1008
|
Thursday, May 02, 2024, 13:45 |
Dave Neilson | - | LP-SIS | | | 44691-8 | 45235-26 | In progress | Mass marker testing | Wednesday, May 01, 2024, 12:44:
pumped down to rough vacuum, TP1B now on.
Wednesday, May 01, 2024, 12:49: |
|
912
|
Monday, February 28, 2022, 08:08 |
Aaron Schmidt | | LP-SIS | | | | | | Mass marker / Coil-Tube target Test #2 | Installed & roughing Friday.
Monday, February 28, 2022, 08:07:
Turbopump TP1B on. |
|
1047
|
Tuesday, March 11, 2025, 14:36 |
Brady Borrmann | | | | | 44691-8 | 44378-2 | In progress | Mass Marker Test Target | Tuesday, March 11, 2025, 14:36 Roughing.
Target installed.
Tuesday, March 11, 2025, 15:06 TP1B |
|
665
|
Monday, June 04, 2018, 16:02 |
Anders Mjos | | | | | | | Problems/Solutions | MB1 timeout | Mass separator magnet timed out. Tried
reconfigure. Called Kyle from controls who
power cycled the CANbus card. This resolved |
|
293
|
Thursday, April 11, 2013, 08:49 |
Anders Mjos | | | | | | | Problems/Solutions | MB1 Power Supply operational |
|
|
815
|
Tuesday, October 13, 2020, 12:34 |
Aaron Schmidt | | HP-FEBIAD | | | 38295-8 | 42752-5 | In progress | MB1 Check. | He & Ar calibrated leak bottles in.
Tuesday, October 13, 2020, 12:33:
Roughing. |
|
400
|
Wednesday, August 20, 2014, 16:25 |
Anders Mjos | | | | | | | Problems/Solutions | Lost power on TGHT, TBHT and EE simultaniously | Possible controls problem. Breaker 18 found
latched. Can not be re-energized. Burnt smell
in PLC / HV area. e-faut 7561 |
|
112
|
Thursday, June 28, 2012, 11:29 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Lost all cnntrol interface, complete whiteout of the epics system. | |
|
93
|
Wednesday, May 16, 2012, 16:01 |
Anders Mjos | | | | | | | Problems/Solutions | Loose chip of insulator material detected | A chip of insulator material was
detected below the lower target insulator
stand-off (attachment - left picture). The |
|
97
|
Thursday, May 17, 2012, 12:19 |
Anders Mjos | SiC#27 | HP-SIS | ITE | TM4 | | | Problems/Solutions | Loose chip of insulator material detected |
|
|
115
|
Thursday, June 28, 2012, 17:18 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Leave the cathode heater at 275 A overninght. | |
|
362
|
Tuesday, March 11, 2014, 09:03 |
Anders Mjos | | | | | | | Problems/Solutions | Leak on water line for Heat Shield | Tuesday, March 11, 2014, 09:03: Venting
to investigate |
|
578
|
Wednesday, April 12, 2017, 16:04 |
Anders Mjos | | | | | | | Problems/Solutions | Leak on FS#3 COIL and EE | A water to vacuum leak has been found on
FS#3. The leak is not detected on the leak
detector, but can be seen as an increase |
  |
416
|
Thursday, December 18, 2014, 16:38 |
Anders Mjos | | | | | | | Problems/Solutions | Leak found on service cap F/T Q 9 pin connector | Largest response on the bottom of the insulator.
Thursday, December 18, 2014, 16:39:
Closing pumping valves. Will allow system |
 |
921
|
Thursday, April 21, 2022, 13:38 |
Aaron Schmidt | | | | | | | Problems/Solutions | Leak checks | https://elog.triumf.ca/TIS/Test-Stand/919
Vacuum Group LD#1
(A) Top feed through fittings upgraded |
|
150
|
Thursday, July 19, 2012, 08:42 |
Anders Mjos | | | | | | | Problems/Solutions | Leak checking source chamber - leak found on front door | Due to high vacuum a leak check will be
done on the system.
Thursday, July 19, 2012, 09:00 : |
|
851
|
Tuesday, February 16, 2021, 14:52 |
Fernando Maldonado | | | | | | | Problems/Solutions | Leak checking gas lines. | Vacuum side
Tuesday, February 16, 2021, 13:42:
The gas lines inside have been check. The |
|
154
|
Thursday, July 19, 2012, 12:59 |
Anders Mjos | | | | | | | Problems/Solutions | Leak checking doors - no response | Thursday, July 19, 2012, 12:57: Doors leak
checked. No response. Base rate 1.6E-8 atm-cc/sec.
TP pressuer 0.0E-4 Torr . TSGIG1 4.2E-6 Torr. |
|
242
|
Wednesday, December 05, 2012, 11:18 |
Anders Mjos | | | | | | | In progress | Leak checking 9-pin feed through | Vacuum at 4.4E-7T
Base leak rate 2 - 3 E-9 mbar-l/sec
No response above background. |
|
239
|
Monday, December 03, 2012, 15:33 |
Anders Mjos | | | | | | | In progress | Leak check of 9-pin feed through | Base leak rate 6 - 7 E-9 mbar-l/s
A leak was found around the 9-pin
feed through. |
|