Entry  Thursday, November 05, 2015, 16:20, Laura Lambert, , 41077-3, LP-SIS, In progress, Sintering TaC coating on 'temporary endcaps' springs 2015-11-02_16.03.10.jpg'temporary_endcap'_springs_nov.3_2015.jpgIMG_20151105_141239627_HDR.jpgIMG_20151105_141248901_HDR.jpg
 Thursday, November 05, 2015, 16:19
Springs coated with TaC and loaded into container for sintering.
3x Ta heat shield.
    Reply  Monday, November 09, 2015, 12:56, John Wong, , 41077-3, LP-SIS, In progress, Sintering TaC coating on 'temporary endcaps' springs (Slope changed to 1.04) 


    
        
            Laura Lambert wrote:
        
        
            
             Thursday, November 05, 2015, 16:19
       Reply  Monday, November 09, 2015, 14:22, Laura Lambert, , 41077-3, LP-SIS, Done, Sintering TaC coating on 'temporary endcaps' springs (Slope changed to 1.04) Evernote_Camera_Roll_20151110_113123.jpg


    
        
            John Wong wrote:
        
        
            
            
            
Entry  Monday, November 02, 2015, 16:29, Laura Lambert, Empty, 41077-3, LP-SIS, Done, temp measurements with 3xTa h.s on LPSIS (small block) container temp_measurements_on_LPSIS_(small_block)_container.xlsx3xTa_h.s_-_striptool_voltage.JPG
 Monday, November 02, 2015, 16:28
Container previously sintered with TaC coating and temperature measurements taken with 1x Ta
heat shield [see elog ID# 256] and 2x Ta heat shield [see elog ID#257]
Entry  Monday, October 26, 2015, 16:17, Laura Lambert, Empty, 41077-3, LP-SIS, Done, temp measurements with 2xTa h.s on LPSIS (small block) container 6x
 Monday, October 26, 2015, 16:16
Container previously sintered with TaC coating and temperature measurements taken with 1x Ta heat shield [see elog ID# 256]
2x Ta heat shields on this container.
Entry  Wednesday, October 21, 2015, 17:39, John Wong, Empty, 41077-3, LP-SIS, In progress, Sintering TaC on LPSIS (small block) container 
 Wednesday, October 21, 2015, 17:35
This container is prepared for a backup UCx target (otherwise it will be used for development purposes).
The container is coated with TaC; one layer of Ta-heat shield is used. 
    Reply  Thursday, October 22, 2015, 11:41, Laura Lambert, Empty, 41077-3, LP-SIS, In progress, Sintering TaC on LPSIS (small block) container 


    
        
            John Wong wrote:
        
        
            
             Wednesday, October 21, 2015, 17:35
       Reply  Thursday, October 22, 2015, 17:10, John Wong, Empty, 41077-3, LP-SIS, In progress, Sintering TaC on LPSIS (small block) container 


    
        
            Laura Lambert wrote:
        
        
            
            
            
              
          Reply  Monday, October 26, 2015, 16:14, Laura Lambert, Empty, 41077-3, LP-SIS, Done, Sintering TaC on LPSIS (small block) container & temp measurements with 1xTa h.s temp_measurements_on_sintering_TaC_on_LPSIS_(small_block)_container.xlsx


    
        
            John Wong wrote:
        
        
            
            
            
Entry  Tuesday, September 01, 2015, 17:20, John Wong, SiC, 39530-5, HP-FEBIAD, In progress, Sintering SiC#32 
Tuesday, September 01, 2015, 17:16
Target container contains 533 discs of SiC with packed length of 17cm. 
Mass of 533 discs SiC(green)  = 57.8979g
    Reply  Wednesday, September 02, 2015, 11:28, Laura Lambert, SiC, 39530-5, HP-FEBIAD, In progress, Sintering SiC#32 Screenshot-1stsintering-prewindow_coating.JPG


    
        
            John Wong wrote:
        
        
            
            Tuesday, September 01, 2015, 17:16
       Reply  Tuesday, September 08, 2015, 15:56, John Wong, SiC, 39530-5, HP-FEBIAD, In progress, Sintering SiC#32 SiC#33_HPFEBIAD_temp.PNGSiC#33_HPFEBIAD_temp.xlsxleft_window.JPGleft_window_1.JPG


    
        
            Laura Lambert wrote:
        
        
            
            
            
              
          Reply  Wednesday, September 09, 2015, 18:24, John Wong, SiC, 39530-5, HP-FEBIAD, In progress, Re-conditioning SiC#32 Screen_Shot_2015-09-09_at_5.53.15_PM.png


    
        
            John Wong wrote:
        
        
            
            
            
             Reply  Thursday, September 10, 2015, 09:58, Laura Lambert, SiC, 39530-5, HP-FEBIAD, In progress, Re-conditioning SiC#32 


    
        
            John Wong wrote:
        
        
            
            
            
                Reply  Thursday, September 10, 2015, 12:05, John Wong, SiC, 39530-5, HP-FEBIAD, Done, Re-conditioning SiC#32 Screen_Shot_2015-09-15_at_12.37.19_PM.pngScreen_Shot_2015-09-18_at_9.10.13_AM.pngScreen_Shot_2015-09-24_at_11.30.25_AM.png


    
        
            Laura Lambert wrote:
        
        
            
            
            
Entry  Tuesday, August 25, 2015, 11:54, Laura Lambert, Empty, , HP-FEBIAD, In progress, Sintering TaC coating container for SiC Target 
 Tuesday, August 25, 2015, 11:50
Container coated with TaC using new method: Ends tapped off,  with liquid poured in and swirled around entire container, then poured back
out - 'flushing technique'
    Reply  Thursday, August 27, 2015, 16:37, John Wong, Empty, , HP-FEBIAD, Done, Sintering TaC coating container for SiC Target 


    
        
            Laura Lambert wrote:
        
        
            
             Tuesday, August 25, 2015, 11:50
Entry  Monday, August 24, 2015, 12:58, John Wong, , , , Maintenance, Replacing turbo pump, IEVAP2TP1 
 Monday, August 24, 2015, 12:54
The turbo pump was found to be faulty.  The pump couldn't get on full speed and eventually timed out.  Vacuum group inspected the pump
and it is time for a service.  
Entry  Tuesday, August 18, 2015, 16:02, Laura Lambert, Ta, , HP-SIS, In progress, Conditioning Ta#46 Target 
Tuesday, August 18, 2015, 15:53
Target consists of 505 discs.
Total packed length 3.4cm.
    Reply  Wednesday, August 19, 2015, 17:26, John Wong, Ta, , HP-SIS, In progress, Conditioning Ta#46 Target 


    
        
            Laura Lambert wrote:
        
        
            
            Tuesday, August 18, 2015, 15:53
       Reply  Thursday, August 20, 2015, 10:07, Laura Lambert, Ta, , HP-SIS, In progress, Conditioning Ta#46 Target 


    
        
            John Wong wrote:
        
        
            
            
            
          Reply  Thursday, August 20, 2015, 17:15, John Wong, Ta, , HP-SIS, Done, Conditioning Ta#46 Target 


    
        
            Laura Lambert wrote:
        
        
            
            
            
              
Entry  Thursday, August 06, 2015, 15:45, Laura Lambert, Endcaps, , TARGET BOAT, Done, Sintering TaC coating on Ta endcaps round2_july_batch_(1).jpground2_july_batch_(2).jpground2_july_batch_(3).jpgsingle_round_sintering_(1).jpgsingle_round_sintering_(2).jpg
 Thursday, August 06, 2015, 15:36
The endcaps are stacked together with a punched out disc of graphite foil placed in between each endcap for separation so endcaps won't fuse together.
The end caps are further wrapped in a larger piece of graphite foil to hold together as a tube [same method used in elogID # 158]
Entry  Friday, July 31, 2015, 15:51, John Wong, Ta, , TARGET BOAT, In progress, Test for homogeneity: Sintering TaC coating on a Ta tube Screen_Shot_2015-07-31_at_3.46.10_PM.png
 Friday, July 31, 2015, 15:39
A Ta tube was coated with TaC.  The inner of the tube was filled with TaC solution and the excess was drained out to give a homogenous coating.
 The outer layer of the tube was brushed with TaC. 
    Reply  Tuesday, August 04, 2015, 12:04, Laura Lambert, Ta, , TARGET BOAT, Done, Test for homogeneity: Sintering TaC coating on a Ta tube Temp_measurements_of_new_port_window_for_2nd_OMEGA.xlsxIMG_20150806_151719182.jpgIMG_20150806_151748536.jpg


    
        
            John Wong wrote:
        
        
            
             Friday, July 31, 2015, 15:39
Entry  Friday, July 31, 2015, 15:10, John Wong, , , , Maintenance, Installed leftside port 
Friday, July 31, 2015, 15:09
The left side port was installed on the evaporator #2.  Leak check was performed and no leak was detected. 

 
Entry  Thursday, July 30, 2015, 17:07, John Wong, , , , Maintenance, Connect NALCW to EVAP1  
 Thursday, July 30, 2015, 17:02
EVAP1 cooling system is now on the NALCW.  The city water has been removed from the system.  
Tested all the cooling system interlocks by shutting off each individual valve, and the main supply valve to the lab -  All Passed!  
Entry  Monday, July 13, 2015, 11:54, Laura Lambert, Endcaps, 40282-5, TARGET BOAT, Problems, Sintering TaC coating on Ta endcaps endcaps_july_14_2015.JPGIMG_20150715_102332633.jpgIMG_20150715_102240364_HDR.jpgIMG_20150715_102631676.jpg
 Monday, July 13, 2015, 11:53
A Ta foil is placed in the target boat with separate slots for each endcap [same as elog 200]
The target boat is wrapped with 3-layers of Ta-heat shield.
Entry  Monday, June 29, 2015, 16:18, Laura Lambert, Empty, 41369-2, LP-SIS, In progress, Sintering TaC coating container 
 Monday, June 29, 2015, 16:17
Target container is coated with TaC. No Ta-heat shields are used.
TGHT will be ramped up to 580A at 0.2A/min.
    Reply  Monday, June 29, 2015, 23:42, John Wong, Empty, 41369-2, LP-SIS, In progress, Sintering TaC coating container 


    
        
            Laura Lambert wrote:
        
        
            
             Monday, June 29, 2015, 16:17
       Reply  Tuesday, June 30, 2015, 09:50, Laura Lambert, Empty, 41369-2, LP-SIS, In progress, Sintering TaC coating container LP-SIS_july3_2015_(1).jpgLP-SIS_july3_2015_(2).jpgLP-SIS_july3_2015_(3).jpgLP-SIS_july3_2015_(4).jpg


    
        
            John Wong wrote:
        
        
            
            
            
          Reply  Monday, July 06, 2015, 12:07, John Wong, Empty, 41369-2, LP-SIS, In progress, Sintering TaC coating container Screen_Shot_2015-07-06_at_11.52.16_AM.png


    
        
            Laura Lambert wrote:
        
        
            
            
            
             Reply  Monday, July 06, 2015, 16:30, Laura Lambert, Empty, 41369-2, LP-SIS, Done, Sintering TaC coating container July_10_2015_-_2nd_round_sintering_-_coating_(1).jpgJuly_10_2015_-_2nd_round_sintering_-_coating_(2).jpgJuly_10_2015_-_2nd_round_sintering_-_coating_(3).jpgJuly_10_2015_-_2nd_round_sintering_-_coating_(4).jpg


    
        
            John Wong wrote:
        
        
            
            
            
Entry  Thursday, June 25, 2015, 16:20, Laura Lambert, ZrC, 41177-2, LP-SIS, In progress, Sintering back-up ZrC 
 Thursday, June 25, 2015, 16:14
Total number of foils: 422 discs
Total mass of materials [incl graphite foils]: 
    Reply  Monday, June 29, 2015, 07:05, John Wong, ZrC, 41177-2, LP-SIS, Done, Sintering back-up ZrC Screen_Shot_2015-06-29_at_7.14.12_AM.png


    
        
            Laura Lambert wrote:
        
        
            
             Thursday, June 25, 2015, 16:14
Entry  Tuesday, June 23, 2015, 12:26, John Wong, SiC, 38817-6, HP-SIS, In progress, RUSH! SiC backup target undergoes sintering process 
Tuesday, June 23, 2015, 12:21
Target container is loaded with 485 discs of SiC with packed length of 17.4cm. 
Container is wrapped with 3 Ta-heat shields and previously coated/sintered with TaC.
    Reply  Thursday, June 25, 2015, 16:13, Laura Lambert, SiC, 38817-6, HP-SIS, Done, RUSH! SiC backup target undergoes sintering process IMG_20150625_152233125.jpgIMG_20150625_152256456.jpg


    
        
            John Wong wrote:
        
        
            
            Tuesday, June 23, 2015, 12:21
Entry  Monday, June 22, 2015, 13:11, John Wong, Empty, 38817-6, HP-SIS, In progress, RUSH! Sintering TaC coated container for SiC  
Monday, June 22, 2015, 13:00
Containers is coated with TaC. Wrapped with 3 layers of Ta heat-shield.  Air blown to for quick dry.
Installed, and pumped down, vac currently at 6.7e-6 Torr. 
    Reply  Tuesday, June 23, 2015, 10:18, Laura Lambert, Empty, 38817-6, HP-SIS, Done, RUSH! Sintering TaC coated container for SiC  


    
        
            John Wong wrote:
        
        
            
            Monday, June 22, 2015, 13:00
Entry  Thursday, June 18, 2015, 11:39, Rick Maharaj, , , , , Installation of Extraction Electrode Insulator - New Material 
Tuesday June 16, 2015
An Extraction Insulator ITD0381 made from a different grade of AiN was installed in Evaporator 2 for testing purposes. The sub assembly included
the SIS Restraint Housing ITD0389, New Extraction Insulator ITD0381, Repeller Electrode ITD0377, Extraction Electrode ITD0374 with fingerstock mounted.
Entry  Tuesday, June 09, 2015, 10:44, Laura Lambert, Empty, 41177-2, LP-SIS, In progress, Sintering TaC coating container for ZrC back-up 
 Tuesday, June 09, 2015, 9:16
Target container is coated with TaC. No Ta-heat shields are used.
TGHT will be ramped up to 580A at 0.2A/min.
    Reply  Wednesday, June 10, 2015, 16:35, John Wong, Empty, 41177-2, LP-SIS, In progress, Sintering TaC coating container for ZrC back-up 


    
        
            Laura Lambert wrote:
        
        
            
             Tuesday, June 09, 2015, 9:16
       Reply  Thursday, June 11, 2015, 16:10, Laura Lambert, Empty, 41177-2, LP-SIS, In progress, Sintering TaC coating container for ZrC back-up 


    
        
            John Wong wrote:
        
        
            
            
            
          Reply  Monday, June 15, 2015, 15:30, John Wong, Empty, 41177-2, LP-SIS, Done, Re-Sintering TaC coating container for ZrC back-up 


    
        
            Laura Lambert wrote:
        
        
            
            
            
              
Entry  Thursday, June 04, 2015, 11:10, Laura Lambert, Empty, , LP-IG-LIS, In progress, Sintering TaC coating container for UCx 
 Thursday, June 04, 2015, 9:07
Container was sprayed with TaC and let dry.
Container has 3x Ta heat shields including center block.
    Reply  Friday, June 05, 2015, 12:19, John Wong, Empty, , LP-IG-LIS, In progress, Sintering TaC coating container for UCx 


    
        
            Laura Lambert wrote:
        
        
            
             Thursday, June 04, 2015, 9:07
       Reply  Friday, June 05, 2015, 13:22, Laura Lambert, Empty, 40860-1, LP-IG-LIS, In progress, Sintering TaC coating container for UCx IMG_20150608_145926159.jpgIMG_20150608_145950384.jpg


    
        
            John Wong wrote:
        
        
            
            
            
          Reply  Wednesday, June 10, 2015, 12:15, John Wong, Empty, 40860-1, LP-IG-LIS, In progress, Sintering TaC coating container for UCx 


    
        
            Laura Lambert wrote:
        
        
            
            
            
             Reply  Friday, June 12, 2015, 14:59, Laura Lambert, Empty, 40860-1, LP-IG-LIS, In progress, Sintering TaC coating container for UCx 


    
        
            John Wong wrote:
        
        
            
            
            
                Reply  Friday, June 12, 2015, 16:08, John Wong, Empty, 40860-1, LP-IG-LIS, In progress, Re-Sintering TaC coating container for UCx 


    
        
            Laura Lambert wrote:
        
        
            
            
            
                   Reply  Sunday, June 14, 2015, 09:40, John Wong, Empty, 40860-1, LP-IG-LIS, Done, Re-Sintering TaC coating container for UCx 2coats.png


    
        
            John Wong wrote:
        
        
            
            
            