Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 35 of 35  Not logged in ELOG logo
ID Date Author Target Material Target Oven W.O# Source Status Subject Text Attachments
  8   Tuesday, March 20, 2012, 14:39 John WongBeOTarget boat #1 DoneSintering BeO pellets

    

       
            
  
  7   Tuesday, March 20, 2012, 14:35 John Wong   DoneEvap#2 Backing up muffler not connected to the exhaust system. Tuesday, March 20, 2012, 14:22
The Evaporator #2 backing pump (IEVAP2:BP1)
muffler has not connected to the exhaust
 Evap2_backingpump.jpgscroll_pump_exhaust.jpg 
  6   Monday, March 19, 2012, 17:10 Nikita BernierBeOTarget boat #1 DoneSintering BeO pellets Monday, March 19, 2012, 17:04
 
Target boat contains 4 BeO pellets
  
  5   Thursday, March 01, 2012, 14:42 John Wong    IEVAP2:TGHT/TBHT max current setpoint issueThursday, March 01, 2012, 14:35
Both the IEVAP2:TBHT and IEVAP2:TGHT
maximum current setpoints on the vacuum page
 TGHT_TBHT_setpoints.JPG 
  4   Tuesday, February 28, 2012, 11:00 John WongEmptyTest oven LP-SISDoneMeasuring temperatures, currents & voltages Tuesday, February 28, 2012, 10:36
Two thermocouples were inserted through
the left side of the copper heat shield,
 Evap_2_thermocouple.jpg 
  3   Monday, February 13, 2012, 16:24 John Wong   DoneEvaporator #2 Commissioned  Monday, February 13, 2012, 16:21
The Evaporator 2 is now commissioned.
 See attachment#1 for the commissioning
 Evap2_Commissioning_Report.PDF 
  2   Thursday, July 21, 2011, 17:33 Pierre Bricault   Maintenance Rick mentioned to me that the evaporator is
ready for the next steps of the commissioning
process.
  
  1   Monday, March 28, 2011, 12:40 John Wong    Under ConstructionEvaporator #2 is still under construction. 
For further information please contact Jens
Lassen.
  
ELOG V2.9.2-2455