ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  504   Friday, April 15, 2016, 16:07 Anders Mjos      Problems/SolutionsANODE polarity switched to positiveto test the effect of extraction when biasing
of the target.
  
  503   Wednesday, April 13, 2016, 13:03 Aaron Schmidt LP-SIS  41790-239956-8 Testing restraint insulator prototype (2)Wednesday, April 13, 2016, 13:03: Begin
roughing. (Plasma electrode in. Salts in)
Wednesday, April 13, 2016, 13:34:
 Anode_Voltage_and_EE_(neg_bias).xlsxAnode_Voltage_and_EE_(pos_bias).xlsxRP#1_(2).docx 
  502   Monday, April 04, 2016, 11:33 Aaron Schmidt LP-SIS  41790-239956-8In progressTesting restraint insulator prototypeMonday, April 04, 2016, 11:31: Begin roughing.
(No plasma electrode)
Monday, April 04, 2016, 12:47: Started
 Anode_Voltage_VS_Current.xlsxTS-2016-04-05_Restraint_Test.rgaTS-2016-04-13_Restraint_Test.rgaRP#1.docx 
  501   Wednesday, March 30, 2016, 16:32 Aaron SchmidtTa#47LP-SISITETM441790-141120-05In progressConditioning Ta#47Wednesday, March 30, 2016, 16:31: Roughing.
Wednesday, March 30, 2016, 17:34
: Turbos started -AM
 TS-2016-03-30_Ta#47.rgaER-580-230-30kV-m23.txtER-580-230-30kV-m27.txtITE-TM4-Ta#47-LP-SIS_Test_Stand.docxTa#47.docx 
  500   Tuesday, March 29, 2016, 14:44 Aaron Schmidt       Pumping down empty chamber.Tuesday, March 29, 2016, 14:43: Roughing.

 Wednesday, March 30,
2016, 14:33: Venting   -AM
  
  499   Wednesday, March 16, 2016, 09:59 Anders MjosTarget tube only  TM139459-240898-2In progressConditiong Heat Shield for UC#15Back up heat shield for UC#15
Wednesday, March 16, 2016, 09:58:
Roughing
  
  498   Friday, March 11, 2016, 15:46 Anders Mjos      In progressTesting end cap leak tightnessTwo Ta-tubes sealed with 2 end caps each
placed in the vacuum chamber. 
Friday, March 11, 2016, 15:03: Rouging
  
  497   Friday, March 04, 2016, 14:23 Anders MjosTarget tube onlyLP-SISITWTM239459-241120-10In progressConditiong Heat Shield for UC#15Friday, March 04, 2016, 14:20: Roughing
Friday, March 04, 2016, 15:05: Turbos
started
  
  496   Wednesday, March 02, 2016, 12:08 Anders Mjos      Problems/SolutionsTGHT insulator broken The insulator for the TGHT terminals
cracked during an attempt to remove a seized
bolt.The right TGHT block was removed with
  
  495   Tuesday, February 23, 2016, 10:43 Anders MjosSiCLP-SIS  41077-3  EE coating test - no Plasma ElectrodeCleaned up EE and around target tube. Removed
PE
Tuesday, February 23, 2016, 10:40:
  
  494   Friday, January 22, 2016, 15:34 Anders MjosSiCLP-SIS  41077-3 In progressEE coating testFriday, January 22, 2016, 15:30: Turbos
started
Friday, January 22, 2016, 16:14:
 2016-02-14_EE_V_limit.png 
  493   Friday, January 22, 2016, 13:35 Aurelia Laxdal      Problems/SolutionsTSG:RP1 nor performing

    

       
            
  
  492   Friday, January 22, 2016, 11:07 Anders Mjos      In progressVenting Friday, January 22, 2016, 11:07:
Stopped turbos
  
  491   Thursday, January 21, 2016, 13:04 Aurelia Laxdal      Problems/SolutionsTSG:RP1 nor performing

    

       
            
  
  490   Wednesday, January 20, 2016, 19:11 Aurelia Laxdal      Problems/SolutionsTSG:RP1 nor performing

    

       
            
  
  489   Wednesday, January 20, 2016, 14:26 Aurelia Laxdal      Problems/SolutionsTSG:RP1 nor performing

    

       
            
  
  488   Tuesday, January 19, 2016, 18:34 Aurelia Laxdal      Problems/SolutionsTSG:RP1 nor performing

    

       
            
  
  487   Monday, January 18, 2016, 15:38 Aurelia Laxdal      Problems/SolutionsTSG:RP1 nor performing

    

       
            
 2016-01-18_Pumping_on_Ta46Clone_(leak_at_Lid-Base_HS).png 
  486   Monday, January 18, 2016, 08:41 Anders Mjos      Problems/SolutionsTSG:RP1 nor performingThe pump failed to pump down below 2 Torr.
on Friday 15th E-fault 8680 submitted. Vacuum
group will replace the pump today
  
  485   Monday, January 11, 2016, 09:02 Anders Mjos       VentingMonday, January 11, 2016, 09:02: Turbos
stopped.
Monday, January 11, 2016, 12:58:
  