Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 14 of 34  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target Material Target Oven W.O# Source Status Subject
  419   Tuesday, September 11, 2018, 10:47 Aaron Schmidt    Evap 2 step discrepancy

 Tuesday, September 11, 2018, 10:45:

TGHT: 53.4 A   TBHT: 57.75

Actual

TGHT: 60.0A  TBHT: 59.0A

Uploaded the rest to Word doc. Screenshots included.

  418   Monday, September 10, 2018, 15:09 Marla CervantesEmpty42218-3LP-IG-LISDoneTaC coating/sintering for UC target container

 Monday, September 10, 2018, 15:09

Container is coated with TaC and wrapped with Ta heat-shield ( 3 layers)

Desired temp = 1900 C (expected TGHT ~445A/7.5V), TBHT will be set fixed at 230A (max).

Good vac at 3.00-5 Torr

Bad vac at 5.0e-5 Torr.

Chamber is currently being pumped down


 Tuesday, September 11, 2018, 09:27

Pressure at IGP1 8.61e-7 Torr. 

Auto ramping TGHT at 1A/min to reach 400A, and TBHT at 1A/min to reach 230A.


 Tuesday, September 11, 2018, 12:05

Pressure increased to 6.9e-e5 Torr and auto-ramp reduced the current:

TGHT from 94.6 A to 84.86 A

TBHT from 87.8 A to 78.87 A

(see figure EVAP2-_01)

EPICS automatically started ramping up TBHT and TGHT current when the pressure was between the good limit.


 Tuesday, September 11, 2018, 14:29

TBHT current reached ~230 A and EPICS stopped inputting current automatically. 

TBHT current reading on:

EPICS 232.8 A

Power supply: 235 A


 Tuesday, September 11, 2018, 16:53

TGHT reached 400 A, EPICS stopped auto-ramping automatically. (Fig. Heater-ramp and Plot_400A-230A)

Temperature read by OMEGA 1837 C (Fig. Tempeature-at-400A)


 Tuesday, September 11, 2018, 17:40

TGHT current was increased manually to 419 A (power supply current 422 A, EPICS plot 421.6 A) in steps of ~5A/2min

The temperature after ~30 min of being at 419 A is 1898 C.

The container will stay 5 hours at 1898 C 


Wednesday, September 12, 2018, 09:05 

EVAP2 remained at max setpoints for 5hrs

Auto-cool was set to 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.

The automatic ramp decreased the TBHT current to 0A, but not so for TGHT, 

TGHT only reduced to 22 A, the TGHT was manually tapped to 0A


 Wednesday, September 12, 2018, 18:30

Process completed (fig. TaC-coating). 

Chamber was vented.

  417   Tuesday, September 04, 2018, 17:04 John WongEmpty LP-SISProblemsTaC coating/sintering for UC target container

Tuesday, September 04, 2018, 16:58

Container is coated with TaC and wrapped with Ta heat-shield ( 3 layers)

Desired temp = 1900 C (expected TGHT ~445A/7.5V), TBHT will be set fixed at 230A (max).

Good vac at 3.00-5 Torr

Bad vac at 5.0e-5 Torr.

Chamber is currently being pumped down


 Wednesday, September 05, 2018, 10:53

Pressure at 9.5-7 Torr. 

Auto ramping TGHT at 1A/min to reach 400A, and TBHT at 1A/min to reach 230A.


 Wednesday, September 05, 2018, 17:52

Problem with TGHT readback vs setpoint.  TGHT ramped up to 400A, temp measured at 1830C.  However, the setup remained at 228A (see attachment).  The autoramping program only sees the readback; in this case, the TGHT would continue to keep ramping up until the target breaks.  The autoramping program has stopped just in time. 

TGHT stepped down to 400A (setpoint), readback at 206A/6.59V.  TGHT at 230A/4.16V.  Temperature holding at 1783C. 

Control has been informed.


 Thursday, September 06, 2018, 10:54

Target temp holding at 1773C.  Pressure at 8.5e-7 Torr. 

Ramping down TGHT and TBHT, and inspect the container later. 

Problem with the TGHT readback/setpoint will need to be investigated.


 Friday, September 07, 2018, 16:03

Target container is nicely sintered.

Awaiting for Control group to investigate with the problem on TGHT readback/setpoint. 


 

  416   Monday, August 20, 2018, 18:10 John Wongnp-SiC43044-1LP-SISDonenano-SiC final conditioning

Monday, August 20, 2018, 17:58

14.9 g of np-SiC fibrous target discs are loaded into the container (previously coated with TaC and sintered, see elog ID 414).

Total loaded length 9.5 cm. 

A 1.5" width graphite sheet is used as under layer to prevent TaC diffused to the discs; this was observed during the heat treatment, (see dropbox SEM images).

Both end caps are in.  With ionizer pointing out, right cap is expended BUT NOT left cap - will need to expend this after the conditioning.

No Ta heat-shield is used.

Final conditioning temperature:  1500 C (As per e-log 414, TGHT = 450A/7.31V, 3.28kW) 

Keeping TBHT at 0A for now - will ramp up after TGHT reach to the desired temperature. 

OMEGA slope set at 0.99

Good vac = 3.0e-5 Torr,

Bad vac = 5.0e-5 Torr.


 Tuesday, August 21, 2018, 10:24

Pressure at 1.2e-6 Torr. 

Initiated autoramping at 2A/min for TGHT to reach 400A - monitoring temp and vacuum.

TBHT set at 10A. 


 Tuesday, August 21, 2018, 15:13

Temp reached to 1350C. TGHT at 400A/6.7V. Pressure at 1.9e-6 Torr after holding at the temp for 100 min.


 Tuesday, August 21, 2018, 15:28

Tapped up TGHT to 450A/7.8V (3.5kW).  Temp measured at 1465 +/- 5 C.  Pressure coming down from 3.5 e-6 Torr.


 Tuesday, August 21, 2018, 15:32

Tapping up TBHT to 230A


 Tuesday, August 21, 2018, 16:25

TBHT at 230A/4.33V.  Pressure started to increase from 150A, and reached to 3.3e-6 Torr after TGHT reached to the setting.

Temperature measured at 1475 C +/- 5C.  Holding at this temperature until vacuum comes to stabilization (est.2-3 hours)


 Tuesday, August 21, 2018, 16:45

Checked with Mikron (slope set at 0.99); temp on left end-cap measured at 1490 +/- 20C (that's close enough).  Temp on ionizer tube about 1900C


 Tuesday, August 21, 2018, 22:12

Pressure at 1.7e-6 Torr.  Temp holding at 1480C, TGHT at 450/7.7V, TBHT 230A/4.27V.

Cooling down at 2A/min for TGHT and 1A/min for TBHT


 

  415   Wednesday, July 25, 2018, 17:33 John WongEmpty43044-2LP-SISDoneTaC coating/sintering for UCx#24

Wednesday, July 25, 2018, 17:32

Container is coated with TaC and wrapped with 3 layers of Ta heat-shields.

Desired sintering temperature ~1900 C, TGHT is estimated to be ~ 445A (3.3 kW), TBHT set to 230A (as usual).

OMEGA slope set to 0.99

Good vac = 3.0 e-5 Torr, Bad vac = 5.0 e-5 Torr.

Chamber is currently being pumped down.


 Friday, July 27, 2018, 10:32

Vacuum at 9.9 e-7 Torr. 

Autoramp TGHT at 1A/min to 300A and TBHT at 1A/min to 230A. Will monitor temp and adjust TGHT to reach the desire temp.


 Friday, July 27, 2018, 16:31

TGHT reached to 1500 C, and TBHT at 230A, Temp at 1480 C, pressure at 2.e-6 Torr.

Autoramp TGHt at 1A/min to 400A.  Continue monitoring temp.


 Saturday, July 28, 2018, 12:41

TGHT at 400A/6.2V. Temp at 1730 C.  Pressure 7.4 e-7 Torr.

Tapped up TGHT to 450A/7.2V, temp at 1891 C. Holding at this current... Pressure coming down from 1.2e-6 Torr.


 Monday, July 30, 2018, 22:40

Target temp has been held at 1880 C, TGHT at 450A/7.57V, TBHT 230/4.18V, vaccum at 3.8 e-7 Torr. 

Cooling TGHT and TBHT at 2A/min and 1A/min, respectively. 


 Tuesday, July 31, 2018, 10:23

TGHT/TBHT at 0A.  Pressure at 1.5e-7 Torr. 

Process completed. 

Venting chamber.

Target containers looks good.  Transferred to Ar glovebox.


 

  414   Tuesday, July 10, 2018, 16:43 John WongEmpty LP-SISDoneFor nano-SiC#1

Tuesday, July 10, 2018, 16:40

Container was flashed with TaC solution and let dry in air. 

No Ta heat shield is used. 

Desired temperature 1900C, ramp up TGHT accordingly. (Take note at 1500 and 1600 C).  

OMEGA slope setting = 0.98

TBHT set at 250A (as usual)

Chamber is currently being pump down.


 Wednesday, July 11, 2018, 10:54

Pressure at 4.5 e-7 Torr. 

Autoramping TGHT at 0.1A/min to reach 300A and TBHT at 0.1A/min to reach 230A. 

Once TGHT setting is reached, it will be further increased according to the temp measurement. 


 Friday, July 13, 2018, 10:57

TGHT at 300A/4.02V but temp is still too low to be detected. 

Increase TGHT to 400A, ramping at 1A/min.  TBHT is already at 230A/4.0V.

Current pressure at 4.4e-7 Torr.


 Friday, July 13, 2018, 13:09

TGHT reached 400A/5.85V, temp reading 1112C.

Ramping up to 500A


 TGHT reached 500A/7.9V.  temp reading 1250 C.

Ramping up to 600A


 Friday, July 13, 2018, 17:13

TGHT reached 600A/10.74V, temp reading 1742 C.

Ramping up to 650A


 Wednesday, July 18, 2018, 11:54

TGHT has remained at 650A/12.05V since Friday July 13.

Temperature check:

pyrometer: 1650 (250 correction) = 1900 C

OMEGA:  1-color (e= 0.32 for spectral hemispherical) = 1910 C

OMEGA: 2-color (slope @ 0.99) = 1905 C

Measurements are in agreement

Cooling TGHT at 2A/min, TBHT at 1A/min. Current pressure 3.7e-7 Torr.


 Wednesday, July 18, 2018, 13:47

TGHT at 500A, 8.4V, temp at 1600 C (4.2 kW)

TGHT at 475/7.84V, temp at 1550 C (3.72 kW - Max operating target heating power)

TGHT at 450/7.31V, temp at 1500 C (3.28 kW)

With TBHT set for 230A, usual operation setting, the temperature on the transfer tube is to exceed 2000 C.  Keeping TBHT at that setting may affect the overall temperature.

Note:  To condition the nanoSiC, it is better to keep TBHT at 0A and ramp up TGHT to 475A while monitoring the vacuum.  Then step up TBHT; any increase in vacuum would indicate a local evaporation of nanoSiC close to the ionizer. 

Temp measurement is complete, cooling down TGHT/TBHT to zero.


 Thursday, July 19, 2018, 12:23

TGHT has been at 0A for over 18 hours.  Vacuum pressure at 7e-8 Torr.

Venting chamber.


 

  413   Tuesday, July 03, 2018, 17:05 John Wongnp-SiCTube container DoneNanoSiC thermal treatment batch #3

Tuesday, July 03, 2018, 17:02

49 discs/ 15.42g np-SiC fibrous discs loaded into the tube container

Heat treatment is similar to previous process, see elog#408/409.

TGHt should be set at 330A/5.2V to reach temp 1575C (+/- 25C)

Omega slope set at 1.05 (for carbide)

Chamber is currently being pumped down


 Wednesday, July 04, 2018, 10:38

Pressure at 1.5 e-6 Torr.

Initiated auto-ramping at 0.2A/min to reach 330A/5.2V.


 Monday, July 09, 2018, 14:44

TGHT has been stabilized at 330A/5.2V for 24 hours.  Pressure at 3.7e-7 Torr.

Temp was measured at 1400C - light coating on window likely affected the measurements.

Measured with one-color pyrometer on Ta body inside the target container = 1550 C (with the correction of 250C for Ta). 

Adjusted OMEGA slope to 1.18, temp currently at 1580 C.


 Monday, July 09, 2018, 16:42

Pressure stabilized at 3.5e-7 Torr. 

Initiated auto-cooling at 1A/min.


 Tuesday, July 10, 2018, 11:11

Target is at room temperature. 

Process completed; see attachment for the data retrieval and dropbox (np-SiC production folder) for screen capture.

mass loss = (15.42 - 8.09) g = 7..33 g (47.5%) [in agreement - good!]


 

  412   Thursday, June 21, 2018, 11:38 Aaron SchmidtTa42218-9HP-SISDoneConditioning Ta#56

 Ta#56 HP-SIS target description:

Total Ta foils = 470 [6x20 packs + 350 single discs]

Foil Thickness = 0.025mm

Target density = 14.01 g/cm3

Target length = 3.4 cm

Total Mass = 47.374 g [Incl foils + Ta wire on 6 packs]

Total mass w/ Target oven= 1469 g

Discs in target are arranged as follows: 1pack / 75singles / 1pack / 100singles / 2packs / 100singles / 1pack / 75singles / 1pack


 

Thursday, June 21, 2018, 11:430: Ta#56 loaded into Evap 2 

Thursday, June 21, 2018, 11:37: Roughing

Thursday, June 21, 2018, 11:48 : Turbo pump started.

Thursday, June 21, 2018, 11:56 : Turbo pump at speed


Monday, June 25, 2018, 08:00: Vacuum @ 3.35e-07T

Monday, June 25, 2018, 08:05: TGHT/TBHT Power supplies switched on.

Monday, June 25, 2018, 09:35: Vacuum @ 3.23e-07T. Manually bump up TGHT to 40A.

Slope found / set.

TBHT will be ramped up to 230A at 1.0A/min.

TGHT will be ramped up to 650A at 2.0A/min.

Final desired temperature = 1900C

OMEGA slope = 0.98

Monday, June 25, 2018, 11:41: Auto-ramping TGHT / TBHT @ 2 / 1 A per min to 300 / 180 A 

Monday, June 25, 2018, 13:28: Check: Vacuum @ 1.08e-06T. TGHT / TBHT @ 248 / 110 A

Monday, June 25, 2018, 13:50: TGHT ramping halted momentarily. Limit increased to 350 A, continue ramping.

Monday, June 25, 2018, 14:44: Check: Vacuum @ 1.08e-06T. TGHT / TBHT @ 350 / 180 A. (hold till am)

Omega: 1033 deg C


Tuesday, June 26, 2018, 08:37: Vacuum @ 3.03e-07T. Auto-ramping TGHT / TBHT @ 2 / 1 A per min to 600 / 230 A . Omega: 1010 deg C (approx)

Tuesday, June 26, 2018, 11:25: Vacuum @ 1.34e-06T. TGHT / TBHT @ 248 / 110 A. Omega: 1605 deg C (approx) 

Auto-ramping TGHT  @ 2 A per min to 650 A

Tuesday, June 26, 2018, 12:06: Limited at 608A ? Display still ramping past the auto-ramp limit. 

Tuesday, June 26, 2018, 12:24 : Auto ramp halted. Display brought to 610 A. Readback 603 A

Tuesday, June 26, 2018, 12:41: Voltage limit adjusted to 12.00V. Mnaualy increased TGHT to 620 A. Auto-ramping TGHT  @ 2 A per min to 650 A

Tuesday, June 26, 2018, 12:59: Check: Vacuum @ 1.53e-06T. TGHT / TBHT @ 650 / 230 A. 

Omega: 1747 deg C

Tuesday, June 26, 2018, 15:07: Check: Vacuum @ 9.73e-07T. TGHT / TBHT @ 650 / 230 A. (hold till am)

Omega: 1760 deg C


Wednesday, June 27, 2018, 07:49: Check: Vacuum @ 5.06e-07T. TGHT / TBHT @ 650 / 230 A.

Omega: 1796 deg C. Begin auto-ramping TGHT to 700 A @ 2 A per min with pause at 675 A. Monitor.

Wednesday, June 27, 2018, 08:00: Check: Vacuum @ 5.80e-07T. TGHT / TBHT @ 675 / 230 A.

Omega: 1843 deg C. Begin auto-ramping TGHT to 700 A @ 2 A per min. Monitor.

Wednesday, June 27, 2018, 08:16: Vacuum @ 7.45e-07T. TGHT / TBHT @ 700 / 230 A. Omega: 1890 deg C (approx). 

Wednesday, June 27, 2018, 08:23: Vacuum @ 8.53e-07T. TGHT / TBHT @ 707 / 230 A. TGHT Voltage= 10.783V. Omega: 1906-1913 deg C. Desired temperature = 1900C reached.

Wednesday, June 27, 2018, 13:11: Vacuum @ 6.77e-07T. Omega: 1902-1915 deg C

Wednesday, June 27, 2018, 14:53: Begin auto-cooling TGHT / TBHT @ - 2 / -1 A per min overnight. 


Thursday, June 28, 2018, 07:39: Power supplies off. Turbo pump off.  

Thursday, June 28, 2018, 09:38: Vented. Remove From Evap 2.

  411   Friday, June 08, 2018, 08:33 Aaron Schmidt   Problems resolvedChiller tripped / Alarm

Alarm noted on passing Hot Lab. RPG notified, no radiological hazards. ISAC ops contacted, drop in DI water last night.

Entered w/ PPE. Chiller alarming. Evap 1 running ok

Friday, June 08, 2018, 08:30: Chiller turned on/off. Reset. No alarm.

  410   Wednesday, May 23, 2018, 15:21 Laura LambertEmpty HP-FEBIAD-CTLDoneSintering TaC coating container for UCx#23

Wednesday, May 16, 2018, 09:56

Container coated with TaC using 'flushing technique' and let dry over weekend.

Cleaned ionizer tube with acetone, no coating inside ionizer tube.

Wrapped with 3 x Ta heat shields, not incl center block

OMEGA slope = 0.98

*NOTE: realized after pumping down, filament on IGP2 is burnt out and needs replacing, will order a new one and use IGP1 for this process


Thursday, May 17, 2018, 13:15 

HS water valves remained open since the last time evap2 was used, no leak check done.

Tapped up manually to 50A.

Waited ~1hr

Vacuum stable.

IGP1 = 1e-6 Torr

Initiating auto ramp for TGHT @ 0.2A/min to a max setpoint of 350A

Initiating auto ramp for TBHT @ 0.1A/min to a max setpoint of 230A

Once max setpoints achieved, will tap up manually to final desired temperature of 1900C


Friday, May 18, 2018, 13:00 

Tapped up manually.

TGHT = 495A, 8.84V

TBHT = 230A, 3.26V

MIKRON = 2000C

Filament = 1910C

OMEGA = 1910C

Will remain at max setpoints over weekend.


Tuesday, May 22, 2018, 10:04 

Remained at max setpoints over long wknd.

TGHT = 495A, 8.85V

TBHT = 230A, 3.26V

IGP1 = 2.47e-7 Torr

Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


Wednesday, May 23, 2018, 10:08 

Vented in air this morning.

Container looks good!

Transferred into glove box.


 

 

  409   Tuesday, May 08, 2018, 15:06 John Wongnp-SiCTube container  DoneNanoSiC thermal treatment batch#2

Tuesday, May 08, 2018, 15:02

22 np-SiC fibrous discs loaded in the tube container (coated and sintered with TaC)

Heat treatment is similar to previous process, see elog #408. 

TGHT should be set at 330A/5.2V to reach temp 1575C (+/- 25).

Omega slope set at 1.05 (for carbide)

Chamber is currently being pumped down


 Tuesday, May 08, 2018, 22:46

Pressure at 2.2e-6 Torr.

Initiated autoramping at 0.2A/min to reach 330A


 Friday, May 11, 2018, 11:11

TGHT reached to 330A/5.1V but temp was measured at 1400A; It was held at that current for about 10 hours.

Increased TGHT to 335A/5.2V - temp is holding at 1420C (Will check the window if there is any coating that might have caused the discrepancy)


 Sunday, May 13, 2018, 00:25

In fact, the window is slightly coated.  The temperature should already be at optimum, 1600C.  Will keep heating for another day.


 Sunday, May 13, 2018, 14:10

Temp holding up well.. Pressure at 1.8e-7 torr. 

cooling down at 2A/min.


 Monday, May 14, 2018, 09:33

Target has been cooled for over 18 hours.  Pressure at 1.1e-7 Torr.

Venting chamber.

mass loss = (8.65 - 4.32)g = 4.33 g (50%) [slightly higher than expected, likely due to increase of 5A on TGHT]


 

  408   Tuesday, May 01, 2018, 18:07 John Wongnp-SiCTube container DoneNanoSiC thermal treatment batch#1

Tuesday, May 01, 2018, 18:06

21 fibrous discs of nanoSiC are loaded into a tube container (coated/Sintered with TaC). 

Thermal treatment temperature at 1600C, TGHT is ~338A/5.5V, according to elog #407.


 Wednesday, May 02, 2018, 08:27

20 mins ago... initiate auto ramping at 0.2A to reach TGHT 250A.  Instead of ramping incrementally, TGHT jumped straight to 250A; vacuum shot up to milli torr.

Turn off TGHT immediately to let vacuum stable down to 10-6 Torr. 

System problem??  Archive striptool for more details. 

Re-activate auto-ramping - OK!

Once TGHT reached 250A (18 hours later from now), will continue ramping up to reach 1600C


 Friday, May 04, 2018, 01:09

TGHT just reach 250A, temp at about 1190C.  Pressure remained high at 4.2e-5 Torr. 

Continue autoramping to reach TGHT 300A.


 Friday, May 04, 2018, 11:07

TGHT at 300A for about 1.5 hr.  Temp at 1315C.  Pressure at 5.7e-6 Torr.

Autoramp to 320A.


 Friday, May 04, 2018, 14:39

Tapping up to 330A; temp at 1560C with slope changed to 1.05 (for carbide material). Will keep at this current/temp.


 Sunday, May 06, 2018, 13:25

TGHT at 330A/5.2V; holding temp at 1550C.  No coating on windows.  Pressure at 1.6e-7 Torr.

Cooling down at 2A/min. 


 Monday, May 07, 2018, 10:49

Evap cooled.  Venting chamber. 

Inspection of the discs next...

mass loss = 6.79 - 3.62 = 3.1 g (46%) [in agreement, good]


 

  407   Saturday, April 28, 2018, 16:12 John WongEmptyTube container  DoneTaC coating/sintering of Tube container

Saturday, April 28, 2018, 16:09

Container is coated with TaC and wrapped with TaC heatshield. 

Will be used for carbonizing nanoSiC target materials.

Chamber is pumping down...

Sintering temp 1800C, est TGHT ~550A


 Saturday, April 28, 2018, 18:08

Pressure at 5.e-6 Torr. 

Initial auto-ramp at 1.0A/min reaching TGHT 500A.  Monitoring temp.


 Sunday, April 29, 2018, 23:37

Target temp stabilizes at 1800C with TGHT holding at 400A/7.02V for 24 hours.  Pressure at 4.4 e-7 Torr.

Lower TGHT to 338A/5.51V to reach 1600C - This will temp/current will be used for carbonizing the nanoSiC fibers.

Holding TGHT overnight to determine temp stability.


 Monday, April 30, 2018, 18:04

Temp is holding at 1600C, TGHT 338A/5.5V.  Pressure at 3.0 e-7 Torr. 

Initiated cooling down at 2A/min.


 

  406   Wednesday, April 25, 2018, 07:21 Aaron Schmidt   DoneHS swap evap 2

Wednesday, April 25, 2018, 07:05: TGHT & TBHT off

Wednesday, April 25, 2018, 07:15: BV1 & TP1 off

Wednesday, April 25, 2018, 07:17: PV1 & BP1off

Wednesday, April 25, 2018, 07:19: Begin venting

Wednesday, April 25, 2018, 07:22: Full venting.

Wednesday, April 25, 2018, 07:29: HS waterlines purged.

Wednesday, April 25, 2018, 07:48: Aurelia's test ta target assembly was removed. The blank target heating heat shield for evap 2 was reinstalled. shields in but empty.

Evap 2 Doors closed.

  405   Thursday, April 19, 2018, 12:38 Laura LambertTa41177-3LP-SISDoneRound 2. Temp measurements for Aurelia target Ta#56

 Thursday, April 19, 2018, 12:37

See elog i.d. 404 for target description and first round of heating.

Endcaps inserted and expanded.

No Rh foil inserted.

Loaded into evap2 and chamber currently pumping down.


Thursday, April 19, 2018, 14:00: water cooling lines opened. No response. Vacuum @ 1.8e-06T - AS

Thursday, April 19, 2018, 14:07: Power supplies swtiched on. - AS

  404   Tuesday, April 17, 2018, 10:24 Laura LambertTa41177-3LP-SISDoneConditioning Ta#56 back-up target/ Temp measurements for Aurelia

 Tuesday, April 17, 2018, 10:20

Target consists of 470 discs.

Total packed length 3.4cm [exactly 7.8cm space on both sides]

Total mass g [Incl foils + Ta wire on 6 packs]

Target consists of 350 single discs and 6x20 packs of Ta discs

Discs in target are arranged as follows: 1pack / 75singles / 1pack / 100singles / 2packs / 100singles / 1pack / 75singles / 1pack

No Heat shields.

No endcaps inserted, no Rh foil inserted.

Chamber pumped down over night.

HS water valves opened, no leaks detected
 
Tapped up manually to 35A
 
Vacuum stable, IGP1 = 6.5e-7 Torr
 
Initiating auto-ramp.
 
OMEGA slope = 0.98

TGHT will be ramped up to 300A at 1.0A/min.

Aurelia will take over for temp measurements.

Final desired temperature = 1900C

Vacuum limit stop at 3.0e-5 Torr, backing off at 8.0e-5 Torr.


 Thursday, April 19, 2018, 08:39

First round of temperature measurements complete.

Reached a max current of 600A, ~1700C

Cooled down overnight.

Will remove from evap2, insert endcaps, and load back in for more measurements.


 Thursday, April 19, 2018, 12:35

Vented in air and removed from evap2.

See next elog for follow up temperature measurements.


 

  403   Thursday, March 08, 2018, 11:05 Marla CervantesEmpty39530-3LP-FEBIADDoneTemperature measurements for ARIEL

 Friday, March 09, 2018, 11:03

LP-FEBIAD loaded into evap2 and pumped down.

Temperature measurements of the ionizer will be done by Fernando for ARIEL development.

Ta foil covering side holes on heat shield so no temp measurements can be done using OMEGA on side ports of evaporator as per request of Fernando

No Ta heat shields on container.

HS water valves opened, no leaks detected.

IGP1 = 1.72e-7 Torr

 

 

IGP2 = 1.36e-7 Torr

Tapped up to TGHT = 50 A, 0.54 V; TBHT = 50 A, 0.45 V

IGP1 = 1.8e-6 Torr

IGP2 = 1.4e-6 Torr

Initiating auto ramp for TGHT at 2.0A/min up to 310A and TBHT at 1.0A/min up to 210A


Monday, March 12, 2018, 10:16 

IGP1 = 8.8e-8 Torr

IGP2 = 6.6e-8 Torr

TGHT = 310A, 5.06V

TBHT = 210A, 2.98 V

TGHT and TBHT will be adjusted accordingly for temperature measurements


Tuesday, March 13, 2018, 16:00 

Temperature measurements done.

Initiated auto-cool.

TGHT cooling at 2.0A/min and TBHT at 1.0A/min.


 

 

 

 

 

 

 

 

 

 

 

Wednesday, March 14, 2018, 16:03

Removed from evap2.

  402   Wednesday, February 28, 2018, 15:18 Laura LambertEmpty42218-13LP-SISDoneSintering TaC coating on UCx#22 container

 Wednesday, February 28, 2018, 15:16

Container coated with TaC using 'flushing technique' and let dry.

Q-tip to plug ionizer became stuck in ionizer, removed manually with small drill bit.

Inspected ionizer with microscope, ionizer still good.

Cleaned ionizer tube with acetone.

Wrapped with 3 x Ta heat shields, incl center block

Currently pumping down in evap2

OMEGA slope = 0.98

Good vac at 3.0e-5, bad vac at 8.0e-5 Torr.


 Thursday, March 01, 2018, 10:06

HW water valves opened yesterday, no leaks detected.

IGP1 = 2.8e-7 Torr

Tapped up manually to 40A.

Waited ~3hrs

Vacuum stable.

IGP1 = 5.3e-7 Torr

IGP2 = 5.4e-7 Torr

Initiating auto ramp for TGHT @ 1.0A/min to a max setpoint of 350A

Initiating auto ramp for TBHT @ 0.5A/min to a max setpoint of 230A

Once max setpoints achieved, will tap up manually to final desired temperature of 1900C


 Thursday, March 01, 2018, 14:39

Vacuum started to climb very fast - auto-ramp was stopped.

Vacuum climbed up to IGP1 = 1.3e-4 Torr

Tapped TGHT back down to 80A from 90A, TBHT down to 50A from 60A.

Waited ~40min.

Vacuum stable, IGP1 = 2.6e-6 Torr

Restarting auto-ramp.


 Thursday, March 01, 2018, 14:54

IGP1 = 2.1e-5 Torr

Vacuum climbing quite rapidly again, stopped auto-ramp and vacuum started to drop right away.

TGHT = 100A

TBHT = 56A

Waited ~10min

IGP1 = 6.0e-6 Torr

IGP2 = 5.2e-6 Torr

Decreasing ramping rate to 0.5A/min and 0.2A/min for the TGHT and TBHT respectively, and re-initiating auto-ramp.


 Friday, March 02, 2018, 10:18

TGHT = 350A, 5.61V

TBHT = 230A, 4.04V

IGP1 = 4.3e-7 Torr

IGP2 = 3.8e-7 Torr

OMEGA = 1624C

Vacuum stable.

Increasing max setpoint of TGHT to 400A

Re-initiating auto-ramp of TGHT.


 Friday, March 02, 2018, 11:04

TGHT = 372A, 6.05V

IGP1 = 5.0e-7 Torr

Increasing ramping rate for TGHT to 1.0A/min


 Friday, March 02, 2018, 11:44

TGHT = 400A, 6.60V

IGP1 = 6.9e-7 Torr

OMEGA = 1780C

Vacuum stable.

Increasing max setpoint of TGHT to 430A

Re-initiating auto-ramp of TGHT.


 Friday, March 02, 2018, 12:17

TGHT = 430A, 7.22V

OMEGA = 1866C

IGP1 = 9.5e-7 Torr

Tapped up manually to OMEGA = 1910C

TGHT = 445A, 7.57V

TBHT = 230A, 4.07V

IGP1 = 1.1e-6 Torr

IGP2 = 9.9e-7 Torr


 Monday, March 05, 2018, 08:41

Remained at max setpoints over the weekend.

TGHT = 445A, 7.47V

TBHT = 230A, 4.06V

IGP1 = 1.87e-7 Torr

IGP2 = 1.47e-7 Torr

OMEGA = 1894C

Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


 Tuesday, March 20, 2018, 14:53

Vented in air.

Container was transferred to glove box for loading ~1 week ago

Container looks good.


 

  401   Monday, February 19, 2018, 14:16 Laura LambertEmpty39530-3LP-FEBIADDoneTemperature measurements for ARIEL

Monday, February 19, 2018, 13:39

LP-FEBIAD loaded into evap2 this morning and pumped down.

Temperature measurements of the ionizer will be done by Fernando for ARIEL development.

Ta foil covering side holes on heat shield so no temp measurements can be done using OMEGA on side ports of evaporator as per request of Fernando

No Ta heat shields on container.

HS water valves opened, no leaks detected.

IGP1 = 2.75e-6 Torr

IGP2 = 1.42e-6 Torr

Tapped up to TGHT = 50A, 0.53V; TBHT = 50A, 0.56V

IGP1 = 2.64e-6 Torr

IGP2 = 1.35e-6 Torr

Initiating auto ramp for TGHT at 2.0A/min up to 350A and TBHT at 1.0A/min up to 210A


 Tuesday, February 20, 2018, 09:15

IGP1 = 6.9e-7 Torr

IGP2 = 3.8e-7 Torr

TGHT = 350A, 5.98V

TBHT = 210A, 3.02V

TGHT and TBHT will be adjusted accordingly for temperature measurements...


 Tuesday, February 27, 2018, 14:55

Temperature measurements done.

Initiated auto-cool.

TGHT cooling at 2.0A/min and TBHT at 1.0A/min.


 Wednesday, February 28, 2018, 10:39

Tuesday, December 19, 2017, 11:40

Vented in air and removed from evap2 today.


 

  400   Wednesday, December 13, 2017, 10:55 Laura LambertEmpty39530-3LP-FEBIADDoneTemperature measurements for ARIEL

 Wednesday, December 13, 2017, 10:36

LP-FEBIAD loaded into evap2 this morning and pumped down.

Temperature measurements of the ionizer will be done by Fernando for ARIEL development.

Ta foil covering side holes on heat shield so no temp measurements can be done using OMEGA on side ports of evaporator as per request of Fernando

No Ta heat shields on container.

HS water valves opened, no leaks detected.

IGP1 = 2.3e-6 Torr

IGP2 = 1.7e-6 Torr

Tapped up to TGHT = 50A, 0.30V; TBHT = 50A, 0.59V

IGP1 = 1.8e-6 Torr

IGP2 = 1.4e-6 Torr

Initiating auto ramp for TGHT at 2.0A/min up to 350A and TBHT at 1.0A/min up to 210A


 Wednesday, December 13, 2017, 14:53

IGP1 = 7.6e-7 Torr

IGP2 = 6.4e-7 Torr

TGHT = 350A, 5.85V

TBHT = 210A, 3.02V

TGHT and TBHT will be adjusted accordingly for temperature measurements...


Thursday, December 14, 2017, 09:16 

IGP1 = 2.1e-7 Torr

IGP2 = 1.7e-7 Torr

TGHT = 385A, 6.80V

TBHT = 210A, 3.01V

Tapped up to TGHT = 400A, 7.11V

Stopped for temperature measurements.

Tapped up to TGHT = 450A, 8.20V


 Friday, December 15, 2017, 09:50

IGP1 = 1.2e-7 Torr

IGP2 = 9.6e-8 Torr

TGHT = 350A, 5.82V

TBHT = 210A, 2.94V

Initiating auto-ramp to TGHT = 650A


Monday, December 18, 2017, 10:43

Temperature measurements done.

Initiated auto-cool.

TGHT cooling at 2.0A/min and TBHT at 1.0A/min.


 Tuesday, December 19, 2017, 11:40

Vented in air and removed from evap2 today.


 

ELOG V2.9.2-2455