504
|
Friday, April 15, 2016, 16:07 |
Anders Mjos | | | | | | | Problems/Solutions | ANODE polarity switched to positive | to test the effect of extraction when biasing
of the target. |
|
503
|
Wednesday, April 13, 2016, 13:03 |
Aaron Schmidt | | LP-SIS | | | 41790-2 | 39956-8 | | Testing restraint insulator prototype (2) | Wednesday, April 13, 2016, 13:03: Begin
roughing. (Plasma electrode in. Salts in)
Wednesday, April 13, 2016, 13:34: |
|
502
|
Monday, April 04, 2016, 11:33 |
Aaron Schmidt | | LP-SIS | | | 41790-2 | 39956-8 | In progress | Testing restraint insulator prototype | Monday, April 04, 2016, 11:31: Begin roughing.
(No plasma electrode)
Monday, April 04, 2016, 12:47: Started |
|
501
|
Wednesday, March 30, 2016, 16:32 |
Aaron Schmidt | Ta#47 | LP-SIS | ITE | TM4 | 41790-1 | 41120-05 | In progress | Conditioning Ta#47 | Wednesday, March 30, 2016, 16:31: Roughing.
Wednesday, March 30, 2016, 17:34
: Turbos started -AM |
|
500
|
Tuesday, March 29, 2016, 14:44 |
Aaron Schmidt | | | | | | | | Pumping down empty chamber. | Tuesday, March 29, 2016, 14:43: Roughing.
Wednesday, March 30,
2016, 14:33: Venting -AM |
|
499
|
Wednesday, March 16, 2016, 09:59 |
Anders Mjos | Target tube only | | | TM1 | 39459-2 | 40898-2 | In progress | Conditiong Heat Shield for UC#15 | Back up heat shield for UC#15
Wednesday, March 16, 2016, 09:58:
Roughing |
|
498
|
Friday, March 11, 2016, 15:46 |
Anders Mjos | | | | | | | In progress | Testing end cap leak tightness | Two Ta-tubes sealed with 2 end caps each
placed in the vacuum chamber.
Friday, March 11, 2016, 15:03: Rouging |
|
497
|
Friday, March 04, 2016, 14:23 |
Anders Mjos | Target tube only | LP-SIS | ITW | TM2 | 39459-2 | 41120-10 | In progress | Conditiong Heat Shield for UC#15 | Friday, March 04, 2016, 14:20: Roughing
Friday, March 04, 2016, 15:05: Turbos
started |
|
496
|
Wednesday, March 02, 2016, 12:08 |
Anders Mjos | | | | | | | Problems/Solutions | TGHT insulator broken | The insulator for the TGHT terminals
cracked during an attempt to remove a seized
bolt.The right TGHT block was removed with |
|
495
|
Tuesday, February 23, 2016, 10:43 |
Anders Mjos | SiC | LP-SIS | | | 41077-3 | | | EE coating test - no Plasma Electrode | Cleaned up EE and around target tube. Removed
PE
Tuesday, February 23, 2016, 10:40: |
|
494
|
Friday, January 22, 2016, 15:34 |
Anders Mjos | SiC | LP-SIS | | | 41077-3 | | In progress | EE coating test | Friday, January 22, 2016, 15:30: Turbos
started
Friday, January 22, 2016, 16:14: |
|
493
|
Friday, January 22, 2016, 13:35 |
Aurelia Laxdal | | | | | | | Problems/Solutions | TSG:RP1 nor performing |
|
|
492
|
Friday, January 22, 2016, 11:07 |
Anders Mjos | | | | | | | In progress | Venting | Friday, January 22, 2016, 11:07:
Stopped turbos |
|
491
|
Thursday, January 21, 2016, 13:04 |
Aurelia Laxdal | | | | | | | Problems/Solutions | TSG:RP1 nor performing |
|
|
490
|
Wednesday, January 20, 2016, 19:11 |
Aurelia Laxdal | | | | | | | Problems/Solutions | TSG:RP1 nor performing |
|
|
489
|
Wednesday, January 20, 2016, 14:26 |
Aurelia Laxdal | | | | | | | Problems/Solutions | TSG:RP1 nor performing |
|
|
488
|
Tuesday, January 19, 2016, 18:34 |
Aurelia Laxdal | | | | | | | Problems/Solutions | TSG:RP1 nor performing |
|
|
487
|
Monday, January 18, 2016, 15:38 |
Aurelia Laxdal | | | | | | | Problems/Solutions | TSG:RP1 nor performing |
|
|
486
|
Monday, January 18, 2016, 08:41 |
Anders Mjos | | | | | | | Problems/Solutions | TSG:RP1 nor performing | The pump failed to pump down below 2 Torr.
on Friday 15th E-fault 8680 submitted. Vacuum
group will replace the pump today |
|
485
|
Monday, January 11, 2016, 09:02 |
Anders Mjos | | | | | | | | Venting | Monday, January 11, 2016, 09:02: Turbos
stopped.
Monday, January 11, 2016, 12:58: |
|
|