ID Date Author Target Material Target Oven W.O# Source Status Subject Text Attachments
  688   Friday, March 28, 2025, 10:34 Darwin Ortiz RosalesEmpty45447-20LP-SISDoneTaC coating sinteringFriday, March 28, 2025, 06:49
The coated container was wrapped
in 4 Ta foil heatshields.
  
  687   Tuesday, March 25, 2025, 15:26 Darwin Ortiz RosalesEmpty45447-16LP-SISDoneTaC coating sinteringTuesday, March 25, 2025, 15:25
The coated container as wrapped in
4 Ta foil heatshields.
  
  686   Thursday, March 20, 2025, 06:10 Darwin Ortiz RosalesEmpty45447-19LP-SISDoneTaC coating sinteringWednesday, March 19, 2025, 13:08
The coated container was wrapped
in 4 Ta foil heatshields.
  
  685   Tuesday, March 18, 2025, 06:53 Darwin Ortiz RosalesEmpty45447-6LP-IG-LISDoneTaC coating sinteringTuesday, March 18, 2025, 06:48
The coated container was wrapped
in 4 Ta foil heatshields.
  
  684   Wednesday, March 12, 2025, 07:10 Darwin Ortiz RosalesEndcaps TARGET BOATDoneTaC coating sinteringTuesday, March 11, 2025, 15:44
The coated container was wrapped
in 3 Ta foil heatshields.
  
  683   Monday, March 10, 2025, 09:56 Darwin Ortiz RosalesEmpty45447-3HP-FEBIADDoneTaC coating sintering
Monday, March 10, 2025, 09:50
The coated container was wrapped
in 4 Ta foil heatshield and left in evap2 
  
  682   Monday, March 03, 2025, 17:58 Darwin Ortiz RosalesEmpty45447-21LP-FEBIADDoneTaC coating sinteringMonday, March 03, 2025, 17:56
LP FEBIAD WO# 45447-21 initial wt=471.0
g (without T bar)
  
  681   Saturday, February 01, 2025, 09:24 Darwin Ortiz RosalesEmpty45447-28HP-SISDoneTaC coating sinteringSaturday, February 01, 2025, 09:23
The coated container was wrapped
in 4 Ta foil heatshield and left in evap2
  
  680   Thursday, January 30, 2025, 09:21 Darwin Ortiz RosalesEmpty45447-30HP-SISDoneTaC coating sinteringThursday, January 30, 2025, 09:17
Left to pump down on previous night
The coated container was wrapped
  
  679   Saturday, November 23, 2024, 11:11 Darwin Ortiz RosalesZrC LP TUBEDoneZrC 24E9T1 + std conditioning and sinteringSaturday, November 23, 2024, 11:08
 No milling ZrC material sintering
inside graphite cartridge
  
  678   Wednesday, October 02, 2024, 19:24 Darwin Ortiz RosalesTiC LP TUBEDonesintering TiC Experiment Wednesday, October 02, 2024, 19:21
Ta endcup at front end of container
End-caps on the graphite cartridge
  
  677   Tuesday, September 10, 2024, 13:16 Darwin Ortiz RosalesEndcaps TARGET BOATDoneTaC coating sinteringA boat lined up with graphite and wrapped
in 3 Ta heatshileds
Vacuum IGP1 initial =6.1 e-06 Torr
  
  676   Monday, September 09, 2024, 19:08 Darwin Ortiz RosalesTaC LP-SISDoneTaC coating sintering LP-SIS with gas lineMonday, September 09, 2024, 19:06
The coated container was wrapped
in 4 Ta foil heatshields.
  
  675   Saturday, September 07, 2024, 09:55 Darwin Ortiz RosalesTaC45447-13LP-SISDoneTaC coating sinteringSaturday, September 07, 2024, 09:54
The coated container was wrapped
in 4 Ta foil heatshields.
  
  674   Friday, August 30, 2024, 11:33 Darwin Ortiz RosalesTaC45447-8LP-IG-LISDoneTaC coating sinteringFriday, August 30, 2024, 11:31
The coated container was wrapped
in 4 Ta foil heatshields.
  
  673   Monday, August 19, 2024, 13:17 John Wongnp-Ta TARGET BOATIn progressCarbonization of heat stabilized np-Ta fibres - 2nd AttemptMonday, August 19, 2024, 13:06
Target container consists of 2 samples,
and both samples were heat stabilized at
 Capture.PNG 
  672   Wednesday, August 14, 2024, 16:24 Marla CervantesC44139-5 SKLP TUBEIn progressEVAP2 Calibration - Vanadium  
 


    
  
  671   Wednesday, August 14, 2024, 16:22 Marla CervantesC44139-5 SKLP TUBEProblems resolvedEVAP2 Calibration - Vanadium

    

       
            
  
  670   Wednesday, August 14, 2024, 07:23 Marla CervantesC44139-5 SKLP TUBEProblemsEVAP2 Calibration - Vanadium Tuesday, August 13, 2024, 17:20 Pressure
kept increasing when turning the turbo pump
on 
 TP-not_speeding_up.JPG 
  669   Thursday, August 08, 2024, 11:17 Marla CervantesC44139-5 SKLP TUBEDoneGraphite foils conditioning

    

       
            
 GraphiteFoil-Conditioning-EVAP2.JPG 