  Evaporator_2, Page 14 of 35  Not logged in ELOG logo
    Reply  Wednesday, June 15, 2016, 17:58, John Wong, SiC, 41369-4, HP-SIS, In progress, Sintering SiC#33 - 1st beta-SiC target! 


    
        
            Laura Lambert wrote:
        
        
            
            
            
              
    Reply  Thursday, June 16, 2016, 10:58, Laura Lambert, SiC, 41369-4, HP-SIS, Done, Sintering SiC#33 - 1st beta-SiC target! 


    
        
            John Wong wrote:
        
        
            
            
            
Entry  Thursday, June 16, 2016, 11:01, Laura Lambert, SiC, 41369-4, HP-SIS, Done, Conditioning SiC#33 - 1st beta SiC target! 9x
 Thursday, June 16, 2016, 10:59
Previously sintered over weekend [see elog i.d 306]
Target container contains 450 discs of SiC [4 x 5 packs + 430 single discs]
Entry  Monday, June 29, 2015, 16:18, Laura Lambert, Empty, 41369-2, LP-SIS, In progress, Sintering TaC coating container 
 Monday, June 29, 2015, 16:17
Target container is coated with TaC. No Ta-heat shields are used.
TGHT will be ramped up to 580A at 0.2A/min.
    Reply  Monday, June 29, 2015, 23:42, John Wong, Empty, 41369-2, LP-SIS, In progress, Sintering TaC coating container 


    
        
            Laura Lambert wrote:
        
        
            
             Monday, June 29, 2015, 16:17
    Reply  Tuesday, June 30, 2015, 09:50, Laura Lambert, Empty, 41369-2, LP-SIS, In progress, Sintering TaC coating container LP-SIS_july3_2015_(1).jpgLP-SIS_july3_2015_(2).jpgLP-SIS_july3_2015_(3).jpgLP-SIS_july3_2015_(4).jpg


    
        
            John Wong wrote:
        
        
            
            
            
    Reply  Monday, July 06, 2015, 12:07, John Wong, Empty, 41369-2, LP-SIS, In progress, Sintering TaC coating container Screen_Shot_2015-07-06_at_11.52.16_AM.png


    
        
            Laura Lambert wrote:
        
        
            
            
            
    Reply  Monday, July 06, 2015, 16:30, Laura Lambert, Empty, 41369-2, LP-SIS, Done, Sintering TaC coating container July_10_2015_-_2nd_round_sintering_-_coating_(1).jpgJuly_10_2015_-_2nd_round_sintering_-_coating_(2).jpgJuly_10_2015_-_2nd_round_sintering_-_coating_(3).jpgJuly_10_2015_-_2nd_round_sintering_-_coating_(4).jpg


    
        
            John Wong wrote:
        
        
            
            
            
Entry  Tuesday, September 12, 2023, 09:54, Darwin Ortiz Rosales, TaC, 41369-2, HP-SIS, Done, TaC coating sintering 
Tuesday, September 12, 2023, 09:51
The coated container was wrapped in 3 Ta foil heatshield and left in evap2 over night to attain vacuum.
Target temperature on OMEGA= 1850-1900 C
Entry  Thursday, December 14, 2023, 09:58, Darwin Ortiz Rosales, SiC, 41369-2, HP-SIS, Done, 231208SiC conditioning Screenshot_2023-12-14_133432.png
Thursday, December 14, 2023, 09:53
Target left pumping down in Evap2 overnight. 
Initial weight including protective jig = 1474.3 g
Entry  Thursday, May 11, 2017, 11:25, Laura Lambert, Empty, 41369-10, HP-FEBIAD-CTL, Done, RUSH! Sintering TaC coated container for SiC#36 LS_during_TaC_sintering.jpgRS_during_TaC_sintering.jpg
 Thursday, May 11, 2017, 11:21
Turns out SiC HP-FEBIAD that has finished conditioning is loaded in the wrong container and it should be a SiC HP-FEBIAD cold transfer line...so
rush on new target.
Entry  Tuesday, May 16, 2017, 11:57, Laura Lambert, SiC, 41369-10, HP-FEBIAD-CTL, Done, Sintering SiC#36 window_at_max_setpoint_after_1_day.jpg20170530_094047_Richtone(HDR).jpg20170530_094118_Richtone(HDR).jpg20170530_094137_Richtone(HDR).jpg
 Tuesday, May 16, 2017, 10:56
Target container contains 460 discs of SiC 
Target packed length = 17cm. 
Entry  Tuesday, April 17, 2018, 10:24, Laura Lambert, Ta, 41177-3, LP-SIS, Done, Conditioning Ta#56 back-up target/ Temp measurements for Aurelia 
 Tuesday, April 17, 2018, 10:20
Target consists of 470 discs.
Total packed length 3.4cm [exactly 7.8cm space on both sides]
Entry  Thursday, April 19, 2018, 12:38, Laura Lambert, Ta, 41177-3, LP-SIS, Done, Round 2. Temp measurements for Aurelia target Ta#56 
 Thursday, April 19, 2018, 12:37
See elog i.d. 404 for target description and first round of heating.
Endcaps inserted and expanded.
Entry  Thursday, February 19, 2015, 15:21, Laura Lambert, Empty, 41177-2, LP-SIS, Done, Sintering TaC coating container for UCx#12 
 Thursday, February 19, 2015, 15:19
Target container coated with TaC, loaded in EVAP2.
No Ta heat shields.
Entry  Tuesday, June 09, 2015, 10:44, Laura Lambert, Empty, 41177-2, LP-SIS, In progress, Sintering TaC coating container for ZrC back-up 
 Tuesday, June 09, 2015, 9:16
Target container is coated with TaC. No Ta-heat shields are used.
TGHT will be ramped up to 580A at 0.2A/min.
    Reply  Wednesday, June 10, 2015, 16:35, John Wong, Empty, 41177-2, LP-SIS, In progress, Sintering TaC coating container for ZrC back-up 


    
        
            Laura Lambert wrote:
        
        
            
             Tuesday, June 09, 2015, 9:16
    Reply  Thursday, June 11, 2015, 16:10, Laura Lambert, Empty, 41177-2, LP-SIS, In progress, Sintering TaC coating container for ZrC back-up 


    
        
            John Wong wrote:
        
        
            
            
            
    Reply  Monday, June 15, 2015, 15:30, John Wong, Empty, 41177-2, LP-SIS, Done, Re-Sintering TaC coating container for ZrC back-up 


    
        
            Laura Lambert wrote:
        
        
            
            
            
              
Entry  Thursday, June 25, 2015, 16:20, Laura Lambert, ZrC, 41177-2, LP-SIS, In progress, Sintering back-up ZrC 
 Thursday, June 25, 2015, 16:14
Total number of foils: 422 discs
Total mass of materials [incl graphite foils]: 