623
|
Friday, January 26, 2018, 13:59 |
Aaron Schmidt | | LP-SIS | | | (Blank) | 42752-3 | Done | HV test 1 | Friday, January 26, 2018, 14:00: BIAS/EZL/EE ramp up.
Friday, January 26, 2018, 14:06: BIAS/EZL/EE @ 30/13/1.5 kV.
Friday, January 26, 2018, 14:09: BIAS/EZL/EE @ 35/13/1.5 kV.
Spark at BIAS 30 kV and 40kV
Friday, January 26, 2018, 14:12: BIAS/EZL/EE @ 40/13/1.5 kV.
Friday, January 26, 2018, 14:15: BIAS/EZL/EE @ 45/13/1.5 kV.
Audible sparks, but none showing on the strip tool.
Friday, January 26, 2018, 14:19: BIAS/EZL/EE @ 45/19/1.5 kV.
Friday, January 26, 2018, 14:22: BIAS/EZL/EE @ 47/22/1.5 kV. Sparks @ 47000 to 47250 V.
Sparks observed on EE feed through in cage.
Friday, January 26, 2018, 14:27: BIAS/EZL/EE @ 50/22/1.7 kV.
Friday, January 26, 2018, 14:39: BIAS/EZL/EE @ 55/23.5/1.8 kV.
Bias controls 55 kV Actual @ 50 kV.
Friday, January 26, 2018, 14:44: Spark free 5 min.
Friday, January 26, 2018, 14:49: Spark free 10 min. |
Attachment 1: 2018_HV_test_1.docx
|
624
|
Monday, January 29, 2018, 10:07 |
Aaron Schmidt | | LP-SIS | | | (Blank) | 42752-3 | Done | Power outage / HV test 2 | HV test 2 cancelled. 9:38: BIAS/EZL/EE @ 30/13/1.5 kV
Monday, January 29, 2018, 09:40 (Roughly) Power went out completely
Monday, January 29, 2018, 10:00: Power up TS
Monday, January 29, 2018, 10:07:Turbos on.
Monday, January 29, 2018, 10:11: Ion gauge on Vacuum @ 3.3e-06T
Monday, January 29, 2018, 11:47; Power cycled. PLC and Canbus reset/cfg.
Monday, January 29, 2018, 11:54: Optics & Sources ok/reset.
Monday, January 29, 2018, 13:27: BIAS/EZL/EE @ 30 / 13 / 1.5 kV.
Monday, January 29, 2018, 13:30: BIAS/EZL/EE @ 40 / 17 / 2 kV.
Monday, January 29, 2018, 13:33: BIAS/EZL/EE @ 45 / 19.5 / 2.25 kV.
Monday, January 29, 2018, 13:36: BIAS/EZL/EE @ 50 / 21.5 / 2.5 kV.
Monday, January 29, 2018, 13:40: BIAS/EZL/EE @ 55 / 23.8 / 2.75 kV.
Monday, January 29, 2018, 13:43: BIAS/EZL/EE @ 60 / 26 / 3 kV.
SPARKS*
Monday, January 29, 2018, 13:48: BIAS/EZL/EE @ 55 / 23.8 / 2.75 kV.
Monday, January 29, 2018, 13:51: BIAS/EZL/EE @ 57.5 / 26 / 2.9 kV.
Sparks
Monday, January 29, 2018, 13:57: BIAS/EZL/EE @ 58 / 27 / 2.95 kV.
Monday, January 29, 2018, 14:03: Holding.
Monday, January 29, 2018, 14:07: BIAS/EZL/EE @ 59 / 28 / 3.1 kV.
Monday, January 29, 2018, 14:14: Spark*
Monday, January 29, 2018, 14:45: Holding
Monday, January 29, 2018, 14:56: BIAS/EZL/EE @ 0. Test Complete |
Attachment 1: 2018_HV_test_2.docx
|
625
|
Tuesday, January 30, 2018, 06:51 |
Aaron Schmidt | | LP-SIS | | | (Blank) | 42752-3 | Done | HV test 3 | Tuesday, January 30, 2018, 06:50: BIAS / EZL / EE @ 30 / 13 / 1.5
Tuesday, January 30, 2018, 06:52: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Tuesday, January 30, 2018, 06:58: Optics on / set
Tuesday, January 30, 2018, 06:59: IV4 opened.
RGA switched completely off and unplugged.
Tuesday, January 30, 2018, 13:15: BIAS / EZL / EE @ 40 / 17 / 2
Tuesday, January 30, 2018, 13:20: BIAS / EZL / EE @ 50 / 21.8 / 2.5
Tuesday, January 30, 2018, 13:50: Half hour wait. Ok. No sparks.
Tuesday, January 30, 2018, 13:55: BIAS / EZL / EE @ 55 / 24 / 2.8
15 minute wait. No sparks.
Tuesday, January 30, 2018, 14:10: BIAS / EZL / EE @ 57.5 / 27 / 3.1
Tuesday, January 30, 2018, 14:23: BIAS / EZL / EE @ 60 / 28 / 3.1
Tuesday, January 30, 2018, 14:35: No sparks.
Tuesday, January 30, 2018, 15:05: BIAS / EZL / EE @ 0
Tuesday, January 30, 2018, 15:06: Auto-cooling started.
Wednesday, January 31, 2018, 06:59: Power/sources off.
|
Attachment 1: 2018_HV_test_3.docx
|
626
|
Wednesday, January 31, 2018, 09:53 |
Aaron Schmidt | | | | | (Blank) | 42752-3 | Done | Wire moved. | Wednesday, January 31, 2018, 09:50: A wire (B - F) was too close (Almost touching) to the EZL and had visible sparks during HV tests 1 & 2. The wire was adjusted to sit higher. and away from the EZL |
630
|
Thursday, February 08, 2018, 14:44 |
Carla Babcock | | | | | | | Done | Conditioning station power supply integrated into EPICS | The 75kV power supply is now in EPICS under the usual TSG:BIAS controls. The upper limit has been set to 70kV to protect the transformer. |
655
|
Tuesday, April 17, 2018, 11:02 |
Aaron Schmidt | | | | | | | Done | Roughing pump issue. | Tuesday, April 17, 2018, 10:57: Vacuum not coming down. @ 1.514T . Backing valves have been closed.
TSG:CG1A @ 1.515T
TSG:CG1B @ 1.529T.
Tuesday, April 17, 2018, 11:02: TSG:PV1 Closed. Roughing pump off.
Vacuum group notified.
Wednesday, April 18, 2018: Replace pump & adapters. Clean.
Wednesday, April 18, 2018, 08:45: Start TSG:RP1 and open PV1, BV1A & BV1B
Wednesday, April 18, 2018, 08:55: exhaust pipe/mesh cleared out back
Wednesday, April 18, 2018, 08:57: Turbo pumps on.
RP status ok.
Thursday, April 19, 2018, 08:30: waterlines opened. No response on RGA. Vacuum @ 3.42e-07T |
656
|
Thursday, April 19, 2018, 12:55 |
Fernando Maldonado | | | | | | | Done | Re-wiring Anode PS | Thursday, April 19, 2018, 12:52: Pin J1 was reconnected into the anode power supply. All jumpers were put back to remote control.
NOTE: the cable EXTLKT is still not connected. I will ask Carla about this one.
Thursday, April 19, 2018, 18:00: Cable EXTLKT connected.
Thursday, April 19, 2018, 18:12 When turning the transformer on, the Anode PS was not turned on. Neither the TGHT.
Thursday, April 19, 2018, 18:30: I turned off everything. Will check tomorrow with someone.
Friday, April 20, 2018, 11:01 : Issue fixed. I've attached a picture of the jumpers connection for future references
|
Attachment 1: 20180420_104954.jpg
|
|
657
|
Friday, April 20, 2018, 13:20 |
Carla Babcock | | | | | | | Done | BIAS* fan sounds like it is dying | The fan in the EZL power supply is making a terrible noise - keep an eye on it, it sounds like it might give up soon.
Monday, April 23, 2018, 10:47: The back panel was opened. Original entry stated EZL power supply issue. Corrected to BIAS PS. High voltage group notified. Fan replacement required.
Monday, May 14, 2018, 13:20: BIAS fans, external an internal were replaced. Re-installed @ TS.
Monday, May 14, 2018, 13:26: BIAS ramped up to 10 kV. Response ok on epics and locally on the PS. No odd noise on the fans either. The issue appears to be fixed. |
669
|
Tuesday, June 19, 2018, 10:30 |
Aaron Schmidt | | | | | | | Done | RGA repair | Monday, June 18, 2018, 10:00: RGA removed from ISAC TS. Handed to Travis C. Communications issues found
Communications chip replaced.
Tuesday, June 19, 2018, 08:36: Re-install RGA.
Tuesday, June 19, 2018, 10:29: RGA confirmed operational |
693
|
Monday, October 29, 2018, 11:03 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 42752-5 | Done | Test FEBIAD w/ Silver bolts & sealed end caps | Restarting FEBIAD
Monday, October 29, 2018, 10:56: Restart roughing & Turbo pumps.
Monday, October 29, 2018, 11:03: Ion gauges on.
Monday, October 29, 2018, 11:10: Power on
Monday, October 29, 2018, 11:12: Gas lines opened to pump down with TS. Vacuum @ 1.20e-05T.
Monday, October 29, 2018, 11:20: RGA restarted.
Tuesday, October 30, 2018, 07:24: BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV. Anode @ 200 V.
Tuesday, October 30, 2018, 07:26: Auto-ramping TGHT / TBHT to 580 / 320 A @ 2A per min.
Tuesday, October 30, 2018, 07:31: Optics set.
Tuesday, October 30, 2018, 07:32 : IV4 Opened.
Tuesday, October 30, 2018, 08:50: Auto ramping aborted. While the source does increment, the actual power supply does not. It's not actually ramping.
Tuesday, October 30, 2018, 08:51: Unable to bump up the coil either. Tapping down the all the voltage to 0.
Tuesday, October 30, 2018, 08:55: IV4 closed. Gases closed.
Tuesday, October 30, 2018, 08:57: Power shut off & restarted.
Tuesday, October 30, 2018, 09:01: Gases re-opened.
Tuesday, October 30, 2018, 09:03: Sources switched on. Manually bumped up TGHT & TBHT. No response.
Tuesday, October 30, 2018, 09:04: Gases closed. Sources off.
Tuesday, October 30, 2018, 10:41: IV4 Opened.
Tuesday, October 30, 2018, 10:47: BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV. Anode @ 200 V. Voltage limits reset for the TGHT, TBHT, & Coil. Responses given
Tuesday, October 30, 2018, 10:49: Auto-ramping TGHT / TBHT to 580 / 320 A @ 2A per min.
Tuesday, October 30, 2018, 10:55: Optics reset.
Tuesday, October 30, 2018, 11:01: Gases reopened. Vacuum @ 4.52e-07T.
Wednesday, October 31, 2018, 06:59: Auto-ramping TBHT to 330 A @ 2A per min.
Wednesday, October 31, 2018, 07:00: Coil @ 50 A.
Wednesday, October 31, 2018, 10:57 : Mass & wire scans appear ok.
FM:
Wednesday, October 31, 2018, 12:10 : Auto-ramping TBHT to 340 A @ 1A per min.
Wednesday, October 31, 2018, 12:49 : Vacuum @ 5.90e-07T.
Wednesday, October 31, 2018, 12:54 : Auto-ramping TBHT to 350 A @ 1A per min.
Wednesday, October 31, 2018, 15:25 : Vacuum @ 6.03E-7T.
Wednesday, October 31, 2018, 15:28 : Auto-ramping TBHT to 360 A @ 1A per min.
Wednesday, October 31, 2018, 15:34 : Changing Gain in FC0 from 33 nA to 100 nA
Wednesday, October 31, 2018, 15:42 : Increasing Gain in FC0 from 100 nA to 1 uA.
Voltage drop from 200 to 196 V. The anode is current limited. Increasing the current limit on the anode from 100 mA to 110 mA .
Voltage back to 200 V
FM
Thursday, November 01, 2018, 11:35 : Optics set to the previous tune. Check entry 688.
Anode set to 150 V. FC6 stable
Thursday, November 01, 2018, 11:37 Closing Neon Valve
Thursday, November 01, 2018, 12:38 : FC6 stable. Closing Argon valve.
Thursday, November 01, 2018, 13:05 : Assuming 720 nA entering the source (from Brad). Efficiency measurement = 0.96%. Almost a factor of two larger than previous measurement with the same conditions!
Thursday, November 01, 2018, 13:08 : Opening the valves
Thursday, November 01, 2018, 15:41 : FC6 stable 5.38e-9A. Closing neon valve.
Thursday, November 01, 2018, 16:50 : FC6 stable overall 5.33e-9A. Closing argon Valve
Thursday, November 01, 2018, 18:42 : FC6 stable 1.44e-10A. efficiency= 0.72%
Opening gas valves
FM
Friday, November 02, 2018, 09:39 : Increasing AV to 200V.
Friday, November 02, 2018, 09:47 : Increasing anode current to 150 mA.
Friday, November 02, 2018, 18:01 : Coil sweep from 0-80 A for AV=25,50 completed. Efficiencies of 0.035 % and 0.34% respectively.
Leaving the cathode hot to continue test tomorrow morning.
Saturday, November 03, 2018, 18:01: Coil sweep from 0-80 A for AV=75,100 completed. Efficiencies of 0.56 % and 0.77% respectively.
Sunday, November 04, 2018, 09:01 : Anode current increased from 56 to around 95 mA overnight under the same conditions. This could indicate a cleaner surface on the cathode and hence a better emission or, the anode cathode distance is reducing fue to the thermal expansion.
Cooling down manually TBHT to 300 A @ 2A per min.
Monday, November 05, 2018, 09:00: Short on TBHT appeared around 8 am. Investigate.
Monday, November 05, 2018, 09:15: Auto-cooling TGHT / TBHT @ 2 A per min.
Monday, November 05, 2018, 14:22: Gas lines closed.
Monday, November 05, 2018, 14:32: Sources/power off.
Monday, November 05, 2018, 14:40: Short confirmed up top. RGA off.
Monday, November 05, 2018, 14:43: IV4 closed/reset, Ion gauge off, Turbos off. |
712
|
Monday, March 11, 2019, 13:56 |
Aaron Schmidt | | | | | | | Done | TGHT PS replaced | Monday, March 11, 2019, 13:55: The TGHT PS was replaced.
Brought up to 20 A. Operation. ok. |
717
|
Monday, April 15, 2019, 14:42 |
Aaron Schmidt | | LP-SIS | | | | 42972-1 | Done | Conditioning UC#27 HS & test FS#3 | New coil lines installed for P2N testing later.
Monday, April 15, 2019, 14:15: Roughing.
Monday, April 15, 2019, 14:49: Turbo pumps on.
Tuesday, April 16, 2019, 08:20: RGA on.
Gradually open each line. Wait 5 minutes & monitor the response.
Tuesday, April 16, 2019, 08:30: Open Return & Supply main valves.
Tuesday, April 16, 2019, 08:32: Open FS#5. Vacuum @ 4.29e-06T. No response on RGA (water).
Tuesday, April 16, 2019, 08:37: Vacuum @ 4.37e-06T
Tuesday, April 16, 2019, 08:38: Open FS#4. Vacuum @ 4.37e-06T. No response on RGA (water).
Tuesday, April 16, 2019, 08:43 Vacuum @ 4.29e-06T
Tuesday, April 16, 2019, 08:44 Open FS#3. Vacuum @ 4.29e-06T. No response on RGA (water).
Tuesday, April 16, 2019, 08:49: Vacuum @ 4.26e-06T.
Tuesday, April 16, 2019, 08:50: Open FS#2. Vacuum @ 4.29e-06T. No response on RGA (water).
Tuesday, April 16, 2019, 08:57: Vacuum @ 4.29e-06T.
Wednesday, April 17, 2019, 08:30: Power/sources on. Vacuum @ 2.46e-06T.
Wednesday, April 17, 2019, 10:30: Auto-ramping TGHT to 150 @ 2A per min. Vacuum limit increased to 3.000e-06T.
Wednesday, April 17, 2019, 11:53: Auto-ramping TGHT to 300 @ 2A per min. Vacuum @ 2.50e-06T.
Wednesday, April 17, 2019, 13:10: Auto-ramping TGHT to 350 @ 2A per min. Vacuum @ 2.95e-06T.
Thursday, April 18, 2019, 07:23: Auto-ramping TGHT to 575 @ 2A per min. Vacuum @ 2.40e-06T.
Tuesday, April 23, 2019, 06:45: Auto-Cooling TGHT @ 2A per min. Vacuum @ 9.22e-07T.
Tuesday, April 23, 2019, 08:29: RGA error. Shut off RGA.
Tuesday, April 23, 2019, 11:34: Power/sources off.
Tuesday, April 23, 2019, 11:37: IG1 off. Turbos off.
Tuesday, April 23, 2019, 12:53: Venting. |
Attachment 1: UC#27_&_FS#3_check.docx
|
Attachment 2: TS-2019-04-16-08-20.rga
|
718
|
Tuesday, April 23, 2019, 14:39 |
Aaron Schmidt | | LP-SIS | | | | 42752-8 | Done | Conditioning UC#28 HS | Tuesday, April 23, 2019, 14:39: Roughing.
Tuesday, April 23, 2019, 15:09: Turbo pumps started.
Tuesday, April 23, 2019, 15:18: Ion gauge on.
Wednesday, April 24, 2019, 07:33: RGA on.
Wednesday, April 24, 2019, 07:37: Waterlines opened. Vacuum ok @ 7.99e-07T. No response on RGA
Wednesday, April 24, 2019, 07:41: Power / sources on.
Wednesday, April 24, 2019, 07:43: Auto-ramping TGHT to 575 @ 2A per min. Vacuum limit remains at 3.000e-06T.
Thursday, April 25, 2019, 14:07: Auto-cooling @ 2 A per min.
Friday, April 26, 2019, 07:53: sources off.
Friday, April 26, 2019, 07:55: RGA off. Power off.
Friday, April 26, 2019, 07:57: Turbos off.
Friday, April 26, 2019, 08:00: HS waterlines purged. |
Attachment 1: TS-2019-04-24-07-30.rga
|
Attachment 2: UC#28_HS.docx
|
727
|
Monday, June 03, 2019, 14:13 |
Aaron Schmidt | | | | TM4 | 395530-3 | 42752-5 | Done | TMS:TP6 Turbo pump issue. (Ok now) | Monday, June 03, 2019, 14:09:
Turbo pump TMS:TP6 was making a loud hum / buzz sound. The vacuum pressure is steadily increasing on IG6. Edi Contacted. Turbo pump likely failing.
The sound tapered off.
Monday, June 03, 2019, 14:32: Sound was the turbo pump spinning down. Edi restarted & reset the main controller. It was knocked out by one of the morning sparks.
|
729
|
Monday, June 10, 2019, 14:34 |
Aaron Schmidt | | | | | | | Done | Removed TM4 Source Tray | Monday, June 10, 2019, 09:30: TM4 Source Tray removed - To HC area. |
730
|
Monday, June 10, 2019, 14:35 |
Aaron Schmidt | | | | | | | Done | Optics Tray / EZL inspection. | Monday, June 10, 2019, 13:00: Optics Tray removed.
Megger'd @ 1000V on EZL and Collimator. Passed. Open it.
Monday, June 10, 2019, 14:34: 3 cracked insulators found. 1 quite broken on the threads (see attached pictures). Replaced insulators & re-assembled optics tray.
Megger'd @ 1000V on EZL and Collimator. Passed.
Thursday, June 13, 2019, 14:23: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. EZL current @ 61 uA. EZL appears to be fixed. :) |
Attachment 1: 20190610_135100.jpg
|
|
Attachment 2: 20190610_135926.jpg
|
|
Attachment 3: 20190610_135045.jpg
|
|
Attachment 4: 20190610_135517.jpg
|
|
732
|
Thursday, June 13, 2019, 14:05 |
Aaron Schmidt | | | | | | | Done | Spare TGHT PS installed. | Thursday, June 13, 2019, 14:04: Spare TGHT PS installed / tested. The old one is to be sent out for repair.
|
733
|
Wednesday, June 19, 2019, 17:25 |
Fernando Maldonado | | | | | | | Done | Thermocouple connection | Wednesday, June 19, 2019, 17:13 Ferran and Fernando tested the 9-pin connector to have a reading on a thermocouple following the connections used by Aurelia (see elog 721).
Wednesday, June 19, 2019, 17:24: Test succesful!
|
735
|
Saturday, June 22, 2019, 17:05 |
Luca Egoriti | p2n | | | | | | Done | Test stand installation | I opened the test stand because I forgot to install tantalum heat shields around the target. Everything was reinstalled as before (with heat shields). I could turn on the TSGTP1B but TSGTP1A does not turn on for some reason. I tried multiple times opening/closing its valve (BV1A) but the pump never starts.
Will keep pumping over the weekend with TP1B only. |
741
|
Tuesday, July 02, 2019, 18:25 |
Fernando Maldonado | | | | | | | Done | Blank on FEBIAD gas line installed | Tuesday, July 02, 2019, 18:24: A blind is installed on the FEBIAD gas line (see attached picture) to rule out the possibility of gases entering the TIS. |
Attachment 1: 20190702_182254.jpg
|
|
|