Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 45 of 53  Not logged in ELOG logo
ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Statusdown Subject Text Attachments
  527   Thursday, July 28, 2016, 11:12 Aaron Schmidt       Pump down empty chamber.Thursday, July 28, 2016, 10:00 Roughing.   
  528   Wednesday, August 03, 2016, 13:47 Aaron SchmidtTa#49HP-SISITWTM2 41751-10 Conditioning Ta#49Wednesday, August 03, 2016, 13:47: Roughing
Wednesday, August 03, 2016, 14:17:
Turbo pumps started.
 7x 
  529   Monday, August 08, 2016, 09:48 Aaron Schmidt    41882-441751-1 HS Test Full CleanHeat Shield Test (Fully Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge
 HS_41751-1_TEST.docxTS-2016-08-08-11-45.rga20160824_144103.jpg20160824_144106.jpg 
  530   Wednesday, August 10, 2016, 08:09 Aaron Schmidt    41882-441751-2 HS Test Full CleanHeat Shield Test (Fully Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge
 HS_41751-2_TEST.docxTS-2016-08-10-11-45.rga20160824_143539.jpg 
  532   Monday, August 15, 2016, 08:09 Aaron Schmidt    41882-441751-4 HS Test OR CleanHeat Shield Test (OR Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge
 HS_41751-4_TEST.docxTS-2016-08-15-11-45.rga20160824_143550.jpg 
  533   Wednesday, August 17, 2016, 08:19 Aaron Schmidt    41882-441751-5 HS Test OR CleanHeat Shield Test (OR Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge
 HS_41751-5_TEST.docxTS-2016-08-17-11-45.rga20160824_143555.jpg20160824_143558.jpg 
  534   Monday, August 22, 2016, 08:20 Aaron Schmidt    41882-441751-3 HS Test Full CleanHeat Shield Test (Fully Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge
 HS_41751-3_TEST.docxTS-2016-08-22-11-50.rga20160824_143544.jpg 
  535   Wednesday, August 24, 2016, 09:16 Aaron Schmidt    41882-441751-6 HS Test OR CleanHeat Shield Test (OR only).
For all 6 tests:
-Start Turbo pumps & Ion gauge
 7x 
  536   Monday, August 29, 2016, 10:08 Aaron Schmidt       Pump down empty chamber.Monday, August 29, 2016, 10:07: Roughing.

Friday, September 02, 2016,
14:33: Venting
  
  537   Friday, September 02, 2016, 15:47 Aaron SchmidtSiC#34LP-IG-LISITETM439814-V2-141751-9 Conditioning SiC# 34Friday, September 02, 2016, 15:47: Roughing.
Friday, September 02, 2016, 16:18:
Turbos started -AM
 ER-580-270-m40.txtITE-TM4-SiC#34-LP-IG-LIS_Test_Stand.docxSiC#34.docxTS-2016-09-06-08-12.rga 
  539   Wednesday, September 07, 2016, 15:51 Aaron Schmidt       Flexible waterlines test.Wednesday, September 07, 2016, 15:35: Roughing

Thursday, September 08, 2016,
08:33: Turbo pumps started.
 Flexible_Line_Test.docxTS-2016-09-08-08-47.rga 
  550   Wednesday, November 16, 2016, 10:50 Aaron Schmidt       Pump down empty chamber.Wednesday, November 16, 2016, 10:50: Begin
roughing.
Wednesday, November 16, 2016, 11:52:
  
  551   Thursday, November 24, 2016, 10:36 Aaron Schmidt       Camera Container test 1.Thursday, November 24, 2016, 10:15: Discuss
w/ Aurelia. Camera container filled with
Argon. Place under Vacuum, monitor w/ RGA.
 Camera_Case_Test_1.docxTS-2016-11-24-12-50.rgaTS-2016-11-25-10-10.rga 
  553   Friday, November 25, 2016, 14:28 Anders Mjos       Camera Container test 2Friday, November 25, 2016, 14:28: Roughing
Friday, November 25, 2016, 14:47:
Turbos started
 Camera_Case_Test_2.docxTS-2016-11-25-14-50_Test_2.rgaTS-2016-11-28-08-40_Test_2.rga 
  556   Wednesday, November 30, 2016, 07:25 Aaron Schmidt       Camera Container test 3.Wednesday, November 30, 2016, 07:23: Venting
Wednesday, November 30, 2016, 08:35:
Roughing.
 Camera_Case_Test_3.docxTS-2016-11-30-09-00_Test_3.rga 
  557   Wednesday, November 30, 2016, 10:16 Aaron Schmidt       Pump down empty chamber. (Close off for holidays)Wednesday, November 30, 2016, 10:16: Roughing
Wednesday, November 30, 2016, 11:05:
Turbo pumps on.
  
  558   Tuesday, January 03, 2017, 08:27 Aaron Schmidt       Pump down empty chamber. (Restart. Post holidays)Tuesday, January 03, 2017, 08:26: TSG :
RP1 & TMS : RP2 restarted.

Wednesday, January 04, 2017,
  
  562   Monday, January 23, 2017, 15:30 Aaron Schmidt       Pump down empty chamber.Monday, January 23, 2017, 15:30: Roughing

Wednesday, January 25, 2017,
09:05: Venting
  
  563   Tuesday, January 24, 2017, 14:14 Aaron Schmidt       Calibrated leak tanks removedTuesday, January 24, 2017, 13:30: Calibrated
leak tanks of Argon & Neon removed. Both
old Neon tanks were re-installed in their
  
  573   Wednesday, March 22, 2017, 09:37 Anders Mjos       Pump down empty chamberWednesday, March 22, 2017, 09:3: Roughing
Wednesday, March 22, 2017, 10:05:
Turbos started
  
ELOG V2.9.2-2455