283
|
Tuesday, March 19, 2013, 12:34 |
Anders Mjos | SiC#28 | | ITE | TM4 | | | Done | Installation of SiC#28 LP-RFQ | Tuesday, March 19, 2013, 12:32 : Turbos off (vaccum at 2E-7 Torr)
Tuesday, March 19, 2013, 13:35: Venting
Target SiC#28 LP-RFQ inserted
New bolts used. Old bolts removed.
All bolts torqued to 120 in lbs
By Sebastian (SR) & Henning
modification of 9 Pin connector needed to match wiring in TM4 (see separate e-log entry)
Tuesday, March 19, 2013, 18:32 : started roughing - SR
Tuesday, March 19, 2013, 18:52: started turbos - SR
Tuesday, March 19, 2013, 18:57: TSGIP1 on - SR
Tuesday, March 19, 2013, 19:00: turbos at speed - SR
Tuesday, March 19, 2013, 19:02: vacuum at 1.68E-5T
By Anders
Wednesday, March 20, 2013, 08:18: Opened cooling water. Vacuum stable at 6.8E-7 Torr
By Sebastian (SR) & Henning
Wednesday, March 20, 2013, 11:39: 9PIN connector in HV cage connected
4,5,6,9 on GND 1,2 to RF, 7,8,RFoffest,Source for now also on GND
RF: 800kHz, 20Vampl, 0.128mA
HV cage locked up for heating
Wednesday, March 20, 2013, 16:42: heating is taken care of by ISAC operations, now at 300A / 3V TGHT and 250A / 1.47V TBHT reading on the panel is really close
Friedhelm restarted some of the CANBUS ports, since not all optics were working properly
Thursday, March 21, 2013, 10:53 start cooling down
Vacuum not perfect was around 2E-6T, over nigth not full current
Suppression tested yesterday: full beam (SRC +3V, others GND) was 40nA, while no signal on FB0B with SRC +3V, IGOffset&Exit +25V
!!!!! but short on #7 --> 2nd Repeller, was OK when tested, after some minutes on 25V short was there, reading now (Thursday, March 21, 2013, 10:58 ) <1OHM, will be checked while heating down
Magnet had wrong polarity - so no mass scans yesterday evening, Friedhelm looked into this this morning
Mass scan only for good transmission mode (SRC +3V) this morning - see attached scan (seen Na, Al, K, Ca, Cr, Rb, Sr, Cs and Ba)
Thursday, March 21, 2013, 12:26: stopped turbos
#7 still short
By Anders
Thursday, March 21, 2013, 13:25: Venting |
Attachment 1: grab.n5HwXJ.png
|
|
Attachment 2: 20130321_heating_and_signal.PNG
|
|
286
|
Thursday, March 21, 2013, 15:05 |
Sebastian Raeder | SiC#28 | | ITE | TM4 | | | Done | 2nd heating of SiC#28 LP-RFQ - short resolved |
Anders Mjos wrote:
|
Tuesday, March 19, 2013, 12:32 : Turbos off (vaccum at 2E-7 Torr)
Tuesday, March 19, 2013, 13:35: Venting
Target SiC#28 LP-RFQ inserted
By Sebastian (SR) & Henning
modification of 9 Pin connector needed to match wiring in TM4 (see separate e-log entry)
Tuesday, March 19, 2013, 18:32 : started roughing - SR
Tuesday, March 19, 2013, 18:52: started turbos - SR
Tuesday, March 19, 2013, 18:57: TSGIP1 on - SR
Tuesday, March 19, 2013, 19:00: turbos at speed - SR
Tuesday, March 19, 2013, 19:02: vacuum at 1.68E-5T
By Anders
Wednesday, March 20, 2013, 08:18: Opened cooling water. Vacuum stable at 6.8E-7 Torr
By Sebastian (SR) & Henning
Wednesday, March 20, 2013, 11:39: 9PIN connector in HV cage connected
4,5,6,9 on GND 1,2 to RF, 7,8,RFoffest,Source for now also on GND
RF: 800kHz, 20Vampl, 0.128mA
HV cage locked up for heating
Wednesday, March 20, 2013, 16:42: heating is taken care of by ISAC operations, now at 300A / 3V TGHT and 250A / 1.47V TBHT reading on the panel is really close
Friedhelm restarted some of the CANBUS ports, since not all optics were working properly
Thursday, March 21, 2013, 10:53 start cooling down
Vacuum not perfect was around 2E-6T, over nigth not full current
Suppression tested yesterday: full beam (SRC +3V, others GND) was 40nA, while no signal on FB0B with SRC +3V, IGOffset&Exit +25V
!!!!! but short on #7 --> 2nd Repeller, was OK when tested, after some minutes on 25V short was there, reading now (Thursday, March 21, 2013, 10:58 ) <1OHM, will be checked while heating down
Magnet had wrong polarity - so no mass scans yesterday evening, Friedhelm looked into this this morning
Mass scan only for good transmission mode (SRC +3V) this morning - see attached scan (seen Na, Al, K, Ca, Cr, Rb, Sr, Cs and Ba)
Thursday, March 21, 2013, 12:26: stopped turbos
#7 still short
By Anders
Thursday, March 21, 2013, 13:25: Venting
|
Thursday, March 21, 2013, 14:46: started roughing
Target was out, visibly inspected, nothing to be seen, no short on the target - wiring of the 9Pin connector shows short circuit inside vacuum chamber
Wires removed - short could be reproduced with the strandings of the shielding from the kapton twisted pairs going into the peek connector
wire shieldings now fixed to position further away with Cu wire
all wires against ground and each other tested for holding 250V - all fine
everything reconnected and target put in, torcked w 120 inch pounds
Thursday, March 21, 2013, 15:05 : turbos started
Thursday, March 21, 2013, 15:14: turbos at speed
Thursday, March 21, 2013, 15:17: vacuum at 1.4E-5T
Thursday, March 21, 2013, 18:01: vacuum at 1.45E-6T opening water lines - vacuum is stable
Thursday, March 21, 2013, 19:19 : vacuum at 8.6E-7T - start ramping heater to 580A / 250 A
Friday, March 22, 2013, 00:08: target is heated full way up
setpoint 570A and 7.250V voltage limit
readback 564.1A and 7.201V --> needs more voltage than the normal target !
vacuum at 1.2E-6T
Friday, March 22, 2013, 15:15: vacuum at 5.4E-7T
preparing for HV test and mass scan
transmission mode: Source +3V, everything else on GND: 12nA - mass scan see attachment
suppression mode 1: Source -15V, everything else on GND: 20pA - mass scan see attachment
suppression mode 2: Source +3V, everything else on +25V: <1pA - FC0 current while biasing see attachment
NOTE: the legs of the target are glowing differently, the left leg (view from the lid side onto the target unit) glows brighter, this side was open during the sintering process of the SiC and needed more alignment at the jig --> see attached picture
NOTE2: there is a slight increase in TGHT voltage over time: in ~ 22h from 7.201V to 7.216V
Friday, March 22, 2013, 21:33 : vacuum at 4.8E-7, start ramping down
Friday, March 22, 2013, 22:47: heaters down and turned off, vacuum at 2.7E-7T
Monday, March 25, 2013, 00:15: vacuum at 1.4E-7T, IG off, turbos off
By Anders
Monday, March 25, 2013, 08:18: Venting
Monday, March 25, 2013, 08:33: Purging water lines
Monday, March 25, 2013, 08:42: Target removed |
Attachment 1: 20130322_heating.png
|
|
Attachment 2: 20130322_massscan_transmission.png
|
|
Attachment 3: 20130322_massscan_suppression1.png
|
|
Attachment 4: 20130322_suppression2.png
|
|
Attachment 5: legs.JPG
|
|
287
|
Monday, March 25, 2013, 11:39 |
Anders Mjos | Ta#39 | LP-SIS | ITW | TM1 | | | Done | Ta#39 commissioning | Target installed with 130 in lbs torque on all bolts.
Monday, March 25, 2013, 11:36: Roughing
Monday, March 25, 2013, 11:54: Starting turbos
Monday, March 25, 2013, 12:02: Both turbos at speed
Monday, March 25, 2013, 12:04: Vacuum at 2E-5 Torr
Tuesday, March 26, 2013, 08:03: Opened water supply. Vacuum stable at 3E-7 Torr
Tuesday, March 26, 2013, 09:11
All P/S switched on.
ISAC Ops will condition this target as a training exercise.
ISAC ops e-log
ISAC ops e-log 2
Wednesday, March 27, 2013, 13:41: ISAC ops called to inform that the target has been cooled down and bias is off.
Thursday, March 28, 2013, 08:22: Closed TPS:IV4 and switched off turbos.
Thursday, March 28, 2013, 13:27: Venting
Thursday, March 28, 2013, 13:33: Water purged |
292
|
Wednesday, April 10, 2013, 12:14 |
Anders Mjos | Ta#40 | HP-SIS | ITE | TM4 | 38295-4 | | Done | Conditioning Ta#40 | Wednesday, April 10, 2013, 12:13: Stopped turbos in preparation for venting the chamber.
Wednesday, April 10, 2013, 13:05: Venting
Wednesday, April 10, 2013, 13:37: Ta#40 installed with 130 in lbs torque on all bolts.
Wednesday, April 10, 2013, 13:37: Roughing
Wednesday, April 10, 2013, 13:58: Started turbos
Wednesday, April 10, 2013, 14:07: Turbos at speed
Wednesday, April 10, 2013, 14:08: Vacuum at 9.2E-6 Torr
Thursday, April 11, 2013, 08:26: Opened cooling water. Vacuum stable at 2.2E-7 Torr
Monday, April 15, 2013, 08:40: HV conditioned to 30kV TSG:BIAS:RDCUR at 37 uA
Monday, April 15, 2013, 08:46: Started Target Heat Ramp 580A / 230A
Monday, April 15, 2013, 13:30: Target at temperature TGHT:RDCUR=574A, TBHT:RDCUR=230A
Monday, April 15, 2013, 15:10: Mass scan
Monday, April 15, 2013, 16:21: Target will be left at temperature overnight.
Tuesday, April 16, 2013, 08:40: Mass scan
Tuesday, April 16, 2013, 13:08: Started Target Cooling Sequence
Wednesday, April 17, 2013, 08:43: High voltage BIAS to zero
Wednesday, April 17, 2013, 08:47: Turbos off
Wednesday, April 17, 2013, 16:20: Target will likely be removed tomorrow Thursday.
Thursday, April 18, 2013, 11:13 : Venting
Thursday, April 18, 2013, 11:17: Water lines purged
Thursday, April 18, 2013, 11:29: Chamber vented. Target Removed |
295
|
Thursday, April 18, 2013, 13:50 |
Anders Mjos | Ta#40 | HP-SIS | ITE | TM4 | 38295-4 | | Done | Ta#40 stored under vacuum | Target installed at the Test Stand after an inspection in the lab. EE was cleand. All bolts torqued to 130 in lbs
Thursday, April 18, 2013, 13:48: Rouging
Thursday, April 18, 2013, 14:11: Starting turbos
Thursday, April 18, 2013, 14:20 : Turbos at speed
Thursday, April 18, 2013, 14:21 : Vacuum at 2.3E-5 T
Friday, April 19, 2013, 08:23: Opened cooling water. Vacuum stable at 9.6E-6 T
Vacuum is somewhat higher than expected (5.2E-7 T) . Will went and clean the o-rings on the doors.
Monday, April 22, 2013, 09:32: Turbos off.
Monday, April 22, 2013, 10:57: Venting
Monday, April 22, 2013, 12:25: Vented
Monday, April 22, 2013, 14:09: Roughing
Monday, April 22, 2013, 14:31: Started Turbos
Monday, April 22, 2013, 14:40: Turbos at speed
Monday, April 22, 2013, 14:41: Vacuum at 1.8E-5 T
Tuesday, April 23, 2013, 09:52 : Vacuum at 2.6E-7 T - already an improvement from yesterday
Thursday, April 25, 2013, 08:47: Stopped turbos. A test target with at new FEBIAD coil will be tested.
Thursday, April 25, 2013, 13:27: Venting |
308
|
Wednesday, May 29, 2013, 12:10 |
Anders Mjos | CTL FEBIAD | HP-FEBIAD | | | 38481-5 | | Done | CTL Test | Wednesday, May 29, 2013, 12:09: Debiased to insert temp logger
Wednesday, May 29, 2013, 14:40: Temp logger installed
CH1 COIL
CH2 CTL Block
Wednesday, May 29, 2013, 14:51: Opening gas lines
Temperatures [deg C]
COIL: 190
CTL: 44
Wednesday, May 29, 2013, 15:31: Coil at 50A
Temperatures [deg C]
COIL: 212
CTL: 45
Thursday, May 30, 2013, 09:18: TGHT was voltage limited at about 570A. Increased voltage limit to 5.5V and raised current to 580A
Thursday, May 30, 2013, 09:20: Ramping TBHT to 280A
Thursday, May 30, 2013, 10:03
Temperatures [deg C]
COIL: 227
CTL: 48
Thursday, May 30, 2013, 10:07: Heard a noise from the vacuum chamber coinciding with a spike in vacuum on both gauges.
Monday, June 03, 2013, 08:54: Target debiased and gases off. Target cooling started in preparation for power outage tomorrow at 9am.
Wednesday, June 05, 2013, 09:57: Purging gas lines to vacuum chamber
Wednesday, June 05, 2013, 10:13: Target biased again. Started target heating.
Thursday, June 06, 2013, 13:23:
Temperatures [deg C]
COIL: 227
CTL: 48
Thursday, June 06, 2013, 16:45: TBHT increased ti 290A
Temperatures [deg C]
COIL: 230
CTL: 50
Friday, June 07, 2013, 08:40: Magnet found off. TPS:Q4 and TPS:Q2 found off.
Temperatures [deg C]
COIL: 227
CTL: 48
Friday, June 07, 2013, 14:21: Anode current limit increased to 500 mA. Adjusted magnet current. Increasing TBHT.
Friday, June 07, 2013, 16:24: TBHT at 296A
Temperatures [deg C]
COIL: 237
CTL: 50
Monday, June 10, 2013, 08:19
Temperatures [deg C]
COIL: 232
CTL: 49
Monday, June 10, 2013, 16:55: COIL at 60A
Temperatures [deg C]
COIL: 244
CTL: 49
Tuesday, June 11, 2013, 08:42: TBHT voltage limited this morning at 291A
Temperatures [deg C]
COIL: 242
CTL: 49
Tuesday, June 11, 2013, 11:02: COIL at 70A
Temperatures [deg C]
COIL: 256
CTL: 49
Tuesday, June 11, 2013, 15:49: COIL at 80A
Temperatures [deg C]
COIL: 272
CTL: 49
Wednesday, June 12, 2013, 08:19:
Short on TBHT - see attached photo.
T/C logger is is off.
Gas lines closed.
Cooling down target.
Target debiased.
Thursday, June 13, 2013, 08:37: Turbos stopped.
Thursday, June 13, 2013, 09:20: Water lines purged.
Thursday, June 13, 2013, 09:41: Venting
Thursday, June 13, 2013, 10:19: Target removed |
Attachment 1: Photo_2013-06-13_10_33_42_AM.jpg
|
|
315
|
Thursday, June 13, 2013, 10:19 |
Anders Mjos | | | | | | | Done | Pumping down empty chamber | Thursday, June 13, 2013, 10:17: Roughing.
Thursday, June 13, 2013, 10:52: Turbos started
Thursday, June 13, 2013, 11:00 : Both turbos at speed.
Thursday, June 13, 2013, 11:02 : Vacuum at 7.5E-6 Torr
|
317
|
Wednesday, July 10, 2013, 10:21 |
Anders Mjos | SiC#29 | HP-FEBIAD-CTL | ITE | TM4 | 38481-6 | 39956-4 | Done | Testing SiC#29 CTL Target | Wednesday, July 10, 2013, 10:20 : Turbos off. Vacuum at 1.3 E-7 T
Wednesday, July 10, 2013, 11:23: Venting chamber
Wednesday, July 10, 2013, 12:00: Vented
Wednesday, July 10, 2013, 12:38: Roughing
Wednesday, July 10, 2013, 12:54: Pumping on gas lines for 10 min.
Wednesday, July 10, 2013, 12:58: Starting Turbos
Wednesday, July 10, 2013, 13:07 : Both turbos at speed. TP1A timed out one.
Wednesday, July 10, 2013, 13:08 : Vacuum at 1.5E-5 T
T/C connectors removed from HV rack. All connections put to ground.
Thursday, July 11, 2013, 08:43: Opened up cooling water supply. Vacuum stable at 2.2E-7 T
Thursday, July 11, 2013, 08:58: Starting ramp up of TGHT and TBHT to 100A and 50A respectively to verify proper function of the new power supply set-up.
Thursday, July 11, 2013, 09:20: TBHT reached 50A. EPICS read back 51.2A / 0.186V. P/S local read back 51A / 0.20V
Thursday, July 11, 2013, 09:44: BIAS 30kV, EE -800V, EZL 13kV
Thursday, July 11, 2013, 09:44: TGHT reached 100A. EPICS read back 100.2A / 0.488V. P/S local read back 99A / 0.46V
Thursday, July 11, 2013, 09:46: IV4 opened
Thursday, July 11, 2013, 09:53: Starting ramp up of TGHT and TBHT to 500A and 200A respectively
Thursday, July 11, 2013, 10:00: Coil and Anode to 50A and 200V respectively
Thursday, July 11, 2013, 14:59: TGHT and TBHT to 500A and 207A EPICS read back. Local read back 500A and 205A.
Thursday, July 11, 2013, 15:03: Opening gas lines into chamber.
Thursday, July 11, 2013, 15:12: Starting ramp up of TGHT and TBHT to 550A and 220A respectively
Thursday, July 11, 2013, 15:21: Some current on FC0 at TBHT 210A
Thursday, July 11, 2013, 15:25: He leak valve at 5.5
Thursday, July 11, 2013, 16:07: Will leave target in current condition over night and continue the test tomorrow.
Friday, July 12, 2013, 08:25: Target ran without interruptions overnight. Started magnet scan. Masscorr constants had to be reentered after the reboot of EPICS.
Friday, July 12, 2013, 10:30: TMS:Q1 and TMS:Q6 found off. Restarted.
Friday, July 12, 2013, 10:32: Starting TGHT ramp to 580A. Increased EE to -1200V
Friday, July 12, 2013, 10:47: Reached 580A. EPICS 581.7A / 5.724V. PS local 580A / 5.69V.
Friday, July 12, 2013, 10:51: Starting manual ramp of TBHT.
Friday, July 12, 2013, 11:14: Autoramping TBHT to 250A
Friday, July 12, 2013, 11:23: Reached 250A. EPICS 259.6A / 1.934V. PS local 256A / 1.93V
Friday, July 12, 2013, 11:35: Manual ramp. ANODE current @ 2mA seen at TBHT @ 262A.
Friday, July 12, 2013, 11:41: BIAS spark seen on current and vacuum.
Friday, July 12, 2013, 12:09: TBHT:RDCUR at 269A
Friday, July 12, 2013, 13:18:TBHT:RDCUR at 280A.. PS local 277A.
Friday, July 12, 2013, 13:21: EE to -1500V / 510uA
Friday, July 12, 2013, 13:30: Ne leak opened.
Friday, July 12, 2013, 14:12: Mass scan started.
Friday, July 12, 2013, 15:04: A thumb sound and flash was seen. Confirmed with AAPS operator. TMS:SX3 went off. TMS:MB1 does not respond to current adjustments.
Friday, July 12, 2013, 15:53: The source will be left in it's present state over the weekend.
Saturday, July 13, 2013, 07:10: FC0 Bias found off. Restarted. Could be related to sparking.
No further issues over the weekend.
Monday, July 15, 2013, 09:10: Starting mass scan.
Monday, July 15, 2013, 10:39: Magnet at Ne (20 amu). FC6 1.3E-10. Ne gas off: FC6 < 1E-11
Monday, July 15, 2013, 10:45: Ne gas on.
Monday, July 15, 2013, 10:50: EE to 2kV. EE:RDCUR at 684 uA.
Monday, July 15, 2013, 13:27: Manually increasing TBHT to 290A. Local 287A.
Monday, July 15, 2013, 15:07: Cooling down target.
Monday, July 15, 2013, 15:26: COIL off. Gases off (earlier). ANODE off.
Monday, July 15, 2013, 15:31: IV4 closed.
Tuesday, July 16, 2013, 08:21: BIAS, EZL and EE to zero.
Tuesday, July 16, 2013, 08:24: Turbos off. Vacuum at 1.3E-7 T.
Tuesday, July 16, 2013, 15:12: Venting
Tuesday, July 16, 2013, 15:38: Target removed. |
330
|
Friday, August 30, 2013, 15:09 |
Anders Mjos | NiO#2 | HP-FEBIAD | ITE | TM3 | 39530-6 | 39069-4 | Done | Conditioning of NiO#2 | Friday, August 30, 2013, 15:09 : Turbos stopped in preparation for installation.
Friday, August 30, 2013, 16:22: Venting
Friday, August 30, 2013, 17:08: Roughing with NiO#2
Friday, August 30, 2013, 17:27: Starting turbos
Friday, August 30, 2013, 17:35: Turbos at speed
Friday, August 30, 2013, 17:37: Vacuum at 1.9 E-7 T
Monday, September 09, 2013, 14:04: Opened up water. Vacuum stable at 1.5E-7 T
Tuesday, September 10, 2013, 08:59: Pumping out the gas lines.
Tuesday, September 10, 2013, 09:10: Gas lines evacuated.
Tuesday, September 10, 2013, 09:23: TPS:IV4 opened
Tuesday, September 10, 2013, 10:06: TGHT PS was off. Debiased to access el cage.
Tuesday, September 10, 2013, 10:07: EZL/EE/BIAS: 15/2/30 kV 61/674/55 uA
Tuesday, September 10, 2013, 10:08: COIL/ANODE: 50A/200V
Tuesday, September 10, 2013, 10:09: Started target heat to TGHT/TBHT 250/230A
Tuesday, September 10, 2013, 15:12: Started target heat to TGHT 350A (TBHT remains at 230A)
Wednesday, September 11, 2013, 13:06: Heating TGHT to 500A
Thursday, September 12, 2013, 08:44: Heating TGHT to 580A
Thursday, September 12, 2013, 09:39: Heating TBHT to 260A
Thursday, September 12, 2013, 10:06: BIAS sparking occurred at 9:48 TBHT:RDCUR at 256A. Gradually reduced TBHT:RDCUR to 254A. Sparking stopped after ~20 min. ANODE:RDCUR, EE:RDCUR and IG1:RDVAC showed correlated sparking responses. ANODE:RDCUR went to 0 mA and back up after sparking had stopped.
Thursday, September 12, 2013, 10:30: Manually increased TBHT:RDCUR to 260A.
Thursday, September 12, 2013, 11:06: A jump in TBHT:RDVOLT and TBHT:RDCUR at 10:44. Reduced TBHT:RDCUR to 255A
Thursday, September 12, 2013, 12:10: TPS:Q4 was taken out by a spark. Restarted.
Thursday, September 12, 2013, 12:19: EZL to 13 kV
Thursday, September 12, 2013, 13:14: TBHT:RDCUR to 260A
Thursday, September 12, 2013, 13:31: TBHT:RDCUR to 265A. Sparking returns. Lower to 260A
Friday, September 13, 2013, 10:51: Increased TBHT:RDCUR to 265A
Friday, September 13, 2013, 10:58 : Increased TBHT:RDCUR to 270A
Friday, September 13, 2013, 11:05: Some sparking. Lowered EE to 1kV
Friday, September 13, 2013, 11:07 : Increased TBHT:RDCUR to 275A
Friday, September 13, 2013, 11:15 : Increased TBHT:RDCUR to 280A
Friday, September 13, 2013, 11:24 : Increased TBHT:RDCUR to 290A. ANODE:RDCUR 8.5mA. FC0 1.3E-6 A
Friday, September 13, 2013, 11:53: SV5 and SV2 gas lines opened.
Friday, September 13, 2013, 12:05: A spark took out Q4. Restarted.
Friday, September 13, 2013, 12:07: Lowered TBHT:RDCUR to 285A
Friday, September 13, 2013, 13:03: Started mass scan.
Friday, September 13, 2013, 14:27: Lowered TBHT:RDCUR to 280A
Friday, September 13, 2013, 15:01 : Lowered TBHT:RDCUR to 270A
Monday, September 16, 2013, 08:00: Mass scan started.
Monday, September 16, 2013, 09:00: Starting heater ramp down. 2A/min. Gas lines closed.
Monday, September 16, 2013, 13:30: Source off. Target debiased.
Monday, September 16, 2013, 13:56: Turbos stopped
Monday, September 16, 2013, 14:50: Venting. |
Attachment 1: 2013-09-12_NiO#2_TBHT_jump.PNG
|
|
333
|
Monday, September 16, 2013, 17:07 |
Anders Mjos | NiO#2 | HP-FEBIAD | ITE | TM3 | 39530-6 | 39069-4 | Done | Conditioning NiO#2 take 2 | The GE on the Source tray and EE on the target was cleaned. The target will be conditioned again to verify if sparking has been reduced. Torque 120 in lbs
Monday, September 16, 2013, 17:05: Roughing. The roughing pump is somewhat noisy.
Monday, September 16, 2013, 17:26: Starting turbos.
Monday, September 16, 2013, 17:34: Turbos at speed
Monday, September 16, 2013, 17:36: Vacuum at 3.8E-5 T.
Tuesday, September 17, 2013, 08:10: Opened cooling water. Vacuum stable at 6.5E-7. EE flow 4.8 l/min 27.9 C
Tuesday, September 17, 2013, 08:20: Target biased: 30kV, 15kV, -1kV.
Tuesday, September 17, 2013, 08:25: Opening gas line SV5 and Ne SV3 evacuated
Tuesday, September 17, 2013, 08:32: Started auto-ramping to 580A/230A
Tuesday, September 17, 2013, 08:34: Coil to 50A, Anode to 200V (0mA)
Tuesday, September 17, 2013, 08:36: Opened IV4
Tuesday, September 17, 2013, 10:39: EE flow 4.9 l/min 28.5 C
Tuesday, September 17, 2013, 13:05: EE flow 4.9 l/min 28.8 C
Tuesday, September 17, 2013, 15:03: EE flow 4.9 l/min 28.8 C
Tuesday, September 17, 2013, 15:04 :TGHT at 580A, TBHT at 280A.
Tuesday, September 17, 2013, 15:30: TBHT:RDCUR to 290A
Wednesday, September 18, 2013, 08:07: Stared mass scan.
Wednesday, September 18, 2013, 08:08:EE flow 4.9 l/min 28.8 C
Wednesday, September 18, 2013, 09:14: EE to 2kV. Current at 676 uA
Wednesday, September 18, 2013, 09:23: Opened He gas to 6.0. It was later found the SV2 was closed. I.e. no He was supplied to the target.
Wednesday, September 18, 2013, 09:26: Tuning source. EE 0.8kV, EZL 1.3kV
Wednesday, September 18, 2013, 09:32: Started mass scan.
Wednesday, September 18, 2013, 09:55: A jump in BIAS current from 42 to 61 uA. Came down towards 42 after 30 min
Wednesday, September 18, 2013, 10:22: Ramping down heaters at 2A and 2.5A /min
Wednesday, September 18, 2013, 10:23: He and Ne off.
Wednesday, September 18, 2013, 10:48: Gas lines closed.
Wednesday, September 18, 2013, 10:53: EE flow 4.9 l/min 28.5 C
Wednesday, September 18, 2013, 10:55: IV4 closed.
Wednesday, September 18, 2013, 10:59: Target de-biased.
Wednesday, September 18, 2013, 12:18: Heaters off.
Wednesday, September 18, 2013, 12:18: Stopped turbos.
Wednesday, September 18, 2013, 12:56: Started wenting.
Wednesday, September 18, 2013, 13:02: EE flow 4.9 l/min 28.2 C
Wednesday, September 18, 2013, 13:20 : Chamber vented. |
336
|
Wednesday, September 18, 2013, 16:18 |
Anders Mjos | | HP-FEBIAD | | | Tube only | 38307-9 | Done | Test Target - FEBIAD COIL | Wednesday, September 18, 2013, 16:18: Starting turbos
Wednesday, September 18, 2013, 16:26 : Turbos at speed
Wednesday, September 18, 2013, 16:28 : Vacuum at 2.8 E-5 T
Wednesday, September 25, 2013, 15:11
TGHT flow 5.52, temp 28.6
TBHT flow 5.92, temp 28.5
Thursday, September 26, 2013, 09:25: Stopped turbos. Vacuum at 1.4 E-7 T
Friday, September 27, 2013, 08:35
TGHT flow 5.49, temp 28.2
TBHT flow 5.90, temp 28.0
Friday, September 27, 2013, 10:47: Venting |
337
|
Friday, September 27, 2013, 11:41 |
Anders Mjos | Ta#41 | HP-SIS | ITW | TM4 | 39069-5 | 38817-10 | Done | Ta#41 Conditioning | Friday, September 27, 2013, 11:41: Roughing
Friday, September 27, 2013, 12:08: Turbos started
Friday, September 27, 2013, 12:16: Turbos at speed.
Friday, September 27, 2013, 12:18: Vacuum at 1.5E-5 T
Monday, September 30, 2013, 08:41: Opened water supply. Vacuum stable at 1.5E-7 T
TGHT Q=5.5 T=28.0
TBHT Q=5.8 T=28.0
Monday, September 30, 2013, 15:19: Flow sensor moved from TBHT to HS
TGHT Q=5.5 T=27.9
HS Q=3.6 T=27.8
Tuesday, October 01, 2013, 12:08: Taget Biased to 30kV.
Wednesday, October 02, 2013, 08:50: Started autoramping to 580A/230A
Wednesday, October 02, 2013, 08:50: Opened IV4
Wednesday, October 02, 2013, 10:51 TGHT/TBHT 250A / 239A
TGHT Q=5.5 T=28.5
HS Q=3.6 T=29.2
SUPPLY (ext) 27.3
RETURN (ext) 27.8
Wednesday, October 02, 2013, 13:28 TGHT/TBHT 250A / 570A
TGHT Q=5.5 T=30.4
HS Q=3.6 T=33.4
SUPPLY (ext) 27.4
RETURN (ext) 29.3
Wednesday, October 02, 2013, 13:30: TBHT was starting to limit on voltage. Increased voltage limit to 2.4V.
Thursday, October 03, 2013, 08:21: TMS:TP2 timed out over night.
Magnet PS breaker tripped during a mass scan yesterday. Reset breaker and cleared interlocks.
TGHT Q=5.5 T=30.4
HS Q=3.6 T=34.0
SUPPLY (ext) 27.3
RETURN (ext) 29.3
Thursday, October 03, 2013, 08:28: Started mass scan 200 -> 0 m/q. FC0 7.5E-8 A
Thursday, October 03, 2013, 14:29
TGHT Q=5.5 T=30.6
HS Q=3.6 T=33.9
SUPPLY (ext) 27.4
RETURN (ext) 29.6
Thursday, October 03, 2013, 15:14: Lowered TBHT:RDCUR to 230A.
Thursday, October 03, 2013, 15:37: Increased EE to -2000 V
Thursday, October 03, 2013, 16:22
TGHT Q=5.5 T=30.6
HS Q=3.6 T=33.9
SUPPLY (ext) 27.5
RETURN (ext) 29.6
Friday, October 04, 2013, 08:08
TGHT Q=5.5 T=30.6
HS Q=3.5 T=33.9
SUPPLY (ext) 27.5
RETURN (ext) 29.3
Mass scan started.
Friday, October 04, 2013, 08:46: Cool down started.
Friday, October 04, 2013, 13:35: TPS:IV4 closed
Friday, October 04, 2013, 13:41: Source debiased.
Tuesday, October 15, 2013, 09:56: Turbos stopped. Vacuum at 1.15 E-7 T
Tuesday, October 15, 2013, 12:44: Venting
After the conditioning, some oxidation (?) from the standards (?) were found on the Plasma Electrode and around the Target Tube. See attachment |
Attachment 1: Ta#41_EE_After_Test_Stand.pdf
|
|
341
|
Tuesday, October 15, 2013, 16:17 |
Anders Mjos | | | | | | | Done | TGHT and TB HT test bar test | HS line is looped. Cu-test bars installed on TGHT and TBHT. Torqued all bolts to 120 in lbs.
Tuesday, October 15, 2013, 16:17: Roughing
Tuesday, October 15, 2013, 16:39: Turbos started.
Tuesday, October 15, 2013, 16:48: Turbos at speed
Tuesday, October 15, 2013, 16:49: Vacuum at 3.0 E-5 T
Wednesday, October 16, 2013, 08:38: Opened water on HS. Vacuum stable at 5.5E-7 T.
Wednesday, October 16, 2013, 10:12: TBHT to 300A (0.623V) TGHT to 580A (1.443 V)
Wednesday, October 16, 2013, 10:13: Ramping down at 6A/min
Thursday, October 17, 2013, 08:33: Turbos stopped. Vacuum at 2.6E-7 T.
Thursday, October 17, 2013, 10:24: Venting
Turned TGHT Cu-bar 180 deg. Loosened and re-fastened all bolts to 120 in lbs.
Thursday, October 17, 2013, 10:48: Roughing.
Thursday, October 17, 2013, 11:07: Turbos started.
Thursday, October 17, 2013, 11:16: Turbos at speed.
Thursday, October 17, 2013, 11:17: Vacuum at 1.2E-5 T
TGHT and TBHT were brought up to 580A and 300A.
Flow meters connected.
TGHT
T 27.8
Q 5.5
Monday, October 21, 2013, 13:34: Heating TGHT to 580A (1.411 V)
Monday, October 21, 2013, 13:37
TGHT
T 28.9
Q 5.4
Monday, October 21, 2013, 13:40
TGHT
T 29.1
Q 5.5
Monday, October 21, 2013, 13:45
TGHT
T 29.4
Q 5.4
TGHT RDCUR/VOL 581.5A / 1.421 V
Monday, October 21, 2013, 13:47
TGHT RDCUR/VOL 270.6 A / 0.674V
T 28.4
Q 5.4
Monday, October 21, 2013, 13:52
TGHT RDCUR/VOL 270.6 A / 0.674V
T 28.3
Q 5.5
Monday, October 21, 2013, 13:52: TGHT off.
TGHT
T 27.9
Q 5.5
Tuesday, October 22, 2013, 08:09: Stopped turbos. Vacuum at 1.4E-7 T
Tuesday, October 22, 2013, 12:29: Venting
Results in DocuShare collection |
351
|
Wednesday, December 18, 2013, 12:04 |
Anders Mjos | | | | | 40282-5 | 39230-1 | Done | Heating Test | Wednesday, December 18, 2013, 12:04: Turbos stopped
Wednesday, December 18, 2013, 13:19: Venting
Ta-tube installed. All bolts torqued to 130 in lbs
Thermocouples installed.
CH1 1/2: welded outside tube centre - type C
CH2 4/5: inside probe left side - type C
CH3 6/7: inside probe right side - type C
CH4 8/9: welded on leg - type K
Wednesday, December 18, 2013, 14:41: Roughing
Initial temperatures
CH1 28.1
CH2 30.7
CH3 31.3
CH4 31.0
Wednesday, December 18, 2013, 15:50: Starting turbos.
Wednesday, December 18, 2013, 15:58: Turbos at speed.
Wednesday, December 18, 2013, 16:00: Vacuum at 9.3E-6 Torr
Thursday, December 19, 2013, 09:35 : Opened water for HS. Vacuum stable at 2.5E-7 Torr. Flow ~ 3.9 l/min
temperatures
CH1 26.3
CH2 Un
CH3 28.7
CH4 30.5
Thursday, December 19, 2013, 16:50: Ta-tube at 500A ~ 1380 deg C.
temperatures
CH1 33.6
CH2 1319.3
CH3 1443.4
CH4 20.1
Heated to 580A
Friday, December 20, 2013, 10:48: Started cool down at 2A/min.
Friday, December 20, 2013, 15:46: Switched off TGHT. |
354
|
Tuesday, January 14, 2014, 08:58 |
Anders Mjos | | | | | 40282-5 | 39230-1 | Done | Heating Test | Tuesday, January 14, 2014, 08:57: Stopping turbos. Vacuum at 1.2E-7 T
Tuesday, January 14, 2014, 13:32: Venting
Ta-tube installed. All bolts torqued to 130 in lbs
Thermocouples installed. CH2/3 left/right swapped with respect to previous test.
CH1 1/2: welded outside tube centre - type C
CH2 4/5: inside probe right side - type C
CH3 6/7: inside probe left side - type C
CH4 8/9: welded on leg - type K
Tuesday, January 14, 2014, 15:10: Roughing
Tuesday, January 14, 2014, 15:33: Starting turbos.
Tuesday, January 14, 2014, 15:42: Turbos at speed
Tuesday, January 14, 2014, 15:43: Vacuum at 2.3E-5 T
Wednesday, January 15, 2014, 10:32: Opened water. Vacuum stable at 2.9E-7 T.
Monday, January 20, 2014
Started heating the Target-tube.
Pressure increase observed on water supply around 10. Supply ~100psi, return ~7 psi
Tuesday, January 21, 2014
Continue heating from 250 A
Tuesday, January 21, 2014, 15:47: TGHT at 580 A, 7.23 V
Wednesday, January 22, 2014
Target-tube cooled down over night. Will went to investigate TC connections.
Wednesday, January 22, 2014, 08:38 : Turbos stopped. Vacuum at 1.3E-7 T |
363
|
Wednesday, March 12, 2014, 10:20 |
Rick Maharaj | | | | | | | Done | replace heatshield waterline loop | A new Heatshield waterline loop was manufactured and installed to replace the old one which had a leak.
Chamber vacuum currently being roughed down.
Wednesday, March 12, 2014, 10:41: Started turbos.
Wednesday, March 12, 2014, 10:5:0 Turbos at speed. TP1A timed out once.
Wednesday, March 12, 2014, 10:51: Vacuum at 2.6E-5 T.
By AM
Thursday, March 13, 2014, 10:20: Opened water. Vacuum stable at 9.3E-7 T.
Venting chamber to investigate slow pump down.
Thursday, March 13, 2014, 10:21: Stopped turbos.
Thursday, March 13, 2014, 11:15: Venting
By RM
HS loop wiped with methanol, door seals wiped.
Thursday, March 13, 2014, 11:47: Pump down Started
Thursday, March 13, 2014, 12:05: Turbos started
Thursday, March 13, 2014, 12:09: TP1B at speed
Thursday, March 13, 2014, 12:12: TP1A at speed
Thursday, March 13, 2014, 12:13: IG1 turned on Vacuum at 7.2E-06
By AM
Monday, March 17, 2014, 12:55 : Stopped turbos. Vacuum at 2.4E-7 T.
Monday, March 17, 2014, 17:39: Venting
|
369
|
Thursday, April 03, 2014, 16:46 |
Aurelia Laxdal | TiC#4 | HP-SIS | ITE | TM3 | | | Done | HV and Heaters Conditioning | HV and Heaters Conditioning had finished. The target was cooled down and it's ready for the on-line installation. |
Attachment 1: ITE-TM3-TiC#4-HP-SIS_Test_Stand_Conditioning.docx
|
371
|
Friday, April 04, 2014, 17:01 |
Rick Maharaj | UC#9 | LP-SIS | ITW | TM1 | | 39230-3 | Done | Conditioning Heatshield for UCx#9 | Friday, April 04, 2014, 16:26: Heatshield/Ionsource assembly for UC LP SIS installed in test stand with Ta tube as heat load.
Friday, April 04, 2014, 16:29: Chamber roughing started
Friday, April 04, 2014, 16:51: Turbos started
Friday, April 04, 2014, 16:59: TP1B at speed
Friday, April 04, 2014, 17:00: TP1A at speed
Friday, April 04, 2014, 17:00: IG1 Turned on vacuum at 2.8e-05T
Tuesday, April 08, 2014, 10:37: Vacuum 1.8e-07 T - Heatshield water turned on
Tuesday, April 08, 2014, 10:40: No change in vacuum pressure.
Wednesday, April 09, 2014, 11:46: Started heating tght to 200 amps
Wednesday, April 09, 2014, 14:58: Heating increased to 400 amps
Thursday, April 10, 2014, 14:58: Heating increased to 580 amps
By AM
Friday, April 11, 2014, 14:57: Started cool down. Vacuum at 4.2E-7 T
By AM
Wednesday, April 23, 2014, 09:18: Turbos stopped. Vacuum at 1.2E-7 T
Wednesday, April 23, 2014, 13:50: Venting
Wednesday, April 23, 2014, 14:14: Heat Shield removed |
373
|
Wednesday, April 23, 2014, 14:16 |
Anders Mjos | | | | | | | Done | Cu-strip cleaning test - sample #1, not cleaned | Wednesday, April 23, 2014, 14:15: Roughing
Wednesday, April 23, 2014, 14:34 : Starting turbos
Wednesday, April 23, 2014, 14:42 : Turbos at speed
Wednesday, April 23, 2014, 14:44 : Vacuum at 8.3E-6 T
Thursday, April 24, 2014, 09:12: Opened water for HS loop. Vacuum stable at1.6E-7 T
Thursday, April 24, 2014, 09:25: Started heating TGHT to 580A at 2A/min
Thursday, April 24, 2014, 14:07: Aborted autoramping. Cu-strip glowing. Started Target Cooldown.
Monday, April 28, 2014, 08:36: Stopped turobs. Vacuum at 1.2E-7 T |
Attachment 1: Front_2014-04-24_2_05_56_PM.jpg
|
|
Attachment 2: Side_2014-04-24_2_06_12_PM.jpg
|
|
380
|
Tuesday, May 20, 2014, 12:39 |
Anders Mjos | | | | | | | Done | FEBIAD Cathode Negative BIAS configuration | As per ISK4562 Rev 3 and ISK4563 Rev 3
By Ray D. and co. |
|