  268   Monday, January 14, 2013, 18:18 Friedhelm Ames       TMS:CBC1 not workingThe optics at the teststand has been switched
on, but TMS:CBC1 is not working. A fault
report has been send to controls.
  
  304   Tuesday, May 21, 2013, 19:38 Friedhelm Ames      Problems/Solutionsmagnet power supply water leakThe cyclotron operators discovered a water
leak in the magnet power supply. The water
is valved off and the power is off. A fault
  
  314   Wednesday, June 12, 2013, 20:38 Friedhelm Ames      Problems/Solutionstarget heater power supply removedThe target heater power supply at the teststand
has been removed to replace one in ITE.
  
  453   Monday, June 29, 2015, 16:51 Friedhelm Ames      Problems/SolutionsTSG:BV1B closedfound TSG:TP1B tripped off. Closed TSG:BV1B
as pressure at TSG:iG1 was rising. Pressure
is coming down again.
  
  896   Wednesday, August 25, 2021, 15:30 Ferran Boix Pamies       Thermocouple high voltage testWednesday, August 25, 2021, 15:29: Roughing.

Thursday, August 26, 2021,
04:11: IG1 switched on. Vacuum @ 8.35e-06T
  
  986   Monday, November 27, 2023, 16:09 Ferran Boix Pamies LP-SIS  45220-245235-13In progressHV power surge test plus mass scansMonday, November 27, 2023, 16:09 
Roughing
Monday, November 27, 2023, 17:22
  
  1018   Friday, August 09, 2024, 21:08 Ferran Boix PamiesTa#67 Thin foils LP-SISITETM445447-14 45235-10In progressTa#67 thin foil retestingFriday, August 09, 2024, 21:07 Insulators,
retainer and Re foil have been replaced,
source cup machined so the ion source does
 ITE-TM4-Ta#67-LP-SIS_Thin_Foil.docx 
  772   Friday, November 22, 2019, 19:06 Fernando Maldonado, Ferran Boix Pamies       PEEK seal tests Friday, November 22, 2019, 19:02:
The new design for the PEEK irradiation will
be tested.
  
  651   Wednesday, March 21, 2018, 14:11 Fernando Maldonado LP-FEBIAD  395530-342752-2In progressTest FEBIAD Tests on coil, temperature and the use
of silver bolts.
(3) Vented silver bolts on the TBHT
 10x 
  656   Thursday, April 19, 2018, 12:55 Fernando Maldonado      DoneRe-wiring Anode PSThursday, April 19, 2018, 12:52: Pin J1
was reconnected into the anode power supply.
All jumpers were put back to remote control.
 20180420_104954.jpg 
  733   Wednesday, June 19, 2019, 17:25 Fernando Maldonado      DoneThermocouple connectionWednesday, June 19, 2019, 17:13  Ferran
and Fernando tested the 9-pin connector to
have a reading on a thermocouple following
  
  736   Monday, June 24, 2019, 15:41 Fernando Maldonado      Problems/SolutionsTMS:Q3 polarityMonday, June 24, 2019, 15:25: Current quadrupole
polarities:
  
  737   Tuesday, June 25, 2019, 17:19 Fernando Maldonado      Problems/SolutionsBurnt cables on top of the test standTuesday, June 25, 2019, 16:15: While inspecting
the 9-pin connection with Ferran, it was
noticed how two braided cables were burnt
 20190625_154015.jpg20190625_153834.jpg20190625_165001.jpg 
  740   Thursday, June 27, 2019, 09:51 Fernando Maldonado      Problems/SolutionsMelted cables changedSee elog 737 

  
  741   Tuesday, July 02, 2019, 18:25 Fernando Maldonado      DoneBlank on FEBIAD gas line installed Tuesday, July 02, 2019, 18:24: A
blind is installed  on the FEBIAD gas
line (see attached picture)  to
 20190702_182254.jpg 
  745   Monday, July 15, 2019, 15:59 Fernando MaldonadoP2N     DoneRe-wiring on service cap.Monday, July 15, 2019, 15:54 : TBHT high
current cables moved to Coil feedthroughs.
Coil high current cables moved to
  
  746   Tuesday, July 16, 2019, 10:28 Fernando MaldonadoP2N      P2N 1200 A testTuesday, July 16, 2019, 10:27: The idea
of this run is to have the full 600 A from
TGHT and the full 600 A from TBHT.
  
  747   Friday, July 19, 2019, 13:48 Fernando Maldonado      Problems/SolutionsRMP0A and FC6 gains signal redirection to another channelAfter submitting a fault report (FR - ISAC
Fault 12461) a Work Permit was issued (WP
- C2019-07-19-1),
  
  752   Wednesday, August 07, 2019, 15:19 Fernando Maldonado      Problems/SolutionsTest stand inspectionWednesday, August 07, 2019, 15:12: 
Arthur helped inspected the electric connections
on the TS.
  
  755   Thursday, August 15, 2019, 16:33 Fernando Maldonado      Problems/Solutions9-pin connection modificationThursday, August 15, 2019, 16:17: Q FT
undone to remove the connection to the 9-pin
The idea is to change the cables
  