m94mjuuodwhz5jb/AADEBv_Kha_p_1An40eftWNHa?dl=0
Attempt to re-spray the container and re-sinter.
|
Friday, June 12, 2015, 14:59, Laura Lambert, Empty, 40860-1, LP-IG-LIS, In progress, Sintering TaC coating container for UCx
|
John Wong wrote: |
Laura Lambert wrote: |
John Wong wrote: |
Laura Lambert wrote: |
Thursday, June 04, 2015, 9:07
Container was sprayed with TaC and let dry.
Container has 3x Ta heat shields including center block.
Container was loaded into EVAP2 yesterday and pumped down overnight.
HS water valves were opened up this morning, no leaks detected.
IGP1 = 4.6e-7 Torr.
Tapped up manually to 40A.
Waited ~25min, Vacuum stable.
IGP1 = 5.0e-7 Torr.
Initiating auto-ramp.
TGHT will be ramped to reach 2000C
Friday, June 05, 2015, 10:01
IGP1 = 4.5e-7 Torr.
TGHT = 313A, 4.47V
OMEGA = 1444C
Increasing ramping rate to 1.0A/min
Friday, June 05, 2015, 11:31
IGP1 = 1.2e-6 Torr.
Increasing ramping rate to 2.0A/min
|
Friday, June 05, 2015, 12:01
TGHT reached to 465A/7.56V, temp is stable at 2000C. Current vac at 1.2e-6 Torr and coming down
Cooling down process can be initiated after 4 hours.
|
Friday, June 05, 2015, 13:21
OMEGA = 1995C
Increasing TGHT to 470A to achieve desired max temperature of 2000C
Friday, June 05, 2015, 15:59
TGHT sat at max desired temperature of 2000C for ~4hrs.
TGHT = 470A, 7.7V
Initiating auto-cool at 1.0A/min.
Monday, June 08, 2015, 11:31
Vented in air and opened up this morning.
Target container mostly sintered, two tiny patches near both ends not fully sintered.
Will re-install and re-sinter next week as another container with priority needs to be sintered first.
Tuesday, June 09, 2015, 10:45
See attachements for 'not-fully-sintered' photos
|
Wednesday, June 10, 2015, 12:06
After inspecting the target container, the inner tube surface has "dark" patches, which may not be evenly coated or the coating layer was too think.
See link for photos: https://www.dropbox.com/sh/m94mjuuodwhz5jb/AADEBv_Kha_p_1An40eftWNHa?dl=0
Attempt to re-spray the container and re-sinter.
|
Friday, June 12, 2015, 14:58
re-sprayed with second layer of TaC spray this morning.
re-loaded into evap2.
HS water valves opened, no leaks detected.
will ramp-up over weekend. |
Friday, June 12, 2015, 16:08, John Wong, Empty, 40860-1, LP-IG-LIS, In progress, Re-Sintering TaC coating container for UCx
|
Laura Lambert wrote: |
John Wong wrote: |
Laura Lambert wrote: |
John Wong wrote: |
Laura Lambert wrote: |
Thursday, June 04, 2015, 9:07
Container was sprayed with TaC and let dry.
Container has 3x Ta heat shields including center block.
Container was loaded into EVAP2 yesterday and pumped down overnight.
HS water valves were opened up this morning, no leaks detected.
IGP1 = 4.6e-7 Torr.
Tapped up manually to 40A.
Waited ~25min, Vacuum stable.
IGP1 = 5.0e-7 Torr.
Initiating auto-ramp.
TGHT will be ramped to reach 2000C
Friday, June 05, 2015, 10:01
IGP1 = 4.5e-7 Torr.
TGHT = 313A, 4.47V
OMEGA = 1444C
Increasing ramping rate to 1.0A/min
Friday, June 05, 2015, 11:31
IGP1 = 1.2e-6 Torr.
Increasing ramping rate to 2.0A/min
|
Friday, June 05, 2015, 12:01
TGHT reached to 465A/7.56V, temp is stable at 2000C. Current vac at 1.2e-6 Torr and coming down
Cooling down process can be initiated after 4 hours.
|
Friday, June 05, 2015, 13:21
OMEGA = 1995C
Increasing TGHT to 470A to achieve desired max temperature of 2000C
Friday, June 05, 2015, 15:59
TGHT sat at max desired temperature of 2000C for ~4hrs.
TGHT = 470A, 7.7V
Initiating auto-cool at 1.0A/min.
Monday, June 08, 2015, 11:31
Vented in air and opened up this morning.
Target container mostly sintered, two tiny patches near both ends not fully sintered.
Will re-install and re-sinter next week as another container with priority needs to be sintered first.
Tuesday, June 09, 2015, 10:45
See attachements for 'not-fully-sintered' photos
|
Wednesday, June 10, 2015, 12:06
After inspecting the target container, the inner tube surface has "dark" patches, which may not be evenly coated or the coating layer was too think.
See link for photos: https://www.dropbox.com/sh/m94mjuuodwhz5jb/AADEBv_Kha_p_1An40eftWNHa?dl=0
Attempt to re-spray the container and re-sinter.
|
Friday, June 12, 2015, 14:58
re-sprayed with second layer of TaC spray this morning.
re-loaded into evap2.
HS water valves opened, no leaks detected.
will ramp-up over weekend.
|
Friday, June 12, 2015, 16:07
Vacuum comes down to 6.1e-6 Torr.
Initiated auto-ramping at 0.2A/min for 300A first.
|
Sunday, June 14, 2015, 09:40, John Wong, Empty, 40860-1, LP-IG-LIS, Done, Re-Sintering TaC coating container for UCx
|
John Wong wrote: |
Laura Lambert wrote: |
John Wong wrote: |
Laura Lambert wrote: |
John Wong wrote: |
Laura Lambert wrote: |
Thursday, June 04, 2015, 9:07
Container was sprayed with TaC and let dry.
Container has 3x Ta heat shields including center block.
Container was loaded into EVAP2 yesterday and pumped down overnight.
HS water valves were opened up this morning, no leaks detected.
IGP1 = 4.6e-7 Torr.
Tapped up manually to 40A.
Waited ~25min, Vacuum stable.
IGP1 = 5.0e-7 Torr.
Initiating auto-ramp.
TGHT will be ramped to reach 2000C
Friday, June 05, 2015, 10:01
IGP1 = 4.5e-7 Torr.
TGHT = 313A, 4.47V
OMEGA = 1444C
Increasing ramping rate to 1.0A/min
Friday, June 05, 2015, 11:31
IGP1 = 1.2e-6 Torr.
Increasing ramping rate to 2.0A/min
|
Friday, June 05, 2015, 12:01
TGHT reached to 465A/7.56V, temp is stable at 2000C. Current vac at 1.2e-6 Torr and coming down
Cooling down process can be initiated after 4 hours.
|
Friday, June 05, 2015, 13:21
OMEGA = 1995C
Increasing TGHT to 470A to achieve desired max temperature of 2000C
Friday, June 05, 2015, 15:59
TGHT sat at max desired temperature of 2000C for ~4hrs.
TGHT = 470A, 7.7V
Initiating auto-cool at 1.0A/min.
Monday, June 08, 2015, 11:31
Vented in air and opened up this morning.
Target container mostly sintered, two tiny patches near both ends not fully sintered.
Will re-install and re-sinter next week as another container with priority needs to be sintered first.
Tuesday, June 09, 2015, 10:45
See attachements for 'not-fully-sintered' photos
|
Wednesday, June 10, 2015, 12:06
After inspecting the target container, the inner tube surface has "dark" patches, which may not be evenly coated or the coating layer was too think.
See link for photos: https://www.dropbox.com/sh/m94mjuuodwhz5jb/AADEBv_Kha_p_1An40eftWNHa?dl=0
Attempt to re-spray the container and re-sinter.
|
Friday, June 12, 2015, 14:58
re-sprayed with second layer of TaC spray this morning.
re-loaded into evap2.
HS water valves opened, no leaks detected.
will ramp-up over weekend.
|
Friday, June 12, 2015, 16:07
Vacuum comes down to 6.1e-6 Torr.
Initiated auto-ramping at 0.2A/min for 300A first.
|
Sunday, June 14, 2015, 09:37
TGHT at 254.2A/3.5V3, DV = 1.614V Temp at 1177C.
Vacuum is stable at 3.2e-7 Torr.
Increase ramping rate at 2A/min until TGHT reached 300A.
Sunday, June 14, 2015, 10:04
TGHT reached 300A, temp 1368C.
Tapping up to ~1800C
Sunday, June 14, 2015, 11:26
TGHT at 425A/6.84V, DV 3.59V, temp at 1814C,
Vacuum coming down, currently at 7.5e-7 Torr.
Will remain at that current for at least 4 hours before cooling down
Sunday, June 14, 2015, 17:15
Target container has been sintered with TiC for over 6 hours at 1823C, with TGHT at 425A/6.84V, DV at 3.584V.
Vac at 4.9e-7 Torr.
Cooling initiated.
Chamber can be vented tomorrow and target container can be taken out for inspection.
Monday, June 15, 2015, 11:38
Target container was taken out for inspection.
It's observed that the coated/sintered TaC surface is improved. The sintered temperature was only gone up just above 1800C, so there still some area near the ends that is still somewhat "brownish", fully sintered shows a
smooth . (see attachment)
Spraying into a cylinder tube can be challenging. It was observed that the coating was dispersed out from the end cap to the centre tube. For that reason, the container isn't has much protective layer;vthe Ta surface can
react with carbides and the container eventually breaks. Take the endcap process for example, the caps are evenly coated with TaC and can be sintered up to 2000C (see e-log Evap ID 202).
Suggestions:
Using a spray ball nozzle or some sort so that the inner tube can be evenly coated.
Under investigating...
|
|