  489   Fri Oct 24 10:50:20 2014 Brian MinatoOtherOtherOLIS UpdateThe nitrogen bottle needs to be replaced.
 
MCIS-
  
  491   Tue Oct 28 13:30:47 2014 Brian MinatoOtherOtherMCIS UpdateMCIS-
the cleaning has been completed. 
The oven assembly is removed and the gate
  
  492   Thu Oct 30 13:14:51 2014 Brian MinatoOtherOtherOLIS UpdateMCIS-
a new oven assembly was installed
on the MCIS yesterday.  The cart has
  
  497   Fri Oct 31 20:39:56 2014 Brian MinatoOtherOtherOLIS UpdateMCIS-
the MWS Bias and PE have been moved
on to the MCIS (the MCIS connections have
  
  499   Thu Nov 6 08:37:52 2014 Brian MinatoOtherOtherOLIS UpdateMCIS-
the source is off.  It is under
vacuum and in the HV cage.
  
  501   Thu Nov 13 16:31:54 2014 Brian MinatoOtherOtherSISA new SIS source has been installed. 
The oven has been loaded with Sodium Hydrogen
Carbonate (Alfa Aesar 10863) and Rubidium
  
  502   Thu Nov 13 16:34:29 2014 Brian MinatoOtherOtherMCIS UpdateThe ethernet cable from the CPI TWT amplifier
has been temporarily moved to the Alga 50W
amplifier.  The Alga had been experiencing
  
  507   Wed Dec 17 13:17:13 2014 Brian MinatoOtherOtherMCIS UpdateThe MCIS was vented with nitrogen yesterday. 
The Se oven was drawn back into the tuner. 
It was removed with the tuner and blanked.
  
  509   Wed Apr 29 07:48:22 2015 Brian MinatoOtherOtherRepair- Water leak inside HV cageA water leak was reported inside the HV
cage (FR#8079).  The cage was accessed
to determine the source of the leak (WP#I2015-04-27-1).
  
  2   Thu May 14 12:02:09 2009 Damien GallopRoutineGeneralTesting 2My first OLIS elog entry.   
  4   Thu May 21 16:23:37 2009 Damien GallopRoutineGeneral18O4+/8+ to TUDA-II declared done around noonEnd of run diagnostics done. See ISAC elog.
Supernanogan cart is already installed and
at high vacuum. Prepare to run 17O from Sgan
  
  5   Fri May 22 10:50:06 2009 Damien GallopRoutineGeneralMCIS online with 17O3+ on FC6The previous 18O4+/8+ run to TUDA-II finished
midday yesterday. OLIS was prepared for 17O
delivery from the Supernanogan source. Leak
  
  7   Fri May 22 15:03:55 2009 Damien GallopRoutineGeneralTemporary fix on IOS:TP7Vacuum Group applied a temporary fix to
the lower body seal on IOS:TP7, which we
found last night to be leaking. Edi tells
  
  8   Wed Jun 3 16:17:51 2009 Damien GallopRoutineGeneralMWS started for 18O1+ production to TIGRESSA couple of weeks of 17O3+ to DRAGON ended
yesterday with a photo finish. Supernanogan
went off at 10:00. Preparations for 18O began.
  
  9   Thu Jun 4 10:46:37 2009 Damien GallopRoutineGeneral18O source operation overnightThe MWS delivered 18O overnight, mostly
onto FC6. Sophia complained about source
stability this morning. It definitely could
  
  10   Mon Jun 8 09:31:39 2009 Damien GallopRoutineGeneralEmittance scan of 18O beam from MWSThe TIGRESS run ended this morning. Supernanogan
Development begins now for two weeks. Begin
an 18O1+ emittance scan and also take some
  
  11   Tue Jun 9 16:53:55 2009 Damien GallopRoutineGeneralSupernanogan development in progressKeerthi started the Supernanogan source
today. His primary goal was to test out Rick's
theoretical tune calculations. He was ecstatic
  
  12   Tue Jun 9 20:49:32 2009 Damien GallopRoutineGeneralSupernanogan RF & IOS slitsI have been testing various RF power settings
for cold starts and beam stability. No surprise,
the best tuner setting is approximately midway
 grab.T18854.pnggrab.s18900.png 
  13   Wed Jun 10 11:22:59 2009 Damien GallopRoutineGeneralSupernanogan development mass scansMain event this morning so far: mass scans
and post-scan analysis using Gabe's tools.
We have a pretty good recipe now. Tight scan
 grab.t27875.pnggrab.R27900.pnggrab.H27444.png 
  14   Wed Jun 10 17:49:40 2009 Damien GallopRoutineGeneralBeam to RFQWe handed over the beam to Sophia for testing
Rick's new tune. Although there are RF issues
at the RFQ presently, her feedback to the
  