800
|
Monday, July 13, 2020, 14:52 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 43515-2 | | UCx HS conditioning. | Broken LP-FEBIAD used to out gas.
Monday, July 13, 2020, 14:52: Roughing.
Monday, July 13, 2020, 15:29: Turbo |
|
|
803
|
Tuesday, July 28, 2020, 13:27 |
Aaron Schmidt | | | | | | | Problems/Solutions | Water leak on magnet PS | Fault: 13334
|
|
|
805
|
Wednesday, August 05, 2020, 10:01 |
Aaron Schmidt | | | | | | | Problems/Solutions | Roughing pump swap out. | Wednesday, August 05, 2020, 10:00: TP6
& TP2 off. IG6 off.
Wednesday, August 05, 2020, 12:20: |
|
|
807
|
Tuesday, August 18, 2020, 10:00 |
Aaron Schmidt | | | | | | | | IDP15 Scroll pump installed - RP1 replaced | PN: X3815-64000
SN: MY2005SA02
Description: IDP15 Scroll pump, Std. |
|
|
809
|
Wednesday, August 19, 2020, 08:52 |
Aaron Schmidt | | | | | | | | Leak check / Troubleshoot | Wednesday, August 19, 2020, 08:52: Purging
all lines, except FS#5, It was already purged
/ closed. |
|
|
810
|
Tuesday, August 25, 2020, 07:23 |
Aaron Schmidt | | | | | | | Problems/Solutions | Beam line side vacuum trip | Tuesday, August 25, 2020, 07:07: Beam line
side of the TS appears to have tripped? Open
BV6 & BV2. |
|
|
811
|
Tuesday, September 01, 2020, 14:01 |
Aaron Schmidt | | | | | | | Done | New tubing installed on loops | Tuesday, September 01, 2020, 14:00:
New tubing installed.
Blue on FS#4 loop (A)(B) |
|
|
813
|
Tuesday, September 29, 2020, 11:56 |
Aaron Schmidt | | LP-SIS | | | | | Problems/Solutions | Leak check 3.0 | Installed Indium gasket on FS#2 - (C) water
block / R- TGHT.
Tuesday, September 29, 2020, 11:23: |
|
|
815
|
Tuesday, October 13, 2020, 12:34 |
Aaron Schmidt | | HP-FEBIAD | | | 38295-8 | 42752-5 | In progress | MB1 Check. | He & Ar calibrated leak bottles in.
Tuesday, October 13, 2020, 12:33:
Roughing. |
|
|
818
|
Monday, November 02, 2020, 08:52 |
Aaron Schmidt | | | | | | | Problems/Solutions | Leak check / Troubleshoot | Monday, November 02, 2020, 08:46:
Large Vacuum spike noted 5:30 approx.
Tripped TS. On tail end of the Nb#9 conditioning |
|
|
820
|
Tuesday, November 10, 2020, 12:13 |
Aaron Schmidt | | | | | 43044-13 | 44378-1 | In progress | Pump down empty chamber / Leak. | U-Loop installed on FS#5
Tuesday, November 10, 2020, 12:13:
Roughing. |
|
|
821
|
Monday, November 23, 2020, 10:03 |
Aaron Schmidt | | | | | | | Problems/Solutions | RP2 Check / pump down issue | TMSRP2 has been struggling since the power
bump occurred Nov 18, 2020
Monday, November 23, 2020, 09:48: |
|
|
822
|
Tuesday, December 01, 2020, 11:56 |
Carla Babcock | | | | | | | In progress | Modifications to test stand for TM3 tests | Tuesday, December 01, 2020, 11:56 :
TSG:BIAS unplugged and controls pigtail
(made by Ray) added in order to connect controls |
|
|
823
|
Tuesday, December 01, 2020, 17:04 |
Carla Babcock | | | | | | | Problems/Solutions | Found another burned jumper cable | Between feedthroughs F (magnet coil) and
B (tube heater negative), I found a jumper
with two resistors that has been burned up. |
|
|
824
|
Wednesday, December 02, 2020, 08:32 |
Carla Babcock | | | | | | | | Modifications to test stand for TM3 tests | Wednesday, December 02, 2020, 08:31 :
Added copper wire connection to multipin
screw terminals in HV cage to make sure they |
|
|
825
|
Wednesday, December 02, 2020, 16:18 |
Fernando Maldonado | | | | | | | Done | Gas delivery system upgrade | Yesterday, December 1st, I successfully
installed and tested the gas system inside
the faraday cage. |
|
|
826
|
Thursday, December 03, 2020, 15:55 |
Carla Babcock, Alexander Shkuratoff | | | | | | | | Modifications to ISAC test stand for TM3 tests | Thursday, December 03, 2020, 15:54 :
Got sign off from John Chow to run
the system, though the nylon insulator was |
|
|
827
|
Friday, December 04, 2020, 08:53 |
Carla Babcock | | | | | | | | Modifications to test stand for TM3 tests | Friday, December 04, 2020, 08:52 :
Test stand roughed down to 29mT overnight.
Started turbos for testing later. |
|
|
828
|
Friday, December 04, 2020, 13:39 |
Alexander Shkuratoff | | | | | | | Done | TM3 service tray prototype preparatory HV tests | Friday, December 04, 2020, 13:34
Vacuum is at 3.6e-6 Torr and possibly
still dropping. Starting HV tests with just |
|
|
829
|
Tuesday, December 08, 2020, 11:54 |
Carla Babcock | | | | | | | | Modifications to test stand for TM3 tests | The copper tubes to be used in the TM3
test piece may have flux inside them from
soldering the end caps on. There are holes |
|