Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 27 of 53  Not logged in ELOG logo
ID Date Authordown Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  362   Tuesday, March 11, 2014, 09:03 Anders Mjos      Problems/SolutionsLeak on water line for Heat ShieldTuesday, March 11, 2014, 09:03: Venting
to investigate
  
  364   Monday, March 17, 2014, 19:10 Anders MjosTa#42LP-SISITWTM440282-139956-1 / 39956-9 (base / lid)In progressConditioningNOTE:
TBHT
Power Supply is 600A. EPICS thinks it is
 Ta#42_Test_Stand.docxOMEGA_OM-DAQPRO-5300_21-Mar-14_13.56.35.dlp 
  365   Friday, March 21, 2014, 13:55 Anders Mjos      In progressPumping down empty chamberRoughing
Friday, March 21, 2014, 13:59: Starting
turbos
  
  366   Friday, March 21, 2014, 14:12 Anders Mjos      Problems/SolutionsElevated backing pressure on ISAC Test Stand TMS:RP2The performance of the roughing pump has
gradually gone down. Notably after the system
has been vented. See attached screenshot
 TMSCG2_2014-03-21.png 
  367   Friday, March 28, 2014, 10:39 Anders MjosTiC#4HP-SISITETM3  In progressConditioning TiC#4NOTE:

TBHT Power Supply is 600A. EPICS thinks
  
  370   Friday, April 04, 2014, 08:24 Anders MjosTiC#4HP-SISITETM3  In progressVenting 

    
  
  372   Wednesday, April 23, 2014, 09:37 Anders Mjos      Problems/SolutionsStarted Sources archiverThe archiver was not running   
  373   Wednesday, April 23, 2014, 14:16 Anders Mjos      DoneCu-strip cleaning test - sample #1, not cleanedWednesday, April 23, 2014, 14:15: Roughing
Wednesday, April 23, 2014, 14:34
: Starting turbos
 Front_2014-04-24_2_05_56_PM.jpgSide_2014-04-24_2_06_12_PM.jpg 
  374   Monday, April 28, 2014, 10:23 Anders Mjos      In progressCu-strip cleaning test - sample #2, cleanedMonday, April 28, 2014, 10:23: Started
roughing
Monday, April 28, 2014, 10:48: Started
  
  375   Thursday, May 08, 2014, 15:09 Anders Mjos      Problems/SolutionsSOURCES archiver reported stopped Archiver restarted.   
  376   Friday, May 09, 2014, 10:48 Anders Mjos      Problems/SolutionsEPICS white-out e-fault 7380Monday, May 12, 2014, 10:02: Jane R. power
cycled the hardware. EPICS is back up. Sources
archiver required a restart.
  
  377   Monday, May 12, 2014, 14:20 Anders MjosSiC#30HP-FEBIADITETM338481-839956-5In progressConditioning SiC#30Monday, May 12, 2014, 14:14 : Roughing
Monday, May 12, 2014, 14:34: Starting
turbos
 SiC#30_Conditioning.docx 
  378   Thursday, May 15, 2014, 14:58 Anders Mjos      Problems/SolutionsIOC rebooted to recover from white-out.Restarted archivers.   
  379   Tuesday, May 20, 2014, 11:17 Anders Mjos      Problems/SolutionsBurnt off GND connection on Service CapThe ground connection between B and F (ISK4523D
Rev 6) was found burnt off. It will be switched
out as per CATHODE BIAS configuration (ISK4563D
  
  380   Tuesday, May 20, 2014, 12:39 Anders Mjos      DoneFEBIAD Cathode Negative BIAS configurationAs per ISK4562 Rev 3 and ISK4563 Rev 3
By Ray D. and co.
  
  383   Thursday, June 12, 2014, 09:28 Anders Mjos      Problems/SolutionsElevated backing pressure on ISAC Test Stand TMS:RP2

    

       
            
  
  384   Friday, June 13, 2014, 08:43 Anders MjosSiC#30HP-FEBIADITETM338481-839956-5DoneSiC#30 HV and Heaters Conditioning

    

       
            
  
  385   Monday, June 16, 2014, 09:12 Anders Mjos      In progressEmpty chamberMonday, June 16, 2014, 09:12: Roughing

Tuesday, June 17, 2014, 14:38:
Venting 
  
  386   Tuesday, June 17, 2014, 15:22 Anders MjosSiC#30HP-FEBIADITETM338481-839956-5In progressSiC#30 HV and Heaters Conditioning

    

       
            
 SiC#30_Conditioning_3rd_time.docx 
  387   Wednesday, June 18, 2014, 09:23 Anders Mjos      Problems/SolutionsTSH:MB1 Trip & MB1 June 10th water leakA water leak on MB1 was found and reported
by operations on June 10th e fault 7429
MB1 can not be switched on due to
  
ELOG V2.9.2-2455