ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
|
952
|
Monday, December 19, 2022, 12:49 |
Carla Babcock | | HP-FEBIAD | | | | | | HP-FEBIAD tests | Monday, December 19, 2022, 12:06 : Tomislav
changed the polarity of the anode power supply
last week and everything has been closed |
|
|
953
|
Wednesday, December 21, 2022, 17:06 |
Carla Babcock | | | | | | | | Prep for power outage | Source and beamline power supplies turned
off in EPICS
HV cage power off |
|
|
954
|
Tuesday, January 03, 2023, 10:03 |
Carla Babcock | | | | | | | | Recovery from power outage | Easy recovery after power outage, just
had to power cycle the ground PLC IOC and
the BiRa IOC. |
|
|
956
|
Monday, January 16, 2023, 16:02 |
Aaron Schmidt | | HP-FEBIAD-CTL | | | | | In progress | HP-FEBIAD tests | Extra wraps of foil around the center block
(6) + 3 full wraps around the shield.
Monday, January 16, 2023, 15:40: |
|
|
957
|
Tuesday, January 17, 2023, 09:48 |
Aaron Schmidt | | | | | | | Problems/Solutions | TMS:RP2 Failure | Tuesday, January 17, 2023, 09:48: TMS:RP2
off. Audible failure was in progress. Also
observable on the strip tool. Vacuum group |
|
|
961
|
Thursday, April 13, 2023, 11:07 |
Aaron Schmidt | | | | | | | In progress | Installation of new IDP-15 TMS:TP2 | IDP15 Scroll Pump, Std w/ inlet.
TMS:RP2
PN: X3815-64010 |
|
|
968
|
Thursday, May 25, 2023, 13:47 |
Aaron Schmidt | | | | | | | | Rough down empty chamber | Thursday, May 25, 2023, 13:47: Roughing. |
|
|
970
|
Thursday, June 08, 2023, 14:22 |
Aaron Schmidt | | | | | | | | Rough down empty chamber | Thursday, June 08, 2023, 14:22: Roughing. |
|
|
972
|
Monday, July 10, 2023, 15:01 |
Aaron Schmidt | | | | | | | | Pump down empty chamber | Monday, July 10, 2023, 15:01: Roughing.
Wednesday, July 12, 2023,
09:38: Venting both chambers. |
|
|
973
|
Thursday, July 13, 2023, 07:37 |
Aaron Schmidt | | | | | | | | Tests - Aurelia L | Thursday, July 13, 2023, 07:37: Chamber
is vented. Beamline is vented. Interlock
bypassed on TPS:IV4 - AS |
|
|
974
|
Thursday, July 13, 2023, 18:29 |
Aurelia Laxdal | | LP-SIS | | | | | In progress | Spectrometer tests | Pumping down: TS loaded with a LP-SIS
container for spectrometer test.
Started heating up the target container: |
|
|
977
|
Wednesday, August 16, 2023, 11:32 |
Aaron Schmidt | | | | | | | | Pump down empty chamber | Wednesday, August 16, 2023, 11:32: Roughing.
Thursday, August 17, 2023,
11:01: Venting. |
|
|
979
|
Tuesday, August 29, 2023, 12:14 |
Aaron Schmidt | | | | | | | | Pump down empty chamber | Tuesday, August 29, 2023, 12:14: Roughing.
Tuesday, August 29, 2023, 13:17:
TP1B started. |
|
|
981
|
Thursday, September 28, 2023, 13:42 |
Aaron Schmidt | | | | | | | | Pump down empty chamber | Thursday, September 28, 2023, 13:40: Roughing
- BB.
Tuesday, October 10, 2023, |
|
|
985
|
Thursday, November 16, 2023, 09:43 |
Aaron Schmidt | | LP-SIS | | | | | In progress | Thermal tests | Aurelia has been testing on the ISAC TS
since last week. Thermocouples are installed
in the end cap, left side & the ionizer. |
|
|
987
|
Tuesday, December 12, 2023, 12:41 |
Aaron Schmidt | | | | | | | Done | Source Tray / TS inspection | Tuesday, December 12, 2023, 12:39: Visual
inspection.
Source tray: OK. Minor cracks on |
|
|
989
|
Thursday, January 18, 2024, 10:44 |
Aaron Schmidt | | | | | | | Done | Thermal tests 2 | December 18 - January 15. Were not logged.
Placed holder. Aurelia's tests. Included
thermocouples in the oven & ionizer. |
|
|
990
|
Thursday, January 18, 2024, 10:47 |
Aaron Schmidt | | | | | | | Problems/Solutions | FC0 Solenoid Replaced. | Issues with valve operations due to a leak
in the solenoid valve above FC0. The HPA
leak did not allow for sufficient pressure |
|
|
994
|
Tuesday, February 06, 2024, 14:09 |
Aaron Schmidt | | | | | | | Problems/Solutions | FC0 Solenoid issue | Tuesday, February 06, 2024, 14:06: Attempted
to 'Close' FC0. While it succeeded in moving
into position, HPA rushed out of the exhaust. |
|
|
995
|
Friday, February 16, 2024, 05:03 |
Aaron Schmidt | | | | | | | Problems/Solutions | Coil PS issue | 15-02-2024
The coil PS control card is fried.
Roughly since the beginning of December. |
|
|