Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 13 of 53  Not logged in ELOG logo
  ID Date Author Target/No.# Sourcedown Station Module Target Oven W.O# Heat Shield W.O# Status Subject
  2   Wednesday, September 14, 2011, 15:33 John WongTest#1HP-SISITWTM1testtestIn progresstesting elog for test stand

Wednesday, September 14, 2011, 15:33

blah blah blah...

  53   Tuesday, March 06, 2012, 15:15 Pierre Bricault HP-SIS     ISAC test stand two turbos replaced

Vac group has replaced the two turbo pumps.

  85   Tuesday, May 15, 2012, 07:39 Rick MaharajSic #27HP-SISITETM4  In progressWater on at test stand

The vacuum on TSGIG1 reads 2.85e-07. Turing on water on teststand and observing any changes in vacuum pressure.

  91   Tuesday, May 15, 2012, 10:14 Anders MjosSiC#27HP-SISITETM4  In progresstarget ready to be heated and biased

 Tuesday, May 15, 2012, 10:13: Turbo pumps at speed. Vacuum at 1.4E-5.

Tuesday, May 15, 2012, 12:03: Cooling lines opened. Vacuum stable at 1.6E-6

Tuesday, May 15, 2012, 12:17: Target ready to be heated and biased.

  92   Tuesday, May 15, 2012, 16:18 Aurelia LaxdalSiC#27HP-SISITETM4  In progressTarget/Ion source conditioning

Did the HV conditioning up to 30kV and started to ramp up the heaters to 580A and 230A.

  96   Thursday, May 17, 2012, 08:36 Anders MjosSiC#27HP-SISITETM4  DoneTarget removed

Thursday, May 17, 2012, 08:36: Turbo pumps switched off in preparation of target removal.

Thursday, May 17, 2012, 08:51: Purging cooling lines.

Thursday, May 17, 2012, 08:55: Venting.

Thursday, May 17, 2012, 09:21: Target removed

  97   Thursday, May 17, 2012, 12:19 Anders MjosSiC#27HP-SISITETM4  Problems/SolutionsLoose chip of insulator material detected

Anders Mjos wrote:

 A chip of insulator material was detected below the lower target insulator stand-off (attachment - left picture). The chip may come from the tube heater insulator above (attachment - right picture). The chip will be further investigated when the target is removed.

 The chip came from the lower insulator stand-off on the target assembly (see attachment). After investigating the chipped insulator, it was decided (Pierre, Friedhelm, Anders) not to replace it - as the risk involved may be less than the risk involved in replacing.

Attachment 1: Chipped_insulator_stand-off.pdf
Chipped_insulator_stand-off.pdf
  98   Thursday, May 17, 2012, 13:24 John WongSiC#27HP-SISITETM438817-3 Problems/SolutionsSolid residues found on EE

 Thursday, May 17, 2012, 13:15

After the test-stand, the EE was removed for inspection.  It was discovered that there were some solid residues coated on the extraction electrode and the common plate, but the ionizer tube was clean (see attachment#1).  Some samples were collected and will try to do some analysis.  This problem has been seen before but it's still not clear why the solid residues form after the test-stand.  

The EE & the common plate were cleaned with acetone and re-assembled back to the target.  


 

Attachment 1: SiC#27_after_teststand.pdf
SiC#27_after_teststand.pdf
Attachment 2: SiC#27_clean_EE.pdf
SiC#27_clean_EE.pdf
  199   Tuesday, September 11, 2012, 19:48 Friedhelm AmesNB#7HP-SIS    Donecool down finished, all source power supplies off.
  292   Wednesday, April 10, 2013, 12:14 Anders MjosTa#40HP-SISITETM438295-4 DoneConditioning Ta#40

 Wednesday, April 10, 2013, 12:13: Stopped turbos in preparation for venting the chamber.

Wednesday, April 10, 2013, 13:05: Venting

Wednesday, April 10, 2013, 13:37: Ta#40 installed with 130 in lbs torque on all bolts.

Wednesday, April 10, 2013, 13:37: Roughing

Wednesday, April 10, 2013, 13:58: Started turbos

Wednesday, April 10, 2013, 14:07: Turbos at speed

Wednesday, April 10, 2013, 14:08: Vacuum at 9.2E-6 Torr


 Thursday, April 11, 2013, 08:26: Opened cooling water. Vacuum stable at 2.2E-7 Torr


Monday, April 15, 2013, 08:40: HV conditioned to 30kV TSG:BIAS:RDCUR at 37 uA

Monday, April 15, 2013, 08:46: Started Target Heat Ramp 580A / 230A

Monday, April 15, 2013, 13:30: Target at temperature TGHT:RDCUR=574A, TBHT:RDCUR=230A

Monday, April 15, 2013, 15:10: Mass scan

Monday, April 15, 2013, 16:21: Target will be left at temperature overnight.


 Tuesday, April 16, 2013, 08:40: Mass scan

Tuesday, April 16, 2013, 13:08: Started Target Cooling Sequence


 Wednesday, April 17, 2013, 08:43: High voltage BIAS to zero

Wednesday, April 17, 2013, 08:47: Turbos off

Wednesday, April 17, 2013, 16:20: Target will likely be removed tomorrow Thursday.


Thursday, April 18, 2013, 11:13  : Venting

Thursday, April 18, 2013, 11:17: Water lines purged

 Thursday, April 18, 2013, 11:29: Chamber vented. Target Removed

  295   Thursday, April 18, 2013, 13:50 Anders MjosTa#40HP-SISITETM438295-4 DoneTa#40 stored under vacuum

Target installed at the Test Stand after an inspection in the lab. EE was cleand. All bolts torqued to 130 in lbs

Thursday, April 18, 2013, 13:48: Rouging

Thursday, April 18, 2013, 14:11: Starting turbos

Thursday, April 18, 2013, 14:20 : Turbos at speed

Thursday, April 18, 2013, 14:21 : Vacuum at 2.3E-5 T 


Friday, April 19, 2013, 08:23: Opened cooling water. Vacuum stable at 9.6E-6 T


Vacuum is somewhat higher than expected (5.2E-7 T) . Will went and clean the o-rings on the doors.

Monday, April 22, 2013, 09:32: Turbos off.

Monday, April 22, 2013, 10:57: Venting

Monday, April 22, 2013, 12:25: Vented

Monday, April 22, 2013, 14:09: Roughing

Monday, April 22, 2013, 14:31: Started Turbos

Monday, April 22, 2013, 14:40: Turbos at speed

Monday, April 22, 2013, 14:41: Vacuum at 1.8E-5 T


Tuesday, April 23, 2013, 09:52 : Vacuum at 2.6E-7 T - already an improvement from yesterday


Thursday, April 25, 2013, 08:47: Stopped turbos. A test target with at new FEBIAD coil will be tested.

Thursday, April 25, 2013, 13:27: Venting

  337   Friday, September 27, 2013, 11:41 Anders MjosTa#41HP-SISITWTM439069-538817-10DoneTa#41 Conditioning

Friday, September 27, 2013, 11:41: Roughing

Friday, September 27, 2013, 12:08: Turbos started

Friday, September 27, 2013, 12:16: Turbos at speed.

Friday, September 27, 2013, 12:18: Vacuum at 1.5E-5 T


Monday, September 30, 2013, 08:41: Opened water supply. Vacuum stable at 1.5E-7 T

TGHT Q=5.5 T=28.0
TBHT Q=5.8 T=28.0

Monday, September 30, 2013, 15:19: Flow sensor moved from TBHT to HS

TGHT Q=5.5 T=27.9
HS      Q=3.6 T=27.8


Tuesday, October 01, 2013, 12:08: Taget Biased to 30kV.


Wednesday, October 02, 2013, 08:50: Started autoramping to 580A/230A

Wednesday, October 02, 2013, 08:50: Opened IV4

Wednesday, October 02, 2013, 10:51 TGHT/TBHT 250A / 239A
TGHT Q=5.5 T=28.5
HS      Q=3.6 T=29.2
SUPPLY (ext)    27.3
RETURN (ext)  27.8

Wednesday, October 02, 2013, 13:28 TGHT/TBHT 250A / 570A
TGHT Q=5.5 T=30.4
HS      Q=3.6 T=33.4
SUPPLY (ext)    27.4
RETURN (ext)  29.3

Wednesday, October 02, 2013, 13:30: TBHT was starting to limit on voltage. Increased voltage limit to 2.4V.


Thursday, October 03, 2013, 08:21: TMS:TP2 timed out over night.

Magnet PS breaker tripped during a mass scan yesterday. Reset breaker and cleared interlocks.

TGHT Q=5.5 T=30.4
HS      Q=3.6 T=34.0
SUPPLY (ext)    27.3
RETURN (ext)  29.3

Thursday, October 03, 2013, 08:28: Started mass scan 200 -> 0 m/q. FC0 7.5E-8 A

Thursday, October 03, 2013, 14:29
TGHT Q=5.5 T=30.6
HS      Q=3.6 T=33.9
SUPPLY (ext)    27.4
RETURN (ext)  29.6

Thursday, October 03, 2013, 15:14: Lowered TBHT:RDCUR  to 230A.

Thursday, October 03, 2013, 15:37: Increased EE to -2000 V

Thursday, October 03, 2013, 16:22
TGHT Q=5.5 T=30.6
HS      Q=3.6 T=33.9
SUPPLY (ext)    27.5
RETURN (ext)  29.6


Friday, October 04, 2013, 08:08
TGHT Q=5.5 T=30.6
HS      Q=3.5 T=33.9
SUPPLY (ext)    27.5
RETURN (ext)  29.3

Mass scan started.

Friday, October 04, 2013, 08:46: Cool down started.

Friday, October 04, 2013, 13:35: TPS:IV4 closed

Friday, October 04, 2013, 13:41: Source debiased.


Tuesday, October 15, 2013, 09:56: Turbos stopped. Vacuum at 1.15 E-7 T

Tuesday, October 15, 2013, 12:44: Venting


After the conditioning, some oxidation (?) from the standards (?) were found on the Plasma Electrode and around the Target Tube. See attachment

Attachment 1: Ta#41_EE_After_Test_Stand.pdf
Ta#41_EE_After_Test_Stand.pdf
  367   Friday, March 28, 2014, 10:39 Anders MjosTiC#4HP-SISITETM3  In progressConditioning TiC#4

NOTE:

TBHT Power Supply is 600A. EPICS thinks it is 500. Multiply current setting with 1.2 for actual current to the tube.

Friday, March 28, 2014, 10:38: Stopped turbos. Vacuum at 1.3E-7 T 

Friday, March 28, 2014, 15:05: Venting

 


By RM

Friday, March 28, 2014, 15:22: Target assembly installed

Friday, March 28, 2014, 15:43: Chamber Roughing started

Friday, March 28, 2014, 15:58: Turbos started

Friday, March 28, 2014, 16:03: TP1B at speed

Friday, March 28, 2014, 16:06: TP1A at speed

Friday, March 28, 2014, 16:07: IG1 Turned on - reading 1.29e-05T

 


 By R.M.

Monday, March 31, 2014, 09:55: Water to heatshield line turned on, no change in vacuum: 1.31e-07 T

 

 

 

  368   Tuesday, April 01, 2014, 11:09 Aurelia LaxdalTiC#4HP-SISITETM3  In progressHV and Heaters Conditioning

Started March 31, 2014:

- did the HV conditioning up to 30kV.

April 1, 2014:

- started the Heaters Conditioning. 

Heaters Conditioning finished.

The Power Supplies front panel:

 

TGHT: 5.56V and 580A

TBHT: 2.23V and 227A

April 2, 2014:

 

- did a mass scan. NOTE: data is shifted by 10-15%.

plotdump-local-clean.txt_Apr2_14_16-33-19.txt

 

After the scan finished I found the Test Stand EPICS screens whited-out. Decided with Friedhelm to leave it as it was for the night and to contact Controls next day to reboot it without tripping the heaters and the HV.

April 3, 2014:

Found everything recovered. Except: “SOURCES ARCH IS RUNNING” was red. So, I restarted it. Jane Richards and Friedhelm didn’t do any IOC reboot. Also found that the data from yesterday’s scan was saved (see the previous scan).

Did another mass scan:  plotdump-local-clean.txt_Apr3_14_10-18-13.txt

NOTE: data is shifted by 10-15%.

Cooling down .

 

Attachment 1: ITE-TM3-TiC#4-HP-SIS_Test_Stand_Conditioning.docx
  369   Thursday, April 03, 2014, 16:46 Aurelia LaxdalTiC#4HP-SISITETM3  DoneHV and Heaters Conditioning

HV and Heaters Conditioning had finished. The target was cooled down and it's ready for the on-line installation.

Attachment 1: ITE-TM3-TiC#4-HP-SIS_Test_Stand_Conditioning.docx
  370   Friday, April 04, 2014, 08:24 Anders MjosTiC#4HP-SISITETM3  In progressVenting

 

Aurelia Laxdal wrote:

HV and Heaters Conditioning had finished. The target was cooled down and it's ready for the on-line installation.

 

Friday, April 04, 2014, 08:23: Target bias, EE and EZL to zero. Turbos off.

Friday, April 04, 2014, 10:14: Venting 

Friday, April 04, 2014, 10:48: Target removed - By R.M.

  402   Friday, August 29, 2014, 14:52 Anders MjosTa#44HP-SISITETM438817-940316-11DoneConditioning Ta#44

Friday, August 29, 2014, 14:51: Roughing

Friday, August 29, 2014, 15:11: Starting turbos.

Friday, August 29, 2014, 15:19: Turbos at speed

Friday, August 29, 2014, 15:21: Vacuum at 1.6E-5 T


Tuesday, September 02, 2014, 08:36: HS cooling water supply opened. Vacuum stable at 1.4E-7 T

Tuesday, September 02, 2014, 08:50 : BIAS/ EZL / EE to 30 / 14 / -1.5 kV. Started auto ramping to 500 / 150 (180) A

Tuesday, September 02, 2014, 09:23 

Supply ~97psi, Return ~7psi

Device

Flow
[lpm]
Temp
[C]
HS + MSP 3.9 28.0
TBHT 6.5 27.6
COIL + EE 5.4 28.6
TGHT 5.8 27.8
SUPPLY   28.2

 


Thursday, September 04, 2014, 12:38 : Starting cool-down

Thursday, September 04, 2014, 15:20: Closed IV4

Thursday, September 04, 2014, 15:37 : BIAS / EZL / EE to 0


Friday, September 05, 2014

Target cooled down. Power supplies switched off.


Monday, September 08, 2014, 14:07: Turbos stopped.

Monday, September 08, 2014, 15:15: Venting. HS cooling water lines purged.

Monday, September 08, 2014, 16:00: Target removed.

  431   Monday, March 16, 2015, 18:53 Anders MjosTa#45HP-SISITETM438817-5 In progressConditioning Ta#45

 Monday, March 16, 2015, 18:53: Started turbos

Monday, March 16, 2015, 19:00: Turbos at speed. Vacuum at 1.3E-5 T


Tuesday, March 17, 2015, 09:03: Opened cooling water. Vacuum stable at 1.9E-7 T

Tuesday, March 17, 2015, 09:12: Opened IV4. BIAS/EZL/EE to 30/14/1.5 kV

Tuesday, March 17, 2015, 09:20: Started heating TGHT/TBHT to 400/150 A at 2/1 A/min


Wednesday, March 18, 2015, 08:41: Continued heating TGHT/TBHT to 580/170 A at 2/1 A/min

Wednesday, March 18, 2015, 09:33: MB1 found tripped on water flow. Water pressure is low this morning as cyclotron main magnet was switched on, but not all water pumps. Expected to be resolved soon..

Some emittance scans at 170, 180, 190, 200 A TBHT were done


Thursday, March 19, 2015, 08:47: Heating TBHT to 220 A

Thursday, March 19, 2015, 08:56: Heating TBHT to 230 A

Thursday, March 19, 2015, 10:50: EE at -2000 V for 10 min

Thursday, March 19, 2015, 10:52: EE back at -1.5 kV

Thursday, March 19, 2015, 17:54: Started cool down of target


Friday, March 20, 2015, 08:47: Closed IV4

Friday, March 20, 2015, 08:47: RGA off.

Friday, March 20, 2015, 08:50: Stopped turbos

Friday, March 20, 2015, 10:24: Venting

Friday, March 20, 2015, 11:45: Target removed.

Attachment 1: Ta#45_Test_Stand.docx
Attachment 2: Ta#45_2015-03-17_Mar_17_2015_09-05-31_AM.ana
  446   Monday, May 25, 2015, 14:40 Anders MjosSiC#31HP-SISITWTM438817-7 In progressSiC#31 Conditioning

Monday, May 25, 2015, 14:35: Rouging

Monday, May 25, 2015, 15:05: Turbos started.

Monday, May 25, 2015, 15:15: Turbos at speed. Vacuum at 2.4E-5 T


Tuesday, May 26, 2015, 07:45: Opened water circuit for HS line. Vacuum stable at 6.3E-7 T. No response on RGA

Tuesday, May 26, 2015, 07:50: Autoramping to 500/200 A at 2/1 A/min. Good vacuum 2E-6, bad vacuum 4E-6 T

Tuesday, May 26, 2015, 07:52: IV4 open

Tuesday, May 26, 2015, 13:15: Continue auto-ramping to 580 A

Tuesday, May 26, 2015, 13:48: BIAS/EZL/EE 30 / 15 / 1.5 kV

Tuesday, May 26, 2015, 17:29: ~6 sparks/hour


Wednesday, May 27, 2015, 08:14: A couple of sparks over night.

Wednesday, May 27, 2015, 09:23: Autoramping TBHT to 220 A

Wednesday, May 27, 2015, 09:41: Found FC0 and FC6 bias to be off

Wednesday, May 27, 2015, 09:42: Autoramping TBHT to 230 A

Wednesday, May 27, 2015, 10:30: EE to 2 kV

Wednesday, May 27, 2015, 10:37: Starting cool down at 4/2 A/min

Wednesday, May 27, 2015, 10:40: EE to 1.5 kV

Wednesday, May 27, 2015, 12:37 : BIAS/EZL/EE OFF

Wednesday, May 27, 2015, 12:37 : IV4 closed

Wednesday, May 27, 2015, 13:02: Stopped turbos

Wednesday, May 27, 2015, 13:41: Venting

Attachment 1: SiC#31.docx
Attachment 2: ER30kV580-200.txt
value (Voltage offset       0.0000)
     75.0000
      0.8000
     50.0000
  29978.0220
21
21
./emit.dat
 0.0131 -0.0009 0.0000 0.0003 0.0000 -0.0006 -0.0015 0.0015 -0.0043 -0.0024 -0.0034 -0.0031 -0.0018 -0.0012 -0.0031 -0.0018 0.0092 0.0006 0.0024 0.0034 0.0055
 0.0107 -0.0037 -0.0018 0.0015 -0.0006 -0.0003 -0.0037 -0.0027 -0.0024 -0.0015 -0.0024 -0.0015 0.0058 -0.0015 0.0009 -0.0012 0.0073 0.0003 -0.0006 0.0034 0.0055
 0.0137 -0.0018 -0.0021 0.0015 -0.0009 0.0006 0.0006 -0.0024 -0.0006 -0.0009 -0.0024 -0.0018 -0.0009 -0.0018 -0.0015 0.0000 0.0089 0.0027 0.0000 0.0003 0.0003
 0.0082 -0.0009 -0.0024 -0.0006 -0.0027 0.0012 0.0000 -0.0012 -0.0021 0.0012 -0.0015 -0.0018 -0.0049 -0.0015 0.0009 -0.0043 0.0107 0.0031 0.0000 0.0015 0.0003
 0.0122 0.0003 -0.0027 -0.0018 -0.0009 -0.0006 0.0015 0.0040 0.0009 -0.0006 -0.0009 -0.0015 0.0000 -0.0012 -0.0006 -0.0015 0.0058 0.0024 0.0000 0.0040 -0.0015
 0.0128 -0.0024 -0.0034 0.0006 -0.0012 0.0006 -0.0003 0.0049 -0.0003 0.0040 0.0140 0.0012 -0.0009 0.0000 0.0000 -0.0006 0.0061 -0.0003 0.0015 0.0000 0.0027
 0.0119 -0.0027 -0.0015 -0.0003 0.0006 -0.0012 -0.0009 0.0006 0.0027 0.0391 0.1184 0.1059 0.0482 0.0055 -0.0024 -0.0018 0.0098 0.0021 0.0027 0.0024 0.0024
 0.0140 -0.0034 -0.0018 -0.0009 -0.0031 -0.0012 0.0000 0.0009 0.0015 0.0778 0.1892 0.2051 0.1620 0.0763 0.0027 -0.0018 0.0052 0.0018 0.0009 0.0003 0.0049
 0.0119 -0.0006 -0.0018 -0.0021 -0.0018 -0.0006 0.0015 0.0012 0.0027 0.0885 0.2640 0.3473 0.2960 0.1498 0.0403 -0.0006 0.0092 0.0021 0.0000 0.0021 0.0027
 0.0119 -0.0018 -0.0021 -0.0018 -0.0012 0.0021 0.0021 0.0021 0.0003 0.1001 0.4187 0.6180 0.5743 0.3156 0.0836 0.0116 0.0183 0.0018 -0.0027 0.0046 0.0015
 0.0079 0.0043 -0.0009 -0.0015 0.0015 0.0125 0.0052 0.0009 -0.0003 0.0952 0.5145 0.9247 0.9613 0.5710 0.1602 0.0247 0.0220 0.0015 -0.0018 0.0024 0.0021
 0.0134 -0.0021 0.0000 -0.0009 0.0061 0.0058 0.0043 0.0040 0.0021 0.0671 0.5103 1.1981 1.4487 0.9302 0.2875 0.0439 0.0116 0.0027 0.0006 0.0034 0.0018
 0.0095 -0.0015 0.0000 0.0055 0.0049 0.0037 0.0000 0.0012 0.0024 0.0418 0.3949 1.6235 2.2305 1.6080 0.4742 0.0952 0.0504 0.0348 0.0009 0.0012 0.0027
 0.0107 -0.0018 0.0003 0.0003 -0.0018 0.0095 0.0076 -0.0021 0.0018 0.0177 0.2280 1.1844 1.8930 1.7804 0.8380 0.1935 0.0409 0.0446 0.1483 0.0034 0.0018
 0.0101 -0.0009 -0.0003 -0.0034 -0.0027 0.0034 0.0027 -0.0021 -0.0012 0.0049 0.1041 0.5759 1.1823 1.2555 0.9869 0.3024 0.0571 0.0208 0.2191 0.0772 0.0018
 0.0076 -0.0009 -0.0009 -0.0027 -0.0018 0.0006 -0.0021 0.0018 -0.0015 0.0015 0.0381 0.2502 0.6845 1.0934 0.9415 0.4208 0.1108 0.0168 0.0348 0.0507 0.0009
 0.0101 -0.0031 -0.0018 -0.0006 -0.0006 0.0000 -0.0021 -0.0009 0.0034 0.0009 0.0098 0.0992 0.3369 0.6430 0.7822 0.4846 0.1813 0.0165 0.0110 0.0067 0.0027
 0.0073 -0.0006 -0.0012 0.0000 -0.0006 -0.0009 0.0012 -0.0009 -0.0006 0.0134 0.0021 0.0342 0.1541 0.3702 0.4874 0.4376 0.2237 0.0369 0.0119 0.0015 0.0031
 0.0101 -0.0024 0.0006 0.0000 -0.0009 -0.0027 0.0009 0.0021 0.0003 -0.0003 0.0082 0.0180 0.0650 0.1892 0.3043 0.2966 0.2097 0.0723 0.0067 0.0040 0.0003
 0.0067 0.0000 -0.0003 -0.0012 -0.0018 0.0027 0.0000 -0.0012 0.0009 0.0000 0.0009 0.0058 0.0375 0.0885 0.1822 0.1828 0.1566 0.0882 0.0125 0.0037 0.0012
 0.0082 -0.0006 0.0009 -0.0024 -0.0021 0.0024 0.0000 0.0027 -0.0009 -0.0003 0.0015 -0.0006 0.0089 0.0400 0.0885 0.1178 0.1004 0.0714 0.0107 0.0195 0.0024
Attachment 3: ER30kV580-230.txt
value (Voltage offset       0.0000)
     75.0000
      0.8000
     50.0000
  29978.0220
21
21
./emit.dat
 -0.0009 -0.0009 0.0024 -0.0006 -0.0031 0.0064 0.0027 -0.0009 0.0043 0.0018 0.0000 -0.0024 -0.0006 -0.0037 -0.0006 -0.0024 -0.0012 0.0012 -0.0024 0.0006 0.0027
 0.0003 -0.0031 0.0000 0.0037 0.0012 0.0061 0.0031 0.0006 -0.0021 0.0037 -0.0012 -0.0024 -0.0040 -0.0021 -0.0012 -0.0043 -0.0018 0.0006 -0.0009 0.0009 0.0092
 -0.0027 -0.0009 0.0031 -0.0021 0.0024 0.0037 0.0049 -0.0015 -0.0031 0.0021 0.0000 -0.0049 -0.0015 -0.0052 0.0009 -0.0015 -0.0034 0.0000 -0.0003 0.0018 0.0092
 -0.0027 -0.0037 0.0031 -0.0049 -0.0027 0.0049 0.0043 0.0006 -0.0040 0.0015 -0.0009 -0.0027 -0.0024 -0.0024 0.0018 -0.0024 -0.0037 0.0027 -0.0009 0.0018 0.0067
 -0.0015 -0.0027 0.0034 -0.0031 -0.0024 0.0052 0.0021 -0.0021 -0.0031 0.0034 -0.0015 -0.0018 -0.0021 -0.0037 0.0031 -0.0015 0.0006 0.0040 -0.0006 -0.0006 0.0098
 -0.0021 -0.0024 -0.0006 -0.0009 -0.0009 0.0064 0.0024 -0.0024 -0.0018 0.0061 0.0006 -0.0021 -0.0021 -0.0018 0.0034 -0.0027 -0.0012 0.0015 0.0012 -0.0006 0.0027
 -0.0034 -0.0003 0.0012 0.0003 -0.0043 0.0058 0.0058 -0.0009 0.0003 0.0095 0.0089 0.0034 0.0000 0.0018 0.0043 -0.0021 0.0006 0.0003 -0.0009 0.0012 0.0040
 -0.0046 0.0012 0.0015 0.0012 -0.0012 0.0040 0.0049 -0.0006 0.0006 0.0482 0.1517 0.2005 0.0616 0.0122 0.0015 0.0006 -0.0027 0.0015 -0.0012 0.0024 0.0098
 -0.0027 0.0012 0.0000 -0.0003 0.0006 0.0027 0.0015 -0.0009 0.0110 0.1740 0.4355 0.7028 0.3497 0.0717 0.0168 -0.0006 -0.0015 0.0027 0.0003 -0.0012 0.0104
 -0.0031 -0.0021 0.0009 -0.0027 -0.0003 0.0058 0.0018 -0.0009 0.0052 0.2228 0.6641 0.9564 0.6808 0.1855 0.0323 0.0043 -0.0024 0.0003 -0.0006 -0.0006 0.0131
 -0.0043 -0.0003 0.0024 -0.0018 -0.0040 0.0058 0.0031 -0.0006 0.0040 0.1422 0.7123 1.0974 1.1118 0.4178 0.0848 0.0052 0.0000 -0.0009 0.0000 -0.0018 0.0052
 -0.0027 -0.0012 0.0000 -0.0024 -0.0024 0.0049 0.0027 -0.0009 0.0027 0.0806 0.5936 1.1768 1.3040 0.8737 0.2533 0.0107 -0.0018 0.0009 -0.0031 0.0024 0.0027
 -0.0031 -0.0003 0.0012 -0.0031 0.0000 0.0034 0.0037 -0.0034 0.0018 0.0403 0.3281 1.1108 1.3599 1.2180 0.5121 0.0201 0.0034 0.0467 -0.0015 0.0015 0.0064
 -0.0024 0.0012 0.0012 -0.0024 0.0012 0.0034 0.0018 -0.0012 0.0079 0.0156 0.1288 0.7346 1.2213 1.1874 0.6903 0.0458 0.0012 0.0418 0.1047 0.0015 0.0064
 -0.0040 -0.0012 0.0021 -0.0043 -0.0015 0.0055 0.0027 0.0006 -0.0021 0.0082 0.0403 0.3973 0.7742 0.8746 0.7599 0.0897 0.0034 0.0101 0.0275 0.0122 0.0076
 -0.0031 -0.0043 0.0040 -0.0018 0.0089 0.0064 0.0031 0.0003 -0.0027 0.0058 0.0134 0.1047 0.3873 0.6091 0.6433 0.1285 0.0052 0.0015 0.0052 0.0015 0.0049
 -0.0021 -0.0018 0.0024 -0.0031 -0.0021 0.0049 0.0034 -0.0012 -0.0018 0.0043 0.0012 0.0217 0.1511 0.3198 0.3851 0.1474 0.0076 0.0003 0.0137 0.0024 0.0040
 -0.0009 -0.0024 0.0024 -0.0015 0.0000 0.0052 0.0058 -0.0024 0.0003 0.0024 0.0015 0.0037 0.0253 0.1089 0.1926 0.1376 0.0079 0.0061 0.0153 0.0027 0.0055
 -0.0015 -0.0015 0.0018 -0.0024 0.0021 0.0040 0.0027 -0.0012 -0.0003 0.0021 0.0006 0.0027 0.0089 0.0195 0.0735 0.0671 0.0101 0.0082 0.0104 0.0012 0.0134
 -0.0027 -0.0034 0.0024 -0.0012 -0.0018 0.0049 0.0024 0.0000 -0.0006 0.0034 -0.0024 -0.0009 -0.0006 0.0049 0.0186 0.0323 0.0043 0.0067 0.0027 0.0015 0.0046
 -0.0037 -0.0021 0.0006 0.0006 0.0323 0.0040 0.0027 0.0003 -0.0043 0.0052 -0.0024 -0.0021 -0.0046 -0.0009 0.0076 0.0049 0.0055 0.0031 0.0009 0.0015 0.0107
  462   Friday, September 11, 2015, 11:43 Anders MjosTa#46HP-SISITETM4  DoneTa#46 conditioning

EE is ST-200 material (AlN)

Friday, September 11, 2015, 11:0: Roughing

Friday, September 11, 2015, 12:12: Turbos started.

Friday, September 11, 2015, 12:22: Turbos at speed. Vacuum at 2.2E-5 T

Friday, September 11, 2015, 14:02: RGA on.


Monday, September 14, 2015, 08:05: Opened water for HS circuit. Vacuum stable at 2.3E-7 T. No response on RGA.

Monday, September 14, 2015, 08:08: Opened IV4

Monday, September 14, 2015, 08:11: Starting Target Heat. TGHT/TBHT 580 / 200 A at 2 / 1 A/min. Good/bad vacuum 4E-6 / 6E-6 T

Monday, September 14, 2015, 08:12: Interlock for BIAS does not clear although EE is on. Interlock cleared when beam line elements were turned on

Monday, September 14, 2015, 08:20: BIAS/EZL/EE at 30 / 15 / 1.5 kV

Monday, September 14, 2015, 08:25: Returned MB1 to remote control

Monday, September 14, 2015, 13:28: Target at temperature

Monday, September 14, 2015, 15:06: Heating TBHT to 230 A 


Tuesday, September 15, 2015, 15:03: EE to 2 kV

Tuesday, September 15, 2015, 16:39: EE to 1.5 kV

Tuesday, September 15, 2015, 17:01: Starting target cool down


Wednesday, September 16, 2015, 09:01: HV and source off. Closed IV4. Turbos off

Wednesday, September 16, 2015, 12:52: RGA off. Venting

Attachment 1: Ta#46.docx
ELOG V2.9.2-2455