Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 23 of 53  Not logged in ELOG logo
  ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Statusdown Subject Text Attachments
  559   Wednesday, January 18, 2017, 09:23 Aaron SchmidtTa TestLP-FEBIAD  39530-3 In progressTri-Coil FEBIAD for testingWednesday, January 18, 2017, 09:22: Roughing
Wednesday, January 18, 2017, 09:41:
Turbo pumps started.
 12x 
  572   Friday, March 10, 2017, 15:42 Aaron SchmidtUC#19   41882-441751-2In progressConditioning Heat shield for UC#19Friday, March 10, 2017, 15:40: Roughing.
Friday, March 10, 2017, 15:58: Turbo
pumps started.
 TS-2017-03-10-16-20.rgaOMEGA_OM-DAQPRO-5300_22-Mar-17_09.05.23.dlp 
  574   Friday, March 24, 2017, 14:43 Aaron SchmidtTa#51LP-SISITWTM241790-441751-5In progressConditioning Ta#51Friday, March 24, 2017, 15:40: Roughing.
Friday, March 24, 2017, 15:59: Turbo
pumps on.
 9x 
  576   Thursday, April 06, 2017, 12:06 Aaron Schmidt HP-FEBIAD-CTL    In progressTri-Coil CTL-FEBIAD testThursday, April 06, 2017, 12:06: Roughing.
Thursday, April 06, 2017, 13:07:
Turbo pumps on.
  
  592   Friday, June 09, 2017, 13:28 Aaron SchmidtTa#52LP-SISITETM442218-1441751-8In progressConditioning Ta#52Friday, June 09, 2017, 13:27: Roughing.
Friday, June 09, 2017, 14:09: Turbo
pumps on.
 8x 
  594   Friday, June 30, 2017, 13:31 Aaron SchmidtTa#53HP-SISITWTM242218-641751-6In progressConditioning Ta#53 Friday, June 30, 2017, 13:48: Roughing.
Friday, June 30, 2017, 14:26: Turbo
pumps on.
 Ta#53.docxTS-2017-06-30-14-35.rga 
  595   Thursday, July 06, 2017, 13:16 Aaron SchmidtTa#55LP-SIS  42218-1142738-2In progressConditioning Ta spare for Ta#52Thursday, July 06, 2017, 13:56: Roughing.
Thursday, July 06, 2017, 14:25: Turbo 
pumps started.
 10x 
  596   Monday, July 10, 2017, 13:27 Aaron SchmidtTa#53HP-SISITWTM242218-641751-6In progressConditioning Ta#53Monday, July 10, 2017, 14:03: Roughing.
Monday, July 10, 2017, 14:27: Turbo
pumps started.
 7x 
  597   Monday, July 17, 2017, 09:55 Aaron Schmidt    41882-442738-1In progressOut Gas HS for Target Cleaning Test-No EE. Insulators, gripper arms,
and blank EE plate included
 OMEGA_OM-DAQPRO-5300_24-Jul-17_10.23.02.dlpTarget_Cleaning_Test_HS_Outgassing.docxTS-2017-07-17-11-17.rga 
  602   Tuesday, August 15, 2017, 08:41 Aaron SchmidtTa#55LP-SIS  42218-1142738-2In progressTBHT sight in testHeat TGHT to 580 A & TGHT to 
200 A for view port test.
Tuesday, August 15, 2017, 08:40:
  
  605   Wednesday, September 20, 2017, 14:11 Aaron SchmidtTa#54HP-SISITWTM242218-10 In progressConditioning Ta#54Wednesday, September 20, 2017, 14:08: Roughing.
Wednesday, September 20, 2017, 14:28:
Turbos on.
 6x 
  607   Friday, October 06, 2017, 12:14 Aaron SchmidtSiC#37HP-FEBIADITETM439530-1041751-4In progressConditioning SiC#37NOTE* : The right coil terminal terminates
into the heat shield. DO NOT TURN ON COIL.
Friday, October 06, 2017, 12:12:
 9x 
  609   Tuesday, October 10, 2017, 14:56 Aaron Schmidt      In progressFEBIAD Anode bias configurationUnable to hold Anode voltage after power
supply change out.
Tuesday, October 10, 2017, 14:55:
  
  610   Friday, October 13, 2017, 15:53 Aaron SchmidtSiC#37HP-FEBIADITETM439530-1041751-4In progressConditioning SiC#37 (ii)Previous short fixed. Grid clamp removed.
Grid tack welded.
Friday, October 13, 2017, 15:49:
 10x 
  611   Monday, October 16, 2017, 11:46 Aaron Schmidt      In progressPump down empty chamber Test EEMonday, October 16, 2017, 11:45: Roughing.
Monday, October 16, 2017, 12:05:
Turbo pumps started.
  
  615   Friday, December 01, 2017, 14:31 Aaron Schmidt LP-SIS  (Blank)42752-3In progressSilver plated bolts test / Outgas TSChamber 'open state, no turbos' 2 weeks.
Testing Silver plated 3/8"-16x1"
(SCR, SHC, 18-8, AG) bolt on the TBHT.
 1st_silver_bolts_test.docxTS-2017-12-05-08-10.rga 
  627   Wednesday, January 31, 2018, 12:58 Aaron Schmidt LP-SIS  (Blank)42752-3In progressHV test 4Wednesday, January 31, 2018, 12:53: Power/sources
on.
Wednesday, January 31, 2018, 12:58:
 2018_HV_test_4.docx 
  648   Tuesday, March 13, 2018, 06:00 Aaron SchmidtUC#22LP-SISITETM4  In progressConditioning Heat Shield for UC#22Tuesday, March 13, 2018, 08:50: Roughing.
Tuesday, March 13, 2018, 09:10: Turbo
Pumps started.
  
  649   Friday, March 16, 2018, 08:15 Aaron SchmidtNb#8HP-SISITWTM238817-242738-12In progressConditioning Nb#08Friday, March 16, 2018, 08:42: Roughing.
Friday, March 16, 2018, 10:34: Turbo
pumps started.
 6x 
  651   Wednesday, March 21, 2018, 14:11 Fernando Maldonado LP-FEBIAD  395530-342752-2In progressTest FEBIAD Tests on coil, temperature and the use
of silver bolts.
(3) Vented silver bolts on the TBHT
 10x 
ELOG V2.9.2-2455