Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_1, Page 6 of 15  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target Material Target Oven W.O# Source Status Subjectdown Text Attachments
  135   Monday, September 12, 2016, 17:41 John Wong  TARGET BOATIn progressRUSH. Sintering end-caps Monday, September 12, 2016, 17:30
A bunch of end caps (12?) and a long
Ta-wire in spring sharp  were coated
  
  136   Tuesday, September 20, 2016, 10:49 Laura Lambert  TARGET BOATDoneRUSH. Sintering end-caps

    

       
            
 Evernote_Camera_Roll_20160919_154129.jpgEvernote_Camera_Roll_20160919_154130.jpgEvernote_Camera_Roll_20160919_154131.jpgEvernote_Camera_Roll_20160919_154132.jpg 
  143   Tuesday, December 20, 2016, 15:03 Laura Lambert   MaintenanceRETURN and SUPPLY valves CLOSED for xmas break    
  219   Saturday, September 29, 2018, 19:04 John WongUO2/C TARGET BOATIn progressProcessing UC2_flk_22Saturday, September 29, 2018, 18:52
Cast is from Jar#1.  (see process
sheet for details)
 striptool_capture.JPGTGHT_tripped.JPGpressure_limiting.JPG 
  116   Thursday, July 30, 2015, 17:19 John WongUO2/C40282-1TARGET BOATIn progressProcessing UC2_flk_07 Thursday, July 30, 2015, 17:10
The mixture of UO2/C was prepared
on July 13, 2015.  See screen shot for
 IMG_20150714_145857963.jpg 
  117   Tuesday, August 11, 2015, 10:23 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2_flk_07

    

       
            
  
  222   Monday, October 22, 2018, 17:58 Marla CervantesUO2/C27252-1TARGET BOATProblemsProcessing UC2Flk_22Monday, October 22, 2018, 17:55 
UO2/C green was prepared , September
 current-trip-1.jpgcurrent-trip-2.jpg 
  226   Wednesday, October 24, 2018, 20:01 Marla CervantesUO2/C27252-1TARGET BOATProblemsProcessing UC2Flk_22

    

       
            
 PowerSupply-TempLog.xlsxCT-2.jpg 
  227   Thursday, October 25, 2018, 09:10 Marla CervantesUO2/C27252-1TARGET BOATDoneProcessing UC2Flk_22

    

       
            
  
  214   Wednesday, July 11, 2018, 17:44 John WongUO2/C TARGET BOATDoneProcessing UC2Flk_21Wednesday, July 11, 2018, 17:41
Cast prepared by Marla (see note
in Hotlab)
  
  203   Tuesday, April 17, 2018, 12:45 Laura LambertUO2/C40282-2TARGET BOATDoneProcessing UC2Flk_20 Tuesday, April 17, 2018, 10:30
UO2/C green was prepared April
  
  169   Tuesday, October 10, 2017, 14:16 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_19 Tuesday, October 10, 2017, 14:11
UO2/C green was prepared Oct
  
  168   Wednesday, September 27, 2017, 12:05 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_18 Wednesday, September 27, 2017, 09:25
UO2/C green was prepared Sept
  
  154   Monday, June 12, 2017, 15:07 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_17 Monday, June 12, 2017, 11:41
UO2/C green was prepared June
 UC2Flk_17_entire_carbonization_process_using_new_vacuum_limits.JPGUC2Flk_17_vac_vs._cur.JPGUC2Flk_17_vac_vs._volt.JPG 
  145   Friday, March 03, 2017, 15:51 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_15 Friday, March 03, 2017, 08:53
UO2/C green was prepared
 evap1_tripped_off_UCxFlk_15.jpg 
  142   Tuesday, November 29, 2016, 16:20 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_14 Tuesday, November 29, 2016, 16:13
UO2/C green was prepared Nov
 UCxFlk_14[1].jpgUC2flk_14_carbonized_in_new_boat.jpg 
  139   Monday, November 07, 2016, 13:34 Laura LambertUO2/C40282-1TARGET BOATIn progressProcessing UC2Flk_13 Monday, November 07, 2016, 13:29
UO2/C green was prepared Nov
 UCxFlk_13[4].jpgUCxFlk_13[1].jpg 
  140   Tuesday, November 15, 2016, 10:02 John WongUO2/C40282-1TARGET BOATIn progressProcessing UC2Flk_13

    

       
            
  
  141   Wednesday, November 16, 2016, 16:41 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_13

    

       
            
 UCxFlk_10_carbonization.jpgUCxFlk_13_not_done_carbonization_at_520A-see_vacuum.jpgUCxflk_13.xlsx 
  137   Friday, September 23, 2016, 16:09 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_12Friday, September 23, 2016, 16:01
*Note: materials were scaled back
small amount since only 48.5g of UO2 was
  
ELOG V2.9.2-2455