Entry  Monday, July 09, 2018, 10:44, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Coil Test July  
Monday, July 09, 2018, 10:43: Rouging.
Monday, July 09, 2018, 13:14: Turbo pumps on.

Tuesday, July 10, 2018, 07:45: Waterlines opened. Vacuum ok @ 6.93e-07T. No response on RGA.
Entry  Thursday, July 12, 2018, 08:24, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Power outage / restart 
Power outage (07/11/2018 @ approx 21:53) shut down the test stand.
Entry  Thursday, July 12, 2018, 10:11, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Coil Test #5 
 *** REVIEW Elog entry #673 Power outage & restart ***
Thursday, July 12, 2018, 10:10: Opened IV4
Thursday, July 12, 2018, 10:20: Attempt auto-ramp cancelled. Max increment values reached. Wait on Vacuum.
Entry  Friday, August 10, 2018, 10:56, Aaron Schmidt, , , , , , , Problems/Solutions, New PS installation and Cathode BIAS set 
Friday, August 10, 2018, 10:25: Remove TBHT 500 PS and replace with TBHT 600 PS.
Friday, August 10, 2018, 10:50: Switch wiring in the high voltage cage from and Anode BIAS to Cathode BIAS setting.
Friday, August 10, 2018, 11:32: TBHT limit increased from 500A to 600A by Controls group.
Entry  Tuesday, August 14, 2018, 11:03, Aaron Schmidt, , LP-SIS, , , 41177-3, 42752-6, , Voltage Tests (Ta target) 
Tuesday, August 14, 2018, 10:55: Auto ramping TGHT @ 6 A per min to 40 A.
Tuesday, August 14, 2018, 11:03: TGHT @ 40 A. Display @ 0.198 V. PS @ 0.18 V. Multimeter @ 033 mV.
Tuesday, August 14, 2018, 11:09: Auto ramping TGHT @ 6 A per min to 80 A.
Entry  Tuesday, August 21, 2018, 12:54, Anders Mjos, , , , , , , Problems/Solutions, 9-pin connection configuration 
Pin configuration between top 9-pin connector on Source Tray and terminal in high voltage rack. Measured 2018-08-21 by Aaron and Anders

    
        
            Grounded
             

            
            X
             
             
             
           
Entry  Wednesday, August 22, 2018, 15:20, Aaron Schmidt, , LP-SIS, , , 41177-3, , , Voltage Tests (Ta Target)  
 Wires reconfigured / set 
Wednesday, August 22, 2018, 13:10: Roughing. 
Wednesday, August 22, 2018, 15:18: Turbo Pumps on.
Entry  Wednesday, August 29, 2018, 11:36, Aaron Schmidt, , , , , , , , Epics / putty crash. 
Wednesday, August 29, 2018, 11:35: EPIC's crashed.... epically.
Unable to restart Putty or TS controls.
Entry  Friday, August 31, 2018, 10:16, Aaron Schmidt, , , , , , , Problems/Solutions, RGA connection loss. 
Friday, August 31, 2018, 10:10: The RGA will not re-connect to the computer. Manually turned it off while under vacuum to protect the filament before
shutting down the turbo pumps.
Friday, August 31, 2018, 10:15: Ion gauge & turbo pumps off.
Entry  Tuesday, October 02, 2018, 13:39, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Test FEBIAD w/ Silver bolts & sealed end caps w/ stoppage FEBIAD_Coil_Test_6_-_POS_Cathode.docxTS-2018-10-11-10-37.rga
Silver bolts used on Coil, TGHT, & TBHT.
End caps in target
Tuesday, October 02, 2018, 13:36: Roughing.
Entry  Monday, October 15, 2018, 14:23, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Test FEBIAD w/ Silver bolts & sealed end caps  FEBIAD_Coil_Test_6-2_-_Neg_Cathode.docxTS-2018-10-15-14-15.rga
Anode / Cathode BIAS PS polarity reversed by John Chow. PS: Negative
Monday, October 15, 2018, 14:12: Power/sources on
Monday, October 15, 2018, 14:17: RGA on.
Entry  Monday, October 15, 2018, 14:38, Aaron Schmidt, , , , , , , Problems/Solutions, Anode / Cathode PS to Negative 
Monday, October 15, 2018, 13:00-14:00 Anode / Cathode BIAS PS polarity reversed by John Chow.
PS: Negative
Entry  Monday, October 22, 2018, 07:18, Aaron Schmidt, , , , , , , , TS restart after power outage 
Friday, October 19, 2018, 10:00 (Approx): Site wide power outage. TS completely shut down. 
Power brought back Saturday
Monday, October 22, 2018, 07:15: Full white out on screens. To restart PLC.
Entry  Monday, October 22, 2018, 11:07, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Test FEBIAD w/ Silver bolts & sealed end caps  epics-plot-whiteout-181028_1322.PNGepics-whiteout-181028_1322.PNGFEBIAD_COIL_Test_6-3_Caps_in.docxTS-2018-10-22-09-47.rga
Restarted post power outage.
Water & Turbos on.
Monday, October 22, 2018, 10:55: Power / sources on. MB1?
Entry  Monday, October 29, 2018, 10:56, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, Problems/Solutions, TS communications issues. 
Sometime around 00:30 Sunday, October 28, 2018, the ISAC test stand lost communication to the PLC and shut down abruptly.
Monday, October 29, 2018, 09:00: PLC communications issues.
Rod N. was contacted this morning& the issues fixed by controls group.
Entry  Monday, October 29, 2018, 11:03, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, Done, Test FEBIAD w/ Silver bolts & sealed end caps 
Restarting FEBIAD
Monday, October 29, 2018, 10:56: Restart roughing & Turbo pumps.
Monday, October 29, 2018, 11:03: Ion gauges on.
Entry  Tuesday, November 06, 2018, 08:52, Aaron Schmidt, , , , , , , In progress, Pump down empty chamber 
Tuesday, November 06, 2018, 08:50: Roughing
Tuesday, November 06, 2018, 08:51: Doors sealed.
Tuesday, November 06, 2018, 09:51: Turbo pumps on. 
Entry  Thursday, November 08, 2018, 10:54, Aaron Schmidt, , LP-FEBIAD, , , 395530-3, 42752-5, In progress, Test FEBIAD w/ Silver bolts & sealed end caps 
Silver bolts used on Coil, TGHT, & TBHT. Back panel opened for new gas bottles.
Thursday, November 08, 2018, 10:52: Roughing
Thursday, November 08, 2018, 10:53: Doors sealed.
Entry  Thursday, November 08, 2018, 14:13, Aaron Schmidt, , , , , , , , Ar & Ne gas bottle replacement. GasLeak_Datasheet.pdf
Thursday, November 08, 2018, 14:05: Fresh / recently calibrated Neon & Argon bottles installed.
Leak rates: Argon=2.02E-7 atm*cc/sec
                   Neon=1.75E-7 atm*cc/sec
Entry  Monday, November 19, 2018, 14:22, Aaron Schmidt, , , , , , , Problems/Solutions, Vacuum issues. 