Monday, January 14, 2013, 18:18, Friedhelm Ames, , , , , , , , TMS:CBC1 not working
|
The optics at the teststand has been switched on, but TMS:CBC1 is not working. A fault report has been send to controls. |
Tuesday, May 21, 2013, 19:38, Friedhelm Ames, , , , , , , Problems/Solutions, magnet power supply water leak
|
The cyclotron operators discovered a water leak in the magnet power supply. The water is valved off and the power is off. A fault report has been issued
to the power supplies group. |
Wednesday, June 12, 2013, 20:38, Friedhelm Ames, , , , , , , Problems/Solutions, target heater power supply removed
|
The target heater power supply at the teststand has been removed to replace one in ITE. |
Monday, June 29, 2015, 16:51, Friedhelm Ames, , , , , , , Problems/Solutions, TSG:BV1B closed
|
found TSG:TP1B tripped off. Closed TSG:BV1B as pressure at TSG:iG1 was rising. Pressure is coming down again.
Tuesday, June 30, 2015 by AM
Found the control cable not completely inserted. Inserted cable, which tripped TP1A. Started both turbo pumps again. |
Wednesday, August 25, 2021, 15:30, Ferran Boix Pamies, , , , , , , , Thermocouple high voltage test
|
Wednesday, August 25, 2021, 15:29: Roughing.
Thursday, August 26, 2021, 04:11: IG1 switched on. Vacuum @ 8.35e-06T - AS
Thursday, August 26, 2021, 14:04 Water on, no spike in vacuum. IG1:2.6e-6T |
Monday, November 27, 2023, 16:09, Ferran Boix Pamies, , LP-SIS, , , 45220-2, 45235-13, In progress, HV power surge test plus mass scans
|
Monday, November 27, 2023, 16:09 Roughing
Monday, November 27, 2023, 17:22 Both turbos are on, leaving vacuum over night.
Tuesday, November 28, 2023, 09:28 after pumping over night IG1 is at .15e-6 T. Water cooling on. |
Friday, August 09, 2024, 21:08, Ferran Boix Pamies, Ta#67 Thin foils , LP-SIS, ITE, TM4, 45447-14 , 45235-10, In progress, Ta#67 thin foil retesting
|
Friday, August 09, 2024, 21:07 Insulators, retainer and Re foil have been replaced, source cup machined so the ion source does not short against it.
Venting TS now.
Friday, August 09, 2024, 22:17 Roughing. |
Friday, November 22, 2019, 19:06, Fernando Maldonado, Ferran Boix Pamies, , , , , , , , PEEK seal tests
|
Friday, November 22, 2019, 19:02: The new design for the PEEK irradiation will be tested.
Blinds were removed and a new LP-SIS assembly with a modify heatshield was installed. Three termocuples installed.
Friday, November 22, 2019, 19:04: Roughing |
Wednesday, March 21, 2018, 14:11, Fernando Maldonado, , LP-FEBIAD, , , 395530-3, 42752-2, In progress, Test FEBIAD 10x
|
Tests on coil, temperature and the use of silver bolts.
(3) Vented silver bolts on the TBHT and (2) Full silver bolts on the coil
Wednesday, March 21, 2018, 14:10: Roughing. |
Thursday, April 19, 2018, 12:55, Fernando Maldonado, , , , , , , Done, Re-wiring Anode PS
|
Thursday, April 19, 2018, 12:52: Pin J1 was reconnected into the anode power supply. All jumpers were put back to remote control.
NOTE: the cable EXTLKT is still not connected. I will ask Carla about this one.
Thursday, April 19, 2018, 18:00: Cable EXTLKT connected. |
Wednesday, June 19, 2019, 17:25, Fernando Maldonado, , , , , , , Done, Thermocouple connection
|
Wednesday, June 19, 2019, 17:13 Ferran and Fernando tested the 9-pin connector to have a reading on a thermocouple following the connections used
by Aurelia (see elog 721).
Wednesday, June 19, 2019, 17:24: Test succesful! |
Monday, June 24, 2019, 15:41, Fernando Maldonado, , , , , , , Problems/Solutions, TMS:Q3 polarity
|
Monday, June 24, 2019, 15:25: Current quadrupole polarities:
Top/Bottom
North/South
|
Tuesday, June 25, 2019, 17:19, Fernando Maldonado, , , , , , , Problems/Solutions, Burnt cables on top of the test stand
|
Tuesday, June 25, 2019, 16:15: While inspecting the 9-pin connection with Ferran, it was noticed how two braided cables were burnt out pretty bad to
the point they were separated in half (see attached pictures). Additionally the plastic insulator for the anode wire was melted.
Tuesday, June 25, 2019, 16:30: Braided cables need to be changed and anode wire redone. |
Thursday, June 27, 2019, 09:51, Fernando Maldonado, , , , , , , Problems/Solutions, Melted cables changed
|
See elog 737
Fernando |
Tuesday, July 02, 2019, 18:25, Fernando Maldonado, , , , , , , Done, Blank on FEBIAD gas line installed
|
Tuesday, July 02, 2019, 18:24: A blind is installed on the FEBIAD gas line (see attached picture) to rule out the possibility
of gases entering the TIS. |
Monday, July 15, 2019, 15:59, Fernando Maldonado, P2N, , , , , , Done, Re-wiring on service cap.
|
Monday, July 15, 2019, 15:54 : TBHT high current cables moved to Coil feedthroughs.
Coil high current cables moved to TBHT feedthroughs.
Resistor across Coil feedthroughs E and F are now moved between TBHT feedthroughs A and B. |
Tuesday, July 16, 2019, 10:28, Fernando Maldonado, P2N, , , , , , , P2N 1200 A test
|
Tuesday, July 16, 2019, 10:27: The idea of this run is to have the full 600 A from TGHT and the full 600 A from TBHT.
This will done based on the rewiring done previously (see entry 745)
Tuesday, July 16, 2019, 12:16: Jumper cable F-H burning while target was at 600 A total. Ramp up aborted and auto-cooling started to remove the |
Friday, July 19, 2019, 13:48, Fernando Maldonado, , , , , , , Problems/Solutions, RMP0A and FC6 gains signal redirection to another channel
|
After submitting a fault report (FR - ISAC Fault 12461) a Work Permit was issued (WP - C2019-07-19-1),
Controls tunnel the faulty signal to another ADC by removing signal no longer used at the Test Stand.
Test successful with a constant current power supply in the range 1 nA-40 nA. |
Wednesday, August 07, 2019, 15:19, Fernando Maldonado, , , , , , , Problems/Solutions, Test stand inspection
|
Wednesday, August 07, 2019, 15:12: Arthur helped inspected the electric connections on the TS.
One of the coil positive waterlines was touching a HS waterline. Manually adjusted them to have a better clearance.
|
Thursday, August 15, 2019, 16:33, Fernando Maldonado, , , , , , , Problems/Solutions, 9-pin connection modification
|
Thursday, August 15, 2019, 16:17: Q FT undone to remove the connection to the 9-pin
The idea is to change the cables to have individual signals. This will allow 4 thermocouple readings.
NB: The FT is not vacuum tight as of now (gasket needs to be replaced and flange needs to be tight) |
|