623
|
Friday, January 26, 2018, 13:59 |
Aaron Schmidt | | LP-SIS | | | (Blank) | 42752-3 | Done | HV test 1 | Friday, January 26, 2018, 14:00: BIAS/EZL/EE
ramp up.
Friday, January 26, 2018, 14:06: |
|
624
|
Monday, January 29, 2018, 10:07 |
Aaron Schmidt | | LP-SIS | | | (Blank) | 42752-3 | Done | Power outage / HV test 2 | HV test 2 cancelled. 9:38: BIAS/EZL/EE
@ 30/13/1.5 kV
Monday, January 29, 2018, 09:40 (Roughly) |
|
625
|
Tuesday, January 30, 2018, 06:51 |
Aaron Schmidt | | LP-SIS | | | (Blank) | 42752-3 | Done | HV test 3 | Tuesday, January 30, 2018, 06:50: BIAS
/ EZL / EE @ 30 / 13 / 1.5
Tuesday, January 30, 2018, 06:52: |
|
626
|
Wednesday, January 31, 2018, 09:53 |
Aaron Schmidt | | | | | (Blank) | 42752-3 | Done | Wire moved. | Wednesday, January 31, 2018, 09:50: A wire
(B - F) was too close (Almost touching) to
the EZL and had visible sparks during HV |
|
630
|
Thursday, February 08, 2018, 14:44 |
Carla Babcock | | | | | | | Done | Conditioning station power supply integrated into EPICS | The 75kV power supply is now in EPICS under
the usual TSG:BIAS controls. The upper limit
has been set to 70kV to protect the transformer. |
|
655
|
Tuesday, April 17, 2018, 11:02 |
Aaron Schmidt | | | | | | | Done | Roughing pump issue. | Tuesday, April 17, 2018, 10:57: Vacuum
not coming down. @ 1.514T . Backing valves
have been closed. |
|
656
|
Thursday, April 19, 2018, 12:55 |
Fernando Maldonado | | | | | | | Done | Re-wiring Anode PS | Thursday, April 19, 2018, 12:52: Pin J1
was reconnected into the anode power supply.
All jumpers were put back to remote control. |
|
657
|
Friday, April 20, 2018, 13:20 |
Carla Babcock | | | | | | | Done | BIAS* fan sounds like it is dying | The fan in the EZL power supply is making
a terrible noise - keep an eye on it, it
sounds like it might give up soon. |
|
669
|
Tuesday, June 19, 2018, 10:30 |
Aaron Schmidt | | | | | | | Done | RGA repair | Monday, June 18, 2018, 10:00: RGA removed
from ISAC TS. Handed to Travis C. Communications
issues found |
|
693
|
Monday, October 29, 2018, 11:03 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 42752-5 | Done | Test FEBIAD w/ Silver bolts & sealed end caps | Restarting FEBIAD
Monday, October 29, 2018, 10:56:
Restart roughing & Turbo pumps. |
|
712
|
Monday, March 11, 2019, 13:56 |
Aaron Schmidt | | | | | | | Done | TGHT PS replaced | Monday, March 11, 2019, 13:55: The TGHT
PS was replaced.
Brought up to 20 A. Operation. ok. |
|
717
|
Monday, April 15, 2019, 14:42 |
Aaron Schmidt | | LP-SIS | | | | 42972-1 | Done | Conditioning UC#27 HS & test FS#3 | New coil lines installed for P2N testing
later.
Monday, April 15, 2019, 14:15: Roughing. |
|
718
|
Tuesday, April 23, 2019, 14:39 |
Aaron Schmidt | | LP-SIS | | | | 42752-8 | Done | Conditioning UC#28 HS | Tuesday, April 23, 2019, 14:39: Roughing.
Tuesday, April 23, 2019, 15:09: Turbo
pumps started. |
|
727
|
Monday, June 03, 2019, 14:13 |
Aaron Schmidt | | | | TM4 | 395530-3 | 42752-5 | Done | TMS:TP6 Turbo pump issue. (Ok now) | Monday, June 03, 2019, 14:09:
Turbo pump TMS:TP6 was making a loud
hum / buzz sound. The vacuum pressure is |
|
729
|
Monday, June 10, 2019, 14:34 |
Aaron Schmidt | | | | | | | Done | Removed TM4 Source Tray | Monday, June 10, 2019, 09:30: TM4 Source
Tray removed - To HC area. |
|
730
|
Monday, June 10, 2019, 14:35 |
Aaron Schmidt | | | | | | | Done | Optics Tray / EZL inspection. | Monday, June 10, 2019, 13:00: Optics Tray
removed.
Megger'd @ 1000V on EZL and Collimator. |
|
732
|
Thursday, June 13, 2019, 14:05 |
Aaron Schmidt | | | | | | | Done | Spare TGHT PS installed. | Thursday, June 13, 2019, 14:04: Spare TGHT
PS installed / tested. The old one
is to be sent out for repair. |
|
733
|
Wednesday, June 19, 2019, 17:25 |
Fernando Maldonado | | | | | | | Done | Thermocouple connection | Wednesday, June 19, 2019, 17:13 Ferran
and Fernando tested the 9-pin connector to
have a reading on a thermocouple following |
|
735
|
Saturday, June 22, 2019, 17:05 |
Luca Egoriti | p2n | | | | | | Done | Test stand installation | I opened the test stand because I forgot
to install tantalum heat shields around the
target. Everything was reinstalled as before |
|
741
|
Tuesday, July 02, 2019, 18:25 |
Fernando Maldonado | | | | | | | Done | Blank on FEBIAD gas line installed | Tuesday, July 02, 2019, 18:24: A
blind is installed on the FEBIAD gas
line (see attached picture) to |
|
|