  311   Tuesday, August 02, 2016, 13:56 Laura LambertSiC40860-3LP-IG-LISDoneSintering SiC#34

 Tuesday, August 02, 2016, 13:41

Target container contains 471 discs of SiC [6 x 5 packs + 441 single discs]

Target packed length = 16cm. 

Mass of SiC(green)  = 52.7172g

Container is wrapped with 3 heatshields; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.

Sintering temp = 1800C

TGHT max = 350A.  TBHT max at 230A. 

Chamber is currently being pumped down. 

Slope on OMEGA = 1.04


Tuesday, August 02, 2016, 16:00

Tapped up manually to 30A - vacuum to high, lowered down to 20A to be able to initiate auto-ramp.

IGP1 = 2.3e-5 Torr

Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.


 Friday, August 05, 2016, 11:57

Evap2 has reached TGHT = 350A, 5.33V

TBHT = 187A, 2.31V and still climbing...

OMEGA = 1365C

IGP1 = 7.88e-7 Torr

Increased max setpoint for TGHT to 400A.


 Friday, August 05, 2016, 13:33

TGHT = 380A, 5.97V

TBHT = 197A, 2.45V

OMEGA = 1396C

IGP1 = 8.75e-7 Torr

Increasing ramping rate to 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.

New final setpoint for the TGHT = 450A


 Friday, August 05, 2016, 14:17

TBHT = 230A, 2.97V

TGHT = 450A, 7.4V

OMEGA = 1572C

IGP1 = 3.2e-6 Torr

Increasing max setpoint for TGHT to 500A and re-initiating auto-ramp.


 Friday, August 05, 2016, 15:18

At TGHT = 480A, OMEGA temperature dropped to 1400C due to coating on window.

Last reading was ~1600C

Tapped up manually to TGHT = 500A, 8.61V

Window fully coated therefore OMEGA reading is negligible at this point

Attempted to take temperature reading with other OMEGA from behind evaporator or using handheld manual temperature reader - all windows have a coating, therefore unsuccessful.

IGP1 = 1.75e-6 Torr

Reduced max voltage set for TGHT to 9.0V to minimize possibly voltage 'creep'

Will remain at these setpoints over wknd and ramp down monday morning.


 Monday, August 08, 2016, 08:45

TGHT = 500A on the 'current set' and 466A on the readout, 8.74V

TBHT = 230A, 2.99V

IGP1 = 6.6e-8 Torr

OMEGA = 1460C [reading through coating on window port]

Evap2 has been at these setpoints for the wknd.

Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


 Monday, August 08, 2016, 10:38

Quick observational note:

while ramping down OMEGA readings have slowly increased.

At ~350A OMEGA = ~1500C

At ~300A, OMEGA = ~1750C

Currently at 280A, OMEGA = ~2800C

Coating on window has affected the OMEGA readings in a weird way...


 Monday, August 08, 2016, 15:17

Vented in air and opened up this afternoon.

Cleaned windows but left target loaded in evap2 for conditioning process.


 

Attachment 1: sintering-_coating_on_window1.jpg
sintering-_coating_on_window1.jpg
Attachment 2: sintering-_coating_on_window2.jpg
sintering-_coating_on_window2.jpg
Attachment 3: sintering-_coating_on_window3.jpeg
sintering-_coating_on_window3.jpeg
  312   Monday, August 08, 2016, 15:22 Laura LambertSiC40860-3LP-IG-LISProblemsConditioning SiC#34

 Monday, August 08, 2016, 15:19

Previously sintered over weekend [see elog i.d 311]

Target container contains 471 discs of SiC [6 x 5 packs + 441 single discs]

Target packed length = 16cm. 

Mass of 533 discs SiC(green)  = 52.7172g

Container is wrapped with 3 heatshields; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.

Conditioning temp = 1800C.

TGHT max = 450A.  TBHT max = 230A. 

Chamber is currently being pumped down. 


 Monday, August 08, 2016, 16:38

Target was not removed from evap2 after sintering, vented and cleaned windows only.

IGP1 = 5.5e-6 Torr

Stepped up manually to 80A, vacuum stable.

IGP1 = 3.2e-6 Torr

Initiating auto-ramp at 0.2A/min for the TGHT and 0.1A/min for the TBHT.


 Thursday, August 11, 2016, 14:14

Tues the TGHT reached ~280A via auto-ramp

Evap2 was then tapped up manually to 480A/ ~1800C

Temperature readings on OMEGA have fluctuated up and down during conditioning process which was also observed for SiC#33

Also consistent with SiC#33, a lower current was required to reach 1800C during the conditioning process compared to the sintering process.

See attached link for data.


 Tuesday, August 16, 2016, 16:25

TGHT remained at 480A, 9.2V for ~7 days.

IGP1 = 6.5e-6 Torr

OMEGA = 1470C [with window coating, so temperature reading compromised]

Initiating auto cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


Wednesday, August 17, 2016, 13:40

Vented in air and opened this morning.

Target broke  

Target clearly heated to high.

See attached snapshot of striptool from conditioning process.

Will update later with photos of broken container


 

Attachment 1: conditioning_temperature_graph.xlsx
Attachment 2: striptool_conditioning_target_BROKEN.JPG
striptool_conditioning_target_BROKEN.JPG
  313   Friday, August 12, 2016, 11:08 Laura Lambert   MaintenanceNEW PUMP FOR GLOVE BOX

Wednesday, August 03, 2016, 16:16

Tues July 26th had some problems with the transfer chamber

Transfer chamber was not going below -20in pressure, when usually it will drop all the way to -30in

To by pass and put the uranium target into the glove box, the transfer chamber was flushed 10x - when opened, no change in H2O and O2 in glove box; therefore, 'bypass' worked.

Pump removed and tested by vacuum group - showed no reading on gauge when being tested, how was it even pumping?

New pump installed July 27th.

New pump = bigger/ faster/ quieter 


 

  314   Wednesday, August 17, 2016, 17:31 Laura LambertEmpty39814-V2-1LP-IG-LISIn progresssintering TaC coating on SiC#34 container...round2

 Wednesday, August 17, 2016, 17:30

Container coated with TaC using 'flushing technique', cleaned ionizer tube with acetone, so no coating inside ionizer tube

Wrapped with 3 x Ta heat shields, incl center block

Currently pumping down in evap2


Thursday, August 18, 2016, 10:14 

HS water valves opened...leak detected  see attachment for photo from archives

Vented and opened up.

Anders performed leak check, nothing found.

Replaced all seals with blue seals.

Pumping down now


 Thursday, August 18, 2016, 16:12

HS water valves opened...leak detected again  see attachment for photo of striptool

Vented and opened up.

working with Anders on finding leak...


 Monday, August 22, 2016, 10:38

leaks FIXED!

HS water valves opened, NO leaks detected!

Tapped up manually to 70A

Vacuum stable, IGP1 = 2.5e-6 Torr

Initiating auto ramp for TGHT @ 0.2A/min to a max setpoint of 350A

Initiating auto ramp for TBHT @ 0.1A/min to a max setpoint of 230A

Once max setpoints achieved, will tap up manually to final desired temperature of 1900C


 Monday, August 22, 2016, 14:58

TGHT = 115A, 1.3V

TBHT = 89A, 0.97V

IGP1 = 4.1e-7 Torr.

Increasing ramping rate to 1.0A/min and 0.5A/min for the TGHT and TBHT respectively.


 Monday, August 22, 2016, 16:01

IGP1 = 1.25e-6 torr

TGHT = 174A, 2.2V

TBHT = 118A, 1.4V

Lowering ramping rate to 0.2A/min and 0.1A/min for the TGHT and TBHT respectively for overnight ramping.


 

Attachment 1: leak.JPG
leak.JPG
Attachment 2: water_leak.JPEG
water_leak.JPEG
  322   Thursday, September 15, 2016, 16:37 Laura LambertSiC39530-9HP-FEBIADIn progressSintering SiC#35

 Thursday, September 15, 2016, 16:23

Target container contains 487 discs of SiC 

Target packed length = 16cm. 

Mass of SiC(green)  = 58.8795g

Container is wrapped with 1x heatshield around each side of cooling fins; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.

Sintering temp = 1800C

Chamber is currently being pumped down. 


 Friday, September 16, 2016, 10:50

Tapped up manually to 50A

Waited ~1hr , vacuum stable.

IGP1 = 1.24e-5 Torr

Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.

TGHT max = 500A.  TBHT max at 230A. 

Slope on OMEGA = 1.15


 Monday, September 19, 2016, 10:53

OMEGA = 1230C

TGHT = 360A, 4.75V

TBHT = 204A, 2.68V

IGP1 = 5.3e-6 Torr

Increasing ramping rate to 1.0A/min and 0.5A/min for the TGHT and TBHT respectively.


 Monday, September 19, 2016, 11:57

OMEGA = ~1300C

TBHT = 230A, 3.16V

TGHT = 409A, 5.55V

Lowering ramping rate to 0.2A/min while vaccum high

IGP1 = 3.05e-5 Torr


 Monday, September 19, 2016, 13:22

OMEGA = 1350C

TGHT = 425A, 5.82V

IGP1 = 1.97e-5 Torr

Stepping ramping rate back up to 1.0A/min


 

  324   Tuesday, September 20, 2016, 15:40 Laura LambertSiC39530-9HP-FEBIADIn progressSintering SiC#35

John Wong wrote:

Laura Lambert wrote:

 Thursday, September 15, 2016, 16:23

Target container contains 487 discs of SiC 

Target packed length = 16cm. 

Mass of SiC(green)  = 58.8795g

Container is wrapped with 1x heatshield around each side of cooling fins; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.

Sintering temp = 1800C

Chamber is currently being pumped down. 


 Friday, September 16, 2016, 10:50

Tapped up manually to 50A

Waited ~1hr , vacuum stable.

IGP1 = 1.24e-5 Torr

Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.

TGHT max = 500A.  TBHT max at 230A. 

Slope on OMEGA = 1.15


 Monday, September 19, 2016, 10:53

OMEGA = 1230C

TGHT = 360A, 4.75V

TBHT = 204A, 2.68V

IGP1 = 5.3e-6 Torr

Increasing ramping rate to 1.0A/min and 0.5A/min for the TGHT and TBHT respectively.


 Monday, September 19, 2016, 11:57

OMEGA = ~1300C

TBHT = 230A, 3.16V

TGHT = 409A, 5.55V

Lowering ramping rate to 0.2A/min while vaccum high

IGP1 = 3.05e-5 Torr


 Monday, September 19, 2016, 13:22

OMEGA = 1350C

TGHT = 425A, 5.82V

IGP1 = 1.97e-5 Torr

Stepping ramping rate back up to 1.0A/min


 

 Monday, September 19, 2016, 18:24

Measuring the temperature on the SiC is difficult due to the changing in emissivity as the temperature goes up.  So, I will use the MIKRON to measure the temperature on the Ta surface near the end of the tube and OMEGA for measuring the inside.  

Using the analogue pyrometer, the temperature on the Ta surface at the end of the tube was measured at around ~1450C; this temperature match the temperature on the Mikron at slope 0.98 (as usual).  To match it with OMEGA, I changed the slope to 1.04 since this measurement is taking readings on the  inside of the tube and on the SiC material.   

Note:  The measurements are NOT the absolute temperature.  These are relative temperature measurements  which give some guideline where the target current should be at for the sintering process.  Please plot the temp vs current as the TGHT is being ramped up.  At some point, the windows will get coated and the measurement is no longer reliable.   The plot will be used to give an estimation of the current for 1800C.  


 

 

 Tuesday, September 20, 2016, 15:18

there was a temperature fluctuation resulting in the MIKRON no longer matching the readout on the OMEGA

this prompted another change in the slope on the OMEGA to 1.08

TGHT was then tapped up manually to 600A/ 1800C

will remain at this max setpoint for a few days before ramping down

see attachment for raw data


 Wednesday, September 21, 2016, 11:34

temperatures dropped a small amount overnight.

tapped up manually to 625A/ 1810C

still no coating on window.

see attachment for updated raw data


 

Attachment 1: sintering_target_data.xlsx
  326   Monday, September 26, 2016, 13:49 Laura LambertSiC39530-9HP-FEBIADDoneSintering SiC#35

John Wong wrote:

Laura Lambert wrote:

John Wong wrote:

Laura Lambert wrote:

 Thursday, September 15, 2016, 16:23

Target container contains 487 discs of SiC 

Target packed length = 16cm. 

Mass of SiC(green)  = 58.8795g

Container is wrapped with 1x heatshield around each side of cooling fins; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.

Sintering temp = 1800C

Chamber is currently being pumped down. 


 Friday, September 16, 2016, 10:50

Tapped up manually to 50A

Waited ~1hr , vacuum stable.

IGP1 = 1.24e-5 Torr

Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.

TGHT max = 500A.  TBHT max at 230A. 

Slope on OMEGA = 1.15


 Monday, September 19, 2016, 10:53

OMEGA = 1230C

TGHT = 360A, 4.75V

TBHT = 204A, 2.68V

IGP1 = 5.3e-6 Torr

Increasing ramping rate to 1.0A/min and 0.5A/min for the TGHT and TBHT respectively.


 Monday, September 19, 2016, 11:57

OMEGA = ~1300C

TBHT = 230A, 3.16V

TGHT = 409A, 5.55V

Lowering ramping rate to 0.2A/min while vaccum high

IGP1 = 3.05e-5 Torr


 Monday, September 19, 2016, 13:22

OMEGA = 1350C

TGHT = 425A, 5.82V

IGP1 = 1.97e-5 Torr

Stepping ramping rate back up to 1.0A/min


 

 Monday, September 19, 2016, 18:24

Measuring the temperature on the SiC is difficult due to the changing in emissivity as the temperature goes up.  So, I will use the MIKRON to measure the temperature on the Ta surface near the end of the tube and OMEGA for measuring the inside.  

Using the analogue pyrometer, the temperature on the Ta surface at the end of the tube was measured at around ~1450C; this temperature match the temperature on the Mikron at slope 0.98 (as usual).  To match it with OMEGA, I changed the slope to 1.04 since this measurement is taking readings on the  inside of the tube and on the SiC material.   

Note:  The measurements are NOT the absolute temperature.  These are relative temperature measurements  which give some guideline where the target current should be at for the sintering process.  Please plot the temp vs current as the TGHT is being ramped up.  At some point, the windows will get coated and the measurement is no longer reliable.   The plot will be used to give an estimation of the current for 1800C.  


 

 

 Tuesday, September 20, 2016, 15:18

there was a temperature fluctuation resulting in the MIKRON no longer matching the readout on the OMEGA

this prompted another change in the slope on the OMEGA to 1.08

TGHT was then tapped up manually to 600A/ 1800C

will remain at this max setpoint for a few days before ramping down

see attachment for raw data


 Wednesday, September 21, 2016, 11:34

temperatures dropped a small amount overnight.

tapped up manually to 625A/ 1810C

still no coating on window.

see attachment for updated raw data


 

 Thursday, September 22, 2016, 12:07

Temperature reader on OMEGA dropped slightly to 1785C overnight.  The temperature on the leg remained at 1800C (MIKRON).  No coating on windows.  

Increased TGHT to 635A/10.12V (local 10.40V).  OMEGA reads 1800C, MIKRON ~1817C.  

Continue to monitor… (see dropbox for captured photos) 


 

 Monday, September 26, 2016, 13:24

Temperature decreased over weekend.

MIKRON dropped from ~1800C to ~1670C, OMEGA on right side remained ~1800C

Comparing screen shots of temperature readings and camera looking at target from left side, changes can be seen:

-darker area on top edge of target tube, above inside tube, grows larger when temperature drops - indicating 'cooler area' has grown

-initially darker area covers top above target materials on tube, when drops to ~1670C darker area extends down sides of target tube and reaches past target material area

See attached picture showing these details

Target has remained at this max setpoint for ~4-5 days

Windows remain un-coated.

Current and voltage readings remain un-changed.

Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


 Wednesday, September 28, 2016, 17:05

Vented in air, target taken out today.

Target looks good!

A small amount of material was removed from the windows in evap2, very thin layer of coating.

Will update tomorrow with photos

Endcaps inserted.


 

Attachment 1: comparison_of_temperature_drop_-_3x_snapshots.JPG
comparison_of_temperature_drop_-_3x_snapshots.JPG
  327   Wednesday, September 28, 2016, 17:09 Laura LambertEmpty41790-6LP-SISDonesintering TaC coating on UCx container

 Wednesday, September 28, 2016, 17:08

Container coated with TaC using 'flushing technique' today, cleaned ionizer tube with acetone, no coating inside ionizer tube

Dried by blowing air into tube

Wrapped with 3 x Ta heat shields, incl center block - new method of each layer being one long single Ta foil covering entire container incl center block

Currently pumping down in evap2


 Thursday, September 29, 2016, 11:11

HS water valves opened

Tapped up to 35A

Waited ~45min, vacuum stable

IGP1 = 1.4e-6 Torr

Initiating auto ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.

Max setpoints for TGHT = 350A and TBHT  = 230A

Once max setpoints achieved, will tap up manually to final desired temperature of 1900C


 Friday, September 30, 2016, 10:51

IGP1 = 7.8e-7 Torr

TGHT = 315A, 4.57V

TBHT = 174A, 2.8V

Increasing ramping rate to 1.0A/min and 0.5A/min for the TGHT and TBHT respectively.


 Friday, September 30, 2016, 11:44

Changed OMEGA slope to 0.98

IGP1 = 1e-6 Torr

TGHT = 350A, 5.2V

TBHT = 201A, 3.4V

Increasing ramping rate of TBHT to 1.0A/min

OMEGA = 1625C / MIKRON = 1625C


 Friday, September 30, 2016, 15:45

IGP1 = 1.1e-6 Torr

TGHT = 430A, 6.79V

TBHT = 230A, 4.07V

OMEGA = 1903C

Will remain at max setpoints over weekend.

See attached link for raw data of manual tap up.

Also see attached photos of screenshots showing oval - not circular - tube of target container at two different temperatures...


 Monday, October 03, 2016, 13:28

IGP1 = 1.79e-7 Torr

TGHT = 430A, 6.87V

TBHT = 230A, 4.06V

OMEGA = 1892C

MIKRON = 1847C

Attached is a picture taken through the MIKRON, the slight oval shape appears to be a minor bend in the target container:

With the ionizer tube facing into the page, the bend appears to be in the center with both ends of the container bent slightly towards the page

This possible bend in the container gives the appearance of the oval shape through the camera while it is being heated, due to the angle of the camera

Remained at max setpoints over weekend.

Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


 Tuesday, October 04, 2016, 13:40

Vented in air and opened up this morning.

Container done, TaC coating looks good.

Waiting further inspection...


 Tuesday, October 04, 2016, 14:48

Container placed on jig and inspected.

Approved to go ahead for use online by Anders and Friedhelm.


 

Attachment 1: sintering_TaC_coating.xlsx
Attachment 2: sintering_TaC_coating.JPG
sintering_TaC_coating.JPG
Attachment 3: sintering_TaC_coating2.JPG
sintering_TaC_coating2.JPG
Attachment 4: sintering_TaC_coating-combo_of_both_pics.JPG
sintering_TaC_coating-combo_of_both_pics.JPG
  328   Friday, October 07, 2016, 16:42 Laura LambertTa41790-5LP-SISIn progressConditioning Ta#50

Friday, October 07, 2016, 16:40

Target consists of 470 discs.

Total packed length 3.4cm [exactly 7.8cm space on both sides]

Total mass 47.6889g [Incl foils + Ta wire on 6 packs]

Note: Target consists of 350 single discs and 6x20 packs of Ta discs

3x Ta Heat shields.

No endcaps inserted, no Rh foil inserted.

Chamber currently pumping down.

TBHT will be ramped up to 230A at 1.0A/min.

TGHT will be ramped up to 300A at 2.0A/min.

Final desired temperature = 1900C


 Tuesday, October 11, 2016, 10:02
 
HS water valves opened, no leaks detected
 
Tapped up manually to 35A
 
Vacuum stable, IGP1 = 2e-7 Torr
 
Initiating auto-ramp.
 
OMEGA slope = 0.98

 Wednesday, October 12, 2016, 16:15

Tapped up to 1900C? [see attached link for data concerning temperature readings]

TGHT = 450A, 7.16V

TBHT = 230A, 4.1V

OMEGA = 1748C

IGP1 = 6.1e-7 Torr


 

Attachment 1: Ta#50_no_endcaps_3xh.s..xlsx
  330   Thursday, October 13, 2016, 17:32 Laura LambertTa41790-5LP-SISDoneConditioning Ta#50

John Wong wrote:

Laura Lambert wrote:

Friday, October 07, 2016, 16:40

Target consists of 470 discs.

Total packed length 3.4cm [exactly 7.8cm space on both sides]

Total mass g [Incl foils + Ta wire on 6 packs]

Note: Target consists of 350 single discs and 6x20 packs of Ta discs

3x Ta Heat shields.

No endcaps inserted, no Rh foil inserted.

Chamber currently pumping down.

TBHT will be ramped up to 230A at 1.0A/min.

TGHT will be ramped up to 300A at 2.0A/min.

Final desired temperature = 1900C


 Tuesday, October 11, 2016, 10:02
 
HS water valves opened, no leaks detected
 
Tapped up manually to 35A
 
Vacuum stable, IGP1 = 2e-7 Torr
 
Initiating auto-ramp.
 
OMEGA slope = 0.98

 Wednesday, October 12, 2016, 16:15

Tapped up to 1900C? [see attached link for data concerning temperature readings]

TGHT = 450A, 7.16V

TBHT = 230A, 4.1V

OMEGA = 1748C

IGP1 = 6.1e-7 Torr


 

 Wednesday, October 12, 2016, 21:14

Current status before cooling down:

TGHT at 450A/7.32V; TBHT at 230A/4.10V; OMEGA at 1747C

Vacuum at 4.05 e-7 Torr.

Initiate auto-rampping at 2A/min for TGHT and 1A/min for TBHT


 

 Thursday, October 13, 2016, 17:32

vented in air and opened up this morning.

target looks good.

  331   Thursday, October 13, 2016, 18:05 Laura LambertTa41790-5LP-SISIn progressTemperature measurements for Ta#50

Thursday, October 13, 2016, 18:04

Target loaded into evap2

No heat shields.

Both endcaps inserted and expanded.

Rh foil inserted [when inserting, the Ta rod used to expand the Rh foil inside the ionizer tube snapped off inside the container - this piece was able to be shaken out and is no longer inside]

Chamber pumped down.

HS water valves opened, no leaks detected
 
Tapped up manually to 35A
 
Vacuum stable, IGP1 = 5e-7 Torr
 
Initiating auto-ramp.
 
OMEGA slope = 0.98

TBHT will be ramped up to 230A at 1.0A/min.

TGHT will be ramped up to 300A at 2.0A/min.

Final desired temperature = 1900C


Friday, October 14, 2016, 13:28

TGHT and TBHT had reached 300A/ 230A respectively.

Power bump ~10min ago caused evap2 to trip off.

Tapped back up manually to 35A.

Re-initiating auto ramp now.


 

  334   Tuesday, October 18, 2016, 09:23 Laura LambertTa41790-5LP-SISDoneTemperature measurements for Ta#50

Aurelia Laxdal wrote:

Aurelia Laxdal wrote:

Laura Lambert wrote:

Thursday, October 13, 2016, 18:04

Target loaded into evap2

No heat shields.

Both endcaps inserted and expanded.

Rh foil inserted [when inserting, the Ta rod used to expand the Rh foil inside the ionizer tube snapped off inside the container - this piece was able to be shaken out and is no longer inside]

Chamber pumped down.

HS water valves opened, no leaks detected
 
Tapped up manually to 35A
 
Vacuum stable, IGP1 = 5e-7 Torr
 
Initiating auto-ramp.
 
OMEGA slope = 0.98

TBHT will be ramped up to 230A at 1.0A/min.

TGHT will be ramped up to 300A at 2.0A/min.

Final desired temperature = 1900C


Friday, October 14, 2016, 13:28

TGHT and TBHT had reached 300A/ 230A respectively.

Power bump ~10min ago caused evap2 to trip off.

Tapped back up manually to 35A.

Re-initiating auto ramp now.


 

Friday October 14: the target was ramp up to 300A/230A after Laura started it. Then, I cooled down at 6pm before leaving TRIUMF. <br>

Saturday October 15: restated the auto-ramp for Ta#50 in EVAP2. It's currently set to go to 300A/230A.

 Sunday October 16: the target temperature measurements up to 620A/230A were performed today not on October 15 (yesterday, it was cooled down before reaching 300A/230A). Currently the target is cooling down, to be ready tomorrow morning for the Test Stand. 

 Monday, October 17, 2016, 09:21

Vented in air and taken out this morning.

Target looks good!


 

  337   Thursday, November 17, 2016, 11:15 Laura Lambertnp-SiC TARGET BOATIn progressHeat-treatment: Beta-SiC (1um) fiber mats - SAMPLE ID: A1

John Wong wrote:

Tuesday, November 15, 2016, 16:48

Three samples were prepared  (see my logbook#1 page 3, preparing for carbonization).

One layer of Ta foil was used to wrap around the target boat. 

Chamber is currently being pumped down


 Wednesday, November 16, 2016, 11:04

Ramping up TGHT at 2A/min, set at 350A.

Desired temperature, ~1530C (similar heating condition as raw npSiC heat treatment, elog ID335)


 Thursday, November 17, 2016, 10:09

TGHT reached to 350A/5.80V, stayed for over 20 hours.  Temp measured at 1276 C (Mikon) and 1270 (Omega), vac at 6.07e-7 Torr. 

Stepping up TGHT to reach the desired temp.


 

 Thursday, November 17, 2016, 11:13

TGHT = 400A, 6.73V

IGP1 = 8.2e-7 Torr

OMEGA = 1385C

MIKRON = 1389C

Tapping up manually to 1500C or a max setpoint of 450A


Thursday, November 17, 2016, 11:56

TGHT = 450A, 7.85V

IGP1 = 1.7e-6 Torr

OMEGA = 1502C

MIKRON = 1510C


 Friday, November 18, 2016, 10:08

IGP1 = 5.3e-7 Torr

TGHT = 450A, 7.9V

OMEGA = 1510C

MIKRON = 1515C

Evap2 has remained at max setpoints for 23hrs.

Initiating auto-cool at 2.0A/min


 

  339   Tuesday, November 22, 2016, 15:58 Laura LambertNb40282-3TARGET BOATDoneConditioning Nb samples for Doug

Tuesday, November 22, 2016, 15:53

Target boat has a layer of niobium foil on the bottom of the boat.

A niobium foil has been made with slots to hold samples [similar to when sintering endcaps] *See attached photos

Niobium samples are placed in slots, holding in place, to avoid warping.

Smaller samples closest to MIKRON IR reading [left side]

Boat is wrapped with 1 large layer of Ta foil, wrapped around the boat 3x, careful to avoid touching samples.

Loaded into evap2 today.

Pumping down now...


 Wednesday, November 23, 2016, 11:45

HS water valves opened, no leaks detected.

Tapped up manually to 35A.

IGP1 = 6.4e-7 Torr

Setting auto-ramp rate at 0.2A/min to max setpoint of 250A.

Will tap up manually to final desired temperature of 1400C.


 Wednesday, November 23, 2016, 13:17

IGP1 = 5.9e-7

TGHT = 66A, 0.51V

Vacuum stable.

Increasing ramping rate to 1.0A/min


 Thursday, November 24, 2016, 08:46

IGP1 = 3.9e-7 Torr

TGHT = 250A, 3.41V      *NOTE: the current set reads 243.8A but the readout is 250A

OMEGA = 1013C

MIKRON has no reading yet

Tapping up manually to 1400C


 Thursday, November 24, 2016, 15:42

Samples have remained at ~1400C for 5hrs.

IGP1 = 5.8e-7 Torr

TGHT = 420A, 6.5V

OMEGA = 1410C

MIKRON = 1420C

Initiating auto-cool at 2.0A/min


 Friday, November 25, 2016, 11:39

Vented in air and opened up this morning.

Samples look good!


 

Attachment 1: samples.jpg
samples.jpg
Attachment 2: evap2.jpg
evap2.jpg
Attachment 3: heating_up.xlsx
Attachment 4: visual_of_MIKRON_pointing_at_samples.JPG
visual_of_MIKRON_pointing_at_samples.JPG
  340   Thursday, December 01, 2016, 16:08 Laura LambertEmpty42218-12LP-SISDonesintering TaC coating on UCx#19 container

 Thursday, December 01, 2016, 16:06

Container coated with TaC using 'flushing technique' and let dry overnight.

Cleaned ionizer tube with acetone, no coating inside ionizer tube

Wrapped with 3 x Ta heat shields, incl center block

Currently pumping down in evap2

OMEGA slope = 0.98


 Friday, December 02, 2016, 11:24

Opened up HS water valves, no leaks detected.

Tapped up manually to 35A.

Waited ~25min, vacuum stable.

IGP1 = 1.65e-6 Torr

Initiating auto-ramp at 0.2A/min for the TGHT and 0.1A/min for the TBHT.

Max setpoints set for 350A and 230A for the TGHT and TBHT respectively.

Once max setpoints achieved, will tap up manually to final desired temperature of 1900C


 Monday, December 05, 2016, 09:38

TGHT = 350A, 5.38V

TBHT = 230A, 4.03V

OMEGA = 1550C

IGP1 = 3.2e-7 Torr

Tapping up to 1900C...


 Monday, December 05, 2016, 14:11

OMEGA = 1905C

TGHT = 475A, 7.63V

TBHT = 230A, 4.07V

IGP1 = 8.5e-7 Torr


 Tuesday, December 06, 2016, 08:41

TGHT = 475A, 7.76V

TBHT = 230A, 4.07V

IGP1 = 3.9e-7 Torr

Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


Wednesday, December 07, 2016, 08:46 

Evap2 was vented in air and opened up yesterday afternoon.

Container looks good, coating fully sintered.


 

  341   Friday, December 16, 2016, 14:14 Laura LambertTa39530-3LP-FEBIADDoneConditioning Ta FEBIAD target for shutdown tests

 Friday, December 16, 2016, 14:08

Target consists of 470 discs.

Total packed length 3.4cm [exactly 7.8cm space on both sides]

Total mass 45.9091g [Incl foils + Ta wire on 6 packs]

Target consists of 350 single discs and 6x20 packs of Ta discs

Discs in target are arranged as follows: 1pack / 75singles / 1pack / 100singles / 2packs / 100singles / 1pack / 75singles / 1pack

3x Ta Heat shields.

LP-FEBIAD container with large center block.

No endcaps inserted, no Rh foil inserted.

Chamber currently pumping down.

TBHT will be ramped up to 230A at 1.0A/min.

TGHT will be ramped up to 350A at 2.0A/min.

Final desired temperature = 1900C


 Friday, December 16, 2016, 14:32

HS water valves opened, no leaks detected
 
Tapped up manually to 35A
 
Vacuum stable, IGP1 = 2.1e-6 Torr
 
Initiating auto-ramp.
 
OMEGA slope = 0.98

 Monday, December 19, 2016, 11:52

Tapped up manually to ~1900C [see attached excel for details on data collected - interesting temperature fluctuations]

 Will remain at max setpoints for min 4hrs then auto-cool


 Monday, December 19, 2016, 15:20

Target has remained at max setpoints for just over 4hrs

TGHT = 520A, 8.67V

OMEGA = 1820C

IGP1 = 5.2e-7 Torr

Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


 Tuesday, December 20, 2016, 11:52

Vented in air and opened up this morning.

Looks like the windows was coated in evap2, unsure if this was missed and coated before conditioning target or if this is from materials coming out during conditioning process...

Target looks good.

Endcaps inserted but not expanded.


 

Attachment 1: Ta-FEBIAD.xlsx
Attachment 2: Evernote_Camera_Roll_20161220_145947.jpg
Evernote_Camera_Roll_20161220_145947.jpg
  342   Tuesday, December 20, 2016, 15:04 Laura Lambert   MaintenanceRETURN and SUPPLY valves CLOSED for xmas break

Tuesday, December 20, 2016, 15:05

confirmed ~full tank of Ar for glove box --> ~1600psi 

  343   Tuesday, January 31, 2017, 16:03 Laura LambertEmpty39530-10HP-FEBIADDoneSintering TaC coated container for backup

 Tuesday, January 31, 2017, 13:43

Container coated with TaC using new method: Ends taped off,  with liquid poured in and swirled around entire container, then poured back out - 'flushing technique'

Container is wrapped with 3 x Ta heat shields, not incl center block.

Loaded into EVAP2 and currently pumping down.


Tuesday, January 31, 2017, 16:02 

IGP1 = 3.9e-6 Torr.

HS water valves opened.

No leaks detected.

Tapped up manually to 35A.

Vacuum stable.

Initiated auto ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.

Final setpoints for TGHT = 450A and TBHT = 230A, with final desired temp of 1900C

OMEGA slope = 0.98


 Wednesday, February 01, 2017, 10:01

IGP1 = 5.7e-7 Torr.

TGHT = 254A, 3.0V

TBHT = 142A, 1.8V

Increasing ramping rate to 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


 Wednesday, February 01, 2017, 11:48

IGP1 = 1.7e-6 Torr.

TGHT = 450A, 6.27V

TBHT = 230A, 3.14V

OMEGA = 1176C

Increasing max setpoint of TGHT = 600A


 Wednesday, February 01, 2017, 13:09

IGP1 = 3.7e-6 Torr.

TGHT = 600A, 9.0V

TBHT = 230A, 3.18V

OMEGA = 1480C

Increasing max setpoint of TGHT = 700A


 Wednesday, February 01, 2017, 14:08

IGP1 = 3.8e-6 Torr.

TGHT = 700A, 10.96V

TBHT = 230A, 3.2V

OMEGA = 1705C

Increasing max setpoint of TGHT = 750A


 Wednesday, February 01, 2017, 15:02

IGP1 = 5.1e-6 Torr.

TGHT = 750A, 11.87V

TBHT = 230A, 3.2V

OMEGA = 1808C

Increasing max setpoint of TGHT = 800A


 Wednesday, February 01, 2017, 15:30

IGP1 = 6.6e-6 Torr.

TGHT = 800A, 12.86V

TBHT = 230A, 3.2V

OMEGA = 1903C

Will remain at max setpoints overnight.


 Thursday, February 02, 2017, 09:16

Remained at max setpoints for ~18hrs.

IGP1 = 9.5e-7 Torr.

OMEGA =1914C

TGHT = 800A, 12.83V

TBHT = 230A, 3.22V

Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


 Friday, February 03, 2017, 14:24

Vented in air and opened up this morning

Coating looks good.

See photos attached.


 

Attachment 1: 39530-10(1).JPG
39530-10(1).JPG
Attachment 2: 39530-10(2).JPG
39530-10(2).JPG
  344   Friday, February 03, 2017, 14:18 Laura LambertEndcaps TARGET BOATProblemsSintering TaC coating on Ta endcaps and springs

 Friday, February 03, 2017, 14:17

The endcaps are stacked together with a punched out disc of graphite foil placed in between each endcap for separation so endcaps won't fuse together.

The end caps are further wrapped in a larger piece of graphite foil to hold together as a tube [same method used in elogID # 158 and 235]

There are also 4 coated springs, 2 on each side of the endcaps tube, with the endcaps tube residing in the middle of the boat.

The boat is wrapped with 3-layers of Ta heatshields.

Chamber is currently being pumped down.

Good vac at 3.0e-5, bad vac at 4.0e-5 Torr.

OMEGA slope = 0.98


 Monday, February 06, 2017, 09:29

Power outage this weekend and evap2 tripped off.

Re-pumping down now...


 Tuesday, February 07, 2017, 08:54

HS water valves opened, no leaks detected.

IGP1 = 1.9e-7 Torr

Tapped up manually to 35A

Vacuum stable.

IGP1 = 2.0e-7 Torr

Initiating auto-ramp at 0.2A/min with a final setpoint of 450A.

Final desired temperature = 1800C


 Wednesday, February 08, 2017, 09:52

IGP1 = 2.98e-7 Torr

TGHT = 325A, 3.5V

Vacuum stable.

Increasing ramping rate to 1.0A/min


 Wednesday, February 08, 2017, 11:46

IGP1 = 6.3e-7 Torr

TGHT = 433A, 4.89V

Increasing max setpoint to TGHT = 500A

OMEGA has still yet to show a temperature...should be reading points at this high in current

Will go down to the lab and follow up on OMEGA settings to confirm everything is set up ok before proceeding to a higher current...


 Wednesday, February 08, 2017, 16:03

IGP1 = 4e-7 Torr

TGHT = 500A, 5.75V

OMEGA still not reading

Initiating auto-cool at -2A/min

Will update elog with more details tomorrow


 Thursday, February 09, 2017, 10:52

Evap2 was cooled down and opened up this morning.

Turns out both legs on the target boat were touching the new heatshield and therefore had been loosing power.

Normally a boat at 500A would read ~1800C, in this scenario at 500A the boat read ~1000C.

A lot of power was being lost into the heatshield.

See photos attached of target boat sitting at 500A.

The heatshield is currently being ground down in those two spots to accommodate the target boat.


 

Attachment 1: IMG_1526.JPG
IMG_1526.JPG
Attachment 2: IMG_1527.JPG
IMG_1527.JPG
  346   Thursday, February 09, 2017, 11:49 Laura Lambert   MaintenanceNew heatshield with flexible water lines

 Thursday, February 09, 2017, 11:47

A new heatshield with flexible water lines has been put into evap2 last Friday Feb3rd


 

ELOG V2.9.2-2455