  372   Wednesday, April 23, 2014, 09:37 Anders Mjos      Problems/SolutionsStarted Sources archiver

The archiver was not running

  373   Wednesday, April 23, 2014, 14:16 Anders Mjos      DoneCu-strip cleaning test - sample #1, not cleaned

Wednesday, April 23, 2014, 14:15: Roughing

Wednesday, April 23, 2014, 14:34 : Starting turbos

Wednesday, April 23, 2014, 14:42 : Turbos at speed

Wednesday, April 23, 2014, 14:44 : Vacuum at 8.3E-6 T


Thursday, April 24, 2014, 09:12: Opened water for HS loop. Vacuum stable at1.6E-7 T

Thursday, April 24, 2014, 09:25: Started heating TGHT to 580A at 2A/min

Thursday, April 24, 2014, 14:07: Aborted autoramping. Cu-strip glowing. Started Target Cooldown.


Monday, April 28, 2014, 08:36: Stopped turobs. Vacuum at 1.2E-7 T

Attachment 1: Front_2014-04-24_2_05_56_PM.jpg
Front_2014-04-24_2_05_56_PM.jpg
Attachment 2: Side_2014-04-24_2_06_12_PM.jpg
Side_2014-04-24_2_06_12_PM.jpg
  374   Monday, April 28, 2014, 10:23 Anders Mjos      In progressCu-strip cleaning test - sample #2, cleaned

Monday, April 28, 2014, 10:23: Started roughing

Monday, April 28, 2014, 10:48: Started turbos. CG1 at ~0.3 T 

Monday, April 28, 2014, 10:56 : Turbos at speed

Monday, April 28, 2014, 10:58 : Vacuum at 7.2E-6 T


Tuesday, April 29, 2014, 09:15: Vacuum over night was somewhat erratic with a couple of excursions. Venting to redo door seal and inspect chamber. 

Tuesday, April 29, 2014, 13:18: Venting 

Aborted venting.


Wednesday, April 30, 2014, 10:15: Vented. Cleaned front door o-ring and groove. Inspected VCR joint on HS water loop. No visible issues.

Wednesday, April 30, 2014, 10:15: Roughing

Wednesday, April 30, 2014, 10:35 : Starting turbos

Wednesday, April 30, 2014, 10:44 : Turbos at speed

Wednesday, April 30, 2014, 10:45 : Vacuum at 6.5E-6 T


Thursday, May 01, 2014, 08:44: Vacuum erratic over night. Small burst of pressure increase in vacuum with ~2 hours intervals. Leak found on HS cooling circuit by purging the water line.

Thursday, May 01, 2014, 08:46: Stopping turbos. Vacuum at 2.7E-7 T

HS water line should be purged again before breaking VCR seal.

Thursday, May 01, 2014, 09:59: Venting

Thursday, May 01, 2014, 10:45: Removed HS loop.

Thursday, May 01, 2014, 10:45: Roughing

Thursday, May 01, 2014, 11:11: Starting turbos. CG1 ~ 0.1 T

Thursday, May 01, 2014, 11:19: Turbos at speed

Thursday, May 01, 2014, 11:21 : Vacuum at 5.2E-6 T


Monday, May 12, 2014, 10:03  : Turbos stopped. Vacuum at 1.22 E-7 T

Monday, May 12, 2014, 13:34: Venting

 

  375   Thursday, May 08, 2014, 15:09 Anders Mjos      Problems/SolutionsSOURCES archiver reported stopped

 Archiver restarted.

  376   Friday, May 09, 2014, 10:48 Anders Mjos      Problems/SolutionsEPICS white-out e-fault 7380

Monday, May 12, 2014, 10:02: Jane R. power cycled the hardware. EPICS is back up. Sources archiver required a restart.

  377   Monday, May 12, 2014, 14:20 Anders MjosSiC#30HP-FEBIADITETM338481-839956-5In progressConditioning SiC#30

Monday, May 12, 2014, 14:14 : Roughing

Monday, May 12, 2014, 14:34: Starting turbos

Monday, May 12, 2014, 14:42 : Turbos at speed

Monday, May 12, 2014, 14:44 : Vacuum at  1.7E-5 T


Tuesday, May 13, 2014, 10:51: Opened water for HS circuit. Vacuum stable at 2.2E-7 T. Minor spike to 2.5E-7 T for 10 s.

Tuesday, May 13, 2014, 10:54: Roughing out gas lines.

Tuesday, May 13, 2014, 11:30: Opening SV5 and SV2 to evacuate gas lines completely.

Tuesday, May 13, 2014, 11:58: BIAS to 30kV, EZL to 13 kV. EE to 1.5 kV.

Tuesday, May 13, 2014, 11:59: Opening isolation valve

Tuesday, May 13, 2014, 12:12: Started heating to 450A / 200A TGHT / TBHT.


Target heating stopped at 167 A - likely caused by network problems. Multiple gaps in strip tool. Indicating lost network connection.

Wednesday, May 14, 2014, 10:07: Resuming heating to 450A / 200A TGHT / TBHT (EPICS 170A)

Wednesday, May 14, 2014, 10:12: De-biasing to investigate ANODE/CATHODE BIAS

Switched ON ANODE/CATHODE BIAS PS.

Wednesday, May 14, 2014, 10:22: BIAS to 30kV, EZL to 13 kV. EE to 1.5 kV.

Wednesday, May 14, 2014, 16:07: Continue heating TGHT to 500A

Wednesday, May 14, 2014, 16:33: TGHT at 500A. TBHT at 203 A.


Thursday, May 15, 2014, 14:57: Switched OFF/ON IOC to recover from white-out.

Thursday, May 15, 2014, 15:51: Started heating to 550A / 240A 


COIL to 50A
ANODE to 200V
TGHT to 580A
TBHT to 280A

Friday, May 16, 2014, 11:28  : Opening Ne

Friday, May 16, 2014, 11:56: TBHT to 290 A

Friday, May 16, 2014, 14:12: Started cool down. ANODE/CATHODE Bias requires reconfiguration.


Tuesday, May 20, 2014, 11:10: Ray and co is checking the configuration and troubleshooting the burnt off GND connection. The Test Stand will be configured to CATHODE negative BIAS.

Tuesday, May 20, 2014, 12:35: BIAS, EZL, EE, COIL, ANODE ON.

Tuesday, May 20, 2014, 12:35: Gas lines pumped.

Tuesday, May 20, 2014, 12:35: Auto heating to 240A/500A at 1A/2A /min.

Tuesday, May 20, 2014, 12:44: IV4 opened 

Attachment 1: SiC#30_Conditioning.docx
  378   Thursday, May 15, 2014, 14:58 Anders Mjos      Problems/SolutionsIOC rebooted to recover from white-out.

Restarted archivers.

  379   Tuesday, May 20, 2014, 11:17 Anders Mjos      Problems/SolutionsBurnt off GND connection on Service Cap

The ground connection between B and F (ISK4523D Rev 6) was found burnt off. It will be switched out as per CATHODE BIAS configuration (ISK4563D Rev 3) by Ray D.

  380   Tuesday, May 20, 2014, 12:39 Anders Mjos      DoneFEBIAD Cathode Negative BIAS configuration

As per ISK4562 Rev 3 and ISK4563 Rev 3

By Ray D. and co.

  383   Thursday, June 12, 2014, 09:28 Anders Mjos      Problems/SolutionsElevated backing pressure on ISAC Test Stand TMS:RP2

Anders Mjos wrote:

The performance of the roughing pump has gradually gone down. Notably after the system has been vented. See attached screenshot from the archiver.

E-fault 7258.

 

 Edi replaced the backing pump on June 5th.

  384   Friday, June 13, 2014, 08:43 Anders MjosSiC#30HP-FEBIADITETM338481-839956-5DoneSiC#30 HV and Heaters Conditioning

Aurelia Laxdal wrote:

HV and Heaters Conditioning for SiC#30 was completed Friday, May 23, 2014. The target was cooled down and it's ready for the on-line installation.

 Friday, June 13, 2014, 08:43: Turbos stopped. Vacuum at 1.2E-7 T


Monday, June 16, 2014, 08:26: Venting. Water purged.

Monday, June 16, 2014, 09:00: Target removed

  385   Monday, June 16, 2014, 09:12 Anders Mjos      In progressEmpty chamber

Monday, June 16, 2014, 09:12: Roughing


Tuesday, June 17, 2014, 14:38: Venting 

  386   Tuesday, June 17, 2014, 15:22 Anders MjosSiC#30HP-FEBIADITETM338481-839956-5In progressSiC#30 HV and Heaters Conditioning

Anders Mjos wrote:

Aurelia Laxdal wrote:

HV and Heaters Conditioning for SiC#30 was completed Friday, May 23, 2014. The target was cooled down and it's ready for the on-line installation.

 Friday, June 13, 2014, 08:43: Turbos stopped. Vacuum at 1.2E-7 T


Monday, June 16, 2014, 08:26: Venting. Water purged.

Monday, June 16, 2014, 09:00: Target removed

The target assembly did not pass the megger test between anode and heat shield after the previous conditioning. The AlN insulators were found to have failed during the conditioning. The coil insulation was burnt. AlN insulators and anode ware replaced.

Tuesday, June 17, 2014, 15:22: Roughing

By R.M.

Tuesday, June 17, 2014, 15:52: Turbos Started

Tuesday, June 17, 2014, 15:54: TP1B at speed

Tuesday, June 17, 2014, 15:57: IG1 Turned on  1.92e-05T

Tuesday, June 17, 2014, 15:59: TP1A at speed

Tuesday, June 17, 2014, 15:59: IG1 1.31e-05T


By AM

Wednesday, June 18, 2014, 08:24: Opened HS water circuit. Vacuum stable at 2.2E-7 T.

Wednesday, June 18, 2014, 08:40: Pumping on gas lines.

Wednesday, June 18, 2014, 08:49: Closed pump valve on gas lines.

Wednesday, June 18, 2014, 08:51: Opening TSH:SV5

Wednesday, June 18, 2014, 08:53: Opening TSH:SV2

Wednesday, June 18, 2014, 09:00: BIAS/ EZL / EE 30 / 13 / -1.5 kV

Wednesday, June 18, 2014, 09:04: Starting target heating to 500 / 240 A

Wednesday, June 18, 2014, 09:07: COIL to 50 A. ANODE to 200 V

Wednesday, June 18, 2014, 09:33: OPEN TPS:IV4 

Wednesday, June 18, 2014, 14:05: TBHT at 240 A 2.6 V. TGHT still ramping (403 A)

Wednesday, June 18, 2014, 15:03: TGHT at 500 A 4.5 V 


Thursday, June 19, 2014, 08:51: Ramping to 580 A / 265 A

Thursday, June 19, 2014, 09:37: Continue ramping TBHT to 290A

Thursday, June 19, 2014, 09:44: 8E-8 A on FC0

Thursday, June 19, 2014, 10:52: TBHT at 305A. Running mass scan.

Thursday, June 19, 2014, 11:36: Opening for He.

Thursday, June 19, 2014, 11:46: Opening for Ne.

Thursday, June 19, 2014, 11:54: Lowering TBHT to 300 A

Thursday, June 19, 2014, 13:01: Mass scan. ~1E-10 A Ne current on FC6 with Ne open.

Thursday, June 19, 2014, 15:06: Mass scan up.

Thursday, June 19, 2014, 16:00: Mass scan down.

Thursday, June 19, 2014, 16:49: Started cooling down target.


Friday, June 20, 2014, 08:53: Target de-biased. Turbos off.

Friday, June 20, 2014, 10:23: Venting. Purging water from  HS circuit.

Attachment 1: SiC#30_Conditioning_3rd_time.docx
  387   Wednesday, June 18, 2014, 09:23 Anders Mjos      Problems/SolutionsTSH:MB1 Trip & MB1 June 10th water leak

A water leak on MB1 was found and reported by operations on June 10th e fault 7429

MB1 can not be switched on due to an TSH:MB1 water flow trip. Paddle wheel is rotating.

Wednesday, June 18, 2014, 14:03: Paddle wheel replaced with a used one from beam lines. Model SST150. Signal recovered.

  388   Thursday, June 19, 2014, 10:48 Anders Mjos      Problems/SolutionsFC0 did not retract from beam line

Upon inspection it was found that the bolt attaching the FC to the actuator had fallen off. The bolt was reattached and FC0 can be actuated in/out again.

  389   Friday, June 20, 2014, 11:44 Anders Mjos      In progressPumping down empty chamber

Friday, June 20, 2014, 11:44: Roughing

Friday, June 20, 2014, 13:00: Strarting turbos 

Friday, June 20, 2014, 13:09: Turbos at speed.

Friday, June 20, 2014, 13:10 : Vacuum at 1.3E-5


Thursday, June 26, 2014, 08:52 : Turbos stopped. Vacuum at 1.3E-7 T

Thursday, June 26, 2014, 15:34: Venting 

  390   Thursday, June 26, 2014, 16:32 Anders MjosTa#43LP-SISITWTM140282-239230-6In progressConditioning Ta#43

Thursday, June 26, 2014, 16:31: Roughing.

Thursday, June 26, 2014, 16:51: Starting turbos. 

Thursday, June 26, 2014, 16:59: Turbos at speed.

Thursday, June 26, 2014, 17:01: Vacuum at 1.2E-5 T


Friday, June 27, 2014, 08:39: Opened HS cooling line. Vacuum stable at 1.9E-7 T


Wednesday, July 02, 2014, 10:24: Vacuum at 1.3E-7 T

Wednesday, July 02, 2014, 10:31: BIAS / EE / EZL to 30 / 1.5 / 14 kV

Wednesday, July 02, 2014, 10:32: Opened TPS:IV4

Wednesday, July 02, 2014, 10:36: Started heating TGHT / TBHT to 400 A / 155 A

Wednesday, July 02, 2014, 14:00: Heating finished for today.


Thursday, July 03, 2014, 08:09 : Resuming heating TGHT / TBHT to 580 A / 200 A. Vacuum at 2.1E-7 T

Thursday, July 03, 2014, 09:17: TGHT voltage limiting. Stopped and restarted heating. 

Thursday, July 03, 2014, 12:51 : Heating TBHT to 230 A

Thursday, July 03, 2014, 13:18: TBHT at 227 A (local readback). Started mass scan.

Thursday, July 03, 2014, 15:39: Lowering TBHT to 218 A (local).


Friday, July 04, 2014, 11:00: Heated to 230 A.

Friday, July 04, 2014, 15:40: Q1/Q6 found off. 

Friday, July 04, 2014, 15:42 : Starting cool down.


Monday, July 07, 2014, 09:24 : Closed TPS:IV4

Monday, July 07, 2014, 09:24: EE conditioning to -2kV 

Monday, July 07, 2014, 10:02: BIAS off. Turbos off. 


Tuesday, July 08, 2014, 08:13: Venting

Attachment 1: Ta#43_Conditioning.docx
  391   Tuesday, July 08, 2014, 09:05 Anders Mjos      In progressEmpty chamber

Tuesday, July 08, 2014, 09:05: Roughing

Tuesday, July 08, 2014, 13:23: Starting turbos

Tuesday, July 08, 2014, 13:30 : Turbos at speed

Tuesday, July 08, 2014, 13:33 : Vacuum at 2.8E-6 T

  392   Wednesday, July 09, 2014, 14:08 Anders Mjos      Problems/SolutionsFEBIAD ANODE current readback

The read back of the ANODE current was confirmed to be working today with help of Ray D. using a 1kOhm resistor. There is an offset in the read back which can explain why no current was seen on SiC#30. The resistor between CATHODE and GND was changed from 100 kOhm to 50kOhm.

  393   Friday, July 18, 2014, 08:19 Anders Mjos       Venting

Friday, July 18, 2014, 08:19: Stopped turbos

Friday, July 18, 2014, 10:58: Venting

ELOG V2.9.2-2455