75
|
Thursday, August 22, 2013, 18:00 |
John Wong | UO2/C | Target Boat #2 | | Done | Processing UC2 flaskes (batch#06 - 08222013 | Thursday, August 22, 2013, 17:31
1st attempt:
UO2/C green was prepared on Aug 14, |
|
74
|
Monday, August 05, 2013, 07:52 |
John Wong | UC2 | 38634-7 | LP-SIS | Done | Conditioning UCx # 07 |
|
|
73
|
Friday, August 02, 2013, 11:06 |
Laura Lambert | UC2 | 38634-7 | LP-SIS | In progress | Conditioning UCx # 07 | Thursday, August 01, 2013, 16:16
The target container was previously
coated with TaC and sintered in Evap 2. |
|
72
|
Monday, July 15, 2013, 09:45 |
John Wong | UO2/C | Target boat #2 | | Done | Processing UC2 flakes (batch#05 - 18062013) |
|
|
71
|
Thursday, July 11, 2013, 16:22 |
John Wong | UO2/C | Target boat #2 | | Done | Processing UC2 flakes (batch#05 - 18062013) |
|
|
70
|
Tuesday, July 02, 2013, 11:13 |
Peter Kunz | UO2/C | Target boat #2 | | Done | Processing UC2 flakes (batch#05 - 18062013) |
1. stage - burning off organics complete
2. stage - carbonization began 1-8 |
|
69
|
Tuesday, June 25, 2013, 16:28 |
John Wong | UO2/C | Target boat #2 | | Done | Processing UC2 flakes (batch#05 - 18062013) |
|
|
68
|
Tuesday, June 25, 2013, 14:49 |
Laura Lambert | UO2/C | Target boat #2 | | Done | Processing UC2 flakes (batch#05 - 18062013) | Tuesday, June 25, 2013, 14:35
UO2/C green was prepared on June
18, 2013 and let dry over the weekend. |
|
67
|
Thursday, June 06, 2013, 16:56 |
John Wong | UC2 | 39165-6 | LP-SIS | Done | Conditioning UCx#06 |
|
|
66
|
Wednesday, June 05, 2013, 16:52 |
Laura Lambert | UC2 | 39165-6 | LP-SIS | Done | Conditioning UCx#06 |
|
|
65
|
Thursday, May 30, 2013, 16:25 |
John Wong | UC2 | 39165-6 | LP-SIS | Done | Conditioning UCx#06 | Thursday, May 30, 2013, 16:16
The target container was previously
coated with TaC and sintered in Evap 2. |
|
64
|
Monday, May 06, 2013, 14:34 |
John Wong | UO2/C | Target boat #2 | | Done | Processing UC2 flakes (batch#04 - 05032013) | Monday, May 06, 2013, 14:29
UO2/C green was prepared on May 2,
2013 and let dry over the weekend. |
|
63
|
Tuesday, April 02, 2013, 17:46 |
John Wong | UO2/C | Target boat #2 | | Done | Processing UC2 flakes for UCx#6 (batch#03 - 02042013) | Tuesday, April 02, 2013, 17:25
UO2/C green was prepared on Mar 11,
2013. |
|
62
|
Thursday, October 25, 2012, 15:03 |
John Wong | BeO | Ta-target boat (old) | | In progress | Sintering BeO pellets #5 - testing Re foil as the protective under layer | Thursday, October 25, 2012, 14:50
Previous sintering BeO tests, pellets
1 to 4 were done in Evaporator#2. |
|
61
|
Monday, September 10, 2012, 11:00 |
Peter Kunz | UC2 | 39165-5 | LP-SIS | In progress | Conditioning UCx05 | Plot of conditioning run: IEVAP:IG1, TGHT |
|
60
|
Friday, September 07, 2012, 17:21 |
Peter Kunz | UC2 | 39165-5 | LP-SIS | In progress | Conditioning UCx05 | Target 6h at 520A. IEVAP:IG1 8.4e-6 Torr.
Cool down sequence initiated. |
|
59
|
Tuesday, September 04, 2012, 17:26 |
Peter Kunz | UC2 | 39165-5 | LP-SIS | In progress | Conditioning UCx05 | Organic gunk cleaned out. Beginning 2nd phase
of conditioning. |
|
58
|
Monday, September 03, 2012, 02:56 |
Peter Kunz | UC2 | 39165-5 | LP-SIS | In progress | Conditioning UCx05 | Organic/volatile burnoff complete at TGHT
= 190A. Rampdown initiated. |
|
57
|
Friday, August 24, 2012, 16:44 |
John Wong | UC2 | 39165-5 | LP-SIS | In progress | Conditioning UCx#5 | Friday, August 24, 2012, 16:40
Target is loaded with 245 discs of
UCx (material from batch#02-13062012), |
|
56
|
Thursday, July 19, 2012, 17:14 |
John Wong | UO2/C | Target boat #2 | | Done | Processing UC2 flakes for UCx#5 - (batch#02-13062012) | Thursday, July 19, 2012, 17:09
UO2/C green was prepared on June
13, 2012. |
|