660
|
Tuesday, May 08, 2018, 10:36 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 42752-5 | In progress | C-seal Test | 2 C-Seals installed with SS springs
on water blocks. The SS springs are also
used in the module. |
|
661
|
Tuesday, May 22, 2018, 08:48 |
Anders Mjos | | | | | | | Problems/Solutions | TSG:TP1A not running | Pump found off on Tuesday morning.
Tuesday, May 22, 2018, 08:40: Starting
TP1A |
|
662
|
Thursday, May 24, 2018, 08:38 |
Anders Mjos | | | | | | | Problems/Solutions | Venting beamline for IG6 replacement | Thursday, May 24, 2018, 08:38: TPs stopped
Thursday, May 24, 2018, 09:18: Venting
Thursday, May 24, 2018, 14:30: IG6 |
|
663
|
Thursday, May 24, 2018, 15:28 |
Anders Mjos | | | | | | | Problems/Solutions | Reconfigured FEBIAD coil for testing new source tray | Thursday, May 24, 2018: Configured coil
to be (-) E&F, (+) G&H. Water should
be supplied to both terminals in either configuration. |
|
664
|
Monday, May 28, 2018, 08:46 |
Aaron Schmidt | | LP-FEBIAD | | TM2 | 41790-9 | 42752-5 | In progress | New TM source tray swap out. | Monday, May 28, 2018, 08:45: Venting. Prep
For removal.
Close FS#8. Clean up water |
|
665
|
Monday, June 04, 2018, 16:02 |
Anders Mjos | | | | | | | Problems/Solutions | MB1 timeout | Mass separator magnet timed out. Tried
reconfigure. Called Kyle from controls who
power cycled the CANbus card. This resolved |
|
666
|
Wednesday, June 06, 2018, 14:01 |
Aaron Schmidt | | | | | | | Problems/Solutions | Emittance scanner (E-rig) communication issues. | Wednesday, June 06, 2018, 13:50:
It was noted yesterday during the
TM2 Source HV tests that the E-rig was not |
|
667
|
Thursday, June 07, 2018, 09:21 |
Aaron Schmidt | | | | | | | Problems/Solutions | Pump down empty chamber. Anode check | TM2 Source tray still in.
Thursday, June 07, 2018, 09:20: Roughing.
Thursday, June 07, 2018, 12:42: Turbo |
|
668
|
Tuesday, June 12, 2018, 11:38 |
Aaron Schmidt | | | | | | | In progress | Source Tray re-installation | Re-installation of the ISAC Test Stand
Source tray. The TM2 ST was removed.
Tuesday, June 12, 2018, 10:15: Disconnect |
|
669
|
Tuesday, June 19, 2018, 10:30 |
Aaron Schmidt | | | | | | | Done | RGA repair | Monday, June 18, 2018, 10:00: RGA removed
from ISAC TS. Handed to Travis C. Communications
issues found |
|
670
|
Thursday, June 21, 2018, 16:32 |
Anders Mjos | | LP-FEBIAD | | | 41790-9 | 42752-5 | In progress | Heating target | Thursday, June 21, 2018, 16:30: Short between
ANODE and EE. Do not use until repaired.
Thursday, June 21, 2018, 16:32: Ramping |
|
672
|
Monday, July 09, 2018, 10:44 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 42752-5 | In progress | Coil Test July | Monday, July 09, 2018, 10:43: Rouging.
Monday, July 09, 2018, 13:14: Turbo
pumps on. |
|
673
|
Thursday, July 12, 2018, 08:24 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 42752-5 | In progress | Power outage / restart | Power outage (07/11/2018 @ approx 21:53)
shut down the test stand.
|
|
674
|
Thursday, July 12, 2018, 10:11 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 42752-5 | In progress | Coil Test #5 | *** REVIEW Elog entry #673 Power
outage & restart ***
Thursday, July 12, 2018, 10:10: Opened |
|
677
|
Friday, August 10, 2018, 10:56 |
Aaron Schmidt | | | | | | | Problems/Solutions | New PS installation and Cathode BIAS set | Friday, August 10, 2018, 10:25: Remove
TBHT 500 PS and replace with TBHT 600 PS.
Friday, August 10, 2018, 10:50: Switch |
|
678
|
Tuesday, August 14, 2018, 11:03 |
Aaron Schmidt | | LP-SIS | | | 41177-3 | 42752-6 | | Voltage Tests (Ta target) | Tuesday, August 14, 2018, 10:55: Auto ramping
TGHT @ 6 A per min to 40 A.
Tuesday, August 14, 2018, 11:03: |
|
679
|
Tuesday, August 21, 2018, 12:54 |
Anders Mjos | | | | | | | Problems/Solutions | 9-pin connection configuration | Pin configuration between top 9-pin connector
on Source Tray and terminal in high voltage
rack. Measured 2018-08-21 by Aaron and Anders |
|
680
|
Wednesday, August 22, 2018, 15:20 |
Aaron Schmidt | | LP-SIS | | | 41177-3 | | | Voltage Tests (Ta Target) | Wires reconfigured / set
Wednesday, August 22, 2018, 13:10:
Roughing. |
|
681
|
Wednesday, August 29, 2018, 11:36 |
Aaron Schmidt | | | | | | | | Epics / putty crash. | Wednesday, August 29, 2018, 11:35: EPIC's
crashed.... epically.
Unable to restart Putty or TS controls. |
|
682
|
Friday, August 31, 2018, 10:16 |
Aaron Schmidt | | | | | | | Problems/Solutions | RGA connection loss. | Friday, August 31, 2018, 10:10: The RGA
will not re-connect to the computer. Manually
turned it off while under vacuum to protect |
|
|