Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 11 of 34  Not logged in ELOG logo
  ID Date Authordown Target Material Target Oven W.O# Source Status Subject Text Attachments
  311   Tuesday, August 02, 2016, 13:56 Laura LambertSiC40860-3LP-IG-LISDoneSintering SiC#34 Tuesday, August 02, 2016, 13:41
Target container contains 471
 sintering-_coating_on_window1.jpgsintering-_coating_on_window2.jpgsintering-_coating_on_window3.jpeg 
  312   Monday, August 08, 2016, 15:22 Laura LambertSiC40860-3LP-IG-LISProblemsConditioning SiC#34 Monday, August 08, 2016, 15:19
Previously sintered over weekend
 conditioning_temperature_graph.xlsxstriptool_conditioning_target_BROKEN.JPG 
  313   Friday, August 12, 2016, 11:08 Laura Lambert   MaintenanceNEW PUMP FOR GLOVE BOXWednesday, August 03, 2016, 16:16
Tues July 26th had some problems
with the transfer chamber
  
  314   Wednesday, August 17, 2016, 17:31 Laura LambertEmpty39814-V2-1LP-IG-LISIn progresssintering TaC coating on SiC#34 container...round2 Wednesday, August 17, 2016, 17:30
Container coated with TaC using
 leak.JPGwater_leak.JPEG 
  322   Thursday, September 15, 2016, 16:37 Laura LambertSiC39530-9HP-FEBIADIn progressSintering SiC#35 Thursday, September 15, 2016, 16:23
Target container contains 487
  
  324   Tuesday, September 20, 2016, 15:40 Laura LambertSiC39530-9HP-FEBIADIn progressSintering SiC#35

    

       
            
 sintering_target_data.xlsx 
  326   Monday, September 26, 2016, 13:49 Laura LambertSiC39530-9HP-FEBIADDoneSintering SiC#35

    

       
            
 comparison_of_temperature_drop_-_3x_snapshots.JPG 
  327   Wednesday, September 28, 2016, 17:09 Laura LambertEmpty41790-6LP-SISDonesintering TaC coating on UCx container Wednesday, September 28, 2016, 17:08
Container coated with TaC using
 sintering_TaC_coating.xlsxsintering_TaC_coating.JPGsintering_TaC_coating2.JPGsintering_TaC_coating-combo_of_both_pics.JPG 
  328   Friday, October 07, 2016, 16:42 Laura LambertTa41790-5LP-SISIn progressConditioning Ta#50Friday, October 07, 2016, 16:40
Target consists of 470 discs.
 Ta#50_no_endcaps_3xh.s..xlsx 
  330   Thursday, October 13, 2016, 17:32 Laura LambertTa41790-5LP-SISDoneConditioning Ta#50

    

       
            
  
  331   Thursday, October 13, 2016, 18:05 Laura LambertTa41790-5LP-SISIn progressTemperature measurements for Ta#50Thursday, October 13, 2016, 18:04
Target loaded into evap2
No heat shields.
  
  334   Tuesday, October 18, 2016, 09:23 Laura LambertTa41790-5LP-SISDoneTemperature measurements for Ta#50

    

       
            
  
  337   Thursday, November 17, 2016, 11:15 Laura Lambertnp-SiC TARGET BOATIn progressHeat-treatment: Beta-SiC (1um) fiber mats - SAMPLE ID: A1


   
        
            
  
  339   Tuesday, November 22, 2016, 15:58 Laura LambertNb40282-3TARGET BOATDoneConditioning Nb samples for DougTuesday, November 22, 2016, 15:53
Target boat has a layer of niobium
 samples.jpgevap2.jpgheating_up.xlsxvisual_of_MIKRON_pointing_at_samples.JPG 
  340   Thursday, December 01, 2016, 16:08 Laura LambertEmpty42218-12LP-SISDonesintering TaC coating on UCx#19 container Thursday, December 01, 2016, 16:06
Container coated with TaC using
  
  341   Friday, December 16, 2016, 14:14 Laura LambertTa39530-3LP-FEBIADDoneConditioning Ta FEBIAD target for shutdown tests Friday, December 16, 2016, 14:08
Target consists of 470 discs.
 Ta-FEBIAD.xlsxEvernote_Camera_Roll_20161220_145947.jpg 
  342   Tuesday, December 20, 2016, 15:04 Laura Lambert   MaintenanceRETURN and SUPPLY valves CLOSED for xmas breakTuesday, December 20, 2016, 15:05
confirmed ~full tank of Ar for glove
box --> ~1600psi 
  
  343   Tuesday, January 31, 2017, 16:03 Laura LambertEmpty39530-10HP-FEBIADDoneSintering TaC coated container for backup Tuesday, January 31, 2017, 13:43
Container coated with TaC using
 39530-10(1).JPG39530-10(2).JPG 
  344   Friday, February 03, 2017, 14:18 Laura LambertEndcaps TARGET BOATProblemsSintering TaC coating on Ta endcaps and springs Friday, February 03, 2017, 14:17
The endcaps are stacked together
 IMG_1526.JPGIMG_1527.JPG 
  346   Thursday, February 09, 2017, 11:49 Laura Lambert   MaintenanceNew heatshield with flexible water lines Thursday, February 09, 2017, 11:47
A new heatshield with flexible water
lines has been put into evap2 last Friday
  
ELOG V2.9.2-2455