  283   Tuesday, March 19, 2013, 12:34 Anders MjosSiC#28 ITETM4  DoneInstallation of SiC#28 LP-RFQTuesday, March 19, 2013, 12:32 : Turbos
off (vaccum at 2E-7 Torr)
Tuesday, March 19, 2013, 13:35: Venting
 grab.n5HwXJ.png20130321_heating_and_signal.PNG 
  286   Thursday, March 21, 2013, 15:05 Sebastian RaederSiC#28 ITETM4  Done2nd heating of SiC#28 LP-RFQ - short resolved 

    
 20130322_heating.png20130322_massscan_transmission.png20130322_massscan_suppression1.png20130322_suppression2.pnglegs.JPG 
  287   Monday, March 25, 2013, 11:39 Anders MjosTa#39LP-SISITWTM1  DoneTa#39 commissioningTarget installed with 130 in lbs torque
on all bolts.
Monday, March 25, 2013, 11:36: Roughing
  
  292   Wednesday, April 10, 2013, 12:14 Anders MjosTa#40HP-SISITETM438295-4 DoneConditioning Ta#40 Wednesday, April 10, 2013, 12:13:
Stopped turbos in preparation for venting
the chamber.
  
  295   Thursday, April 18, 2013, 13:50 Anders MjosTa#40HP-SISITETM438295-4 DoneTa#40 stored under vacuumTarget installed at the Test Stand after
an inspection in the lab. EE was cleand.
All bolts torqued to 130 in lbs
  
  308   Wednesday, May 29, 2013, 12:10 Anders MjosCTL FEBIADHP-FEBIAD  38481-5 DoneCTL TestWednesday, May 29, 2013, 12:09: Debiased
to insert temp logger
Wednesday, May 29, 2013, 14:40: Temp
 Photo_2013-06-13_10_33_42_AM.jpg 
  315   Thursday, June 13, 2013, 10:19 Anders Mjos      DonePumping down empty chamberThursday, June 13, 2013, 10:17: Roughing.
Thursday, June 13, 2013, 10:52: Turbos
started
  
  317   Wednesday, July 10, 2013, 10:21 Anders MjosSiC#29HP-FEBIAD-CTLITETM438481-639956-4DoneTesting SiC#29 CTL TargetWednesday, July 10, 2013, 10:20 : Turbos
off. Vacuum at 1.3 E-7 T
Wednesday, July 10, 2013, 11:23:
  
  330   Friday, August 30, 2013, 15:09 Anders MjosNiO#2HP-FEBIADITETM339530-639069-4DoneConditioning of NiO#2Friday, August 30, 2013, 15:09 : Turbos
stopped in preparation for installation. 
Friday, August 30, 2013, 16:22: Venting
 2013-09-12_NiO#2_TBHT_jump.PNG 
  333   Monday, September 16, 2013, 17:07 Anders MjosNiO#2HP-FEBIADITETM339530-639069-4DoneConditioning NiO#2 take 2The GE on the Source tray and EE on the
target was cleaned. The target will be conditioned
again to verify if sparking has been reduced.
  
  336   Wednesday, September 18, 2013, 16:18 Anders Mjos HP-FEBIAD  Tube only38307-9DoneTest Target - FEBIAD COILWednesday, September 18, 2013, 16:18: Starting
turbos
Wednesday, September 18, 2013, 16:26
  
  337   Friday, September 27, 2013, 11:41 Anders MjosTa#41HP-SISITWTM439069-538817-10DoneTa#41 ConditioningFriday, September 27, 2013, 11:41: Roughing
Friday, September 27, 2013, 12:08:
Turbos started
 Ta#41_EE_After_Test_Stand.pdf 
  341   Tuesday, October 15, 2013, 16:17 Anders Mjos      DoneTGHT and TB HT test bar testHS line is looped. Cu-test bars installed
on TGHT and TBHT. Torqued all bolts 
to 120 in lbs.
  
  351   Wednesday, December 18, 2013, 12:04 Anders Mjos    40282-539230-1DoneHeating Test Wednesday, December 18, 2013, 12:04:
Turbos stopped
Wednesday, December 18, 2013, 13:19:
  
  354   Tuesday, January 14, 2014, 08:58 Anders Mjos    40282-539230-1DoneHeating TestTuesday, January 14, 2014, 08:57: Stopping
turbos. Vacuum at 1.2E-7 T
Tuesday, January 14, 2014, 13:32:
  
  363   Wednesday, March 12, 2014, 10:20 Rick Maharaj      Donereplace heatshield waterline loopA new Heatshield waterline loop was manufactured
and installed to replace the old one which
had a leak.
  
  369   Thursday, April 03, 2014, 16:46 Aurelia LaxdalTiC#4HP-SISITETM3  DoneHV and Heaters ConditioningHV and Heaters Conditioning had finished.
The target was cooled down and it's ready
for the on-line installation.
 ITE-TM3-TiC#4-HP-SIS_Test_Stand_Conditioning.docx 
  371   Friday, April 04, 2014, 17:01 Rick MaharajUC#9LP-SISITWTM1 39230-3DoneConditioning Heatshield for UCx#9Friday, April 04, 2014, 16:26: Heatshield/Ionsource
assembly for UC LP SIS  installed in
test stand with Ta tube as heat load.
  
  373   Wednesday, April 23, 2014, 14:16 Anders Mjos      DoneCu-strip cleaning test - sample #1, not cleanedWednesday, April 23, 2014, 14:15: Roughing
Wednesday, April 23, 2014, 14:34
: Starting turbos
 Front_2014-04-24_2_05_56_PM.jpgSide_2014-04-24_2_06_12_PM.jpg 
  380   Tuesday, May 20, 2014, 12:39 Anders Mjos      DoneFEBIAD Cathode Negative BIAS configurationAs per ISK4562 Rev 3 and ISK4563 Rev 3