Entry  Wednesday, September 07, 2016, 15:51, Aaron Schmidt, , , , , , , , Flexible waterlines test. Flexible_Line_Test.docxTS-2016-09-08-08-47.rga

Wednesday, September 07, 2016, 15:35: Roughing


Thursday, September 08, 2016, 08:33: Turbo pumps started.

Thursday, September 08, 2016, 08:38: Ion gauge on. TP1B @ speed 42 KRPM.

Thursday, September 08, 2016, 08:41: TP1A @ speed 38 KRPM.

Thursday, September 08, 2016, 08:47: RGA on.

Thursday, September 08, 2016, 11:00: Checked and screenshots taken. Vacuum @ 1.38E-6T

DaqPro Logger HS+MSP flow checked. Connections disconnect and re-connect.

Thursday, September 08, 2016, 11:45: Waterlines opened. No response on RGA. Vacuum ok @ 1.21 E-6T

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 28.4 3.78
 TBHT  28.6 2.96
 COIL + EE 28.2 4.89
 TGHT  28.4 5.49

 


  Device Temp
[C]
 Flow
[lpm]
 HS + MSP 28.6 3.68
 TBHT  28.6 3.02
 COIL + EE 28.2 4.91
 TGHT  28.2 5.51

Friday, September 09, 2016, 08:51: Vacuum ok @ 3.68E-7T

Friday, September 09, 2016, 15:35: Vacuum ok @ 3.35E-7T

  Device Temp
[C]
 Flow
[lpm]
 HS + MSP 28.7 3.71
 TBHT  28.8 3.06
 COIL + EE 28.2 4.94
 TGHT  28.4 5.56

 


Monday, September 12, 2016, 08:05: Vacuum ok @ 1.97E-7T

  Device Temp
[C]
 Flow
[lpm]
 HS + MSP 28.4 3.68
 TBHT  29.0 3.09
 COIL + EE 28.2 4.95
 TGHT  28.4 5.48

Monday, September 12, 2016, 15:09: Vacuum ok @ 1.97E-07T

  Device Temp
[C]
 Flow
[lpm]
 HS + MSP 28.4 3.72
 TBHT  29.1 3.06
 COIL + EE 28.2 4.87
 TGHT  28.4 5.51

 


Tuesday, September 13, 2016, 08:17: Vacuum ok @ 1.79E-7T

  Device Temp
[C]
 Flow
[lpm]
 HS + MSP 28.4 3.68
 TBHT  28.7 3.07
 COIL + EE 28.0 4.91
 TGHT  28.2 5.51

Tuesday, September 13, 2016, 08:19: RGA off. Ion Gauge off. Turbo pumps off.

Tuesday, September 13, 2016, 08:24: Waterlines purged.


Wednesday, September 14, 2016, 11:33: Venting -AM

Entry  Thursday, September 08, 2016, 09:12, Anders Mjos, , , , , , , Problems/Solutions, Filament change on IG6 

Thursday, September 08, 2016, 08:20: Vacuum group changed to the other filament to investigate vacuum spikes on IG6

Spikes In Green.

Spikes in Grey.

    Reply  Tuesday, September 13, 2016, 14:38, Anders Mjos, , , , , , , Problems/Solutions, TSG:RP1 replaced 

Aaron Schmidt wrote:

Fault report was submitted.

Anders informed Anthony on Tuesday, Sept 6, 2016.

Fault report # 9233.

 Tuesday, September 13, 2016, 14:38: RP1 replaced by Edi

    Reply  Wednesday, September 14, 2016, 13:58, Anders Mjos, , , , , , , Problems/Solutions, TSG:RP1 latched breaker 

Anders Mjos wrote:

Aaron Schmidt wrote:

Fault report was submitted.

Anders informed Anthony on Tuesday, Sept 6, 2016.

Fault report # 9233.

 Tuesday, September 13, 2016, 14:38: RP1 replaced by Edi

Wednesday, September 14, 2016, 13:57: The pump does not run properly. Attempting to contact vacuum group

Found that the exhaust pipe needed to be disconnected from the pump. Asked plant group (Curtis) to investigate exhaust pipe on the outside of the building, to check if it is restricted again.


Thursday, September 15, 2016, 11:03: Starting turbos


Thursday, September 29, 2016, 11:16: Turbos stopped.


Friday, September 30, 2016, 08:24: Venting.

Entry  Friday, September 30, 2016, 11:14, Aaron Schmidt, , , , , , , Problems/Solutions, TSG:RP1 Replacement 
Friday, September 30, 2016, 10:01: Roughing pump RP1 failed during roughing. Breaker was tripped to RP1 & RP2. Friday, September 30, 2016, 10:30: Roughing pump RP1 replaced and tested.
Entry  Tuesday, October 11, 2016, 14:55, Anders Mjos, , , , , , , In progress, Empty 

Breaker tripped during roughing. Removed exhaust line during first 2 min.

Tuesday, October 11, 2016, 14:55: Turbos at speed. Vacuum at 1.0E-6 T


Wednesday, October 12, 2016, 12:09: Ion gauge & Turbo pumps off.

Wednesday, October 12, 2016, 13:52: Venting

Entry  Friday, October 14, 2016, 13:17, Anders Mjos, , , , , , , Problems/Solutions, Powerbump tripped off turbos 

Friday, October 14, 2016, 13:17: Restarted pumps

Friday, October 14, 2016, 13:4: Another trip: restarted pumps


Tuesday, October 18, 2016, 12:12: Venting.

Entry  Monday, October 24, 2016, 16:02, Aaron Schmidt, , , , , , , Problems/Solutions, Pump down empty chamber/Clean Exhaust/Test Exhaust_pump_down.docx

Monday, October 24, 2016, 15:45: Remove metal mesh covering roughing pump exhaust.

Clean out mesh (3/4"-5/8" thick w/ layers of dust/material).

Monday, October 24, 2016, 15:52: Roughing 710.0 T.

Monday, October 24, 2016, 15:54: BV1B opened.

Monday, October 24, 2016, 16:00: Rouging 2.0 T.

Monday, October 24, 2016, 16:10: Turbo pumps available.


Tuesday, October 25, 2016, 08:08: Venting.

Tuesday, October 25, 2016, 08:40: Doors open.

Tuesday, October 25, 2016, 08:50: Roughing.

Tuesday, October 25, 2016, 08:51: Doors sealed for roughing.

Tuesday, October 25, 2016, 08:52: BV1B opened.

Tuesday, October 25, 2016, 09:10: Turbo pumps available & started.

Tuesday, October 25, 2016, 09:20: Ion gauge on.


Thursday, October 27, 2016, 08:35: Ion Gauge & Turbo pumps off.

Thursday, October 27, 2016, 11:44: Venting.

Entry  Wednesday, November 16, 2016, 10:50, Aaron Schmidt, , , , , , , , Pump down empty chamber. 

Wednesday, November 16, 2016, 10:50: Begin roughing.

Wednesday, November 16, 2016, 11:52: Turbo pumps on.

*Note* Unusual sound noticed right at the start up of TSG : TP1B. It was first noticed prior to venting UC#18. The sound only lasts 10-15 seconds within a minute of starting the pump. An odd whine with tapping sound. Operation is otherwise normal, but will continue to monitor the pump.

Wednesday, November 16, 2016, 11:57: Ion gauge on.

Wednesday, November 16, 2016, 12:03: Both pumps are at speed


Thursday, November 24, 2016, 10:08: Ion gauge & Turbo pumps off.

Thursday, November 24, 2016, 11:07: Venting.

Entry  Thursday, November 24, 2016, 10:36, Aaron Schmidt, , , , , , , , Camera Container test 1. Camera_Case_Test_1.docxTS-2016-11-24-12-50.rgaTS-2016-11-25-10-10.rga

Thursday, November 24, 2016, 10:15: Discuss w/ Aurelia. Camera container filled with Argon. Place under Vacuum, monitor w/ RGA.

Thursday, November 24, 2016, 11:43:Pump down started. Camera and case placed near RGA.

Thursday, November 24, 2016, 12:42: Turbo pumps started

Thursday, November 24, 2016, 12:51: Turbo pumps at speed. RGA on

*Note: Nitrogen Anomaly noted on RGA and in report.*


Friday, November 25, 2016, 10:11 : Stopped turbos. RGA off. -AM

Friday, November 25, 2016, 11:10: Venting -AM

Entry  Thursday, November 24, 2016, 10:39, Aaron Schmidt, , , , , , , Problems/Solutions, TMS:TP2  

Thursday, November 24, 2016, 08:05: Whining sound (high pitch) heard from TMS:TP2

Thursday, November 24, 2016, 10:37: Sound fades in and out roughly every 3-5 minutes. Vacuum group notified. Monitor.

Thursday, November 24, 2016, 15:21: Vent tomorrow AM as per Vacuum group. Edi.

Thursday, November 24, 2016, 15:38: Turbo  pumps TMS:TP6 & TMS:TP2 were turned of. Backing valves closed. Ion gauge IG6 also off.

Thursday, November 24, 2016, 16:34: Two short vent bursts. - AM


Friday, November 25, 2016, 10:21: Venting -AM

Friday, November 25, 2016, 11:00: Pump being replaced

 Friday, November 25, 2016, 14:01: Roughing

Friday, November 25, 2016, 14:40: Turbos started.

Friday, November 25, 2016, 14:45: Turbos at speed. Vacuum at 1.9E-5 T

*** Note *** : One of the copper cooling lines was leaking. The line was fixed. Monitor.


Monday, November 28, 2016, 08:47: Turbo pump operating well. No leaks detected on cooling lines.

Entry  Friday, November 25, 2016, 14:28, Anders Mjos, , , , , , , , Camera Container test 2 Camera_Case_Test_2.docxTS-2016-11-25-14-50_Test_2.rgaTS-2016-11-28-08-40_Test_2.rga

Friday, November 25, 2016, 14:28: Roughing

Friday, November 25, 2016, 14:47: Turbos started

Friday, November 25, 2016, 14:56: Turbos at speed. Vacuum at 6.4E-6 T. RGA on


Monday, November 28, 2016, 08:45: Ion gauge & Turbo pumps off.

Monday, November 28, 2016, 15:02: Venting.

Monday, November 28, 2016, 15:32: Camera removed & bagged.

Entry  Monday, November 28, 2016, 15:39, Aaron Schmidt, , , , , , , In progress, Pump down empty chamber/Check Exhaust 

Monday, November 28, 2016, 15:35: Begin roughing. Monitor exhaust mesh cover. 

*Cover was found on the ground earlier today and re-attached*

 Monday, November 28, 2016, 15:55: Exhaust mesh OK. Roughing continued.


Tuesday, November 29, 2016, 14:55: Test partially vented. @ around 550 T. Roughing restarted. Test delayed until tomorrow.


Wednesday, November 30, 2016, 07:23: Venting

Entry  Tuesday, November 29, 2016, 11:20, Anders Mjos, , , , , , , Problems/Solutions, TSH:UHV1 remvoed 

The variable leak rate valve will be used for TM3 HV spark tests in TCS

Entry  Wednesday, November 30, 2016, 07:25, Aaron Schmidt, , , , , , , , Camera Container test 3. Camera_Case_Test_3.docxTS-2016-11-30-09-00_Test_3.rga

Wednesday, November 30, 2016, 07:23: Venting

Wednesday, November 30, 2016, 08:35: Roughing.

Wednesday, November 30, 2016, 09:01: RGA on. Turbos @ speed. Ion gauge on.

Wednesday, November 30, 2016, 09:35: RGA off. Ion gauge off. Turbo pumps off.

Wednesday, November 30, 2016, 09:47: Turbo pumps were internally vented. Venting continued.

Entry  Wednesday, November 30, 2016, 10:16, Aaron Schmidt, , , , , , , , Pump down empty chamber. (Close off for holidays) 

Wednesday, November 30, 2016, 10:16: Roughing

Wednesday, November 30, 2016, 11:05: Turbo pumps on.

Wednesday, November 30, 2016, 11:13: Ion gauge on.


Thursday, December 15, 2016, 09:19: TMS : IG6 off. TSG : IG1 off.

Thursday, December 15, 2016, 09:20: TMS : BV6 & BV2 off. TSG : BV1A, & BV1B off. Turbo pumps TMS : TP6 & TP2 off. TSG : TP1B & TP1A off.


Friday, December 16, 2016, 07:59: Roughing pumps shut down. Test stand closed for the holidays.

Entry  Tuesday, January 03, 2017, 08:27, Aaron Schmidt, , , , , , , , Pump down empty chamber. (Restart. Post holidays) 

Tuesday, January 03, 2017, 08:26: TSG : RP1 & TMS : RP2 restarted.


Wednesday, January 04, 2017, 11:18: TSG : PV1 & TMS : PV2 opened.

Wednesday, January 04, 2017, 11:19: TSG : BV1A & TSG : BV1B opened. TMS : BV2 & TMS : BV6 open.

Wednesday, January 04, 2017, 11:25: Turbo pumps TSG : TP1A & TP1B on. Monitor startup.

Wednesday, January 04, 2017, 11:31: TSG : IG1 on. TP1B @ speed.

Wednesday, January 04, 2017, 11:34: TSG : TP1A @ speed

Wednesday, January 04, 2017, 11:35: Turbo pumps TMS : TP2 & TP6 on. Monitor Startup.

Wednesday, January 04, 2017, 11:40: Both Turbo pumps @ speed. TMS : IG6 on.


Friday, January 13, 2017, 08:49: Ion gauge off, Turbos off.


Wednesday, January 18, 2017, 08:28: Venting.

    Reply  Thursday, January 19, 2017, 13:23, Anders Mjos, , , , , , , Problems/Solutions, TSH:UHV1 remvoed 

Anders Mjos wrote:

The variable leak rate valve will be used for TM3 HV spark tests in TCS

 Variable leak valve returned yesterday (2017-01-18). New calibrated leaks installed. Ar and Ne. System leak checked OK after.

Entry  Friday, January 20, 2017, 08:45, Aaron Schmidt, , , , , , , Problems/Solutions, TSG:TP1A & TSG:BV1A tripped 

Friday, January 20, 2017, 08:25: TSG : TP1A and TSG : BV1A were noticed to be tripped around 6am.

Friday, January 20, 2017, 08:42: Bypass to restart TSG : TP1A and TSG : BV1A. TP1A is at speed.

      ------      

Continue to monitor.

Entry  Monday, January 23, 2017, 15:30, Aaron Schmidt, , , , , , , , Pump down empty chamber. 

Monday, January 23, 2017, 15:30: Roughing


Wednesday, January 25, 2017, 09:05: Venting