Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 33 of 53  Not logged in ELOG logo
Entry  Friday, January 20, 2017, 08:45, Aaron Schmidt, , , , , , , Problems/Solutions, TSG:TP1A & TSG:BV1A tripped 
Friday, January 20, 2017, 08:25: TSG : TP1A and TSG : BV1A were noticed to be tripped around 6am.
Friday, January 20, 2017, 08:42: Bypass to restart TSG : TP1A and TSG : BV1A. TP1A is at speed.
Entry  Monday, January 23, 2017, 15:30, Aaron Schmidt, , , , , , , , Pump down empty chamber. 
Monday, January 23, 2017, 15:30: Roughing

Wednesday, January 25, 2017, 09:05: Venting
Entry  Tuesday, January 24, 2017, 14:14, Aaron Schmidt, , , , , , , , Calibrated leak tanks removed 
Tuesday, January 24, 2017, 13:30: Calibrated leak tanks of Argon & Neon removed. Both old Neon tanks were re-installed in their place. 
Entry  Wednesday, January 25, 2017, 09:48, Aaron Schmidt, , , , , 41882-4, 41751-6, Done, Out gas Heat Shield for Target cleaning test 7x
No EE. Insulators, gripper arms, and blank EE plate included
-New grounded 9 pins included in brackets
-TGHT included to out gas Heat shield
Entry  Wednesday, January 25, 2017, 14:54, Aaron Schmidt, , , , , 42218-9, 41751-6, Done, Target cleaning test HP-SIS CC Clean HP-SIS_CC_Clean.docxTS-2017-01-30-11-00.rgaOMEGA_OM-DAQPRO-5300_01-Feb-17_15.36.02.dlp


v\:* {behavior:url(#default#VML);}
o\:* {behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape {behavior:url(#default#VML);}


Target Test (Fully Cleaned vs Crystal Clean only).
Entry  Wednesday, January 25, 2017, 14:55, Aaron Schmidt, , , , , 42218-6, 41751-6, Done, Target cleaning test (Long) HP-SIS Full Clean HP-SIS_Full_Clean.docxOMEGA_OM-DAQPRO-5300_07-Feb-17_09.17.23.dlpTS-2017-02-01-10-40.rgaTS-2017-02-03-08-50.rga


v\:* {behavior:url(#default#VML);}
o\:* {behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape {behavior:url(#default#VML);}








Normal
0




false
false
false
Entry  Wednesday, January 25, 2017, 14:56, Aaron Schmidt, , , , , 42218-14, 41751-6, Done, Target cleaning test LP-SIS CC Clean LP-SIS_CC_Clean.docxTS-2017-02-07-10-40.rgaOMEGA_OM-DAQPRO-5300_09-Feb-17_10.49.31.dlp


v\:* {behavior:url(#default#VML);}
o\:* {behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape {behavior:url(#default#VML);}








Normal
0




false
false
false
Entry  Wednesday, January 25, 2017, 14:57, Aaron Schmidt, , , , , 42218-11, 41751-6, Done, Target cleaning test LP-SIS Full Clean LP-SIS_Full_Clean.docxOMEGA_OM-DAQPRO-5300_15-Feb-17_13.30.42.dlpTS-2017-02-09-10-40.rga


v\:* {behavior:url(#default#VML);}
o\:* {behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape {behavior:url(#default#VML);}








Normal
0




false
false
false
Entry  Monday, February 06, 2017, 09:14, Aaron Schmidt, , , , , , , Problems/Solutions, Power outage. 
Weekend power outage. All turbos were tripped. Epics white out. Control group notified.
Monday, February 06, 2017, 09:07: Turbo pumps TMS : TP2 & TMS : TP6 restarted.
Monday, February 06, 2017, 09:12: TMS: IG6 ion gauge restarted.
Entry  Wednesday, February 15, 2017, 13:42, Aaron Schmidt, , , , , 42218-11, 41751-6, Problems/Solutions, Vacuum Check (Water leak) 
*Vacuum from previous test still active, minus turbo pumps. Same target, & heat shield as well.*
Wednesday, February 15, 2017, 13:38: Both Turbo pumps started.
Wednesday, February 15, 2017, 13:43: Ion gauge on. TP1B @ speed 42 KRPM.
Entry  Tuesday, February 21, 2017, 10:35, Aaron Schmidt, , , , , 42218-11, 41751-6, Problems/Solutions, Water leak (E)(G) 
Water leak found on water block lines (E) & (G) on FS #3.
Both lines were removed at the water blocks and the coil connection at the heat shield. They ends were blanked off.
Tuesday, February 21, 2017, 10:32: Roughing
Entry  Friday, March 10, 2017, 15:42, Aaron Schmidt, UC#19, , , , 41882-4, 41751-2, In progress, Conditioning Heat shield for UC#19 TS-2017-03-10-16-20.rgaOMEGA_OM-DAQPRO-5300_22-Mar-17_09.05.23.dlp
Friday, March 10, 2017, 15:40: Roughing.
Friday, March 10, 2017, 15:58: Turbo pumps started.
Friday, March 10, 2017, 16:19: Ion gauge on.
Entry  Wednesday, March 22, 2017, 09:37, Anders Mjos, , , , , , , , Pump down empty chamber 
Wednesday, March 22, 2017, 09:3: Roughing
Wednesday, March 22, 2017, 10:05: Turbos started

Friday, March 24, 2017, 11:01: Turbos off. Ion gauge off.
Entry  Tuesday, April 04, 2017, 14:33, Aaron Schmidt, , , , , , , , Power supply failure to E-rig 20170330_094009.jpg20170330_094019.jpg20170407_115355.jpg20170407_115223.jpg20170407_115414.jpg
Wednesday, March 29, 2017, 15:15: DAC power supply appears to have failed. Pop sound and electrical smoke/smell noticed.

Tuesday, April 04, 2017, 14:15: Kepco BOP 500M power supply replaced with back up Kepco BOP 500M.
Tuesday, April 04, 2017, 14:32: No response from new power supply. All connections in OK. Further inquiry required.
Entry  Thursday, April 06, 2017, 12:06, Aaron Schmidt, , HP-FEBIAD-CTL, , , , , In progress, Tri-Coil CTL-FEBIAD test 
Thursday, April 06, 2017, 12:06: Roughing.
Thursday, April 06, 2017, 13:07: Turbo pumps on.
Thursday, April 06, 2017, 13:18: Ion gauge on.
Entry  Monday, April 10, 2017, 15:12, Anders Mjos, , , , , , , Problems/Solutions, Vacuum leak on front door 
The vacuum behaved erratic over night with excursion up into the mid 10^-6 Torr range. To investigate the chamber was vented. With the doors open, the
o-rings and sealing surfaces were cleaned. When pumping down again a vacuum leak could be heard at the front door by the lock. The chamber was vented again
twice, finally the two o-rings were swapped. This removed the large leak. The door is prevented from contacting the box at the lock, which is likely the
Entry  Wednesday, April 12, 2017, 16:04, Anders Mjos, , , , , , , Problems/Solutions, Leak on FS#3 COIL and EE 2017-04-12_COIL_Leak_IG1.png2017-04-12_COIL_Leak_RGA.png4-18-2017_TP1B_&_water_leak.docx
A water to vacuum leak has been found on FS#3. The leak is not detected on the leak detector, but can be seen as an increase in vacuum and on partial
water pressure on the RGA
Wednesday, April 12, 2017, 17:11: The leak is on circuit EG (Coil +). Confirmed with water pressure
Entry  Tuesday, April 18, 2017, 07:46, Aaron Schmidt, , , , , , , Problems/Solutions, TSG:TP1B & TSG:BV1B tripped Cooling_&_Turbo_Replacement.docx
Tuesday, April 18, 2017, 07:30: TSG : TP1B Tripped on Saturday.
Tuesday, April 18, 2017, 07:40: TSG : BV1B opened. TSG : TP1B restarted.
Tuesday, April 18, 2017, 07:48:  TSG : TP1B failed to restart.Turn off.
Entry  Tuesday, May 02, 2017, 14:03, Aaron Schmidt, , , , , , , , Pump down empty chamber. (FS#3 out) 20170504_133718.jpg20170504_133723.jpg20170504_133728.jpg20170504_133735.jpg
Check to fit lines FS#3
Tuesday, May 02, 2017, 14:00: Rouging. 

Wednesday, May 03, 2017, 07:07: Venting.
Entry  Thursday, May 04, 2017, 13:49, Aaron Schmidt, UC#20, LP-IG-LIS, , , , , , Conditioning Heat shield for UC#20 (1) UC#20_Heat_shield_conditioning-1.docxTS-2017-05-05-07-35.rga
Thursday, May 04, 2017, 13:48: Roughing.
Thursday, May 04, 2017, 14:09: Turbos on.

Friday, May 05, 2017, 07:35: RGA on. Vacuum @ 1.56e-06T
ELOG V2.9.2-2455