Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 38 of 53  Not logged in ELOG logo
ID Date Author Target/No.# Sourcedown Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  531   Friday, August 12, 2016, 14:40 Aaron Schmidt      Problems/SolutionsEmittance scanner communicationsWednesday, July 27, 2016, 16:06:  Spark
around 15:10 or 16:05
Emittance rig communications affected.
  
  532   Monday, August 15, 2016, 08:09 Aaron Schmidt    41882-441751-4 HS Test OR CleanHeat Shield Test (OR Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge
 HS_41751-4_TEST.docxTS-2016-08-15-11-45.rga20160824_143550.jpg 
  533   Wednesday, August 17, 2016, 08:19 Aaron Schmidt    41882-441751-5 HS Test OR CleanHeat Shield Test (OR Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge
 HS_41751-5_TEST.docxTS-2016-08-17-11-45.rga20160824_143555.jpg20160824_143558.jpg 
  534   Monday, August 22, 2016, 08:20 Aaron Schmidt    41882-441751-3 HS Test Full CleanHeat Shield Test (Fully Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge
 HS_41751-3_TEST.docxTS-2016-08-22-11-50.rga20160824_143544.jpg 
  535   Wednesday, August 24, 2016, 09:16 Aaron Schmidt    41882-441751-6 HS Test OR CleanHeat Shield Test (OR only).
For all 6 tests:
-Start Turbo pumps & Ion gauge
 7x 
  536   Monday, August 29, 2016, 10:08 Aaron Schmidt       Pump down empty chamber.Monday, August 29, 2016, 10:07: Roughing.

Friday, September 02, 2016,
14:33: Venting
  
  538   Wednesday, September 07, 2016, 15:50 Aaron Schmidt      Problems/SolutionsTSG:RP1 running unevenFault report was submitted.
Anders informed Anthony on Tuesday,
Sept 6, 2016.
  
  539   Wednesday, September 07, 2016, 15:51 Aaron Schmidt       Flexible waterlines test.Wednesday, September 07, 2016, 15:35: Roughing

Thursday, September 08, 2016,
08:33: Turbo pumps started.
 Flexible_Line_Test.docxTS-2016-09-08-08-47.rga 
  540   Thursday, September 08, 2016, 09:12 Anders Mjos      Problems/SolutionsFilament change on IG6Thursday, September 08, 2016, 08:20: Vacuum
group changed to the other filament to investigate
vacuum spikes on IG6
  
  541   Tuesday, September 13, 2016, 14:38 Anders Mjos      Problems/SolutionsTSG:RP1 replaced

    

       
            
  
  542   Wednesday, September 14, 2016, 13:58 Anders Mjos      Problems/SolutionsTSG:RP1 latched breaker

    

       
            
  
  544   Friday, September 30, 2016, 11:14 Aaron Schmidt      Problems/SolutionsTSG:RP1 ReplacementFriday, September 30, 2016, 10:01: Roughing
pump RP1 failed during roughing. Breaker
was tripped to RP1 & RP2.

Friday, September
  
  545   Tuesday, October 11, 2016, 14:55 Anders Mjos      In progressEmptyBreaker tripped during roughing. Removed
exhaust line during first 2 min.
Tuesday, October 11, 2016, 14:55:
  
  546   Friday, October 14, 2016, 13:17 Anders Mjos      Problems/SolutionsPowerbump tripped off turbosFriday, October 14, 2016, 13:17: Restarted
pumps
Friday, October 14, 2016, 13:4: Another
  
  548   Monday, October 24, 2016, 16:02 Aaron Schmidt      Problems/SolutionsPump down empty chamber/Clean Exhaust/TestMonday, October 24, 2016, 15:45: Remove
metal mesh covering roughing pump exhaust.
Clean out mesh (3/4"-5/8"
 Exhaust_pump_down.docx 
  550   Wednesday, November 16, 2016, 10:50 Aaron Schmidt       Pump down empty chamber.Wednesday, November 16, 2016, 10:50: Begin
roughing.
Wednesday, November 16, 2016, 11:52:
  
  551   Thursday, November 24, 2016, 10:36 Aaron Schmidt       Camera Container test 1.Thursday, November 24, 2016, 10:15: Discuss
w/ Aurelia. Camera container filled with
Argon. Place under Vacuum, monitor w/ RGA.
 Camera_Case_Test_1.docxTS-2016-11-24-12-50.rgaTS-2016-11-25-10-10.rga 
  552   Thursday, November 24, 2016, 10:39 Aaron Schmidt      Problems/SolutionsTMS:TP2 Thursday, November 24, 2016, 08:05: Whining
sound (high pitch) heard from TMS:TP2
Thursday, November 24, 2016, 10:37:
  
  553   Friday, November 25, 2016, 14:28 Anders Mjos       Camera Container test 2Friday, November 25, 2016, 14:28: Roughing
Friday, November 25, 2016, 14:47:
Turbos started
 Camera_Case_Test_2.docxTS-2016-11-25-14-50_Test_2.rgaTS-2016-11-28-08-40_Test_2.rga 
  554   Monday, November 28, 2016, 15:39 Aaron Schmidt      In progressPump down empty chamber/Check ExhaustMonday, November 28, 2016, 15:35: Begin
roughing. Monitor exhaust mesh cover. 
*Cover was found on the ground earlier
  