  1031   Thursday, November 28, 2024, 11:47 Isaiah Rabuka      In progressHeating Stage Pellet Testing and DevelopmentOpened the ATTS, placed what I will call
“Cast Alumina Sample #1” into
the ATTS and activated the roughing then
  
  1041   Tuesday, December 17, 2024, 09:46 Dave Neilson     45235-26In progressSIS P2N source cup testingMonday, December 16, 2024, 3:34   Target
loaded in test stand. Confirmed correct connection
to mass marker power supply through multipin.
  
  1044   Tuesday, January 07, 2025, 17:06 Dave Neilson LP-FEBIAD  44692-442972-10In progressFEBIAD development Tuesday, January 07, 2025, 16:00
-  Target assembly installed in test
stand. electrical connections assessed:
  
  5   Thursday, September 15, 2011, 13:46 Anders MjosFEBIAD TestHP-FEBIAD    FailedFEBIAD Broken TubeSee attached file for photos of the broken
tube 
 FEBIAD_Broken_Tube.pdf 
  31   Wednesday, February 08, 2012, 17:39 Friedhelm Ames      FailedTSG:TP1B failureBoth turbo pumps at the source box were
found off. TSG:TP1A has been started normally.
TSG:TP1B does not spin up above 3KRPM even
  
  32   Wednesday, February 08, 2012, 18:16 Friedhelm Ames      FailedTSG:TP1B and TSG:TP1A failure


   
        
            
  
  52   Monday, March 05, 2012, 19:31 Friedhelm Ames      Failedturbo pumps failedBoth turbo pumps at the source box cannot
be started. A fault report has been issued.
  
  70   Wednesday, April 11, 2012, 09:30 Friedhelm Ames      FailedTSGRP1 poor vacuumThe backing pressure at TSGRP1 does not
go below 578 mT. Fault report to vacuum.
  
  220   Wednesday, October 10, 2012, 10:47 Friedhelm Ames      Failedfound teststand tripped offturbo pumps in source section and all ion
gauges off all optics and heaters tripped.
Reason unknown.
  
  221   Wednesday, October 10, 2012, 17:35 Aurelia Laxdal      Failedfound teststand tripped off

    

       
            
  
  843   Monday, February 01, 2021, 08:38 Fernando Maldonado LP-SIS  44139-10 44378-2 FailedEnergy spread calibrationMonday, February 01, 2021, 08:38 : The
anode seems to be shorted but we can still
test the  amount of dispersion at the
 ESC_-_Jan_29_start.docxESC_-__Feb_3_start.docxER-580-230-30kV-m7.txtEr-580-230-30kV-m133.txt 
  846   Monday, February 08, 2021, 09:20 Aaron Schmidt LP-SIS  44139-1044378-2FailedEnergy spread calibration with SIS. No PERe-salted. PE removed. EE Cleaned
Monday, February 08, 2021, 09:17:
Roughing.
 ESC_-_Feb_8_Start.docx 
  848   Wednesday, February 10, 2021, 09:49 Aaron Schmidt LP-SIS  44691-844378-2 / 44378-3FailedEnergy spread calibration with SISNote* target has a ring on the TGHT - Right
leg. EE & PE placed. Target to HS OL
- OK.
 spark_inside_chamber_roof.pngspark_inside_chamber_front_view.png 
  850   Friday, February 12, 2021, 16:38 Fernando Maldonado      FailedFEBIAD parameter scan - efficiency measurements - energy spread.Friday, February 12, 2021, 16:37: FEBIAD
installed with mechanical calibrated leak
Friday, February 12, 2021, 16:38:
  
  855   Thursday, February 18, 2021, 16:48 Fernando Maldonado      FailedFEBIAD parameter scansThursday, February 18, 2021, 15:19: Gas
lines roughed and refilled. Gauge reads -50
kPa. Absolute pressure is 50 kPa.
  
  856   Friday, February 19, 2021, 13:44 Fernando Maldonado      FailedFEBIAD parameter scansFriday, February 19, 2021, 13:28: Roughing
Friday, February 19, 2021, 13:43:
Power on
 GND-COIL_spark.jpgGND-HS_spark.jpg 
  880   Monday, June 21, 2021, 11:53 Aaron SchmidtTa#62LP-SISITETM444139-1044378-4FailedTa#62 Conditioning - 2Replace 9-pin back to normal grounded setup.
Re-salt Ta#62. (Cu Gaskets in-use on FS#5)
Monday, June 21, 2021, 11:30: Roughing
 Ta#62_Conditioning_-_2.docx 
  884   Wednesday, June 30, 2021, 19:08 Fernando Maldonado LP-FEBIAD    FailedFEBIAD parameter scan - efficiency measurements Wednesday, June 30, 2021, 19:08: Roughing

Thursday, July 01, 2021,
08:57: Turbos on 
 anomalous-ionization-regime.pngFernando_screenshots.docx 
  885   Thursday, July 22, 2021, 17:43 Fernando Maldonado LP-FEBIAD  41790-1044378-5FailedFEBIAD efficiency measurements Thursday, July 22, 2021, 17:43: Roughing
New argon gas bottle installed.
Thursday, July 22, 2021, 18:16: Turbos
  
  886   Monday, July 26, 2021, 17:35 Fernando Maldonado LP-FEBIAD  41790-1044378-5FailedFEBIAD efficiency measurements. Monday, July 26, 2021, 17:23: Roughing
Monday, July 26, 2021, 17:55: Turbos