  679   Tuesday, August 21, 2018, 12:54 Anders Mjos      Problems/Solutions9-pin connection configurationPin configuration between top 9-pin connector
on Source Tray and terminal in high voltage
rack. Measured 2018-08-21 by Aaron and Anders
  
  285   Tuesday, March 19, 2013, 19:13 Sebastian Raeder      Problems/Solutions9 Pin connector rewired to match wiring in TM4The 9 Pin connector was rewired in the
ISAC teststand to match the wiring in TM4
The wiring from the connection board
  
  244   Tuesday, December 11, 2012, 13:27 Sebastian Raeder       9 PIN connectorA Sub D 9 Pin connector on a HV insulator
was installed on Port Q of the target box
at the teststand. The insulator is leak tested
  
  913   Monday, March 21, 2022, 13:59 Carla Babcock       3rd mass marker test3rd version of the mass marker target has
been installed. This one is further back
on the heat shield, and has a longer ceramic
  
  286   Thursday, March 21, 2013, 15:05 Sebastian RaederSiC#28 ITETM4  Done2nd heating of SiC#28 LP-RFQ - short resolved 

    
 20130322_heating.png20130322_massscan_transmission.png20130322_massscan_suppression1.png20130322_suppression2.pnglegs.JPG 
  324   Monday, July 22, 2013, 14:08 Anders Mjos      Problems/Solutions20V 60A COIL PS installed for FEBIAD Coil TestBy Ray. Note that controls have not been
updated yet.
  
  707   Monday, January 21, 2019, 10:55 Aaron Schmidt       2019 Anode tests FM-1Monday, January 21, 2019, 10:50: RGA on.
Monday, January 21, 2019, 10:54:
Waterlines opened. No response on RGA. Vacuum
  
  870   Wednesday, April 14, 2021, 10:21 Luca Egoriti P2N test - Apr 2021HP-SIS    In progress P2N test - Electrical reconfiguration Wednesday, April 14, 2021, 10:18
Work started to bring the ATTS PS
inside the ITS HV cage. HV grounding rod
 ITS_electrical_panel_-_removed.jpgResistance_matrix_2021-04-28.png 
  37   Tuesday, February 28, 2012, 11:04 Pierre Bricault         Calibrating the gas valve   
  161   Friday, August 10, 2012, 15:57 Pierre Bricault        Test high voltage to 30 kV ok
Test gas valve open at 6.1 V
Test Ne leak ok
  
  177   Friday, August 17, 2012, 12:53 Pierre Bricault      Done Test completed.
exel file on My Documents in folder
FEBIAD Test Aout2012/TestFEBIAD
 TestFEBIAD.xlsx 
  194   Thursday, September 06, 2012, 09:23 Friedhelm AmesNB#7       start high voltage and heaters   
  652   Thursday, March 29, 2018, 10:58 Carla Babcock        Started with Anode at 25V and coil at 0A,
bias at 30kV. (attachment 1)
Ramped coil to 60A (0.4V) (attachment
 6x 
  834   Thursday, December 17, 2020, 08:16 Carla Babcock, Alexander Shkuratoff        Ramping up to 75kV. Started drawing current
at 63.5kV this time.
Now at 75kV, drawing 5uA of current.
  
  955   Thursday, January 12, 2023, 09:04 Aaron Schmidt LP-SIS  44691-1444378-20In progress Test for Aurelia L. Empty LP-SIS w/ end
caps in. Right side expanded.
Thermocouples installed (R - L):
  
  1006   Wednesday, April 24, 2024, 16:21 Dave Neilson LP-SIS  44691-845235-26   Wednesday, April 24, 2024, 16:20: 
   Target assembly installed.
Wednesday, April 24, 2024, 16:20: 
  
  1032   Thursday, November 28, 2024, 13:47 Isaiah Rabuka         November 28, 2024 1:46PM
Checked in on sample in ATTS.
  
  1034   Tuesday, December 03, 2024, 15:49 Isaiah Rabuka          Tuesday,
December 03, 2024, 15:48
  
  1035   Wednesday, December 04, 2024, 15:43 Isaiah Rabuka          Wednesday,
December 04, 2024, 15:42 Depressurized the
  
  1037   Thursday, December 05, 2024, 14:06 Isaiah Rabuka         Thursday, December 05, 2024, 14:05
Pressurized ATTS with argon, swapped out
samples, and repressurized and heated chamber.
  