Entry  Monday, July 17, 2017, 10:04, Aaron Schmidt, , HP-SIS, , , 42218-10, 42738-1, , Target cleaning test HP-SIS Full Clean  HP-SIS_Full_Clean_(Short).docxTS-2017-07-27-10-40.rga
 Target
Test (Fully Cleaned vs Crystal Clean only).
Entry  Monday, July 17, 2017, 09:58, Aaron Schmidt, , HP-SIS, , , 42218-8, 42738-1, , Target cleaning test (Long) HP-SIS CC Clean  HP-SIS_CC_Clean_(Long).docxOMEGA_OM-DAQPRO-5300_27-Jul-17_10.25.04.dlpTS-2017-07-24-10-40.rga
 Target
Test (Fully Cleaned vs Crystal Clean only).
Entry  Monday, July 17, 2017, 09:55, Aaron Schmidt, , , , , 41882-4, 42738-1, In progress, Out Gas HS for Target Cleaning Test OMEGA_OM-DAQPRO-5300_24-Jul-17_10.23.02.dlpTarget_Cleaning_Test_HS_Outgassing.docxTS-2017-07-17-11-17.rga
-No EE. Insulators, gripper arms, and blank EE plate included
-New grounded 9 pins included in brackets
-TGHT included to out gas Heat shield
Entry  Monday, July 10, 2017, 13:27, Aaron Schmidt, Ta#53, HP-SIS, ITW, TM2, 42218-6, 41751-6, In progress, Conditioning Ta#53 7x
Monday, July 10, 2017, 14:03: Roughing.
Monday, July 10, 2017, 14:27: Turbo pumps started.
Monday, July 10, 2017, 14:33: Ion gauge on.
Entry  Thursday, July 06, 2017, 13:16, Aaron Schmidt, Ta#55, LP-SIS, , , 42218-11, 42738-2, In progress, Conditioning Ta spare for Ta#52 10x
Thursday, July 06, 2017, 13:56: Roughing.
Thursday, July 06, 2017, 14:25: Turbo  pumps started.
Thursday, July 06, 2017, 14:30: Ion gauge on. RGA Started
Entry  Friday, June 30, 2017, 13:31, Aaron Schmidt, Ta#53, HP-SIS, ITW, TM2, 42218-6, 41751-6, In progress, Conditioning Ta#53  Ta#53.docxTS-2017-06-30-14-35.rga
Friday, June 30, 2017, 13:48: Roughing.
Friday, June 30, 2017, 14:26: Turbo pumps on.
Friday, June 30, 2017, 14:31: Ion gauge on.
Entry  Friday, June 16, 2017, 11:23, Aaron Schmidt, , , , , , , , Pump down empty chamber. 
Friday, June 16, 2017, 11:22: roughing.
Friday, June 16, 2017, 14:28: Turbo pumps on

Friday, June 30, 2017, 10:37: Ion gauge, turbos off.
Entry  Friday, June 09, 2017, 13:28, Aaron Schmidt, Ta#52, LP-SIS, ITE, TM4, 42218-14, 41751-8, In progress, Conditioning Ta#52 8x
Friday, June 09, 2017, 13:27: Roughing.
Friday, June 09, 2017, 14:09: Turbo pumps on.
Friday, June 09, 2017, 14:16: Ion gauge on.
Entry  Wednesday, June 07, 2017, 12:49, Aaron Schmidt, , , , , , , , Gas bottles 
 Gas bottles for FEBIAD testing were exchanged yesterday around 1:30. One Neon & one Argon bottle were removed.
Two Neon bottles were added.
Entry  Tuesday, June 06, 2017, 09:22, Aaron Schmidt, , , , , , , , Pump down empty chamber 
Tuesday, June 06, 2017, 09:21: roughing.

Friday, June 09, 2017, 08:50: Ion gauge off. Turbo pumps off.
Friday, June 09, 2017, 10:46: Venting.
Entry  Wednesday, May 24, 2017, 11:12, Anders Mjos, , , , , , , Problems/Solutions, FEBIAD Anode bias configuration 20170524-ST-currentvscoil-CHT300A.PNG
 The Test Stand has been configured for Anode bias. John Chow changed the power supply and the electrical connections have been wired according
to ISK4523D REV 6.
 
    Reply  Saturday, June 03, 2017, 09:34, Anders Mjos, , , , , , , Problems/Solutions, FEBIAD Cathode bias configuration 


    
        
            Anders Mjos wrote:
        
        
            
             The Test Stand has been configured for Anode bias. John Chow changed the power supply and the
Entry  Friday, June 02, 2017, 15:57, Aaron Schmidt, SiC#36, HP-FEBIAD-CTL, ITW, TM2, 41369-10, 42132-6/9, , Conditioning SiC#36 9x
Friday, June 02, 2017, 15:20: Coil loose (Remove lid, Tighten and place lid again)
Friday, June 02, 2017, 15:52: Roughing
Friday, June 02, 2017, 16:13: Turbo pumps on.
Entry  Monday, May 22, 2017, 09:43, Aaron Schmidt, , HP-FEBIAD-CTL, , , , , , Tri-Coil CTL-FEBIAD test IV CTL_FEBIAD_Test_IV.docxTS-2017-05-22-10-07.rgaTS-2017-05-25-15-42.rga
Monday, May 22, 2017, 09:41: Roughing.
Monday, May 22, 2017, 10:00: Turbo pumps started.

Tuesday, May 23, 2017, 07:45: Power/sources on.
Entry  Wednesday, May 17, 2017, 10:17, Anders Mjos, , HP-FEBIAD-CTL, , , , , Problems/Solutions, Sparking between new coil line and ground electrode 
Wednesday, May 17, 2017, 10:17: Sparking around 20 kV. Will need to vent to increase gap between water lines.
Turbos stopped.
Wednesday, May 17, 2017, 10:50: Reset IV4.
Entry  Tuesday, May 16, 2017, 14:25, Aaron Schmidt, , HP-FEBIAD-CTL, , , , , , Tri-Coil CTL-FEBIAD test III 8x
Coil loose (Remove lid, Tighten and place lid again)
Tuesday, May 16, 2017, 14:24: Roughing.
Tuesday, May 16, 2017, 14:45: Turbo pumps on.
Entry  Wednesday, May 10, 2017, 15:07, Aaron Schmidt, , , , , , , , Pump down empty chamber. (FS#3 out) 05-11-2017_Water_leak.docx
FS#3 lines blanked off.
Wednesday, May 10, 2017, 14:40: Roughing
Wednesday, May 10, 2017, 15:05: Turbos on.
Entry  Friday, May 05, 2017, 14:28, Aaron Schmidt, UC#20, LP-IG-LIS, , , , , , Conditioning Heat shield for UC#20 (2)  UC#20_Heat_shield_conditioning-2.docxTS-2017-05-05-17-11.rgaTS-2017-05-11-07-50.rga
New O-rings installed on FS#3.
Friday, May 05, 2017, 14:24: Roughing.
Friday, May 05, 2017, 14:34: Waterlines reconnected to air lines. He likely still in lines. May show in RGA if there's an issue prior to opening
Entry  Thursday, May 04, 2017, 13:49, Aaron Schmidt, UC#20, LP-IG-LIS, , , , , , Conditioning Heat shield for UC#20 (1) UC#20_Heat_shield_conditioning-1.docxTS-2017-05-05-07-35.rga
Thursday, May 04, 2017, 13:48: Roughing.
Thursday, May 04, 2017, 14:09: Turbos on.

Friday, May 05, 2017, 07:35: RGA on. Vacuum @ 1.56e-06T
Entry  Tuesday, May 02, 2017, 14:03, Aaron Schmidt, , , , , , , , Pump down empty chamber. (FS#3 out) 20170504_133718.jpg20170504_133723.jpg20170504_133728.jpg20170504_133735.jpg
Check to fit lines FS#3
Tuesday, May 02, 2017, 14:00: Rouging. 

Wednesday, May 03, 2017, 07:07: Venting.
Entry  Tuesday, April 18, 2017, 07:46, Aaron Schmidt, , , , , , , Problems/Solutions, TSG:TP1B & TSG:BV1B tripped Cooling_&_Turbo_Replacement.docx
Tuesday, April 18, 2017, 07:30: TSG : TP1B Tripped on Saturday.
Tuesday, April 18, 2017, 07:40: TSG : BV1B opened. TSG : TP1B restarted.
Tuesday, April 18, 2017, 07:48:  TSG : TP1B failed to restart.Turn off.