  623   Friday, January 26, 2018, 13:59 Aaron Schmidt LP-SIS  (Blank)42752-3DoneHV test 1

Friday, January 26, 2018, 14:00: BIAS/EZL/EE ramp up.

Friday, January 26, 2018, 14:06: BIAS/EZL/EE @ 30/13/1.5 kV.

Friday, January 26, 2018, 14:09: BIAS/EZL/EE @ 35/13/1.5 kV.

Spark at BIAS 30 kV and 40kV

Friday, January 26, 2018, 14:12: BIAS/EZL/EE @ 40/13/1.5 kV.

Friday, January 26, 2018, 14:15: BIAS/EZL/EE @ 45/13/1.5 kV.

Audible sparks, but none showing on the strip tool.

Friday, January 26, 2018, 14:19: BIAS/EZL/EE @ 45/19/1.5 kV.

Friday, January 26, 2018, 14:22: BIAS/EZL/EE @ 47/22/1.5 kV. Sparks @ 47000 to 47250 V.

Sparks observed on EE feed through in cage.

Friday, January 26, 2018, 14:27: BIAS/EZL/EE @ 50/22/1.7 kV.

Friday, January 26, 2018, 14:39: BIAS/EZL/EE @ 55/23.5/1.8 kV.

Bias controls 55 kV Actual @ 50 kV.

Friday, January 26, 2018, 14:44: Spark free 5 min.

Friday, January 26, 2018, 14:49: Spark free 10 min.

Attachment 1: 2018_HV_test_1.docx
  624   Monday, January 29, 2018, 10:07 Aaron Schmidt LP-SIS  (Blank)42752-3DonePower outage / HV test 2

HV test 2 cancelled.  9:38: BIAS/EZL/EE @ 30/13/1.5 kV

Monday, January 29, 2018, 09:40 (Roughly) Power went out completely

Monday, January 29, 2018, 10:00: Power up TS

Monday, January 29, 2018, 10:07:Turbos on.

Monday, January 29, 2018, 10:11: Ion gauge on Vacuum @ 3.3e-06T

Monday, January 29, 2018, 11:47; Power cycled. PLC and Canbus reset/cfg.

Monday, January 29, 2018, 11:54: Optics & Sources ok/reset.

 

Monday, January 29, 2018, 13:27: BIAS/EZL/EE @ 30 / 13 / 1.5 kV.

Monday, January 29, 2018, 13:30: BIAS/EZL/EE @ 40 / 17 / 2 kV.

Monday, January 29, 2018, 13:33: BIAS/EZL/EE @ 45 / 19.5 / 2.25 kV.

Monday, January 29, 2018, 13:36: BIAS/EZL/EE @ 50 / 21.5 / 2.5 kV.

Monday, January 29, 2018, 13:40: BIAS/EZL/EE @ 55 / 23.8 / 2.75 kV.

Monday, January 29, 2018, 13:43: BIAS/EZL/EE @ 60 / 26 / 3 kV.

SPARKS*

Monday, January 29, 2018, 13:48: BIAS/EZL/EE @ 55 / 23.8 / 2.75 kV.

Monday, January 29, 2018, 13:51: BIAS/EZL/EE @ 57.5 / 26 / 2.9 kV.

Sparks

Monday, January 29, 2018, 13:57: BIAS/EZL/EE @ 58 / 27 / 2.95 kV.

Monday, January 29, 2018, 14:03: Holding.

Monday, January 29, 2018, 14:07: BIAS/EZL/EE @ 59 / 28 / 3.1 kV.

Monday, January 29, 2018, 14:14: Spark*

Monday, January 29, 2018, 14:45: Holding

Monday, January 29, 2018, 14:56: BIAS/EZL/EE @ 0. Test Complete

Attachment 1: 2018_HV_test_2.docx
  625   Tuesday, January 30, 2018, 06:51 Aaron Schmidt LP-SIS  (Blank)42752-3DoneHV test 3

Tuesday, January 30, 2018, 06:50: BIAS / EZL / EE @ 30 / 13 / 1.5

Tuesday, January 30, 2018, 06:52: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.

Tuesday, January 30, 2018, 06:58: Optics on / set

Tuesday, January 30, 2018, 06:59: IV4 opened.

RGA switched completely off and unplugged.

Tuesday, January 30, 2018, 13:15: BIAS / EZL / EE @ 40 / 17 / 2

Tuesday, January 30, 2018, 13:20: BIAS / EZL / EE @ 50 / 21.8 / 2.5

Tuesday, January 30, 2018, 13:50: Half hour wait. Ok. No sparks.

Tuesday, January 30, 2018, 13:55: BIAS / EZL / EE @ 55 / 24 / 2.8

15 minute wait. No sparks.

Tuesday, January 30, 2018, 14:10: BIAS / EZL / EE @ 57.5 / 27 / 3.1

Tuesday, January 30, 2018, 14:23: BIAS / EZL / EE @ 60 / 28 / 3.1

Tuesday, January 30, 2018, 14:35: No sparks.

Tuesday, January 30, 2018, 15:05: BIAS / EZL / EE @ 0

Tuesday, January 30, 2018, 15:06: Auto-cooling started.


Wednesday, January 31, 2018, 06:59: Power/sources off.

 

Attachment 1: 2018_HV_test_3.docx
  626   Wednesday, January 31, 2018, 09:53 Aaron Schmidt    (Blank)42752-3DoneWire moved.

Wednesday, January 31, 2018, 09:50: A wire (B - F) was too close (Almost touching) to the EZL and had visible sparks during HV tests 1 & 2. The wire was adjusted to sit higher. and away from the EZL

  630   Thursday, February 08, 2018, 14:44 Carla Babcock      DoneConditioning station power supply integrated into EPICS

The 75kV power supply is now in EPICS under the usual TSG:BIAS controls. The upper limit has been set to 70kV to protect the transformer.

  655   Tuesday, April 17, 2018, 11:02 Aaron Schmidt      DoneRoughing pump issue.

Tuesday, April 17, 2018, 10:57: Vacuum not coming down. @ 1.514T . Backing valves have been closed.

TSG:CG1A @ 1.515T

TSG:CG1B @ 1.529T.

Tuesday, April 17, 2018, 11:02: TSG:PV1 Closed. Roughing pump off.

Vacuum group notified.


Wednesday, April 18, 2018: Replace pump & adapters. Clean.

Wednesday, April 18, 2018, 08:45: Start TSG:RP1 and open PV1, BV1A  & BV1B

Wednesday, April 18, 2018, 08:55: exhaust pipe/mesh cleared out back

Wednesday, April 18, 2018, 08:57: Turbo pumps on.

RP status ok.


Thursday, April 19, 2018, 08:30: waterlines opened. No response on RGA. Vacuum @ 3.42e-07T

  656   Thursday, April 19, 2018, 12:55 Fernando Maldonado      DoneRe-wiring Anode PS

Thursday, April 19, 2018, 12:52: Pin J1 was reconnected into the anode power supply. All jumpers were put back to remote control.

NOTE: the cable EXTLKT is still not connected. I will ask Carla about this one.

Thursday, April 19, 2018, 18:00: Cable EXTLKT connected.

Thursday, April 19, 2018, 18:12  When turning the transformer on, the Anode PS was not turned on. Neither the TGHT.

Thursday, April 19, 2018, 18:30: I turned off everything. Will check tomorrow with someone. 


Friday, April 20, 2018, 11:01 : Issue fixed. I've attached a picture of the jumpers connection for future references


 

 

Attachment 1: 20180420_104954.jpg
20180420_104954.jpg
  657   Friday, April 20, 2018, 13:20 Carla Babcock      DoneBIAS* fan sounds like it is dying

The fan in the EZL power supply is making a terrible noise - keep an eye on it, it sounds like it might give up soon.


Monday, April 23, 2018, 10:47: The back panel was opened. Original entry stated EZL power supply issue. Corrected to BIAS PS. High voltage group notified. Fan replacement required.


Monday, May 14, 2018, 13:20: BIAS fans, external an internal were replaced. Re-installed @ TS.

Monday, May 14, 2018, 13:26: BIAS ramped up to 10 kV. Response ok on epics and locally on the PS. No odd noise on the fans either. The issue appears to be fixed.

  669   Tuesday, June 19, 2018, 10:30 Aaron Schmidt      DoneRGA repair

Monday, June 18, 2018, 10:00: RGA removed from ISAC TS. Handed to Travis C. Communications issues found

Communications chip replaced.


 Tuesday, June 19, 2018, 08:36: Re-install RGA.

Tuesday, June 19, 2018, 10:29: RGA confirmed operational

  693   Monday, October 29, 2018, 11:03 Aaron Schmidt LP-FEBIAD  41790-942752-5DoneTest FEBIAD w/ Silver bolts & sealed end caps

Restarting FEBIAD

Monday, October 29, 2018, 10:56: Restart roughing & Turbo pumps.

Monday, October 29, 2018, 11:03: Ion gauges on.

Monday, October 29, 2018, 11:10: Power on

Monday, October 29, 2018, 11:12: Gas lines opened to pump down with TS. Vacuum @ 1.20e-05T.

Monday, October 29, 2018, 11:20: RGA restarted.


Tuesday, October 30, 2018, 07:24: BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV. Anode @ 200 V.

Tuesday, October 30, 2018, 07:26: Auto-ramping TGHT / TBHT to 580 / 320 A @ 2A per min.

Tuesday, October 30, 2018, 07:31: Optics set.

Tuesday, October 30, 2018, 07:32 : IV4 Opened.

Tuesday, October 30, 2018, 08:50: Auto ramping aborted. While the source does increment, the actual power supply does not. It's not actually ramping.

Tuesday, October 30, 2018, 08:51: Unable to bump up the coil either. Tapping down the all the voltage to 0.

Tuesday, October 30, 2018, 08:55: IV4 closed. Gases closed.

Tuesday, October 30, 2018, 08:57: Power shut off & restarted.

Tuesday, October 30, 2018, 09:01: Gases re-opened.

Tuesday, October 30, 2018, 09:03: Sources switched on. Manually bumped up TGHT & TBHT. No response.

Tuesday, October 30, 2018, 09:04: Gases closed. Sources off.

Tuesday, October 30, 2018, 10:41: IV4 Opened.

Tuesday, October 30, 2018, 10:47: BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV. Anode @ 200 V. Voltage limits reset for the TGHT, TBHT, & Coil. Responses given

Tuesday, October 30, 2018, 10:49: Auto-ramping TGHT / TBHT to 580 / 320 A @ 2A per min.

Tuesday, October 30, 2018, 10:55: Optics reset.

Tuesday, October 30, 2018, 11:01: Gases reopened. Vacuum @ 4.52e-07T.


Wednesday, October 31, 2018, 06:59: Auto-ramping TBHT to 330 A @ 2A per min.

Wednesday, October 31, 2018, 07:00: Coil @ 50 A.

Wednesday, October 31, 2018, 10:57 : Mass & wire scans appear ok.


FM:

Wednesday, October 31, 2018, 12:10 : Auto-ramping TBHT to 340 A @ 1A per min.

Wednesday, October 31, 2018, 12:49 : Vacuum @ 5.90e-07T.

Wednesday, October 31, 2018, 12:54 : Auto-ramping TBHT to 350 A @ 1A per min.

Wednesday, October 31, 2018, 15:25 : Vacuum @ 6.03E-7T.

Wednesday, October 31, 2018, 15:28 : Auto-ramping TBHT to 360 A @ 1A per min.

Wednesday, October 31, 2018, 15:34 : Changing Gain in FC0 from 33 nA to 100 nA

Wednesday, October 31, 2018, 15:42 : Increasing Gain in FC0 from 100 nA to 1 uA.

Voltage drop from 200 to 196 V.  The anode is current limited. Increasing the current limit on the anode from 100 mA to 110 mA .

Voltage back to 200 V 


FM

Thursday, November 01, 2018, 11:35 : Optics set to the previous tune. Check entry 688.

Anode set to 150 V. FC6 stable

Thursday, November 01, 2018, 11:37 Closing Neon Valve

Thursday, November 01, 2018, 12:38 : FC6 stable. Closing Argon valve.

Thursday, November 01, 2018, 13:05 : Assuming 720 nA entering the source (from Brad). Efficiency  measurement = 0.96%. Almost a factor of two larger than previous measurement with the same conditions!

Thursday, November 01, 2018, 13:08 : Opening the valves

Thursday, November 01, 2018, 15:41 : FC6 stable 5.38e-9A. Closing neon valve.

Thursday, November 01, 2018, 16:50 : FC6 stable overall 5.33e-9A. Closing argon Valve

Thursday, November 01, 2018, 18:42 : FC6 stable 1.44e-10A. efficiency= 0.72%

Opening gas valves


FM

Friday, November 02, 2018, 09:39 : Increasing AV to 200V.

Friday, November 02, 2018, 09:47 : Increasing anode current to 150 mA.

Friday, November 02, 2018, 18:01 : Coil sweep from 0-80 A for AV=25,50 completed. Efficiencies of 0.035 % and 0.34% respectively.

Leaving the cathode hot to continue test tomorrow morning.


Saturday, November 03, 2018, 18:01: Coil sweep from 0-80 A for AV=75,100 completed. Efficiencies of 0.56 % and 0.77% respectively.


Sunday, November 04, 2018, 09:01 : Anode current increased from 56 to around 95 mA overnight under the same conditions. This could indicate a cleaner surface on the cathode and hence a better emission or, the anode cathode distance is reducing fue to the thermal expansion.

Cooling down manually  TBHT to 300 A @ 2A per min.


Monday, November 05, 2018, 09:00: Short on TBHT appeared around 8 am. Investigate.

Monday, November 05, 2018, 09:15: Auto-cooling TGHT / TBHT @ 2 A per min.

Monday, November 05, 2018, 14:22: Gas lines closed.

Monday, November 05, 2018, 14:32: Sources/power off.

Monday, November 05, 2018, 14:40: Short confirmed up top. RGA off.

Monday, November 05, 2018, 14:43: IV4 closed/reset, Ion gauge off, Turbos off.

  712   Monday, March 11, 2019, 13:56 Aaron Schmidt      DoneTGHT PS replaced

Monday, March 11, 2019, 13:55: The TGHT PS was replaced.

Brought up to 20 A. Operation. ok.

  717   Monday, April 15, 2019, 14:42 Aaron Schmidt LP-SIS   42972-1DoneConditioning UC#27 HS & test FS#3

New coil lines installed for P2N testing later.

Monday, April 15, 2019, 14:15: Roughing.

Monday, April 15, 2019, 14:49: Turbo pumps on.


Tuesday, April 16, 2019, 08:20: RGA on.

Gradually open each line. Wait 5 minutes & monitor the response.

Tuesday, April 16, 2019, 08:30: Open Return & Supply main valves.

Tuesday, April 16, 2019, 08:32: Open FS#5. Vacuum @ 4.29e-06T. No response on RGA (water).

Tuesday, April 16, 2019, 08:37: Vacuum @ 4.37e-06T

Tuesday, April 16, 2019, 08:38: Open FS#4. Vacuum @ 4.37e-06T. No response on RGA (water).

Tuesday, April 16, 2019, 08:43 Vacuum @ 4.29e-06T

Tuesday, April 16, 2019, 08:44 Open FS#3. Vacuum @ 4.29e-06T. No response on RGA (water).

Tuesday, April 16, 2019, 08:49: Vacuum @ 4.26e-06T.

Tuesday, April 16, 2019, 08:50: Open FS#2. Vacuum @ 4.29e-06T. No response on RGA (water).

Tuesday, April 16, 2019, 08:57: Vacuum @ 4.29e-06T.


Wednesday, April 17, 2019, 08:30: Power/sources on. Vacuum @ 2.46e-06T.

Wednesday, April 17, 2019, 10:30: Auto-ramping TGHT  to 150 @ 2A per min. Vacuum limit increased to 3.000e-06T.

Wednesday, April 17, 2019, 11:53: Auto-ramping TGHT  to 300 @ 2A per min. Vacuum @ 2.50e-06T.

Wednesday, April 17, 2019, 13:10: Auto-ramping TGHT  to 350 @ 2A per min. Vacuum @ 2.95e-06T.


Thursday, April 18, 2019, 07:23: Auto-ramping TGHT  to 575 @ 2A per min. Vacuum @ 2.40e-06T.


Tuesday, April 23, 2019, 06:45: Auto-Cooling TGHT @ 2A per min. Vacuum @ 9.22e-07T. 

Tuesday, April 23, 2019, 08:29: RGA error. Shut off RGA.

Tuesday, April 23, 2019, 11:34: Power/sources off.

Tuesday, April 23, 2019, 11:37: IG1 off. Turbos off.

Tuesday, April 23, 2019, 12:53: Venting.

Attachment 1: UC#27_&_FS#3_check.docx
Attachment 2: TS-2019-04-16-08-20.rga
  718   Tuesday, April 23, 2019, 14:39 Aaron Schmidt LP-SIS   42752-8DoneConditioning UC#28 HS

Tuesday, April 23, 2019, 14:39: Roughing.

Tuesday, April 23, 2019, 15:09: Turbo pumps started.

Tuesday, April 23, 2019, 15:18: Ion gauge on. 


Wednesday, April 24, 2019, 07:33: RGA on.

Wednesday, April 24, 2019, 07:37: Waterlines opened. Vacuum ok @ 7.99e-07T. No response on RGA

Wednesday, April 24, 2019, 07:41: Power / sources on.

Wednesday, April 24, 2019, 07:43: Auto-ramping TGHT  to 575 @ 2A per min. Vacuum limit remains at 3.000e-06T.


Thursday, April 25, 2019, 14:07: Auto-cooling @ 2 A per min.


Friday, April 26, 2019, 07:53: sources off.

Friday, April 26, 2019, 07:55: RGA off. Power off.

Friday, April 26, 2019, 07:57: Turbos off.

Friday, April 26, 2019, 08:00: HS waterlines purged.

Attachment 1: TS-2019-04-24-07-30.rga
Attachment 2: UC#28_HS.docx
  727   Monday, June 03, 2019, 14:13 Aaron Schmidt   TM4395530-342752-5DoneTMS:TP6 Turbo pump issue. (Ok now)

Monday, June 03, 2019, 14:09:

Turbo pump TMS:TP6 was making a loud hum / buzz sound. The vacuum pressure is steadily increasing on IG6. Edi Contacted. Turbo pump likely failing.

The sound tapered off.

Monday, June 03, 2019, 14:32: Sound was the turbo pump spinning down. Edi restarted & reset the main controller. It was knocked out by one of the morning sparks.

  729   Monday, June 10, 2019, 14:34 Aaron Schmidt      DoneRemoved TM4 Source Tray

Monday, June 10, 2019, 09:30: TM4 Source Tray removed - To HC area.

  730   Monday, June 10, 2019, 14:35 Aaron Schmidt      DoneOptics Tray / EZL inspection.

Monday, June 10, 2019, 13:00: Optics Tray removed.

Megger'd @ 1000V on EZL and Collimator. Passed. Open it.

Monday, June 10, 2019, 14:34: 3 cracked insulators found. 1 quite broken on the threads (see attached pictures). Replaced insulators & re-assembled optics tray.

Megger'd @ 1000V on EZL and Collimator. Passed.


Thursday, June 13, 2019, 14:23: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. EZL current @ 61 uA. EZL appears to be fixed. :)

Attachment 1: 20190610_135100.jpg
20190610_135100.jpg
Attachment 2: 20190610_135926.jpg
20190610_135926.jpg
Attachment 3: 20190610_135045.jpg
20190610_135045.jpg
Attachment 4: 20190610_135517.jpg
20190610_135517.jpg
  732   Thursday, June 13, 2019, 14:05 Aaron Schmidt      DoneSpare TGHT PS installed.

Thursday, June 13, 2019, 14:04: Spare TGHT PS installed /  tested. The old one is to be sent out for repair.

 

  733   Wednesday, June 19, 2019, 17:25 Fernando Maldonado      DoneThermocouple connection

Wednesday, June 19, 2019, 17:13  Ferran and Fernando tested the 9-pin connector to have a reading on a thermocouple following the connections used by Aurelia (see elog 721).

Wednesday, June 19, 2019, 17:24: Test succesful!

 

 

  735   Saturday, June 22, 2019, 17:05 Luca Egoritip2n     DoneTest stand installation

I opened the test stand because I forgot to install tantalum heat shields around the target. Everything was reinstalled as before (with heat shields). I could turn on the TSGTP1B but TSGTP1A does not turn on for some reason. I tried multiple times opening/closing its valve (BV1A) but the pump never starts.

Will keep pumping over the weekend with TP1B only.

  741   Tuesday, July 02, 2019, 18:25 Fernando Maldonado      DoneBlank on FEBIAD gas line installed

 Tuesday, July 02, 2019, 18:24: A blind is installed  on the FEBIAD gas line (see attached picture)  to rule out the possibility of  gases entering the TIS.

Attachment 1: 20190702_182254.jpg
20190702_182254.jpg