489
Fri Oct 24 10:50:20 2014
Brian Minato
Other
Other
OLIS Update
The nitrogen bottle needs to be replaced.
MCIS-
491
Tue Oct 28 13:30:47 2014
Brian Minato
Other
Other
MCIS Update
MCIS-
the cleaning has been completed.
The oven assembly is removed and the gate
492
Thu Oct 30 13:14:51 2014
Brian Minato
Other
Other
OLIS Update
MCIS-
a new oven assembly was installed
on the MCIS yesterday. The cart has
497
Fri Oct 31 20:39:56 2014
Brian Minato
Other
Other
OLIS Update
MCIS-
the MWS Bias and PE have been moved
on to the MCIS (the MCIS connections have
499
Thu Nov 6 08:37:52 2014
Brian Minato
Other
Other
OLIS Update
MCIS-
the source is off. It is under
vacuum and in the HV cage.
501
Thu Nov 13 16:31:54 2014
Brian Minato
Other
Other
SIS
A new SIS source has been installed.
The oven has been loaded with Sodium Hydrogen
Carbonate (Alfa Aesar 10863) and Rubidium
502
Thu Nov 13 16:34:29 2014
Brian Minato
Other
Other
MCIS Update
The ethernet cable from the CPI TWT amplifier
has been temporarily moved to the Alga 50W
amplifier. The Alga had been experiencing
507
Wed Dec 17 13:17:13 2014
Brian Minato
Other
Other
MCIS Update
The MCIS was vented with nitrogen yesterday.
The Se oven was drawn back into the tuner.
It was removed with the tuner and blanked.
509
Wed Apr 29 07:48:22 2015
Brian Minato
Other
Other
Repair- Water leak inside HV cage
A water leak was reported inside the HV
cage (FR#8079). The cage was accessed
to determine the source of the leak (WP#I2015-04-27-1).
2
Thu May 14 12:02:09 2009
Damien Gallop
Routine
General
Testing 2
My first OLIS elog entry.
4
Thu May 21 16:23:37 2009
Damien Gallop
Routine
General
18O4+/8+ to TUDA-II declared done around noon
End of run diagnostics done. See ISAC elog.
Supernanogan cart is already installed and
at high vacuum. Prepare to run 17O from Sgan
5
Fri May 22 10:50:06 2009
Damien Gallop
Routine
General
MCIS online with 17O3+ on FC6
The previous 18O4+/8+ run to TUDA-II finished
midday yesterday. OLIS was prepared for 17O
delivery from the Supernanogan source. Leak
7
Fri May 22 15:03:55 2009
Damien Gallop
Routine
General
Temporary fix on IOS:TP7
Vacuum Group applied a temporary fix to
the lower body seal on IOS:TP7, which we
found last night to be leaking. Edi tells
8
Wed Jun 3 16:17:51 2009
Damien Gallop
Routine
General
MWS started for 18O1+ production to TIGRESS
A couple of weeks of 17O3+ to DRAGON ended
yesterday with a photo finish. Supernanogan
went off at 10:00. Preparations for 18O began.
9
Thu Jun 4 10:46:37 2009
Damien Gallop
Routine
General
18O source operation overnight
The MWS delivered 18O overnight, mostly
onto FC6. Sophia complained about source
stability this morning. It definitely could
10
Mon Jun 8 09:31:39 2009
Damien Gallop
Routine
General
Emittance scan of 18O beam from MWS
The TIGRESS run ended this morning. Supernanogan
Development begins now for two weeks. Begin
an 18O1+ emittance scan and also take some
11
Tue Jun 9 16:53:55 2009
Damien Gallop
Routine
General
Supernanogan development in progress
Keerthi started the Supernanogan source
today. His primary goal was to test out Rick's
theoretical tune calculations. He was ecstatic
12
Tue Jun 9 20:49:32 2009
Damien Gallop
Routine
General
Supernanogan RF & IOS slits
I have been testing various RF power settings
for cold starts and beam stability. No surprise,
the best tuner setting is approximately midway
13
Wed Jun 10 11:22:59 2009
Damien Gallop
Routine
General
Supernanogan development mass scans
Main event this morning so far: mass scans
and post-scan analysis using Gabe's tools.
We have a pretty good recipe now. Tight scan
14
Wed Jun 10 17:49:40 2009
Damien Gallop
Routine
General
Beam to RFQ
We handed over the beam to Sophia for testing
Rick's new tune. Although there are RF issues
at the RFQ presently, her feedback to the
Goto page 1,
2
,
3
...
24
,
25
,
26
Next
ELOG V2.9.2-2455