Tuesday, January 02, 2018, 09:18, Anders Mjos, , , , , , , Problems/Solutions, Starting system
|
Tuesday, January 02, 2018
Cycled power for TCSIOC and PLCIOC
TP2 and TP6 started
TP1B does not start. TP1B controller does not start up correctly - controller will have to be replaced. E-fault submitted (10739).
Controller for PS for Q1,6 was switching constantly. Unplugged and plugged back in resolved the problem
TP1A started
(Aaron Schmidt)
Wednesday, January 03, 2018, 08:15: TSG:TP1B Still non-responsive.
Wednesday, January 03, 2018, 08:20: Power/sources on. Add Voltage/Amp and check power supplies.
BIAS - 300V Reads 290V - OK
EE - 300V Reads 298V - OK
EZL - 300V Reads 293 V - OK
CB1 - 10V Reads 10V - OK
VCB1 - 10V Reads 10V - OK
CBC (both) - 10V Reads 9V - OK
TBHT - 10A Reads 9.9A (009 direct off PS) - OK
TGHT - 10A Reads 9.8A (007 direct off PS) - OK
Optics Check:
Magnet ok - Some optics start, some do not respond. Submit fault report for communications issues.
Fault Report submitted - 10742
Thursday, January 04, 2018, 14:38:
Kyle and Dave were able to get all the canbus optics for ISAC test stand re-configured except one device: TMS:Q2
"We investigated and it looks like the controller board for the TMS:Q2 supply is toast. Unfortunately these boards are a very old style so we don't have a surplus of replacements on hand. Our electronics shop did have some spares but the spares are not ready for use and need to have a few components soldered on. " - Kyle
The repaired controller board should be ready for next week.
Wednesday, January 10, 2018, 13:22: TS optics all fixed. Turbo pump TP1B is still out.
|
Thursday, December 21, 2017, 15:12, Anders Mjos, , , , , , , , Powered down devices
|
Powered down vacuum gauge and turbo pump controllers |
Wednesday, December 20, 2017, 09:11, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, Done, Holiday Shut Down
|
Power/sources already off. The water cooling is currently left on.
Wednesday, December 20, 2017, 09:07: RGA off.
Wednesday, December 20, 2017, 09:08: Both Ion gauges and all 4 turbo pumps off.
Wednesday, December 20, 2017, 11:21: Valves closed. Roughing pumps off.
Wednesday, December 20, 2017, 11:22: RGA shut off completely. |
Tuesday, December 12, 2017, 08:32, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, Done, Pump down w/ possible outgas
|
Check achievable vacuum. Watch for spikes on RGA. Silver bolts removed from the chamber. Vented steel screws in.
Tuesday, December 12, 2017, 08:23: Doors open from previous test. (Open for 7 minutes)
Tuesday, December 12, 2017, 08:30: Doors closed. Roughing.
Tuesday, December 12, 2017, 08:50: Turbo pumps on.
Tuesday, December 12, 2017, 08:56: Ion gauge on.
Wednesday, December 13, 2017, 06:46: Check. Vacuum @ 5.44e-07T. RGA Error.
Wednesday, December 13, 2017, 06:49: RGA restarted.
Wednesday, December 13, 2017, 06:52: Water lines opened. Vacuum @ 5.44e-07T
Wednesday, December 13, 2017, 06:54: Power on.
Wednesday, December 13, 2017, 06:56: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Friday, December 15, 2017, 13:37: Auto-cooling @ 2A per min
Monday, December 18, 2017, 08:15: Power/source off.
Wednesday, December 20, 2017, 09:07: RGA off.
Wednesday, December 20, 2017, 09:08: Both Ion gauges and all 4 turbo pumps off. |
Monday, December 04, 2017, 08:29, Aaron Schmidt, , , , , , , Problems/Solutions, Power outage
|
Power outage over the weekend. Reboot PLC and systems.
Monday, December 04, 2017, 08:22: Turbo pumps TMS:TP6 & TP2 Restarted.
Monday, December 04, 2017, 08:28: Time out on turbo pump TP1B.
Monday, December 04, 2017, 09:25: Turn off/restart TSG:TP1B Maincontrol.
Monday, December 04, 2017, 09:26: TMS:IG6 Restarted.
Monday, December 04, 2017, 14:24: Multi gauge controller to TSG:IG1 burned out. Replaced. Vacuum @ 4.45e-06T. Monitor. |
Friday, December 01, 2017, 14:31, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, In progress, Silver plated bolts test / Outgas TS
|
Chamber 'open state, no turbos' 2 weeks. Testing Silver plated 3/8"-16x1" (SCR, SHC, 18-8, AG) bolt on the TBHT.
Friday, December 01, 2017, 14:26: Roughing. BV1B open.
Friday, December 01, 2017, 14:27: BV1A open
Friday, December 01, 2017, 14:47: Turbo pumps on.
Friday, December 01, 2017, 14:53: Ion gauge on (Vacuum @ 1.44 e-04T)
Friday, December 01, 2017, 14:57: Turbos @ speed. RGA on.
Monday, December 04, 2017, 09:27: System rebooted after weekend power outage.
Tuesday, December 05, 2017, 08:10: RGA on.
Tuesday, December 05, 2017, 08:17: Waterlines opened. Vacuum ok @ 1.56e-06T
Tuesday, December 05, 2017, 08:20: Power on. (Power supplies in off position) Turn power off
Open back. switch power supplies to on.
Tuesday, December 05, 2017, 08:35: Power on
Tuesday, December 05, 2017, 08:37: Auto ramping TGHT / TBHT to 150 / 75 A @ 2A per min.
Tuesday, December 05, 2017, 09:55: Auto ramping TGHT / TBHT to 200 / 75 A @ 2A per min.
Tuesday, December 05, 2017, 10:28: Auto ramping TGHT / TBHT to 400 / 150 A @ 2A per min. Vacuum @ 1.56e-06T.
Tuesday, December 05, 2017, 12:50: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min. Vacuum @ 3.03e-06T.
Tuesday, December 05, 2017, 12:58: Auto ramping halted. Vacuum @ 3.12e-06T. Allow vacuum to improve.
Wednesday, December 06, 2017, 08:03: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min. Vacuum @ 2.65e-06T. Added note*** The Silver bolts are NOT vented ***.
Wednesday, December 06, 2017, 08:30: TGHT / TBHT @ 449 / 199 A. Vacuum @ 3.03e-06T and holding. Auto-ramping continued. No halt.
Wednesday, December 06, 2017, 10:45: Check. TGHT / TBHT @ 449 / 199 A. Vacuum @ 3.36e-06T and holding. Auto-ramping on wait.
Wednesday, December 06, 2017, 14:37: Check. TGHT / TBHT @ 449 / 199 A. Vacuum @ 3.21e-06T and holding. Auto-ramping halted. Allow Vacuum to improve.
Thursday, December 07, 2017, 07:52: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min. Vacuum @ 2.33e-06T.
Thursday, December 07, 2017, 09:00: Check. TGHT / TBHT @ 571 / 200 A. Vacuum @ 3.19e-06T. Auto-ramping halted. Allow Vacuum to improve.
Friday, December 08, 2017, 07:52: Auto ramping TGHT to 580 A from 571 A @ 2A per min. Vacuum @ 2.04e-06T.
Monday, December 11, 2017, 08:00: Auto cooling @ 2A per min.
Monday, December 11, 2017, 13:45: Sources/power off. Water cooling off.
Tuesday, December 12, 2017, 06:35: RGA, Ion gauge, turbo pumps off.
Tuesday, December 12, 2017, 07:45: Venting.
Tuesday, December 12, 2017, 08:23: Doors open. |
Wednesday, November 15, 2017, 10:56, Aaron Schmidt, , , , , , , Problems/Solutions, TMS:TP6 replacement
|
Turbo pump TP6 requires replacement.
Wednesday, November 15, 2017, 09:55: Turbo (TP2) off. Ion gauge off.
Wednesday, November 15, 2017, 10:55: Venting |
Monday, October 30, 2017, 08:54, Anders Mjos, , , , , , , Problems/Solutions, TMS:TP6 shut down due to high noise
|
The turbo pump will need replacement. |
Tuesday, October 24, 2017, 11:38, Anders Mjos, , , , , , , , FEBIAD coil magnetic field measurment
|
with Fernando
Tuesday, October 24, 2017: Testing setup with triple coil
Wednesday, October 25, 2017: Field mapping at 70 A and current/field measurements on triple coil. |
Monday, October 16, 2017, 11:46, Aaron Schmidt, , , , , , , In progress, Pump down empty chamber Test EE
|
Monday, October 16, 2017, 11:45: Roughing.
Monday, October 16, 2017, 12:05: Turbo pumps started.
Monday, October 16, 2017, 12:10; Ion gauge on.
Tuesday, October 17, 2017, 10:43: Waterlines opened. RGA not on. Vacuum ok @ 1.53e-07T. Power/sources on.
Tuesday, October 17, 2017, 10:45: RGA on.
Tuesday, October 17, 2017, 10:50: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Tuesday, October 17, 2017, 14:44: EE Current Stable.
Tuesday, October 17, 2017, 14:52: Power/sources off.
Tuesday, October 17, 2017, 14:54: Waterlines purged.
|
Friday, October 13, 2017, 15:53, Aaron Schmidt, SiC#37, HP-FEBIAD, ITE, TM4, 39530-10, 41751-4, In progress, Conditioning SiC#37 (ii) 10x
|
Previous short fixed. Grid clamp removed. Grid tack welded.
Friday, October 13, 2017, 15:49: Roughing.
By Anders
Friday, October 13, 2017, 16:10: TPs started
Friday, October 13, 2017, 16:20: Vacuum at 2.7E-7 T
Saturday, October 14, 2017, 06:37: Opened water supply to HS. 95/10 psi. Vacuum stable at 5.7E-7 T
Saturday, October 14, 2017, 06:42: Opened gas lines.
Saturday, October 14, 2017, 06:43: Started heater ramping to 580 / 290 A
Saturday, October 14, 2017, 06:45: BIAS/EZL/EE to 30 / 13.5 / 1.5 kV. EE current somewhat unstable around 500 uA - seems related to elevated BIAS current. Improving as BIAS current is gradually coming down.
Saturday, October 14, 2017, 15:19: TBHT to 310 A. Local readback 316 A
Sunday, October 15, 2017, 17:36 : Ramping down heaters.
Monday, October 16, 2017, 09:10: Sources off.
Monday, October 16, 2017, 09:13; IV4 Closed & Reset. FEBIAD Gas lines closed.
Monday, October 16, 2017, 09:15: RGA, Ion gauge, turbos off.
Monday, October 16, 2017, 10:40: Power off. Waterlines purged.
Monday, October 16, 2017, 10:43: Venting. |
Tuesday, October 10, 2017, 14:56, Aaron Schmidt, , , , , , , In progress, FEBIAD Anode bias configuration
|
Unable to hold Anode voltage after power supply change out.
Tuesday, October 10, 2017, 14:55: The Test Stand has been configured for Anode bias and the electrical connections have been wired according to ISK4523D REV 6.
At this current point in time John Chow has removed the power supply (PS). Will update once polarity is switched (if required) and is re-installed to the test stand.
Wednesday, October 11, 2017, 10:25: Polarity was switched and PS is installed on the test stand. Sources/power switched on. |
Tuesday, October 10, 2017, 13:10, Aaron Schmidt, , , , , , , , Gas bottles
|
Tuesday, October 10, 2017, 09:30: Install/swap gas bottles. Elog.
Removed smallest Neon leak. Neon Bottle Serial #11231. Leak rate calibrated @ 1.59e-07 atm*CC/sec (02/09/2016)
In use:
Neon Bottle Serial #09572. Leak rate calibrated @ 1.82e-06 atm*CC/sec (02/09/2016)
Argon Bottle Serial #09937. Leak rate calibrated @ 1.35 x10-6 Atm-CC/sec (08/06/2003)
Tuesday, October 10, 2017, 10:12: Gas bottles opened. Pump not on? Vacuum spiked into e-04T. All closed. Await vacuum stabilization.
Tuesday, October 10, 2017, 10:36: Power on. Pump on Gas bottles opened. Await vacuum stabilization.
pump off. |
Friday, October 06, 2017, 12:14, Aaron Schmidt, SiC#37, HP-FEBIAD, ITE, TM4, 39530-10, 41751-4, In progress, Conditioning SiC#37 9x
|
NOTE* : The right coil terminal terminates into the heat shield. DO NOT TURN ON COIL.
Friday, October 06, 2017, 12:12: Roughing. * Note on installation. Middle TBHT prong 'stuck' to insulator slightly and was moved to fit. Fit ok in Jig.
Friday, October 06, 2017, 13:53: Turbo pumps on.
Friday, October 06, 2017, 14:00: Ion gauge, RGA on.
Tuesday, October 10, 2017, 07:45: Waterlines opened. No response on RGA. Vacuum ok @ 1.35e-07T.
Tuesday, October 10, 2017, 07:49: RGA Fatal communications error. Restart RGA.
Tuesday, October 10, 2017, 07:57: Power/sources on.
Tuesday, October 10, 2017, 08:17: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Tuesday, October 10, 2017, 08:57: BIAS / EZL / EE @ 0 kV. Power/sources off. Locked out*
Tuesday, October 10, 2017, 09:30: Install/swap gas bottles. Elog.
Tuesday, October 10, 2017, 10:36: Power on. Gas bottles opened. Await vacuum stabilization.
Tuesday, October 10, 2017, 10:40: Sources on.
Tuesday, October 10, 2017, 10:50: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Unable to bring Anode to voltage. Power supply was changed and does not 'Float'. Test TGHT & TBHT. Then switch from Cathode Negative Bias to Anode positive*.
Tuesday, October 10, 2017, 11:37: Auto ramping TGHT / TBHT to 20 / 20 A @ 4A per min. (TEST then cool)
Tuesday, October 10, 2017, 11:45: Auto-cooling
Tuesday, October 10, 2017, 11:57: Sources off / BIAS / EZL / EE @ 0 kV.
Wednesday, October 11, 2017, 10:25: Anode & PS switched*. Power/Sources on.
Wednesday, October 11, 2017, 10:38: BIAS / EZL / EE @ 30 / 13 / 1.5 kV.
Wednesday, October 11, 2017, 10:40: Coil @ 0 A. Anode 200 V / 7.326mA.
Wednesday, October 11, 2017, 10:45: Gas bottles opened. Await vacuum stabilization.
Wednesday, October 11, 2017, 10:47: IV4 Opened. Vacuum @ 2.43e-07T
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.6 |
3.78 |
TBHT |
24.6 |
2.75 |
COIL + EE |
24.4 |
4.84 |
TGHT |
24.6 |
5.44 |
Wednesday, October 11, 2017, 10:50: Auto ramping TGHT / TBHT to 580 / 290 A @ 2A per min.
Wednesday, October 11, 2017, 14:21: Check. Vacuum @ 2.99e-06T. Outgassing.
Wednesday, October 11, 2017, 14:42: Note* Slight discrepancy on the TBHT. Direct read out off the PS @ 296A. Source page: TBHT set to 290.0A, shows 302.2A
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
31.4 |
3.84 |
TBHT |
25.4 |
2.98 |
COIL + EE |
25.0 |
4.86 |
TGHT |
27.1 |
5.45 |
Thursday, October 12, 2017, 09:00. Mass scans ok. Spark @ 8:57.
Thursday, October 12, 2017, 10:48: Auto ramping TBHT to 310 A @ 2A per min.
Friday, October 13, 2017, 07:15: Anode short determined. Plotted. Occurred around 18:00 (6pm) yesterday.
Friday, October 13, 2017, 07:20: Auto-cooling @ 4A per min
Friday, October 13, 2017, 10:03: Sources off. Gas lines closed.
Friday, October 13, 2017, 10:06: RGA off. IV4 Closed. Reset IV4
Friday, October 13, 2017, 10:08: Ion gauge off. Turbos off.
Friday, October 13, 2017, 11:10: Venting.
Friday, October 13, 2017, 11:45: power off. Waterlines purged.
Friday, October 13, 2017, 11:49: Doors open, |
Monday, September 25, 2017, 14:10, Aaron Schmidt, , , , , , , , Pump down empty chamber
|
Monday, September 25, 2017, 14:10: Roughing.
Wednesday, September 27, 2017, 08:23: Turbo pumps on
Friday, October 06, 2017, 09:04: Ion gauge off. Turbos off.
Friday, October 06, 2017, 11:17: Venting. |
Wednesday, September 20, 2017, 14:11, Aaron Schmidt, Ta#54, HP-SIS, ITW, TM2, 42218-10, , In progress, Conditioning Ta#54 6x
|
Wednesday, September 20, 2017, 14:08: Roughing.
Wednesday, September 20, 2017, 14:28: Turbos on.
Wednesday, September 20, 2017, 14:33: Ion gauge on.
Wednesday, September 20, 2017, 14:39: RGA on.
Thursday, September 21, 2017, 08:43: Waterlines opened. No response on RGA. Vacuum ok @ 1.7e-07T
Thursday, September 21, 2017, 08:49: Power/sources on.
Thursday, September 21, 2017, 09:03: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Thursday, September 21, 2017, 09:04: IV4 Opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
25.1 |
3.85 |
TBHT |
25.4 |
3.04 |
COIL + EE |
24.9 |
4.94 |
TGHT |
25.1 |
5.59 |
Thursday, September 21, 2017, 09:08: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Friday, September 22, 2017, 13:42: Bias / EZL increased to 40 / 17.3 kV. Tune accordingly.
Mass scan ok
Friday, September 22, 2017, 14:33: Bias / EZL decreased to 30 / 13 kV. Tune accordingly.
Friday, September 22, 2017, 14:39: Auto-cooling @ 2A / min
Monday, September 25, 2017, 10:20: BIAS / EZL / EE @ 0 V.
Monday, September 25, 2017, 10:21:Power/sources off.
Monday, September 25, 2017, 10:32: RGA off. IV4 closed
Monday, September 25, 2017, 10:33: Ion gauge, turbos off.
Monday, September 25, 2017, 10:37: Waterlines purged.
Monday, September 25, 2017, 13:19: Venting. |
Thursday, August 17, 2017, 12:45, Anders Mjos, , , , , , , Problems/Solutions, TBHT power supply removed
|
The Xantrex 10V 600 A power supply for the TBHT has been moved to ITE to replace the failed TGHT power supply |
Monday, August 21, 2017, 16:20, Anders Mjos, , , , , , , Problems/Solutions, TBHT power supply removed
|
Anders Mjos wrote: |
The Xantrex 10V 600 A power supply for the TBHT has been moved to ITE to replace the failed TGHT power supply
|
A spare EMI-EMS 10 V - 500 A power supply was installed last Friday by John Chow. Dave Morris has connected the controls today and updated EPICS. The local voltage readback on the power supply does not work. |
Tuesday, August 15, 2017, 08:41, Aaron Schmidt, Ta#55, LP-SIS, , , 42218-11, 42738-2, In progress, TBHT sight in test
|
Heat TGHT to 580 A & TGHT to 200 A for view port test.
Tuesday, August 15, 2017, 08:40: Roughing.
Tuesday, August 15, 2017, 08:59: Both Turbo pumps started.
Tuesday, August 15, 2017, 09:05: Ion gauge on. TP1B @ speed 42 KRPM.
Tuesday, August 15, 2017, 09:07: TP1A @ speed 38 KRPM.
Tuesday, August 15, 2017, 09:10: RGA on. Vacuum @ 9.14e-06T
Tuesday, August 15, 2017, 11:40: Check. Vacuum @ 6.76e-07T
Tuesday, August 15, 2017, 11:41: Waterlines opened. No response on RGA. Vacuum @ 6.49e-07T
Tuesday, August 15, 2017, 11:43: Power/sources on.
Tuesday, August 15, 2017, 13:57: Check. Vacuum @ 3.88e-07T.
Tuesday, August 15, 2017, 14:33: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Wednesday, August 16, 2017, 10:33: Auto-cooling TBHT to 100 A @ 4A per min.
Thursday, August 17, 2017, 07:05: TGHT / TBHT off. FC0 closed. IV4 Closed.
Thursday, August 17, 2017, 07:11: IV4 reset.
Thursday, August 17, 2017, 07:13: Power off
Thursday, August 17, 2017, 07:15 Waterlines purged
Thursday, August 24, 2017, 13:03: Waterlines ok (open). Power/source on.
Thursday, August 24, 2017, 13:10: Auto ramping TGHT to 580 A @ 2A per min.
Friday, August 25, 2017, 07:59: Open IV4. Open TMS : FC0.
Friday, September 08, 2017, 06:51: Auto ramping TGHT to 580 A @ 2A per min.
Monday, September 11, 2017, 10:55: Close TMS : FC0. Close IV4
Monday, September 11, 2017, 11:58: power/sources off
Monday, September 11, 2017, 11:00: RGA off
Monday, September 11, 2017, 11:01: Ion gauge, turbos off.
Monday, September 11, 2017, 11:59: Venting.
Monday, September 11, 2017, 13:17: Roughing.
Monday, September 11, 2017, 13:34: Turbo pumps on
Monday, September 11, 2017, 13:40: Ion gauge on.
Tuesday, September 12, 2017, 07:24: RGA, power, & sources on.
Tuesday, September 12, 2017, 07:25: Auto ramping TGHT to 580 A @ 2A per min.
Tuesday, September 12, 2017, 07:26: Open IV4. Open TMS : FC0.
Monday, September 18, 2017, 10:53: Close TMS : FC0. Close IV4
Monday, September 18, 2017, 10:57: Power/sources off.
Wednesday, September 20, 2017, 10:25: RGA, Ion gauge, Turbo pumps off. Waterlines purged.
Wednesday, September 20, 2017, 12:49: Venting. |
Thursday, August 03, 2017, 17:00, Anders Mjos, , , , , , , Problems/Solutions, Vacuum system tripped on power interruption
|
Thursday, August 03, 2017, 17:00: Restarted TPs |
Wednesday, July 19, 2017, 09:13, Aaron Schmidt, Ta Targets, , , , , , Done, Ion Peaks
|
Attached is a recent list of Ta targets with their extracted ions peaks. |
|