  847   Tuesday, February 09, 2021, 14:02 Aaron Schmidt      Problems/SolutionsDI water lossTuesday, February 09, 2021, 13:43: DI water
flow completely stopped.
Control room contacted. DI water
  
  848   Wednesday, February 10, 2021, 09:49 Aaron Schmidt LP-SIS  44691-844378-2 / 44378-3FailedEnergy spread calibration with SISNote* target has a ring on the TGHT - Right
leg. EE & PE placed. Target to HS OL
- OK.
 spark_inside_chamber_roof.pngspark_inside_chamber_front_view.png 
  852   Thursday, February 18, 2021, 10:47 Aaron Schmidt       Optics loss / CANBUS failure.Thursday, February 18, 2021, 10:45: TPS:Q3
& the TSB CBC CANBUS controllers had
failed yesterday, as well as a cable was
  
  853   Thursday, February 18, 2021, 11:03 Aaron Schmidt      Problems/SolutionsDI water pump configurationhttps://elog.triumf.ca/TIS/Test-Stand/847
There was a previous DI CU-LCW 
pump trip as per the above elog. The CU-LCW
  
  860   Tuesday, March 02, 2021, 11:42 Aaron Schmidt       TS Tripped.    
  862   Wednesday, March 10, 2021, 14:28 Aaron Schmidt      In progressRP2 swap.Swapped RP2 out from a Varian SH-110 to
a Varian PTS06001.
Wednesday, March 10, 2021, 14:20:
  
  863   Wednesday, March 10, 2021, 14:57 Aaron Schmidt HP-FEBIAD   42752-5In progressEmittance meter test with FEBIADWednesday, March 10, 2021, 14:54: Roughing.
Wednesday, March 10, 2021, 14:57:
BV1A open.
  
  865   Thursday, March 25, 2021, 08:11 Aaron Schmidt       Test Stand Tripped. (Water leak)   Mar_2021_-_FS#3_leak..docx 
  869   Tuesday, April 13, 2021, 13:27 Aaron Schmidt       Indium gaskets installed FS#3Changed the gaskets from C-seals on FS#3
water blocks E, F,& H. G was already
done.
  
  873   Wednesday, May 19, 2021, 16:02 Aaron Schmidt       P2N HS conditioning Parasitic assemblies on the lid & end
plate included. Online HS.
Wednesday, May 19, 2021, 16:00: Roughing.
 HV_test_-_Online_HS_&_parasitic_mods.docx 
  874   Wednesday, May 26, 2021, 14:29 Aaron SchmidtUC#33 (HS)LP-SISITWTM2 44378-3In progressUC#33 HS conditioningHS waterlines were very tight to line up.
Wednesday, May 26, 2021, 14:29: Roughing.
Wednesday, May 26, 2021, 15:09: TP1B
 Conditioning_UC#33_HS.docx 
  875   Wednesday, June 02, 2021, 10:45 Aaron SchmidtUC#34 HSLP-SIS TM243044-1344378-1In progressUC#34 HS conditioning Straight tube target / TGHT for outgassing.
Wednesday, June 02, 2021, 11:06:
Roughing.
  
  876   Monday, June 07, 2021, 13:45 Aaron SchmidtTa#62LP-SISITETM444139-1044378-4In progressTa#62 ConditioningMonday, June 07, 2021, 13:44: Roughing.
Monday, June 07, 2021, 14:16: TP1B
on. (Tripped shortly after?)
 Ta#62_Conditioning_-_1.docx 
  877   Monday, June 07, 2021, 14:40 Aaron Schmidt      DoneFC6 re-installedMonday, June 07, 2021, 14:39: Roughing
beam line section.
Monday, June 07, 2021, 14:46: TMS:TP6
  
  878   Wednesday, June 09, 2021, 11:51 Aaron Schmidt      Problems/SolutionsTPS:CB2 issue.Tuesday, June 08, 2021, 08:25: IV4 open.
Optics set minus TPS:CB2. Shows  as green
'on', set to 500V, however read back shows
  
  879   Wednesday, June 09, 2021, 14:31 Aaron SchmidtTa#62LP-SISITETM444139-1044378-4In progressInstall MB1 window & 9 pin for V test.Installed a new window on MB1 as per Aurelia.
Connect modified 9 pin connector & voltage
meters for Ta#62 testing.
 Ta#62_voltage_tests.docx 
  880   Monday, June 21, 2021, 11:53 Aaron SchmidtTa#62LP-SISITETM444139-1044378-4FailedTa#62 Conditioning - 2Replace 9-pin back to normal grounded setup.
Re-salt Ta#62. (Cu Gaskets in-use on FS#5)
Monday, June 21, 2021, 11:30: Roughing
 Ta#62_Conditioning_-_2.docx 
  881   Wednesday, June 23, 2021, 12:24 Aaron SchmidtSiC#40HP-SISITETM442218-843515-8In progressSiC#40 Conditioning-2Wednesday, June 23, 2021, 12:22: Roughing.
Wednesday, June 23, 2021, 13:22:
TP1B on.
 SiC#40_Conditioning_-_2.docxER-580-230-30kV-m7_-_2.txt 
  882   Friday, June 25, 2021, 11:18 Aaron SchmidtTa#62LP-SISITETM444691-444378-4DoneTa#62 Conditioning - NewReplacement Ta target for the previous
one (44139-10) https://elog.triumf.ca/TIS/Test-Stand/880
Friday, June 25, 2021, 11:16: Roughing.
 Ta#62_44691-4_Conditioning_-_R.docxTa#62_44691-4_Conditioning..docxITE-TM4-Ta#62-LP-SIS_Test_Stand.docx 
  883   Monday, June 28, 2021, 09:22 Aaron Schmidt       Empty ChamberMonday, June 28, 2021, 09:22: Roughing.
Monday, June 28, 2021, 10:10: TP1B
on.
  