Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 38 of 53  Not logged in ELOG logo
Entry  Friday, August 12, 2016, 14:40, Aaron Schmidt, , , , , , , Problems/Solutions, Emittance scanner communications 

Wednesday, July 27, 2016, 16:06: Spark around 15:10 or 16:05

Emittance rig communications affected.

Enter 100 on Dac -- Reads: -500

Enter -100 on Dac -- Reads: -500. No response

@ 10V


Friday, August 12, 2016, 15:53: Soft reboot on Emittance rig communications

Calibrate

test scan & park

Enter: 100 on Dac -- Reads 100

Enter: 200 on Dac -- Reads 200

Enter: 0 on Dac -- Reads 0

Enter: -200 on Dac -- Reads -200

Fixed

Entry  Monday, August 15, 2016, 08:09, Aaron Schmidt, , , , , 41882-4, 41751-4, , HS Test OR Clean HS_41751-4_TEST.docxTS-2016-08-15-11-45.rga20160824_143550.jpg

Heat Shield Test (OR Cleaned).

For all 6 tests:

-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.

-Start Roughing by 10:10am +/- 1 minute and ensure previous HS started venting by 9:15am to meet timeline.


HS# 41751-4 . OR only. TGHT only.

No insulators, bracket, or gripper arms. Blank/Plate. No source cup.

Monday, August 15, 2016, 09:45: 41751-2 removed from test stand. Exchange target & End plates to 41751-2

Monday, August 15, 2016, 10:07: 41751-4 placed into test stand. Door open for 22 minutes.

Monday, August 15, 2016, 10:10: Roughing.

Monday, August 15, 2016, 10:12: Doors sealed for roughing.

Monday, August 15, 2016, 10:21: BV1B OPEN. Opened @ 104T.

Monday, August 15, 2016, 10:44: Both Turbo pumps started.

Monday, August 15, 2016, 10:50: Ion gauge on. TP1B @ speed 42 KRPM.

Monday, August 15, 2016, 10:52: TP1A @ speed 38 KRPM.

Monday, August 15, 2016, 11:45: RGA on. Vacuum @ 4.20E-6T.


Tuesday, August 16, 2016, 08:15: Water lines opened. No response on RGA. Vacuum stable @ 2.43E-7T

Tuesday, August 16, 2016, 08:20: Power/sources on

Tuesday, August 16, 2016, 08:30: TGHT auto-ramping to 580A @ 2A/min. Vacuum stable @ 2.45E-7T

Tuesday, August 16, 2016, 11:15: Screen shots and check made @ 329-330A.

Tuesday, August 16, 2016, 13:20: TGHT @ 580A. Vacuum @4.16E-7T.

Tuesday, August 16, 2016, 16:00: Auto-cooling started @ 2A/min. Vacuum @ 4.25E-7T


Wednesday, August 17, 2016, 08:11: Vacuum @ 1.90E-7T. RGA off. Ion gauge off. Turbos off.

Wednesday, August 17, 2016, 08:16: Water lines purged. Power/sources off.

Wednesday, August 17, 2016, 09:09: Venting.

Entry  Wednesday, August 17, 2016, 08:19, Aaron Schmidt, , , , , 41882-4, 41751-5, , HS Test OR Clean HS_41751-5_TEST.docxTS-2016-08-17-11-45.rga20160824_143555.jpg20160824_143558.jpg

Heat Shield Test (OR Cleaned).

For all 6 tests:

-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.

-Start Roughing by 10:10am +/- 1 minute and ensure previous HS started venting by 9:15am to meet timeline.


HS# 41751-5 . OR only. TGHT only.

No insulators, bracket, or gripper arms. Blank/Plate. No source cup.

Wednesday, August 17, 2016, 09:45: 41751-4 removed from test stand. Exchange target & End plates to 41751-5

Wednesday, August 17, 2016, 10:08: 41751-5 placed into test stand. Door open for 22 minutes.

Wednesday, August 17, 2016, 10:10: Roughing.

Wednesday, August 17, 2016, 10:10: Doors sealed for roughing.

Wednesday, August 17, 2016, 10:18: BV1B OPEN. Opened @ 136T.

Wednesday, August 17, 2016, 10:41: Both Turbo pumps started.

Wednesday, August 17, 2016, 10:46: Ion gauge on. TP1B @ speed 42 KRPM.

Wednesday, August 17, 2016, 10:50: TP1A @ speed 38 KRPM.

Wednesday, August 17, 2016, 11:47: RGA on. Vacuum @ 3.65E-6T.


Thursday, August 18, 2016, 08:19: Water lines opened. No response on RGA. Vacuum stable @ 2.53E-7T.

Thursday, August 18, 2016, 08:22: Power/sources on.

Thursday, August 18, 2016, 08:30: TGHT auto-ramping to 580A @ 2A/min. Vacuum stable @ 2.45E-7T.

Thursday, August 18, 2016, 11:39: Screen shots and check made @ 380-381A.

Thursday, August 18, 2016, 13:20: TGHT @ 580A. Vacuum @4.21E-7T.


Friday, August 19, 2016, 08:30: Auto-cooling started @ 2A/min. Vacuum @ 3.88E-7T

Friday, August 19, 2016, 13:20: Cooling Complete. Vacuum @ 2.25E-7T.

Friday, August 19, 2016, 13:42: Water lines purged. Power/sources off.

Monday, August 22, 2016, 08:17: Vacuum @ 1.37E-7T. RGA off. Ion gauge off. Turbos off.

Monday, August 22, 2016, 09:16: Venting.

Flat Head screw on bottom end plate stripped. Warping found on cup Blank/plate. Discoloration noted on heat shield

Entry  Monday, August 22, 2016, 08:20, Aaron Schmidt, , , , , 41882-4, 41751-3, , HS Test Full Clean HS_41751-3_TEST.docxTS-2016-08-22-11-50.rga20160824_143544.jpg

Heat Shield Test (Fully Cleaned).

For all 6 tests:

-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.

-Start Roughing by 10:10am +/- 1 minute and ensure previous HS started venting by 9:15am to meet timeline.


HS# 41751-3 . OR, Acetone, Methanol. TGHT only.

No insulators, bracket, or gripper arms. Blank/Plate (Warped from 41751-5). No source cup.

Monday, August 22, 2016, 09:50: 41751-5 removed from test stand. Exchange target & End plates to 41751-3

Monday, August 22, 2016, 10:15: 41751-3 placed into test stand. Door open for 25 minutes.

Monday, August 22, 2016, 10:18: Roughing.

Monday, August 22, 2016, 10:19: Doors sealed for roughing.

Monday, August 22, 2016, 10:25: BV1B OPEN. Opened @ 151T.

Monday, August 22, 2016, 10:50: Both Turbo pumps started.

Monday, August 22, 2016, 10:54: Ion gauge on. TP1B @ speed 42 KRPM.

Monday, August 22, 2016, 10:58: TP1A @ speed 38 KRPM.

Monday, August 22, 2016, 11:50: RGA on. Vacuum @ 3.91E-6T.


Tuesday, August 23, 2016, 08:16: Water lines opened. No response on RGA. Vacuum stable @ 2.45E-7T

Tuesday, August 23, 2016, 08:19: Power/sources on.

Tuesday, August 23, 2016, 08:30: TGHT auto-ramping to 580A @ 2A/min. Vacuum @ 2.45E-7T.

Tuesday, August 23, 2016, 13:20: TGHT @ 580A. Vacuum @3.79E-7T.

Tuesday, August 23, 2016, 16:06: Auto-cooling started @ 2A/min. Vacuum @ 3.96E-7T.


Wednesday, August 24, 2016, 08:08: RGA off. Ion gauge and Turbos off.

Wednesday, August 24, 2016, 08:14; Power/sources off.

Wednesday, August 24, 2016, 08:25: Waterlines purged.

Wednesday, August 24, 2016, 09:14: Venting.

Entry  Wednesday, August 24, 2016, 09:16, Aaron Schmidt, , , , , 41882-4, 41751-6, , HS Test OR Clean 7x

Heat Shield Test (OR only).

For all 6 tests:

-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.

-Start Roughing by 10:10am +/- 1 minute and ensure previous HS started venting by 9:15am to meet timeline.


HS# 41751-6 . OR only.

No insulators, bracket, or gripper arms. Blank/Plate (new one, old plate was too warped). No source cup.

Wednesday, August 24, 2016, 09:46 : 41751-3 removed from test stand. Exchange target & End plates to 41751-6

Wednesday, August 24, 2016, 10:08: 41751-6 placed into test stand. Door open for 22 minutes.

Wednesday, August 24, 2016, 10:10: Roughing.

Wednesday, August 24, 2016, 10:10: Doors sealed for roughing.

Wednesday, August 24, 2016, 10:18: BV1B OPEN. Opened @ 79T.

Wednesday, August 24, 2016, 10:41: Both Turbo pumps started.

Wednesday, August 24, 2016, 10:46: Ion gauge on. TP1B @ speed 42 KRPM.

Wednesday, August 24, 2016, 10:49: TP1A @ speed 38 KRPM.

Wednesday, August 24, 2016, 11:45: RGA on. Vacuum @ 3.38E-6T.


Thursday, August 25, 2016, 08:15: Water lines opened. No response on RGA. Vacuum stable @ 2.36E-7T

Thursday, August 25, 2016, 08:20: Power/sources on.

Thursday, August 25, 2016, 08:30: TGHT auto-ramping to 580A @ 2A/min. Vacuum @ 2.36E-7T.

Thursday, August 25, 2016, 11:21: Screen shots and check made @ 340-344A.

Thursday, August 25, 2016, 13:20: TGHT @ 580A. Vacuum @3.70E-7T.


Friday, August 26, 2016, 08:30: Auto-cooling started @ 2A/min. Vacuum @ 3.53E-7T

Friday, August 26, 2016, 13:20: Cooling Complete. Vacuum @ 1.97E-7T


Monday, August 29, 2016, 08:19: RGA off. Ion gauge and Turbos off.

Monday, August 29, 2016, 09:28: Venting.

Monday, August 29, 2016, 09:35: Power/sources off. Waterlines purged.

Entry  Monday, August 29, 2016, 10:08, Aaron Schmidt, , , , , , , , Pump down empty chamber. 

Monday, August 29, 2016, 10:07: Roughing.


Friday, September 02, 2016, 14:33: Venting

Entry  Wednesday, September 07, 2016, 15:50, Aaron Schmidt, , , , , , , Problems/Solutions, TSG:RP1 running uneven 

Fault report was submitted.

Anders informed Anthony on Tuesday, Sept 6, 2016.

Fault report # 9233.

Entry  Wednesday, September 07, 2016, 15:51, Aaron Schmidt, , , , , , , , Flexible waterlines test. Flexible_Line_Test.docxTS-2016-09-08-08-47.rga

Wednesday, September 07, 2016, 15:35: Roughing


Thursday, September 08, 2016, 08:33: Turbo pumps started.

Thursday, September 08, 2016, 08:38: Ion gauge on. TP1B @ speed 42 KRPM.

Thursday, September 08, 2016, 08:41: TP1A @ speed 38 KRPM.

Thursday, September 08, 2016, 08:47: RGA on.

Thursday, September 08, 2016, 11:00: Checked and screenshots taken. Vacuum @ 1.38E-6T

DaqPro Logger HS+MSP flow checked. Connections disconnect and re-connect.

Thursday, September 08, 2016, 11:45: Waterlines opened. No response on RGA. Vacuum ok @ 1.21 E-6T

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 28.4 3.78
 TBHT  28.6 2.96
 COIL + EE 28.2 4.89
 TGHT  28.4 5.49

 


  Device Temp
[C]
 Flow
[lpm]
 HS + MSP 28.6 3.68
 TBHT  28.6 3.02
 COIL + EE 28.2 4.91
 TGHT  28.2 5.51

Friday, September 09, 2016, 08:51: Vacuum ok @ 3.68E-7T

Friday, September 09, 2016, 15:35: Vacuum ok @ 3.35E-7T

  Device Temp
[C]
 Flow
[lpm]
 HS + MSP 28.7 3.71
 TBHT  28.8 3.06
 COIL + EE 28.2 4.94
 TGHT  28.4 5.56

 


Monday, September 12, 2016, 08:05: Vacuum ok @ 1.97E-7T

  Device Temp
[C]
 Flow
[lpm]
 HS + MSP 28.4 3.68
 TBHT  29.0 3.09
 COIL + EE 28.2 4.95
 TGHT  28.4 5.48

Monday, September 12, 2016, 15:09: Vacuum ok @ 1.97E-07T

  Device Temp
[C]
 Flow
[lpm]
 HS + MSP 28.4 3.72
 TBHT  29.1 3.06
 COIL + EE 28.2 4.87
 TGHT  28.4 5.51

 


Tuesday, September 13, 2016, 08:17: Vacuum ok @ 1.79E-7T

  Device Temp
[C]
 Flow
[lpm]
 HS + MSP 28.4 3.68
 TBHT  28.7 3.07
 COIL + EE 28.0 4.91
 TGHT  28.2 5.51

Tuesday, September 13, 2016, 08:19: RGA off. Ion Gauge off. Turbo pumps off.

Tuesday, September 13, 2016, 08:24: Waterlines purged.


Wednesday, September 14, 2016, 11:33: Venting -AM

Entry  Thursday, September 08, 2016, 09:12, Anders Mjos, , , , , , , Problems/Solutions, Filament change on IG6 

Thursday, September 08, 2016, 08:20: Vacuum group changed to the other filament to investigate vacuum spikes on IG6

Spikes In Green.

Spikes in Grey.

    Reply  Tuesday, September 13, 2016, 14:38, Anders Mjos, , , , , , , Problems/Solutions, TSG:RP1 replaced 

Aaron Schmidt wrote:

Fault report was submitted.

Anders informed Anthony on Tuesday, Sept 6, 2016.

Fault report # 9233.

 Tuesday, September 13, 2016, 14:38: RP1 replaced by Edi

    Reply  Wednesday, September 14, 2016, 13:58, Anders Mjos, , , , , , , Problems/Solutions, TSG:RP1 latched breaker 

Anders Mjos wrote:

Aaron Schmidt wrote:

Fault report was submitted.

Anders informed Anthony on Tuesday, Sept 6, 2016.

Fault report # 9233.

 Tuesday, September 13, 2016, 14:38: RP1 replaced by Edi

Wednesday, September 14, 2016, 13:57: The pump does not run properly. Attempting to contact vacuum group

Found that the exhaust pipe needed to be disconnected from the pump. Asked plant group (Curtis) to investigate exhaust pipe on the outside of the building, to check if it is restricted again.


Thursday, September 15, 2016, 11:03: Starting turbos


Thursday, September 29, 2016, 11:16: Turbos stopped.


Friday, September 30, 2016, 08:24: Venting.

Entry  Friday, September 30, 2016, 11:14, Aaron Schmidt, , , , , , , Problems/Solutions, TSG:RP1 Replacement 
Friday, September 30, 2016, 10:01: Roughing pump RP1 failed during roughing. Breaker was tripped to RP1 & RP2. Friday, September 30, 2016, 10:30: Roughing pump RP1 replaced and tested.
Entry  Tuesday, October 11, 2016, 14:55, Anders Mjos, , , , , , , In progress, Empty 

Breaker tripped during roughing. Removed exhaust line during first 2 min.

Tuesday, October 11, 2016, 14:55: Turbos at speed. Vacuum at 1.0E-6 T


Wednesday, October 12, 2016, 12:09: Ion gauge & Turbo pumps off.

Wednesday, October 12, 2016, 13:52: Venting

Entry  Friday, October 14, 2016, 13:17, Anders Mjos, , , , , , , Problems/Solutions, Powerbump tripped off turbos 

Friday, October 14, 2016, 13:17: Restarted pumps

Friday, October 14, 2016, 13:4: Another trip: restarted pumps


Tuesday, October 18, 2016, 12:12: Venting.

Entry  Monday, October 24, 2016, 16:02, Aaron Schmidt, , , , , , , Problems/Solutions, Pump down empty chamber/Clean Exhaust/Test Exhaust_pump_down.docx

Monday, October 24, 2016, 15:45: Remove metal mesh covering roughing pump exhaust.

Clean out mesh (3/4"-5/8" thick w/ layers of dust/material).

Monday, October 24, 2016, 15:52: Roughing 710.0 T.

Monday, October 24, 2016, 15:54: BV1B opened.

Monday, October 24, 2016, 16:00: Rouging 2.0 T.

Monday, October 24, 2016, 16:10: Turbo pumps available.


Tuesday, October 25, 2016, 08:08: Venting.

Tuesday, October 25, 2016, 08:40: Doors open.

Tuesday, October 25, 2016, 08:50: Roughing.

Tuesday, October 25, 2016, 08:51: Doors sealed for roughing.

Tuesday, October 25, 2016, 08:52: BV1B opened.

Tuesday, October 25, 2016, 09:10: Turbo pumps available & started.

Tuesday, October 25, 2016, 09:20: Ion gauge on.


Thursday, October 27, 2016, 08:35: Ion Gauge & Turbo pumps off.

Thursday, October 27, 2016, 11:44: Venting.

Entry  Wednesday, November 16, 2016, 10:50, Aaron Schmidt, , , , , , , , Pump down empty chamber. 

Wednesday, November 16, 2016, 10:50: Begin roughing.

Wednesday, November 16, 2016, 11:52: Turbo pumps on.

*Note* Unusual sound noticed right at the start up of TSG : TP1B. It was first noticed prior to venting UC#18. The sound only lasts 10-15 seconds within a minute of starting the pump. An odd whine with tapping sound. Operation is otherwise normal, but will continue to monitor the pump.

Wednesday, November 16, 2016, 11:57: Ion gauge on.

Wednesday, November 16, 2016, 12:03: Both pumps are at speed


Thursday, November 24, 2016, 10:08: Ion gauge & Turbo pumps off.

Thursday, November 24, 2016, 11:07: Venting.

Entry  Thursday, November 24, 2016, 10:36, Aaron Schmidt, , , , , , , , Camera Container test 1. Camera_Case_Test_1.docxTS-2016-11-24-12-50.rgaTS-2016-11-25-10-10.rga

Thursday, November 24, 2016, 10:15: Discuss w/ Aurelia. Camera container filled with Argon. Place under Vacuum, monitor w/ RGA.

Thursday, November 24, 2016, 11:43:Pump down started. Camera and case placed near RGA.

Thursday, November 24, 2016, 12:42: Turbo pumps started

Thursday, November 24, 2016, 12:51: Turbo pumps at speed. RGA on

*Note: Nitrogen Anomaly noted on RGA and in report.*


Friday, November 25, 2016, 10:11 : Stopped turbos. RGA off. -AM

Friday, November 25, 2016, 11:10: Venting -AM

Entry  Thursday, November 24, 2016, 10:39, Aaron Schmidt, , , , , , , Problems/Solutions, TMS:TP2  

Thursday, November 24, 2016, 08:05: Whining sound (high pitch) heard from TMS:TP2

Thursday, November 24, 2016, 10:37: Sound fades in and out roughly every 3-5 minutes. Vacuum group notified. Monitor.

Thursday, November 24, 2016, 15:21: Vent tomorrow AM as per Vacuum group. Edi.

Thursday, November 24, 2016, 15:38: Turbo  pumps TMS:TP6 & TMS:TP2 were turned of. Backing valves closed. Ion gauge IG6 also off.

Thursday, November 24, 2016, 16:34: Two short vent bursts. - AM


Friday, November 25, 2016, 10:21: Venting -AM

Friday, November 25, 2016, 11:00: Pump being replaced

 Friday, November 25, 2016, 14:01: Roughing

Friday, November 25, 2016, 14:40: Turbos started.

Friday, November 25, 2016, 14:45: Turbos at speed. Vacuum at 1.9E-5 T

*** Note *** : One of the copper cooling lines was leaking. The line was fixed. Monitor.


Monday, November 28, 2016, 08:47: Turbo pump operating well. No leaks detected on cooling lines.

Entry  Friday, November 25, 2016, 14:28, Anders Mjos, , , , , , , , Camera Container test 2 Camera_Case_Test_2.docxTS-2016-11-25-14-50_Test_2.rgaTS-2016-11-28-08-40_Test_2.rga

Friday, November 25, 2016, 14:28: Roughing

Friday, November 25, 2016, 14:47: Turbos started

Friday, November 25, 2016, 14:56: Turbos at speed. Vacuum at 6.4E-6 T. RGA on


Monday, November 28, 2016, 08:45: Ion gauge & Turbo pumps off.

Monday, November 28, 2016, 15:02: Venting.

Monday, November 28, 2016, 15:32: Camera removed & bagged.

Entry  Monday, November 28, 2016, 15:39, Aaron Schmidt, , , , , , , In progress, Pump down empty chamber/Check Exhaust 

Monday, November 28, 2016, 15:35: Begin roughing. Monitor exhaust mesh cover. 

*Cover was found on the ground earlier today and re-attached*

 Monday, November 28, 2016, 15:55: Exhaust mesh OK. Roughing continued.


Tuesday, November 29, 2016, 14:55: Test partially vented. @ around 550 T. Roughing restarted. Test delayed until tomorrow.


Wednesday, November 30, 2016, 07:23: Venting

ELOG V2.9.2-2455