ID |
Date |
Author |
Target Material |
Target Oven W.O# |
Source |
Status |
Subject |
Text |
 |
426
|
Wednesday, January 16, 2019, 11:53 |
Marla Cervantes | TaC | 43630-2 | | Done | TaC coating/sintering for graphite insert test | Tuesday, January 15,
2018, 17:30 |
|
428
|
Wednesday, January 23, 2019, 13:06 |
Marla Cervantes | | 43630-2 | | Done | Graphite insert test #3 | Wednesday, January 23, 2019, 13:01
A previously coated tantalum |
|
430
|
Wednesday, February 13, 2019, 10:08 |
Darwin Ortiz Rosales | | 43630-1 | | Done | Graphite insert test 3b | Wednesday, February 13, 2019, 10:04
A previously coated tantalum |
|
485
|
Friday, May 29, 2020, 10:26 |
Marla Cervantes | Empty | 43044-8 | LP-SIS | Done | TaC coating/sintering | Friday, May 29, 2020, 08:52
Ta tube was coated with TaC |
|
420
|
Thursday, October 25, 2018, 15:37 |
Marla Cervantes | TaC | 43044-7 | LP-SIS | Done | TaC coating/sintering for graphite insert test | Thursday, October 25, 2018, 10:36
Container is coated with TaC |
|
441
|
Tuesday, April 30, 2019, 09:35 |
Darwin Ortiz Rosales | Empty | 43044-6 | LP-SIS | Done | TaC coating/sintering | Tuesday, April 30, 2019, 09:33
Container was coated with TaC and
wrapped with 2 Ta heat shields. |
 |
452
|
Tuesday, July 30, 2019, 15:42 |
Darwin Ortiz Rosales | ZrC | 43044-6 | LP-SIS | Done | Sintering ZrC Discs |
Tuesday,
July 30, 2019, 15:33
ZrC backup Target 12.6 cm disc length, |
|
453
|
Monday, August 12, 2019, 15:55 |
John Wong | ZrC | 43044-6 | LP-SIS | Done | Sintering ZrC Discs |
|
|
427
|
Friday, January 18, 2019, 15:11 |
Darwin Ortiz Rosales | Empty | 43044-5 | LP-SIS | Done | TaC coating/sintering (training/online use) | Friday, January 18, 2019, 15:00
Container was coated with TaC and
wrapped with 3 Ta heat shields. |
|
434
|
Monday, March 18, 2019, 15:58 |
Darwin Ortiz Rosales | ZrC | 43044-5 | LP-SIS | Done | Sintering ZrC | Monday, March 18, 2019, 15:51
Total number of foils: 555
Total mass of material including |
 |
440
|
Tuesday, April 23, 2019, 13:55 |
Aaron Schmidt | Ta | 43044-4 | LP-SIS | In progress | Conditioning Ta#58 | Ta#58 LP-SIS |
 |
415
|
Wednesday, July 25, 2018, 17:33 |
John Wong | Empty | 43044-2 | LP-SIS | Done | TaC coating/sintering for UCx#24 | Wednesday, July 25, 2018, 17:32
Container is coated with TaC and
wrapped with 3 layers of Ta heat-shields. |
|
416
|
Monday, August 20, 2018, 18:10 |
John Wong | np-SiC | 43044-1 | LP-SIS | Done | nano-SiC final conditioning | Monday, August 20, 2018, 17:58
14.9 g of np-SiC fibrous target discs
are loaded into the container (previously |
|
431
|
Thursday, February 21, 2019, 09:15 |
Darwin Ortiz Rosales | Empty | 42464-4 | HP-FEBIAD | Done | | Thursday, February 21, 2019, 09:01
Container coated with TaC and wrapped
with 2 Ta heat shields. |
 |
450
|
Monday, June 24, 2019, 08:42 |
Darwin Ortiz Rosales | SiC | 42464-4 | HP-FEBIAD | Done | Conditioning of BSiC discs |
Monday, June 24, 2019, 08:24
Total number of foils: 484
Total mass in including container |
|
469
|
Saturday, November 23, 2019, 14:03 |
Darwin Ortiz Rosales | TaC | 42464-3 | HP-FEBIAD | Done | TaC coating/sintering | 12.3
Saturday, November 23, 2019, 14:00
Container coated with TaC and wrapped |
|
471
|
Tuesday, November 26, 2019, 15:21 |
Darwin Ortiz Rosales | SiC | 42464-3 | HP-FEBIAD | Done | Conditioning of SiC discs (sintering) (RUSH) | Tuesday, November 26, 2019, 14:53
Total number of foils: 504
Total length packed 17.4 cm |
|
472
|
Tuesday, November 26, 2019, 15:43 |
Anders Mjos | SiC | 42464-3 | HP-FEBIAD | Problems resolved | Water to vacuum leak on heat shield line | This morning, the vacuum responded to shutting
of the water of the heat shield circuit (leak
rate without pumping leveling out). The vacuum |
|
473
|
Wednesday, November 27, 2019, 17:45 |
John Wong | SiC | 42464-3 | HP-FEBIAD | Done | Conditioning of SiC discs (sintering) (RUSH) |
|
|
569
|
Wednesday, March 09, 2022, 06:27 |
Darwin Ortiz Rosales | TaC | 42464-2 | HP-FEBIAD | Done | TaC coating/sintering | Wednesday, March 09, 2022, 06:25
Ta HP-FEBIAD was coated |
|
|