  510   Wednesday, June 01, 2016, 10:02 Aaron SchmidtUC#16LP-IG-LISITETM439814-V2-1  Conditioning Heat shield for UC#16

Wednesday, June 01, 2016, 10:02: Begin roughing.

Wednesday, June 01, 2016, 10:44: Turbo pumps started.

Wednesday, June 01, 2016, 10:47: Ion Gauge IG1 ON.

Wednesday, June 01, 2016, 10:50; Turbos at speed. Vacuum at 1.24-5T.


Thursday, June 02, 2016, 08:54: Sources and power supply on. RGA on. Open water. Vacuum stable at 2.1E-07T. Heat shield water flow at 4.0 lpm.

Thursday, June 02, 2016, 09:05: Auto ramping TGHT/TBHT @ 2A min to 580A/250A

Thursday, June 02, 2016, 09:10: BIAS/EZL/EE to 30/13/1.5kV. IV4 opened

Thursday, June 02, 2016, 11:54: Stopped auto ramping for lunch break. - AM

Thursday, June 02, 2016, 13:01 : Auto ramping resumed. -AM

Thursday, June 02, 2016, 15:03: TGHT/TBHT @ 580A/250A

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  36.1 3.99
 TBHT 27.2 3.14
 COIL + EE  27.1 5.18
 TGHT  29.2 5.78

 

Thursday, June 02, 2016, 20:43: ramping down TGHT/TBHT at 2 / 1 A/min - AM


Friday, June 03, 2016, 08:06: Source off. Turbo pumps off. Ion gauge off. IV4 closed.

Friday, June 03, 2016, 08:21: Supply water pressure: 103 PSI. Return pressure: 10 PSI.

Friday, June 03, 2016, 09:27: Venting.

Attachment 1: OMEGA_OM-DAQPRO-5300_03-Jun-16_08.14.47.dlp
Attachment 2: TS-2016-06-02_UC#16.rga
Attachment 3: TS-2016-06-02-13-46_UC#16.rga
Attachment 4: UC#16.docx
  511   Friday, June 03, 2016, 14:50 Aaron Schmidt       Pumping down empty chamber.

Friday, June 03, 2016, 14:50: Turbo pumps started.

Friday, June 03, 2016, 15:22:  RGA on.


Monday, June 06, 2016, 15:40: RGA still connected. OK. Screen shot saved. Vacuum @ 8.5E-07T


Wednesday, June 08, 2016, 15:26: RGA off

Wednesday, June 08, 2016, 15:29: Ion gauge off. Turbo pumps off.


Thursday, June 09, 2016, 12:44: Venting -AM

  512   Thursday, June 09, 2016, 14:56 Aaron Schmidt LP-SIS     TUBE ONLY

Thursday, June 09, 2016, 14:50: Begin roughing.

Thursday, June 09, 2016, 15:34: Turbo pumps started.

Thursday, June 09, 2016, 15:42: Ion gauge on.


Friday, June 10, 2016, 08:27: RGA on.

Friday, June 10, 2016, 08:35: Water opened. RGA ok. Vacuum stable @ 1.9E-7T

Friday, June 10, 2016, 08:50: BIAS/EZL/EE to 30/13/1.5kV.

Friday, June 10, 2016, 08:52: Auto ramping TBHT only @ 2A min to 50A.

Friday, June 10, 2016, 10:02: Auto ramping TBHT only @ 1A min to 100A.

Friday, June 10, 2016, 11:14: Continue ramping to 150 A -AM

Friday, June 10, 2016, 11:28: Stopped ramping ag 110 A -AM


Monday, June 13, 2016, 08:12: Auto ramping TBHT only @ 1A min to 150A.

Monday, June 13, 2016, 09:59: Ramping to 150 A - AM


Monday, June 13, 2016, 15:51: Ramping down.


Tuesday, June 14, 2016, 07:47: IV4 Reset. Ion gauge off. Turbos off.

Tuesday, June 14, 2016, 07:52: Power/sources off. Water purged.

Tuesday, June 14, 2016, 09:20: Venting.

Attachment 1: Tube_only_SIS_test.zip
  513   Friday, June 10, 2016, 12:42 Anders Mjos      Problems/SolutionsFC0 BIAS probelm

 Graham Waters is looking into this problem. The IOC has been rebooted a couple of times.

  514   Tuesday, June 14, 2016, 10:46 Aaron Schmidt LP-SIS     TUBE ONLY - NO PLASMA ELECTRODE

Tuesday, June 14, 2016, 10:46: Begin roughing.

Tuesday, June 14, 2016, 11:16: Turbo pumps started.

Tuesday, June 14, 2016, 11:23: Ion gauge on.


Wednesday, June 15, 2016, 07:45: Water opened. RGA ok. Vacuum stable @ 1.9E-7T. Power/sources on.

Wednesday, June 15, 2016, 08:24: BIAS / EZL / EE to 30 / 13 / 1.5 kV

Wednesday, June 15, 2016, 08:24: Ramping TBHT to 120 A at 1 A/min

Wednesday, June 15, 2016, 10:23: EZL P/S was not on. Switched on and set to 13 kV

Wednesday, June 15, 2016, 15:05: Ramping down.


Thursday, June 16, 2016, 08:57: IV4 reset. RGA off. Ion gauge off. Turbo pumps off.

Thursday, June 16, 2016, 13:22: Water lines purged. Power/sources off. Venting.

Attachment 1: Tube_only_SIS_test-all-160615.zip
Attachment 2: 2016-06-13.zip
Attachment 3: 2016-06-15.zip
Attachment 4: re-em-plots.zip
  515   Thursday, June 16, 2016, 14:34 Aaron Schmidt LP-SIS     TUBE ONLY (3)

Thursday, June 16, 2016, 14:33: Roughing. Plasma Electrode re-attached. Salts replaced.

Thursday, June 16, 2016, 15:12: Turbo pumps started.

Thursday, June 16, 2016, 15:22: Ion gauge on.


Friday, June 17, 2016, 08:32: Water opened. RGA ok. Vacuum stable @ 2.4E-7T. Power/sources on.


Saturday, June 18, 2016, 09:31: Cool down started.


Monday, June 20, 2016, 09:48: Sources/power/voltages off.

Monday, June 20, 2016, 10:06: IV4 reset. Water lines purged.

 Monday, June 20, 2016, 10:11: RGA off. Ion gauge off. Turbos off.

Monday, June 20, 2016, 11:50: Venting

Attachment 1: Tube_only-full-fernando_test-160617-PE-RPE.zip
Attachment 2: Tube_only-full-fernando_test-160617-WPE.zip
  516   Monday, June 20, 2016, 14:36 Aaron Schmidt       Pump down empty chamber.

Monday, June 20, 2016, 12:50: roughing down

Monday, June 20, 2016, 14:30: Turbo pumps on. Ion gauge on.


Monday, June 27, 2016, 09:00: Ion gauge off. Turbo pumps off.

  517   Friday, June 24, 2016, 08:07 Aaron Schmidt       Emittance scanner check/repair.

Friday, June 24, 2016, 08:06: Ion gauge IG6 OFF. Turbo pumps TP6 and TP2 off.

Friday, June 24, 2016, 09:58: Venting.

Friday, June 24, 2016, 10:17: Remove emittance scanner for inspection.

Friday, June 24, 2016, 10:20: Roughing.

Disassemble, inspect.

Move bearing along screw. Acetone to break down old grease. Wiped clean. Move bearing back and forth, use pick to remove dirt. Re-grease.

Clean, and reassemble.

Test emittance scanner (outside of vacuum) . Draw in OK. Draw out OK.

Friday, June 24, 2016, 13:35: Venting.

Install emittance scanner.

Friday, June 24, 2016, 14:10: Roughing.

Test. Draws in fine. Draw out fails 3/4 of the way back up.

Friday, June 24, 2016, 14:32: Turbo pumps started.

Friday, June 24, 2016, 14:37: Ion gauge on.

Work to continue when more information is found on emittance scanner motor & history.

  519   Wednesday, June 29, 2016, 16:28 Aaron Schmidt       Pump down empty chamber.

Wednesday, June 29, 2016, 16:28 : Roughing


Thursday, June 30, 2016, 08:44: Turbo pumps on.


Thursday, July 07, 2016, 13:11: Turbo pumps off. Ion gauge off.


Monday, July 11, 2016, 12:50: Venting. ERROR on PuTTY.

Monday, July 11, 2016, 13:05: IOC WHITEOUT?

Monday, July 11, 2016, 13:25 All returned to normal.

  520   Wednesday, July 06, 2016, 10:42 Anders Mjos      Problems/SolutionsEmittance scanner check/repair.

Dave Morris increased the current from ~ 1 A to ~2.5 A. This seem to solve the problem with the in/out drive of the emittance meter

  525   Thursday, July 21, 2016, 09:51 Aaron Schmidt LP-FEBIAD     Febiad Test - NEW COIL - No PE

Thursday, July 21, 2016, 08:55: Roughing.

Thursday, July 21, 2016, 09:50: Turbo pumps started.

Thursday, July 21, 2016, 09:54: Ion Gauge on.

Thursday, July 21, 2016, 11:12: RGA on.

Thursday, July 21, 2016, 15:12: Water lines opened. No response on RGA. Vacuum stable @ 5.7E-7 T


Friday, July 22, 2016, 08:40: Opening gas lines.

Friday, July 22, 2016, 09:09: Power/Sources on. BIAS/EZL/EE @ 30/13/1.5 kV . Coil @ 50 A . Anode @ 200 V.

Friday, July 22, 2016, 09:13: IV4 open. Auto ramping TGHT/TBHT to 580/270 A @ 2A/per min.

Friday, July 22, 2016, 09:18: Heat shield flow rate @ 3.82 lpm

Friday, July 22, 2016, 12:10: TBHT ramped to 300 A -AM

Friday, July 22, 2016, 14:08: TBHT ramped to 310 A -AM


Monday, July 25, 2016, 09:39:

Device

  Temp
[C]
 Flow
[lpm]
 HS + MSP  38.0 3.82
 TBHT 27.9 2.96
 COIL + EE  27.7 4.94
 TGHT  29.7 5.51

Monday, July 25, 2016, 16:29: Changed the tune to improve mass resolution.


Wednesday, July 27, 2016, 14:37: Spark tripped off IG6

Wednesday, July 27, 2016, 14:38: BIAS / EZL / EE to 40 / 17.5 / 2 kV

Wednesday, July 27, 2016, 14:51: BIAS / EZL / EE to 45 / 19 / 2.5 kV

Wednesday, July 27, 2016, 15:00: BIAS / EZL / EE to 50 / 21.6 / 2.5 kV

Wednesday, July 27, 2016, 16:06: Spark around 15:10 or 16:05 knocked out magnet (RED)

Wednesday, July 27, 2016, 17:0: BIAS / EZL / EE to 30 / 13 / 1.5 kV. Ramping down target


Thursday, July 28, 2016, 08:03 : Turn off sources. Close IV4. Turn off Ion gauge. Turbos off.

Thursday, July 28, 2016, 09:09: Source gas control off. Venting.

  526   Thursday, July 28, 2016, 08:21 Anders Mjos      Problems/SolutionsTMS:MB1 time out

Fault report submitted. 9156

Thursday, July 28, 2016, 09:55: Controls group resolved the issue by cycling the power on the canbus controller

  527   Thursday, July 28, 2016, 11:12 Aaron Schmidt       Pump down empty chamber.

Thursday, July 28, 2016, 10:00 Roughing.

  531   Friday, August 12, 2016, 14:40 Aaron Schmidt      Problems/SolutionsEmittance scanner communications

Wednesday, July 27, 2016, 16:06: Spark around 15:10 or 16:05

Emittance rig communications affected.

Enter 100 on Dac -- Reads: -500

Enter -100 on Dac -- Reads: -500. No response

@ 10V


Friday, August 12, 2016, 15:53: Soft reboot on Emittance rig communications

Calibrate

test scan & park

Enter: 100 on Dac -- Reads 100

Enter: 200 on Dac -- Reads 200

Enter: 0 on Dac -- Reads 0

Enter: -200 on Dac -- Reads -200

Fixed

  536   Monday, August 29, 2016, 10:08 Aaron Schmidt       Pump down empty chamber.

Monday, August 29, 2016, 10:07: Roughing.


Friday, September 02, 2016, 14:33: Venting

  538   Wednesday, September 07, 2016, 15:50 Aaron Schmidt      Problems/SolutionsTSG:RP1 running uneven

Fault report was submitted.

Anders informed Anthony on Tuesday, Sept 6, 2016.

Fault report # 9233.

  539   Wednesday, September 07, 2016, 15:51 Aaron Schmidt       Flexible waterlines test.

Wednesday, September 07, 2016, 15:35: Roughing


Thursday, September 08, 2016, 08:33: Turbo pumps started.

Thursday, September 08, 2016, 08:38: Ion gauge on. TP1B @ speed 42 KRPM.

Thursday, September 08, 2016, 08:41: TP1A @ speed 38 KRPM.

Thursday, September 08, 2016, 08:47: RGA on.

Thursday, September 08, 2016, 11:00: Checked and screenshots taken. Vacuum @ 1.38E-6T

DaqPro Logger HS+MSP flow checked. Connections disconnect and re-connect.

Thursday, September 08, 2016, 11:45: Waterlines opened. No response on RGA. Vacuum ok @ 1.21 E-6T

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 28.4 3.78
 TBHT  28.6 2.96
 COIL + EE 28.2 4.89
 TGHT  28.4 5.49

 


  Device Temp
[C]
 Flow
[lpm]
 HS + MSP 28.6 3.68
 TBHT  28.6 3.02
 COIL + EE 28.2 4.91
 TGHT  28.2 5.51

Friday, September 09, 2016, 08:51: Vacuum ok @ 3.68E-7T

Friday, September 09, 2016, 15:35: Vacuum ok @ 3.35E-7T

  Device Temp
[C]
 Flow
[lpm]
 HS + MSP 28.7 3.71
 TBHT  28.8 3.06
 COIL + EE 28.2 4.94
 TGHT  28.4 5.56

 


Monday, September 12, 2016, 08:05: Vacuum ok @ 1.97E-7T

  Device Temp
[C]
 Flow
[lpm]
 HS + MSP 28.4 3.68
 TBHT  29.0 3.09
 COIL + EE 28.2 4.95
 TGHT  28.4 5.48

Monday, September 12, 2016, 15:09: Vacuum ok @ 1.97E-07T

  Device Temp
[C]
 Flow
[lpm]
 HS + MSP 28.4 3.72
 TBHT  29.1 3.06
 COIL + EE 28.2 4.87
 TGHT  28.4 5.51

 


Tuesday, September 13, 2016, 08:17: Vacuum ok @ 1.79E-7T

  Device Temp
[C]
 Flow
[lpm]
 HS + MSP 28.4 3.68
 TBHT  28.7 3.07
 COIL + EE 28.0 4.91
 TGHT  28.2 5.51

Tuesday, September 13, 2016, 08:19: RGA off. Ion Gauge off. Turbo pumps off.

Tuesday, September 13, 2016, 08:24: Waterlines purged.


Wednesday, September 14, 2016, 11:33: Venting -AM

Attachment 1: Flexible_Line_Test.docx
Attachment 2: TS-2016-09-08-08-47.rga
  540   Thursday, September 08, 2016, 09:12 Anders Mjos      Problems/SolutionsFilament change on IG6

Thursday, September 08, 2016, 08:20: Vacuum group changed to the other filament to investigate vacuum spikes on IG6

Spikes In Green.

Spikes in Grey.

  541   Tuesday, September 13, 2016, 14:38 Anders Mjos      Problems/SolutionsTSG:RP1 replaced

Aaron Schmidt wrote:

Fault report was submitted.

Anders informed Anthony on Tuesday, Sept 6, 2016.

Fault report # 9233.

 Tuesday, September 13, 2016, 14:38: RP1 replaced by Edi

  542   Wednesday, September 14, 2016, 13:58 Anders Mjos      Problems/SolutionsTSG:RP1 latched breaker

Anders Mjos wrote:

Aaron Schmidt wrote:

Fault report was submitted.

Anders informed Anthony on Tuesday, Sept 6, 2016.

Fault report # 9233.

 Tuesday, September 13, 2016, 14:38: RP1 replaced by Edi

Wednesday, September 14, 2016, 13:57: The pump does not run properly. Attempting to contact vacuum group

Found that the exhaust pipe needed to be disconnected from the pump. Asked plant group (Curtis) to investigate exhaust pipe on the outside of the building, to check if it is restricted again.


Thursday, September 15, 2016, 11:03: Starting turbos


Thursday, September 29, 2016, 11:16: Turbos stopped.


Friday, September 30, 2016, 08:24: Venting.