283
|
Tuesday, March 19, 2013, 12:34 |
Anders Mjos | SiC#28 | | ITE | TM4 | | | Done | Installation of SiC#28 LP-RFQ | Tuesday, March 19, 2013, 12:32 : Turbos
off (vaccum at 2E-7 Torr)
Tuesday, March 19, 2013, 13:35: Venting |
|
|
286
|
Thursday, March 21, 2013, 15:05 |
Sebastian Raeder | SiC#28 | | ITE | TM4 | | | Done | 2nd heating of SiC#28 LP-RFQ - short resolved |
|
|
|
287
|
Monday, March 25, 2013, 11:39 |
Anders Mjos | Ta#39 | LP-SIS | ITW | TM1 | | | Done | Ta#39 commissioning | Target installed with 130 in lbs torque
on all bolts.
Monday, March 25, 2013, 11:36: Roughing |
|
|
292
|
Wednesday, April 10, 2013, 12:14 |
Anders Mjos | Ta#40 | HP-SIS | ITE | TM4 | 38295-4 | | Done | Conditioning Ta#40 | Wednesday, April 10, 2013, 12:13:
Stopped turbos in preparation for venting
the chamber. |
|
|
295
|
Thursday, April 18, 2013, 13:50 |
Anders Mjos | Ta#40 | HP-SIS | ITE | TM4 | 38295-4 | | Done | Ta#40 stored under vacuum | Target installed at the Test Stand after
an inspection in the lab. EE was cleand.
All bolts torqued to 130 in lbs |
|
|
308
|
Wednesday, May 29, 2013, 12:10 |
Anders Mjos | CTL FEBIAD | HP-FEBIAD | | | 38481-5 | | Done | CTL Test | Wednesday, May 29, 2013, 12:09: Debiased
to insert temp logger
Wednesday, May 29, 2013, 14:40: Temp |
|
|
315
|
Thursday, June 13, 2013, 10:19 |
Anders Mjos | | | | | | | Done | Pumping down empty chamber | Thursday, June 13, 2013, 10:17: Roughing.
Thursday, June 13, 2013, 10:52: Turbos
started |
|
|
317
|
Wednesday, July 10, 2013, 10:21 |
Anders Mjos | SiC#29 | HP-FEBIAD-CTL | ITE | TM4 | 38481-6 | 39956-4 | Done | Testing SiC#29 CTL Target | Wednesday, July 10, 2013, 10:20 : Turbos
off. Vacuum at 1.3 E-7 T
Wednesday, July 10, 2013, 11:23: |
|
|
330
|
Friday, August 30, 2013, 15:09 |
Anders Mjos | NiO#2 | HP-FEBIAD | ITE | TM3 | 39530-6 | 39069-4 | Done | Conditioning of NiO#2 | Friday, August 30, 2013, 15:09 : Turbos
stopped in preparation for installation.
Friday, August 30, 2013, 16:22: Venting |
|
|
333
|
Monday, September 16, 2013, 17:07 |
Anders Mjos | NiO#2 | HP-FEBIAD | ITE | TM3 | 39530-6 | 39069-4 | Done | Conditioning NiO#2 take 2 | The GE on the Source tray and EE on the
target was cleaned. The target will be conditioned
again to verify if sparking has been reduced. |
|
|
336
|
Wednesday, September 18, 2013, 16:18 |
Anders Mjos | | HP-FEBIAD | | | Tube only | 38307-9 | Done | Test Target - FEBIAD COIL | Wednesday, September 18, 2013, 16:18: Starting
turbos
Wednesday, September 18, 2013, 16:26 |
|
|
337
|
Friday, September 27, 2013, 11:41 |
Anders Mjos | Ta#41 | HP-SIS | ITW | TM4 | 39069-5 | 38817-10 | Done | Ta#41 Conditioning | Friday, September 27, 2013, 11:41: Roughing
Friday, September 27, 2013, 12:08:
Turbos started |
|
|
341
|
Tuesday, October 15, 2013, 16:17 |
Anders Mjos | | | | | | | Done | TGHT and TB HT test bar test | HS line is looped. Cu-test bars installed
on TGHT and TBHT. Torqued all bolts
to 120 in lbs. |
|
|
351
|
Wednesday, December 18, 2013, 12:04 |
Anders Mjos | | | | | 40282-5 | 39230-1 | Done | Heating Test | Wednesday, December 18, 2013, 12:04:
Turbos stopped
Wednesday, December 18, 2013, 13:19: |
|
|
354
|
Tuesday, January 14, 2014, 08:58 |
Anders Mjos | | | | | 40282-5 | 39230-1 | Done | Heating Test | Tuesday, January 14, 2014, 08:57: Stopping
turbos. Vacuum at 1.2E-7 T
Tuesday, January 14, 2014, 13:32: |
|
|
363
|
Wednesday, March 12, 2014, 10:20 |
Rick Maharaj | | | | | | | Done | replace heatshield waterline loop | A new Heatshield waterline loop was manufactured
and installed to replace the old one which
had a leak. |
|
|
369
|
Thursday, April 03, 2014, 16:46 |
Aurelia Laxdal | TiC#4 | HP-SIS | ITE | TM3 | | | Done | HV and Heaters Conditioning | HV and Heaters Conditioning had finished.
The target was cooled down and it's ready
for the on-line installation. |
|
|
371
|
Friday, April 04, 2014, 17:01 |
Rick Maharaj | UC#9 | LP-SIS | ITW | TM1 | | 39230-3 | Done | Conditioning Heatshield for UCx#9 | Friday, April 04, 2014, 16:26: Heatshield/Ionsource
assembly for UC LP SIS installed in
test stand with Ta tube as heat load. |
|
|
373
|
Wednesday, April 23, 2014, 14:16 |
Anders Mjos | | | | | | | Done | Cu-strip cleaning test - sample #1, not cleaned | Wednesday, April 23, 2014, 14:15: Roughing
Wednesday, April 23, 2014, 14:34
: Starting turbos |
|
|
380
|
Tuesday, May 20, 2014, 12:39 |
Anders Mjos | | | | | | | Done | FEBIAD Cathode Negative BIAS configuration | As per ISK4562 Rev 3 and ISK4563 Rev 3