55
|
Tuesday, March 06, 2012, 15:25 |
Pierre Bricault | | | | | | | | ISAC test stand | Turbos at full speed. P = 1.5E-05 T |
|
108
|
Thursday, June 28, 2012, 11:04 |
Pierre Bricault | Test FEBIAD | LP-FEBIAD | | | | | In progress | Ready to bias the high voltage. | |
|
109
|
Thursday, June 28, 2012, 11:13 |
Pierre Bricault | | LP-FEBIAD | | | | | | ISAC test stand ready for cathode heating | The ISAC test stand is ready for cathode
heating.
Bias voltage: 30000 V |
|
110
|
Thursday, June 28, 2012, 11:19 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Cathode ramping to 230 A in progress | |
|
111
|
Thursday, June 28, 2012, 11:27 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Cathode heating in progress, pressure 8.3e-7 T | |
|
112
|
Thursday, June 28, 2012, 11:29 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Lost all cnntrol interface, complete whiteout of the epics system. | |
|
114
|
Thursday, June 28, 2012, 17:00 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Cathode heater reached its value of 230 A and stoped. good test. | Now ramp cathode current up to 290 A. The
total current out is 1.e-7 A.
|
|
115
|
Thursday, June 28, 2012, 17:18 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Leave the cathode heater at 275 A overninght. | |
|
116
|
Friday, June 29, 2012, 08:57 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Continue cathode heating | This morning the pressure was 3.5E-7
T. Current at 275 A is 30nA.
Continue cathode heating to 290 A |
|
155
|
Thursday, August 09, 2012, 13:08 |
Pierre Bricault | | | | | | | | Test FEBIAD | Waiting Rick for the fitting on the vacuum
pump. |
|
156
|
Friday, August 10, 2012, 11:29 |
Pierre Bricault | NA | | | | N A | NA | In progress | Test FEBIAD | The helium bottle was found empty.
Rick will refill it and hook the
leak detector on the system to find out |
|
157
|
Friday, August 10, 2012, 12:44 |
Pierre Bricault | NA | LP-FEBIAD | | | NA | NA | In progress | FEBIAD test | Rick put the helium bottle back in the
rack.
Waiting for status of the gas lines. |
|
160
|
Friday, August 10, 2012, 15:29 |
Pierre Bricault | NA | LP-FEBIAD | | | NA | NA | | finishing the gas installation and its pump | 1524H Start small pump.
1529H stop the pump.
|
|
161
|
Friday, August 10, 2012, 15:57 |
Pierre Bricault | | | | | | | | | Test high voltage to 30 kV ok
Test gas valve open at 6.1 V
Test Ne leak ok |
|
162
|
Saturday, August 11, 2012, 13:34 |
Pierre Bricault | NA | LP-FEBIAD | | | NA | NA | In progress | Test FEBIAD anode bias 120 V | |
|
163
|
Saturday, August 11, 2012, 16:18 |
Pierre Bricault | | | | | | | | Test FEBIAD anode biased at 120 V | The ramp up finished.
I have 3.35E-6 Amp out of the source
on FC0. |
|
164
|
Sunday, August 12, 2012, 21:50 |
Pierre Bricault | | | | | | | In progress | Test FEBIAD | Lost communication with EPICS. Came in
reset the ...
So far no luck. |
|
165
|
Sunday, August 12, 2012, 22:07 |
Pierre Bricault | | | | | | | In progress | FBIAD test | The reset restored the control.
But magnet supply does not put any
amperage out. |
|
167
|
Monday, August 13, 2012, 10:59 |
Pierre Bricault | | | | | | | Problems/Solutions | Test FEBIAD | This morning I try to contact PS group
no one answer. Dan Louie is in vacation.
I went into the can diagnostics panel |
|
168
|
Monday, August 13, 2012, 14:26 |
Pierre Bricault | | | | | | | In progress | FEBIAD test | I am done with the FEBIAD test (anode biased)
We will swap the bias now to the
cathode and change the polarity to negative. |
|