Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 51 of 53  Not logged in ELOG logo
ID Date Author Target/No.# Source Station Module Target Oven W.O#down Heat Shield W.O# Status Subject Text Attachments
  956   Monday, January 16, 2023, 16:02 Aaron Schmidt HP-FEBIAD-CTL    In progressHP-FEBIAD testsExtra wraps of foil around the center block
(6) + 3 full wraps around the shield.
Monday, January 16, 2023, 15:40:
  
  957   Tuesday, January 17, 2023, 09:48 Aaron Schmidt      Problems/SolutionsTMS:RP2 FailureTuesday, January 17, 2023, 09:48: TMS:RP2
off. Audible failure was in progress. Also
observable on the strip tool. Vacuum group
  
  961   Thursday, April 13, 2023, 11:07 Aaron Schmidt      In progressInstallation of new IDP-15 TMS:TP2IDP15 Scroll Pump, Std w/ inlet.
TMS:RP2
PN: X3815-64010
  
  968   Thursday, May 25, 2023, 13:47 Aaron Schmidt       Rough down empty chamberThursday, May 25, 2023, 13:47: Roughing.   
  970   Thursday, June 08, 2023, 14:22 Aaron Schmidt       Rough down empty chamberThursday, June 08, 2023, 14:22: Roughing.   
  972   Monday, July 10, 2023, 15:01 Aaron Schmidt       Pump down empty chamberMonday, July 10, 2023, 15:01: Roughing.

Wednesday, July 12, 2023,
09:38: Venting both chambers. 
  
  973   Thursday, July 13, 2023, 07:37 Aaron Schmidt       Tests - Aurelia LThursday, July 13, 2023, 07:37: Chamber
is vented. Beamline is vented. Interlock
bypassed on TPS:IV4 - AS
  
  974   Thursday, July 13, 2023, 18:29 Aurelia Laxdal LP-SIS    In progressSpectrometer tests Pumping down: TS loaded with a LP-SIS
container for spectrometer test. 
Started heating up the target container:
  
  977   Wednesday, August 16, 2023, 11:32 Aaron Schmidt       Pump down empty chamberWednesday, August 16, 2023, 11:32: Roughing.

Thursday, August 17, 2023,
11:01: Venting.
  
  979   Tuesday, August 29, 2023, 12:14 Aaron Schmidt       Pump down empty chamberTuesday, August 29, 2023, 12:14: Roughing.
Tuesday, August 29, 2023, 13:17:
TP1B started. 
  
  981   Thursday, September 28, 2023, 13:42 Aaron Schmidt       Pump down empty chamberThursday, September 28, 2023, 13:40: Roughing
- BB.

Tuesday, October 10, 2023,
  
  985   Thursday, November 16, 2023, 09:43 Aaron Schmidt LP-SIS    In progressThermal testsAurelia has been testing on the ISAC TS
since last week. Thermocouples are installed
in the end cap, left side & the ionizer.
  
  987   Tuesday, December 12, 2023, 12:41 Aaron Schmidt      DoneSource Tray / TS inspectionTuesday, December 12, 2023, 12:39: Visual
inspection.
Source tray: OK. Minor cracks on
  
  989   Thursday, January 18, 2024, 10:44 Aaron Schmidt      DoneThermal tests 2December 18 - January 15. Were not logged.
Placed holder. Aurelia's tests. Included
thermocouples in the oven & ionizer.
  
  990   Thursday, January 18, 2024, 10:47 Aaron Schmidt      Problems/SolutionsFC0 Solenoid Replaced.Issues with valve operations due to a leak
in the solenoid valve above FC0. The HPA
leak did not allow for sufficient pressure
  
  994   Tuesday, February 06, 2024, 14:09 Aaron Schmidt      Problems/SolutionsFC0 Solenoid issueTuesday, February 06, 2024, 14:06: Attempted
to 'Close' FC0. While it succeeded in moving
into position, HPA rushed out of the exhaust.
  
  995   Friday, February 16, 2024, 05:03 Aaron Schmidt      Problems/SolutionsCoil PS issue15-02-2024
The coil PS control card is fried.
Roughly since the beginning of December.
 Coil_PS_Control_Card.png 
  997   Tuesday, February 20, 2024, 14:22 Aaron Schmidt       Set to Cathode BIAS ModeTuesday, February 20, 2024, 14:20: TS to
wired to Cathode BIAS mode as per ISK4563D.

Monday, March 11, 2024, 13:59:
  
  998   Monday, February 26, 2024, 10:24 Aaron Schmidt      Problems/SolutionsTMS:RP2 purge. TS exhaust clearing. + TMS:TP6Monday, February 26, 2024, 10:12:
While attempting to cycle FC0, noticed
that the turbo pumps TMS:TP6 & TMS:TP2
  
  1001   Tuesday, April 09, 2024, 15:28 Aaron Schmidt       Set to Anode BIAS Mode & Old gas leak installed.Switched to Anode mode on March 28 including
polarity. The old calibrated leak was also
re-installed.
  
ELOG V2.9.2-2455