Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 38 of 53  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Statusdown Subject Text Attachments
  877   Monday, June 07, 2021, 14:40 Aaron Schmidt      DoneFC6 re-installedMonday, June 07, 2021, 14:39: Roughing
beam line section.
Monday, June 07, 2021, 14:46: TMS:TP6
  
  882   Friday, June 25, 2021, 11:18 Aaron SchmidtTa#62LP-SISITETM444691-444378-4DoneTa#62 Conditioning - NewReplacement Ta target for the previous
one (44139-10) https://elog.triumf.ca/TIS/Test-Stand/880
Friday, June 25, 2021, 11:16: Roughing.
 Ta#62_44691-4_Conditioning_-_R.docxTa#62_44691-4_Conditioning..docxITE-TM4-Ta#62-LP-SIS_Test_Stand.docx 
  890   Friday, July 30, 2021, 16:28 Fernando Maldonado LP-FEBIAD  41790-1044378-5DoneFEBIAD parameter scan - efficiency measurements Restarting everything after swapping
RP1 (see elog 889).
  
  898   Tuesday, September 07, 2021, 16:04 Alexander Shkuratoff      DoneReplaced flange on F/T R with blank flangeFeedthrough R had a flange installed with
a HV feedthrough on it for TM3 service tray
prototype HV tests. It was replaced today
  
  905   Thursday, November 04, 2021, 11:55 Fernando Maldonado      DoneOpening vacuum chamber for thesis pictures :pThursday, November 04, 2021, 11:54: Venting
water loop removed
Thursday, November 04, 2021, 13:39:
  
  929   Friday, May 27, 2022, 07:19 Fernando Maldonado      DoneFEBIAD parameter scan web-app and brief description (with links)A web-app for systematic FEBIAD parametrizations
has been develop and  now includes the
ISAC Test Stand (ITS) :
  
  980   Monday, September 25, 2023, 16:31 Aaron SchmidtTa#66LP-SISITWTM245220-545235-9DoneConditioning Ta#66 & HV Tests.Thermocouples installed on the left end
plate x 2.
Monday, September 25, 2023, 16:23:
 Ta#66_HV_Test_1.docxTa#66_HV_test_2.docxTa#66_Conditioning.docx 
  987   Tuesday, December 12, 2023, 12:41 Aaron Schmidt      DoneSource Tray / TS inspectionTuesday, December 12, 2023, 12:39: Visual
inspection.
Source tray: OK. Minor cracks on
  
  989   Thursday, January 18, 2024, 10:44 Aaron Schmidt      DoneThermal tests 2December 18 - January 15. Were not logged.
Placed holder. Aurelia's tests. Included
thermocouples in the oven & ionizer.
  
  1000   Thursday, April 04, 2024, 10:38 Dave Neilson LP-SIS  44691-845235-26DoneMass marker testing Thursday, April 04, 2024, 09:49:
Target inserted yesterday, April 3. mass
marker tube connections carefully confirmed.
  
  1012   Tuesday, July 23, 2024, 09:43 Dave Neilson LP-SIS  44691-845235-26Donemass marker - reservoir testingWednesday, July 22, 2024, 11:41  -
target installed
Wednesday, July 22, 2024, 13:31 -
  
  1020   Friday, September 06, 2024, 12:08 Dave Neilson      DoneTest Stand repair/updateFriday, September 06, 2024:  New TSH:TGHT
power supply has been installed and is now
functional. Magna-Power TSD-900/208. The
  
  1033   Tuesday, December 03, 2024, 14:55 Dave Neilson      DonePower supply changed to CATHODE mode (-)Tuesday, December 03, 2024, 14:55  ANODE/CATHODE
power supply switched to cathode mode, NEGATIVE
  
  1042   Tuesday, December 17, 2024, 16:09 Dave Neilson      DoneAnode,TGHT, TBHT power supply investigation. Resolved Note, ground and HVC (high voltage
common) are used interchangeably here.
 
  
  1051   Monday, June 23, 2025, 16:58 Dave NeilsonTa#69HP-SISITWTM238817-446560-1DoneTarget ConditioningMonday, June 23, 2025, 15:40   target
installed. roughing
Monday, June 23, 2025, 16:57 turbo
 2025-06-26_Ta#69_HP-SIS_test_stand_target_conditioning.csv 
  1   Wednesday, June 29, 2011, 15:30 John Wong       Testing Yield station elogABC 123 blah blah blah...   
  4   Thursday, September 15, 2011, 09:20 Anders Mjos       ISAC TestStand old e-loglink
to old e-log
  
  9   Friday, September 23, 2011, 15:38 Rick Maharaj       test stand ventedTest stand vented   
  14   Wednesday, September 28, 2011, 14:11 Friedhelm AmesSiC#26 ITETM4   gas system checked and pumpedThe gas system has been checked. The variable
valve opens at about 7.55 very fast. Please
be careful when using it. Stepsize for opening
  
  22   Thursday, October 13, 2011, 12:33 Rick MaharajTraining       Test stand ventedtest stand vented   
ELOG V2.9.2-2455