Entry  Thursday, January 07, 2016, 09:19, Aurelia Laxdal, Ta, 41369-5, HP-SIS, In progress, Temperature measurements Jan_9_and_10_2016_measurements.docx
Temperature measurements in progress this week for Ta HP-SIS.
See attachment for the current settings and rampings of the TGHT/TBHT  for the temperature measurements taken on  Jan. 9-10, 2016 .
Note: TBHT PS tripped off on Jan. 9, 2016 (see first page of the attached file) and couldn't turn it ON again over the week-end.
    Reply  Friday, January 08, 2016, 11:15, Laura Lambert, Ta, 41369-5, HP-SIS, Done, Temperature measurements 


    
        
            Aurelia Laxdal wrote:
        
        
            
            Temperature measurements in progress this week for Ta HP-SIS.
Entry  Wednesday, December 16, 2015, 10:22, Laura Lambert, Ta, 41369-5, HP-SIS, Done, Conditioning back-up Ta Target & emissivity measurements 
 Wednesday, December 16, 2015, 10:09
Target consists of 505 discs.
Total packed length 3.4cm.
Entry  Monday, December 07, 2015, 09:06, Laura Lambert, Empty, 39530-9, HP-FEBIAD, Done, emissivity measurements with no h.s on HP-FEBIAD container - round2 
 Monday, December 07, 2015, 09:04
No heat shields.
Container empty.
Entry  Thursday, September 24, 2015, 09:48, Laura Lambert, Empty, 41077-5, , In progress, Sintering TaC coating container for UCx Target 
Thursday, September 24, 2015, 08:39
IGP1 = 6.5e-7Torr
HS water valves opened, no leaks detected.
    Reply  Thursday, September 24, 2015, 12:18, John Wong, Empty, 41077-5, LP-SIS, Done, Sintering TaC coating container for UCx Target Screen_Shot_2015-09-24_at_11.51.11_AM.png420A_1900.pngTaC_coat_sintered.png


    
        
            Laura Lambert wrote:
        
        
            
            Thursday, September 24, 2015, 08:39
       Reply  Tuesday, October 06, 2015, 15:18, John Wong, Empty, 41077-5, LP-SIS, In progress, Test#1: Measuring temp with thermocouple (centre) & 2C-IR Temp_LPSIS_IR2C_vs_typeC.PNGTemp_LPSIS_IR2C_vs_typeC_heating_cooling.PNG


    
        
            John Wong wrote:
        
        
            
            
            
              
          Reply  Thursday, October 08, 2015, 12:26, John Wong, Empty, 41077-5, LP-SIS, In progress, Test#2: Measuring temp with thermocouple (away from centre) & 2C-IR Test_2_tempcurves.PNGTest1&2_IV_temp_.png


    
        
            John Wong wrote:
        
        
            
            
            
              
             Reply  Tuesday, December 01, 2015, 11:35, Anders Mjos, Empty, 41077-5, LP-SIS, In progress, Test#2: Measuring temp with thermocouple (away from centre) & 2C-IR 2015-10-08_Small_Centre_Block.xlsx2015-10-08.4ch2015-10-06.4ch2015-10-06_Small_Centre_Block.xlsx
 Data from thermocouple attached. Raw data and Excel sheet with plot.
Entry  Monday, November 30, 2015, 15:38, Laura Lambert, Empty, 39530-9, HP-FEBIAD, Done, emissivity measurements with no h.s on HP-FEBIAD container emissivity_measurements.xlsx
 Monday, November 30, 2015, 15:37
No heat shields.
Container empty.
Entry  Monday, November 23, 2015, 14:36, Laura Lambert, Empty, 39530-9, HP-FEBIAD, Done, temp measurements with no h.s on HP-FEBIAD container temp_measurements.xlsx
Monday, November 23, 2015, 14:29
No heat shields.
Container empty.
Entry  Tuesday, November 10, 2015, 14:34, Laura Lambert, SiC, 41077-3, LP-SIS, Done, temp measurements with 3xTa h.s on LPSIS (small block) container with SiC Evernote_Camera_Roll_20151110_110128.jpgEvernote_Camera_Roll_20151110_110129.jpgstriptool_screenshot_above_1700C.JPGtemp_measurements_on_LPSIS_(small_block)_container.xlsx
 Tuesday, November 10, 2015, 14:20
Container previously sintered with TaC coating and temperature measurements taken [see elog ID#
256, 257, 258]
Entry  Thursday, November 05, 2015, 16:20, Laura Lambert, , 41077-3, LP-SIS, In progress, Sintering TaC coating on 'temporary endcaps' springs 2015-11-02_16.03.10.jpg'temporary_endcap'_springs_nov.3_2015.jpgIMG_20151105_141239627_HDR.jpgIMG_20151105_141248901_HDR.jpg
 Thursday, November 05, 2015, 16:19
Springs coated with TaC and loaded into container for sintering.
3x Ta heat shield.
    Reply  Monday, November 09, 2015, 12:56, John Wong, , 41077-3, LP-SIS, In progress, Sintering TaC coating on 'temporary endcaps' springs (Slope changed to 1.04) 


    
        
            Laura Lambert wrote:
        
        
            
             Thursday, November 05, 2015, 16:19
       Reply  Monday, November 09, 2015, 14:22, Laura Lambert, , 41077-3, LP-SIS, Done, Sintering TaC coating on 'temporary endcaps' springs (Slope changed to 1.04) Evernote_Camera_Roll_20151110_113123.jpg


    
        
            John Wong wrote:
        
        
            
            
            
Entry  Monday, November 02, 2015, 16:29, Laura Lambert, Empty, 41077-3, LP-SIS, Done, temp measurements with 3xTa h.s on LPSIS (small block) container temp_measurements_on_LPSIS_(small_block)_container.xlsx3xTa_h.s_-_striptool_voltage.JPG
 Monday, November 02, 2015, 16:28
Container previously sintered with TaC coating and temperature measurements taken with 1x Ta
heat shield [see elog ID# 256] and 2x Ta heat shield [see elog ID#257]
Entry  Monday, October 26, 2015, 16:17, Laura Lambert, Empty, 41077-3, LP-SIS, Done, temp measurements with 2xTa h.s on LPSIS (small block) container 6x
 Monday, October 26, 2015, 16:16
Container previously sintered with TaC coating and temperature measurements taken with 1x Ta heat shield [see elog ID# 256]
2x Ta heat shields on this container.
Entry  Wednesday, October 21, 2015, 17:39, John Wong, Empty, 41077-3, LP-SIS, In progress, Sintering TaC on LPSIS (small block) container 
 Wednesday, October 21, 2015, 17:35
This container is prepared for a backup UCx target (otherwise it will be used for development purposes).
The container is coated with TaC; one layer of Ta-heat shield is used. 
    Reply  Thursday, October 22, 2015, 11:41, Laura Lambert, Empty, 41077-3, LP-SIS, In progress, Sintering TaC on LPSIS (small block) container 


    
        
            John Wong wrote:
        
        
            
             Wednesday, October 21, 2015, 17:35
       Reply  Thursday, October 22, 2015, 17:10, John Wong, Empty, 41077-3, LP-SIS, In progress, Sintering TaC on LPSIS (small block) container 


    
        
            Laura Lambert wrote:
        
        
            
            
            
              
          Reply  Monday, October 26, 2015, 16:14, Laura Lambert, Empty, 41077-3, LP-SIS, Done, Sintering TaC on LPSIS (small block) container & temp measurements with 1xTa h.s temp_measurements_on_sintering_TaC_on_LPSIS_(small_block)_container.xlsx


    
        
            John Wong wrote:
        
        
            
            
            
Entry  Tuesday, September 01, 2015, 17:20, John Wong, SiC, 39530-5, HP-FEBIAD, In progress, Sintering SiC#32 
Tuesday, September 01, 2015, 17:16
Target container contains 533 discs of SiC with packed length of 17cm. 
Mass of 533 discs SiC(green)  = 57.8979g
    Reply  Wednesday, September 02, 2015, 11:28, Laura Lambert, SiC, 39530-5, HP-FEBIAD, In progress, Sintering SiC#32 Screenshot-1stsintering-prewindow_coating.JPG


    
        
            John Wong wrote:
        
        
            
            Tuesday, September 01, 2015, 17:16
       Reply  Tuesday, September 08, 2015, 15:56, John Wong, SiC, 39530-5, HP-FEBIAD, In progress, Sintering SiC#32 SiC#33_HPFEBIAD_temp.PNGSiC#33_HPFEBIAD_temp.xlsxleft_window.JPGleft_window_1.JPG


    
        
            Laura Lambert wrote:
        
        
            
            
            
              
          Reply  Wednesday, September 09, 2015, 18:24, John Wong, SiC, 39530-5, HP-FEBIAD, In progress, Re-conditioning SiC#32 Screen_Shot_2015-09-09_at_5.53.15_PM.png


    
        
            John Wong wrote:
        
        
            
            
            
             Reply  Thursday, September 10, 2015, 09:58, Laura Lambert, SiC, 39530-5, HP-FEBIAD, In progress, Re-conditioning SiC#32 


    
        
            John Wong wrote:
        
        
            
            
            
                Reply  Thursday, September 10, 2015, 12:05, John Wong, SiC, 39530-5, HP-FEBIAD, Done, Re-conditioning SiC#32 Screen_Shot_2015-09-15_at_12.37.19_PM.pngScreen_Shot_2015-09-18_at_9.10.13_AM.pngScreen_Shot_2015-09-24_at_11.30.25_AM.png


    
        
            Laura Lambert wrote:
        
        
            
            
            
Entry  Tuesday, August 25, 2015, 11:54, Laura Lambert, Empty, , HP-FEBIAD, In progress, Sintering TaC coating container for SiC Target 
 Tuesday, August 25, 2015, 11:50
Container coated with TaC using new method: Ends tapped off,  with liquid poured in and swirled around entire container, then poured back
out - 'flushing technique'
    Reply  Thursday, August 27, 2015, 16:37, John Wong, Empty, , HP-FEBIAD, Done, Sintering TaC coating container for SiC Target 


    
        
            Laura Lambert wrote:
        
        
            
             Tuesday, August 25, 2015, 11:50
Entry  Monday, August 24, 2015, 12:58, John Wong, , , , Maintenance, Replacing turbo pump, IEVAP2TP1 
 Monday, August 24, 2015, 12:54
The turbo pump was found to be faulty.  The pump couldn't get on full speed and eventually timed out.  Vacuum group inspected the pump
and it is time for a service.  
Entry  Tuesday, August 18, 2015, 16:02, Laura Lambert, Ta, , HP-SIS, In progress, Conditioning Ta#46 Target 
Tuesday, August 18, 2015, 15:53
Target consists of 505 discs.
Total packed length 3.4cm.
    Reply  Wednesday, August 19, 2015, 17:26, John Wong, Ta, , HP-SIS, In progress, Conditioning Ta#46 Target 


    
        
            Laura Lambert wrote:
        
        
            
            Tuesday, August 18, 2015, 15:53
       Reply  Thursday, August 20, 2015, 10:07, Laura Lambert, Ta, , HP-SIS, In progress, Conditioning Ta#46 Target 


    
        
            John Wong wrote:
        
        
            
            
            
          Reply  Thursday, August 20, 2015, 17:15, John Wong, Ta, , HP-SIS, Done, Conditioning Ta#46 Target 


    
        
            Laura Lambert wrote:
        
        
            
            
            
              
Entry  Thursday, August 06, 2015, 15:45, Laura Lambert, Endcaps, , TARGET BOAT, Done, Sintering TaC coating on Ta endcaps round2_july_batch_(1).jpground2_july_batch_(2).jpground2_july_batch_(3).jpgsingle_round_sintering_(1).jpgsingle_round_sintering_(2).jpg
 Thursday, August 06, 2015, 15:36
The endcaps are stacked together with a punched out disc of graphite foil placed in between each endcap for separation so endcaps won't fuse together.
The end caps are further wrapped in a larger piece of graphite foil to hold together as a tube [same method used in elogID # 158]
Entry  Friday, July 31, 2015, 15:51, John Wong, Ta, , TARGET BOAT, In progress, Test for homogeneity: Sintering TaC coating on a Ta tube Screen_Shot_2015-07-31_at_3.46.10_PM.png
 Friday, July 31, 2015, 15:39
A Ta tube was coated with TaC.  The inner of the tube was filled with TaC solution and the excess was drained out to give a homogenous coating.
 The outer layer of the tube was brushed with TaC. 
    Reply  Tuesday, August 04, 2015, 12:04, Laura Lambert, Ta, , TARGET BOAT, Done, Test for homogeneity: Sintering TaC coating on a Ta tube Temp_measurements_of_new_port_window_for_2nd_OMEGA.xlsxIMG_20150806_151719182.jpgIMG_20150806_151748536.jpg


    
        
            John Wong wrote:
        
        
            
             Friday, July 31, 2015, 15:39
Entry  Friday, July 31, 2015, 15:10, John Wong, , , , Maintenance, Installed leftside port 
Friday, July 31, 2015, 15:09
The left side port was installed on the evaporator #2.  Leak check was performed and no leak was detected. 

 
Entry  Thursday, July 30, 2015, 17:07, John Wong, , , , Maintenance, Connect NALCW to EVAP1  
 Thursday, July 30, 2015, 17:02
EVAP1 cooling system is now on the NALCW.  The city water has been removed from the system.  
Tested all the cooling system interlocks by shutting off each individual valve, and the main supply valve to the lab -  All Passed!  
Entry  Monday, July 13, 2015, 11:54, Laura Lambert, Endcaps, 40282-5, TARGET BOAT, Problems, Sintering TaC coating on Ta endcaps endcaps_july_14_2015.JPGIMG_20150715_102332633.jpgIMG_20150715_102240364_HDR.jpgIMG_20150715_102631676.jpg
 Monday, July 13, 2015, 11:53
A Ta foil is placed in the target boat with separate slots for each endcap [same as elog 200]
The target boat is wrapped with 3-layers of Ta-heat shield.