Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 26 of 34  Not logged in ELOG logo
ID Date Author Target Material Target Oven W.O# Source Status Subject Text Attachments
  179   Tuesday, February 10, 2015, 13:19 Laura LambertEmpty41077-2LP-SISDoneCoating/Sintering TaC on target container - For Graphite Insert

    

       
            
 empty_container_table.JPG 
  178   Thursday, February 05, 2015, 18:03 John WongEmpty41077-2LP-SISIn progressCoating/Sintering TaC on target container - For Graphite Insert

    

       
            
  
  177   Tuesday, February 03, 2015, 10:31 Laura LambertEmpty41077-2LP-SISIn progressCoating/Sintering TaC on target container - For Graphite Insert

    

       
            
  
  176   Monday, February 02, 2015, 16:33 John WongEmpty41077-2LP-SISIn progressCoating/Sintering TaC on target container - For Graphite Insert Monday, February 02, 2015, 16:28
Container is coated with TaC. 
No Ta foil wrapped around. 
  
  175   Thursday, January 22, 2015, 14:21 Anders MjosEmpty  Problems resolvedCG1A replaced See previous e-log entry
for details
  
  174   Wednesday, January 14, 2015, 13:46 Anders MjosEmpty  MaintenancePumping down for water leak test Wednesday, January 14, 2015, 13:46:
Roughing
Wednesday, January 14, 2015, 14:57:
  
  173   Thursday, December 11, 2014, 10:20 Laura Lambert   Maintenancewater supply shut off for lab closure over holidays Thursday, December 11, 2014, 10:17
water supply and return valves closed
for lab closure over the holidays.
  
  172   Wednesday, November 26, 2014, 14:09 Laura Lambert   MaintenanceOMEGA-IR dark patch and backing pump trip Wednesday, November
26, 2014, 13:47
 IR_focus.jpeg 
  171   Wednesday, November 19, 2014, 15:10 Laura LambertEmpty39530-2LP-FEBIADDonetest#1. direct voltage and OMEGA temperature measurements Wednesday, November 19, 2014, 15:10
currently pumping down

 Wednesday, November
 test#1_TGHT_[without_vacuum].JPGtest#1_excel.JPGtest#1_graph1.JPGtest#1_graph2.JPG 
  170   Monday, November 10, 2014, 13:55 Laura LambertEmpty LP-SISDoneSintering TaC coating container for UCx#11 [2nd container]Monday, November 10, 2014, 13:51
target container was sprayed with
TaC on friday and sintered over the weekend.
  
  169   Tuesday, November 04, 2014, 16:21 John WongSiC39530-8HP-FEBIADDoneTesting the new OMEGA-IR2C on SiC#31 target (NOT TO BE USED ONLINE)

    

       
            
  
  168   Tuesday, November 04, 2014, 16:20 John WongSiC TARGET BOATIn progressTEST: Fabrication of SiC & Determine phase transformation 3C vs 6HTuesday, November 04, 2014, 16:08
The purpose of this experiment is
to improve the fabrication of SiC. 
  
  167   Thursday, October 23, 2014, 15:38 Laura LambertSiC39530-8HP-FEBIADIn progressTesting the new OMEGA-IR2C on SiC#31 target Thursday, October 23, 2014, 15:34
*See elog #142 for target description*
one endcap still in place, one removed
 2014-10-23_15.12.56.jpg2014-10-24.jpeg 
  166   Thursday, October 09, 2014, 17:41 John WongNb TARGET BOATDoneConditioning Nb targets (for Bob) Thursday, October 09, 2014, 17:36
Target boat consists of 5 Nb discs. 
Each disc is wrapped with Nb foil, and to
 samples@1400C.png 
  165   Thursday, October 09, 2014, 16:37 John WongEmpty40282-5LP-SISDoneSintering TaC coating container for UCx#11 (temp measured with OMEGA 2IR)

    

       
            
  
  164   Thursday, October 09, 2014, 15:59 John WongNb TARGET BOATIn progressConditioning Nb target (for Bob) Thursday, October 09, 2014, 15:56
The target boat contains 5 samples
of Nb discs.  Each disc is wrapped with
  
  163   Wednesday, October 08, 2014, 11:51 Laura LambertEmpty40282-5LP-SISDoneSintering TaC coating container for UCx#11 (temp measured with OMEGA 2IR)

    

       
            
  
  162   Monday, October 06, 2014, 12:17 John WongEmpty40282-5LP-SISIn progressSintering TaC coating container for UCx#11 (temp measured with OMEGA 2IR)

    

       
            
  
  161   Friday, October 03, 2014, 13:02 Anders MjosEmpty  MaintenanceBroken insulators

    

       
            
 NewInsulators.jpgBrokenInsulators.jpg 
  160   Thursday, October 02, 2014, 11:52 Laura LambertEmpty40282-5LP-SISIn progressSintering TaC coating container for UCx#11 Thursday, October 02, 2014, 11:51
Target container sprayed with TaC,
currently drying in fume hood
  
ELOG V2.9.2-2455